Fleet Management issuesFleet Management issues
Juanjo Dañobeitia; UTM-CSIC, Spain
http://www.utm.csic.es
The Vessel manager point of The Vessel manager point of viewview
Operational Operational IssuesIssuesTechnical Technical IssuesIssues
Logistic Logistic IssuesIssues
Training & mobilityTraining & mobilityInvestment Investment strategiesstrategies
Logistic IssuesLogistic Issues– Coordination of fleet scheduling Coordination of fleet scheduling – Reduce long transits (barter system)Reduce long transits (barter system)– Chartering for spare ship timeChartering for spare ship time– Transport and Customs Transport and Customs – Liability, insuranceLiability, insurance
Operational Operational IssuesIssues• Instrument OperationsInstrument Operations
– Operational safety, protocolsOperational safety, protocols– Standardization (connectors, cables, etc)Standardization (connectors, cables, etc)– Interoperability, exchange large equipment, manoeuvringInteroperability, exchange large equipment, manoeuvring– Good practice, clear rules for everybody. Hierarchy.Good practice, clear rules for everybody. Hierarchy.
Technical Technical IssuesIssues• Instruments mobilizationInstruments mobilization
– Equipment check Equipment check – Maintenance & calibrationMaintenance & calibration– Mobilization; Proper PlanningMobilization; Proper Planning– Logistics (safety, legislation, customs…)Logistics (safety, legislation, customs…)
DATOS
SUNPC
subselect.me
Gravimetrosubselect.me
Meteosubselect.me
Navegacion
PROGRAMASDEVISUALIZACION
GPS
NAVEGACION
subselect.me
CONTROL
PC ControlSUN
subselect.me
INTEGRACION
BASEDATOS
TERMOSALINOGRAFO
subselect.me
ADQUISICION
PC ADQUISICION
SUN
subselect.me
ADQUISICION
PC
GRAVIMETRO
subselect.me
ADQUISICION
PC
METEOROLOGIA
subselect.me
ADQUISICION
NMEA-183
$PHESMET,05121996,100300,3.5,7.7,100.6,OK,3fd
Identificador delInstrumento
Día y Hora de adquisición
Valores de medida ChkSum
Status de la Adquisición
Technical Technical IssuesIssues• Harmonization of Data Acquisition Harmonization of Data Acquisition
systemssystems
• Containerized dedicated labsContainerized dedicated labs
Control System
Training & mobilityTraining & mobility
• Use of transits for training / cross-trainingUse of transits for training / cross-training• School at seaSchool at sea• User manualsUser manuals• Technical stagesTechnical stages• Mobility of technicians and large equipment (deep Mobility of technicians and large equipment (deep
tow, ROV, AUV)tow, ROV, AUV)
Investment Investment StrategiesStrategies• Common strategies for long term investments on costly Common strategies for long term investments on costly
equipmentequipment
• International cooperation in cost sharing for the International cooperation in cost sharing for the construction and operation of ships (regional) and rare construction and operation of ships (regional) and rare equipmentequipment
• Facilitate equipment availability using Facilitate equipment availability using Large Scale Large Scale FacilitiesFacilities
ConclusionsConclusions
• Needs for a multiyear plan cruisesNeeds for a multiyear plan cruises
• New building strategy specially for regional shipsNew building strategy specially for regional ships
• Technicians training activities and recruitment of youngTechnicians training activities and recruitment of young
• Procedures to share (reduce) costs of transportationProcedures to share (reduce) costs of transportation