EastBranchFloodCommissionandDelawareCountySoil&WaterConservationDistrict | November18,2014
Local
Flood
Analysis
Project
MeetingVillageofFleischmannsDavid
Murphy,
P.E.,
CFM
MarkCarabetta,PWS,CFM
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
2/50
Agenda
Reviewstudyareaandmodelingconcepts
Overview
of
alternatives Reviewresultsofmodeling
Nextsteps
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
3/50
ProjectArea
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
4/50
HydraulicModelingConcepts
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
5/50
OverviewofAlternatives
Hydrologic(forfuturemeetings)
Alt
2
Storage
of
water
in
Lake
Switzerland Alt3 Vly/Emorybypass
Hydraulic(focusforthismeeting)
Alt1 Bridgereplacements
Alts4,5,6,7,8,9 Floodplaincreationor
enhancement
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
6/50
OverviewofAlternatives
1. BridgeReplacements
a. EmoryBrookatMainStreet
b. EmoryBrookatWagnerAvenue
c. Vly CreekatMillStreet
d. Vly CreekatMainStreet
e. LittleRed
Kill
at
Snyder
Avenue
f. LittleRedKillatMainStreet
g. LittleRedKillatBridgeStreet
h. Bush
Kill
Creek
at
the
former
Bridge
Street
bridge
(subject
of
meetingsinJulyandAugust2014)
i. BushKillCreekatDepotStreet
j. BigRedKillatOldRoute28
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
7/50
OverviewofAlternatives
FloodplainCreation,Enhancement,etc.
4. Upstreamarea(Emory/Vly confluence)
5. BridgeStreetareaofBushKill(topicofpreviousmeetings)
6. MiddleareaofBushKill(westendofWagnerAvenue,DepotStreet,
andlumberyards)
7. Downstreamarea
of
Bush
Kill
(along
Route
28)
DownstreamareaofBushKill+BigRedKill
8. Vly CreekatMillStreet
9. EmoryBrookatWagnerRoad
Mostalternativesarerelativelymodularanddontaffectoneanother
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
8/50
0 1000 2000 3000 4000
1500
1510
1520
1530
1540
1550
EB_Project_MM I Plan: Duplicate Effective Emory 5/15/2014
Main Channel Distance (ft)
Elevation(
ft)
Legend
WS 500 YR
WS 100 YR
WS 50 YR
WS 25 YR
WS 10 YR
Ground
ReviewResultsofModeling
Wag
nerStreetBri
dge
MainStreetBri
dge
Con
fluenc
ewithBush
kill
1a.BridgeReplacement EmoryBrookatMainStreet
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
9/50
0 50 100 150 200 250 3001535
1540
1545
1550
1555
1560
1565
EB_Project_MM I Plan: Dupli cate Effective Emory 5/15/2014EMO 09: Main Street
Station (ft)
Elevation(
ft)
Legend
WS 500 YR
WS 100 YR
WS 50 YR
WS 25 YR
WS 10 YR
Ground
Ineff
Bank Sta
.06 .04 .06
ReviewResultsofModeling
1a.BridgeReplacement EmoryBrookatMainStreet
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
10/50
ReviewResultsofModeling
1a.BridgeReplacement EmoryBrookatMainStreet
Proposed
improvements
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
11/50
ReviewResultsofModeling
1a.BridgeReplacement EmoryBrookatMainStreet
Current
depths
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
12/50
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
13/50
0 500 1000 1500 2000 2500 3000 3500
1500
1520
1540
1560
VlyCreek_MM I Plan: Corrected Effective VlyCreek Pl an 5/15/2014
Main Channel Distance (ft)
Elevation(
ft)
Legend
WS 500 YR
WS 100 YR
WS 50 YR
WS 25 YR
WS 10 YR
Ground
ReviewResultsofModeling
MainStreetBr
idge
M
illStreetBr
idge
Dama
tLakeSwitz
erlan
d
Con
fluen
cewithBus
hkill
4aand4b.FloodplainEnhancementatVly nearConfluence
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
14/50
ReviewResultsofModeling
0 100 200 300 400 500 600 700 8001500
1505
1510
1515
1520
1525
1530
VlyCreek_MMI Plan: Corrected Effective VlyCreek Plan 5/15/2014
VLY_03X
Station (ft)
Elevation(
ft)
Legend
WS 500 YR
WS 100 YR
WS 50 YR
WS 25 YR
WS 10 YR
Ground
Ineff
Bank Sta
.06 .045 .08 .045 .06
Emory Brook
4aand4b.FloodplainEnhancementatVly nearConfluence
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
15/50
ReviewResultsofModeling
4aand4b.FloodplainEnhancementatVly nearConfluence
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
16/50
ReviewResultsofModeling
4a.FloodplainEnhancementatVly nearConfluence
Currentdepths
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
17/50
ReviewResultsofModeling
4a.FloodplainEnhancementatVly nearConfluence
Depthsafter
floodplain
project
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
18/50
ReviewResultsofModeling
4a.FloodplainEnhancementatConfluence
Comparisonof
inundated
areas
Motel100yr
WSEchanges
from1520.8
to
1517.9andit
partlyleaves
theSFHA
School100yr
WSEchanges
from1515.2to
1513.4
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
19/50
ReviewResultsofModeling
4b.LargerFloodplainEnhancementatConfluence
Depthsafter
floodplain
project
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
20/50
ReviewResultsofModeling
4b.LargerFloodplainEnhancementatVly nearConfluence
Comparisonof
inundated
areas
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
21/50
16000 18000 20000 22000 24000
1440
1460
1480
1500
BushKill _MM I Plan: Existing Conditions Bushkill 5/15/2014
Main Channel Distance (ft)
Elevation(
ft)
Legend
WS Q500
WS Q100
WS Q50
WS Q25
WS Q10
Ground
ReviewResultsofModeling
Route
28Bri
dge
Dep
otStreet
Bri
dgeS
treetConstriction
6aand6b.FloodplainEnhancementnearDepotStreet
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
22/50
ReviewResultsofModeling
0 100 200 300 400 500 600 7001460
1465
1470
1475
1480
1485
BushKill _MMI Plan: Existing Conditions Bushkil l 5/15/2014BUS_37X
Station (ft)
Elevation(
ft)
Legend
WS Q500
WS Q100
WS Q50
WS Q25
WS Q10
Ground
Ineff
Bank Sta
.055 .045 .04 .0
55
Warehouses
6aand6b.FloodplainEnhancementnearDepotStreet
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
23/50
0 100 200 300 400 500 600 700 8001470
1475
1480
1485
1490
1495
BushKil l_MMI Plan: Existing Conditions Bushkill 5/15/2014BUS 39: DEPOT STREET
Station (ft)
Elevatio
n(
ft)
Legend
WS Q500
WS Q100
WS Q50
WS Q25
WS Q10
Ground
Ineff
Bank Sta
.08 .035 .055
House
ReviewResultsofModeling
6aand6b.FloodplainEnhancementnearDepotStreet
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
24/50
ReviewResultsofModeling
6aand6b.FloodplainEnhancementnearDepotStreet
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
25/50
ReviewResultsofModeling
6a.FloodplainEnhancementatDepotStreet
Currentdepths
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
26/50
ReviewResultsofModeling
6a.FloodplainEnhancementatDepotStreet
Depthsafter
floodplain
project
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
27/50
ReviewResultsofModeling
6a.FloodplainEnhancementatDepotStreet
Comparisonof
inundatedareas
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
28/50
ReviewResultsofModeling
6b.LargerFloodplainEnhancementatDepotStreet
Currentdepths
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
29/50
ReviewResultsofModeling
6b.LargerFloodplainEnhancementatDepotStreet
Depthsafter
floodplainproject
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
30/50
ReviewResultsofModeling
6b.LargerFloodplainEnhancementatDepotStreet
Comparisonof
inundatedareas
Homesatthe
westendof
Wagner
see
a
100yrWSE
reductionfrom
1487.2to
1483.8
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
31/50
ReviewResultsofModeling
7a.FloodplainEnhancementatOldRoute28
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
32/50
ReviewResultsofModeling
7a.FloodplainEnhancementatOldRoute28
Currentdepths
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
33/50
ReviewResultsofModeling
7a.FloodplainEnhancementatOldRoute28
Depthsafter
floodplainproject
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
34/50
ReviewResultsofModeling
7a.FloodplainEnhancementatOldRoute28+BigRedKill
Current
inundationarea
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
35/50
ReviewResultsofModeling
7a.FloodplainEnhancementatOldRoute28+BigRedKill
Currentdepths
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
36/50
ReviewResultsofModeling
7a.FloodplainEnhancementatOldRoute28+BigRedKill
Depthsafter
floodplainproject
SelfStorage
100yrWSE
changesfrom
1473.4to
1472.5
Atnearby
homes,WSE
changesfrom
1458.0to
1457.0
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
37/50
ReviewResultsofModeling
7b.ExtensiveFloodplainEnhancementatOldRoute28
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
38/50
ReviewResultsofModeling
7b.ExtensiveFloodplainEnhancementatOldRoute28
Currentdepths
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
39/50
ReviewResultsofModeling
7b.ExtensiveFloodplainEnhancementatOldRoute28
Depthsafter
floodplainproject
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
40/50
ReviewResultsofModeling
8.FloodplainEnhancementatMillStreet
Needstobe
combinedwith
other
alternatives
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
41/50
ReviewResultsofModeling
Reminder:
4a.
Floodplain
Enhancement
at
Vly
Depthsafter
floodplainproject
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
42/50
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
43/50
ReviewResultsofModeling
8b+1d+4a
Comparisonof
inundated
areas
Motel100yr
WSEchanges
from1520.8to
1517.1and
it
partlyleaves
theSFHA
School100yr
WSEchanges
from1515.2to
1513.4
l f d l
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
44/50
0 1000 2000 3000 4000
1500
1510
1520
1530
1540
1550
EB_Project_MM I Plan: Duplicate Effective Emory 5/15/2014
Main Channel Distance (ft)
Elevation(
ft)
Legend
WS 500 YR
WS 100 YR
WS 50 YR
WS 25 YR
WS 10 YR
Ground
ReviewResultsofModeling
WagnerStreetBri
dge
MainStreetBri
dge
Con
fluen
cewithBus
hkill
9.EmoryBrookfloodplain
R i R l f M d li
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
45/50
ReviewResultsofModeling
CrossSection1068 WagnerAvenueBridge PartofFloodplainisusedbyVlyCreekFloodwater
0 50 100 150 2001505
1510
1515
1520
1525
EB_Project_MMI Plan: Dupli cate Effective Emory 5/15/2014EMO 04: Wagner Avenue
Station (ft)
Elevation(
ft)
Legend
WS 500 YR
WS 100 YR
WS 50 YR
WS 25 YR
WS 10 YR
Ground
Ineff
Bank Sta
.06 .04 .06
R i R lt f M d li
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
46/50
ReviewResultsofModeling
9.EmoryBrookfloodplain
9aloneisnot
effective
due
tobackwater
atWagnerRd
bridge
1breplacesthe
WagnerRd
bridge
4bistheVly
floodplainwe
discussed
earlier
R i R lt f M d li
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
47/50
ReviewResultsofModeling
9.Emory
Brook
floodplain
Currentdepths
9aloneisnot
effectivedue
tobackwater
atWagnerRd
bridge
1breplacesthe
WagnerRd
bridge
4bis
the
Vly
floodplainwe
discussed
earlier
R i R lt f M d li
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
48/50
ReviewResultsofModeling
9.Emory
Brook
floodplain
Depthsafter
floodplain
project
Citgo100yr
WSEchanges
from1520.8to
1518.9and
it
appearsto
shiftoutofthe
SFHA,although
floodingfrom
Vly maystill
affectit
Review Results of Modeling
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
49/50
ReviewResultsofModeling
LittleRed
Kill
Next Steps
8/10/2019 Fleischmanns LFA Meeting 11-18-14 for Village
50/50
NextSteps
Refinehydraulicalternativesthathavemerit
Evaluatehydrologicalternatives
Preliminarybenefitcostanalysis
Meettoreviewresults