+ All Categories
Home > Documents > Flexi BTS 4+4+4 Installtion Guide

Flexi BTS 4+4+4 Installtion Guide

Date post: 03-Jan-2016
Category:
Upload: juan-tioluka
View: 61 times
Download: 5 times
Share this document with a friend
Popular Tags:
5
DUAL DUPLEXER MODULE (ERGA-900) RF CABLE ER CABLE (power and control interface for ERxA ) DTRX EXGA (900) ESMA 48 V going to rectifier LMP PORT & Q1 PORT FIFA ERDA (1800 -TRX) EXDA ( 1800 )
Transcript
Page 1: Flexi BTS 4+4+4 Installtion Guide

DUAL DUPLEXER MODULE

(ERGA-900)

RF CABLE

ER CABLE (power and control interface for ERxA )

DTRX EXGA (900)

ESMA

48 V going to rectifier LMP PORT & Q1 PORT

FIFA

ERDA (1800 -TRX)

EXDA ( 1800 )

Page 2: Flexi BTS 4+4+4 Installtion Guide

TxB(ERGA) is connected to TxB (EXGA) RxB(ERGA) is connected to RxB (EXGA)

RxA(ERGA) is connected to RxA (EXGA) TxA(ERGA) is connected to TxA (EXGA)

Page 3: Flexi BTS 4+4+4 Installtion Guide
Page 4: Flexi BTS 4+4+4 Installtion Guide
Page 5: Flexi BTS 4+4+4 Installtion Guide

Recommended