+ All Categories
Home > Documents > Flexible control and solid management of your facility ... · maximize your available resources and...

Flexible control and solid management of your facility ... · maximize your available resources and...

Date post: 26-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
12
Another Musco Innovation Flexible control and solid management of your facility — saves operating cost and improves service Get fingertip control of your facilities from your desk your field your home your phone ... from anywhere
Transcript
Page 1: Flexible control and solid management of your facility ... · maximize your available resources and make solid decisions about managing and expanding your facilities. Control-Link

A n o t h e r M u s c o I n n o v a t i o n

Flexible control andsolid managementof your facility —

saves operating costand improves service

Get fingertip control ofyour facilities from

your desk

your field

your home

your phone

... from anywhere

Page 2: Flexible control and solid management of your facility ... · maximize your available resources and make solid decisions about managing and expanding your facilities. Control-Link

Musco’s Control-Link® Systemfor new and existing sports facilitiesWith cities and recreational needs growing faster than ever, it’s critical tomaximize your available resources and make solid decisions aboutmanaging and expanding your facilities.

Control-Link® is the reliable, cost-effective system that helps control,monitor, and manage your new recreational facility lighting. In addition, itcan control your existing lighting systems and other electrically-operatedequipment. Whether for new lighting systems or to upgrade existing lights,the Control-Link System includes our Control-Link Central™ team, theon-site Control-Link equipment, and an industry-leading warranty. Ourexclusive Control-Link Central team is staffed 24/7 to assist with yourscheduling and reporting needs.

Reduce energy cost and staff legworkControl-Link reduces energy usage by operating lights and equipment onlywhen needed. This helps curtail taxpayers’ concerns about lights operatingwhen fields are not in use. The automated system does not require staff totravel from field to field to turn lights on and off. It also eliminatesdistributing and tracking multiple sets of keys and reduces timecoordinating staff and facility schedules.

Flexible control simplifies operational needsLighting schedules are entered into an easy-to-use Control-Link Centralwebsite or by email, phone, or fax. User passwords have varying accesslevels that you specify. Passwords, unlike keys, can be issued or cancelledat any time – making seasonal personnel or volunteer changes easierto manage.

Emergency schedule changes can be made through Control-Link Centralor an optional on-site Schedule Override screen, and on-site manualcontrols are provided for your maintenance staff.

Solid management tools reduce hassleControl-Link saves you time overseeing facility operations, schedulingstaff, and planning routine maintenance. Control-Link Central accumulatesinformation for you about your facility usage, including operating historyby facility and user group. The Control and Monitoring System providedwith new lighting systems provides proactive monitoring of your lightingsystem, reporting fixture outages to help plan routine maintenance. Apreseason light check helps assure your fields are ready for play.

Our Control-Link Central team can assist you in generating reports andanalyzing your data to provide tools for efficient operations, allocation ofcosts, assessment of user fees, proactive maintenance, and facilityexpansion planning.

These capabilities provide for significant long-term cost savings and thepotential for providing better customer service and innovative uses of yourfacilities without adding staff.

2

Enter schedules atyour convenienceEnter schedules from anylocation via our easy-to-useControl-Link Central website, or by email, phone,or fax.

1

• Saves Energy and Staff Costs

• Allows Flexible Control

• Provides Usage Data

• Increases Security

• Provides Reliable Operation

• Monitors System Performance

Manage you

Page 3: Flexible control and solid management of your facility ... · maximize your available resources and make solid decisions about managing and expanding your facilities. Control-Link

3

Each Control Module can operate8 combinations of switches

Zone 1 Baseball 1Zone 2 Baseball 2Zone 3 Baseball 3Zone 4 Soccer 1Zone 5 Soccer 2Zone 6 Soccer 3Zone 7 ConcessionsZone 8 Parking Lot

Equipment iscontrolledautomaticallyLights and other equipment suchas door locks, concession stands,and security lights are operatedper your schedules.

3 Control-Link Central™provides support,monitoring, andusage dataControl-Link Central supports youevery step of the way. Trained staffprovide schedulingsupport and verification,and monitor your lighting system forfixture outages.Control-Link Central’sdatabase stores field usagedata by facility and user group.

Available24/7

4Schedules arestored on-site,backed-up atControl-Link Central™Schedules are transmitted fromControl-Link Central via digitalcellular technology and stored inthe on-site equipment controller.

2

“Thank you so much for providing

such an effective and advanced

system for scheduling our lights;

it has truly revolutionized the

way we work.”

— Kelly Barker

Athletic Field Permit Coordinator

Dept. of Parks, Recreation and Marine

City of Long Beach, CA

“It’s like being an umpire. If

people don’t know you’re there,

you did a great job. If there

aren’t any complaints about the

lights, I know the system is

doing its job.”

— Roger Russomanno

Ballfield Operations Supervisor

Denver, CO, Parks and Recreation Dept

“I use Control-Link Central™ to

enter the weekly schedules so

I can spend my time taking care

of other things … They do a

great job, week after week.”

— John Banks

Park and Recreation Supervisor

Laguna Niguel, CA

r lights without the late-night hours

Page 4: Flexible control and solid management of your facility ... · maximize your available resources and make solid decisions about managing and expanding your facilities. Control-Link

Meet Our Control-Link Central TeamControl-Link Central™ provides trained technical assistance withthe helpful, “can-do” attitude you expect from Musco, to solveany last-minute change or issue.

Control-Link Central operators oversee on/off control of over4000 fields per night and have experience with controlling over10 million hours of lighting system operation nationwide.

4

Trained Staff Available 24/7Available day or night, the Control-Link Central staff is ready toassist you with facility reports, which analyze data from yourfields’ use by user groups to maximize facility management.

“We strive to provide a level of service where every customerreaches a live operator, rather than a voice mail system, whenthey call in. We can make your last minute schedulingchanges happen in just a few minutes.”

Ryan TigheControl-Link Central™Manager

Page 5: Flexible control and solid management of your facility ... · maximize your available resources and make solid decisions about managing and expanding your facilities. Control-Link

This is a partial sample of a customer’s weekly schedule as entered on Musco’sControl-Link website. The current day is always highlighted.

Control-Link Central’s database stores usage data by field and user group.

©1999, 2003 Musco Lighting

5

Operations SupportControl-Link Central™ provides two options for managementand control of your facilities:

• Directly control your fields via an easy-to-use website

• Contact Control-Link Central’s team of trained operators 24/7to enter your schedules and request last minute changes

Data ManagementControl-Link Central offers effective tools to manage andanalyze the extensive stored information. Standard reportsinclude usage reports by facility, field, and/or end-user.

System and Schedule MonitoringThe Control-Link Control and Monitoring System provided withnew lighting systems checks your system performance each timeyour lights are turned on. If the system detects fixture outagesthat affect playability, Control-Link Central is notified and willcontact you. Preseason checks can be a part of your proactivemaintenance program to help make sure your lights areoperating properly before the first game.

Control-Link Central staff monitors all schedules entered tomake sure they are successfully received by the controller. Inaddition, they monitor the status of the system on a daily basisto ensure it is ready to run your schedules. If any system issuesare detected, the Control-Link Central staff will contact you toresolve them before they become a problem.

Control-Link ActivationOnce the on-site equipment is installed, a Musco technician willcontact the installing contractor and assist them incommissioning the system. The technician will send sampleschedule commands to the Control-Link system to test eachlighting zone and its associated control and lighting equipment.The technician will also collect baseline diagnostic data,allowing the lighting system to be monitored for correctoperation from that point on.

Customer TrainingControl-Link Central staff provides customer training viatelephone, conference, or on-line tutorial covering Control-Linkoperation, scheduling, website access, and all user functions.

Efficient Management Tools

The Control-Link website provides easy and efficient scheduling of fields, reports,and control over the access levels of your Control-Link website users.

“We greatly appreciate yoursuper-friendly service.”

— Kelly BarkerAthletic Field Permit CoordinatorDept. of Parks, Recreation and MarineCity of Long Beach, CA

Page 6: Flexible control and solid management of your facility ... · maximize your available resources and make solid decisions about managing and expanding your facilities. Control-Link

New System: On-Site Equipment Overview

Control and Monitoring Cabinet

The Control-Link Control and Monitoring System providesreliable, cost-effective control, monitoring, and management ofyour new recreational facility lighting.

Your factory-built and tested Control-Link equipment includes

• Digital cellular communication equipment• Control and Monitoring cabinet(s)

Optional Equipment• Remote Manual Switches cabinet• Schedule Override cabinet

Supplied by Contractor• Main disconnect (electrical distribution panel),conduit, and power wiring

• 120 volt AC control circuit(s)• Transformer if 120 volt supply not available• Mounting hardware for cabinets• Conduit and NEMA Type 4 hubs

New Lighting Systems

6

Transformer— if needed(provided bycontractor)

LargeEnclosure

SmallEnclosure

Control and MonitoringCabinet

ElectricalDistribution Panel(standard equipment

provided by contractor)

Enclosure

ON AUTO

ZONE 1OFF

OFF

ZONE 2AUTOON

OFF

ZONE 3AUTOON

OFF

ZONE 4AUTOON

OFF

ZONE 5AUTOON

OFF

ZONE 6AUTOON

OFF

ZONE 7AUTOON

OFF

ZONE 8AUTOON

73.25"

11.38"18.00" 0.44"24.00"

72.00"

10.00"

12.86"

ON AUTO

ZONE 1OFF

OFF

ZONE 2AUTOON

OFF

ZONE 3AUTOON

OFF

ZONE 4AUTOON

OFF

ZONE 5AUTOON

OFF

ZONE 6AUTOON

OFF

ZONE 7AUTOON

OFF

ZONE 8AUTOON

49.25"

11.38"18.00" 0.44"24.00"

48.00"

10.00"

12.86"

Assembled Cabinet• Entire assembly UL 508 LISTED(Industrial Control Equip.)#E204954

• Meets FCC Part 15 Class A• Factory wired, programmed,and tested

• Controls up to 8 zonesper cabinet

• Operating temperature -20°C to+60°C (-4°F to +140°F)

• Internal time clock with batteryback-up

• Database memory protected frompower outages or fluctuations

• Typical enclosure and componentweight: 6 foot – 150 lbs., 4 foot –125 lbs. Project specific detailsavailable upon request

Enclosures• NEMA Type 4, 5052 H32aluminum

• Powder-coat finishafter fabrication

• External mounting feet• Lockable, 3-pointlatching assembly

• Door grounded enclosure

Manual Off-On-Auto Switches• Keyed, maintain position• Make-before-break contacts• Factory wired to terminal blocks• Mounted to maintainNEMA 4 rating

• Legend plate clearlyidentifies zone

• Switches may be placed inoptional remote Manual Switchescabinet, see page 10 for details

Technical Features

Antenna

Control-Link® Control and Monitoring System

Manual Off-On-Auto Switch detail

Zone 1

OFFON

AUTO

Page 7: Flexible control and solid management of your facility ... · maximize your available resources and make solid decisions about managing and expanding your facilities. Control-Link

The on-site Control andMonitoring cabinet operatesand monitors your new lightingsystem. It allows you tomanage your schedules andfacility usage from your home,office, or anywhere.

On/Off Control ModuleReceives and stores schedulesfrom Control-Link Central™ tooperate your equipment andverify that schedules werecarried out.

Monitoring ModuleMonitors your lighting systemand reports any fixture outagesto help plan routinemaintenance and keep yourfacilities operating.

Contactor SwitchingModulesSwitches your equipmenton/off based on the schedulesstored in the control module.

CommunicationModem ModuleReliable, high-speed integratedcommunication systemprovides two-waycommunication to Control-Link Central™.

Technical FeaturesPanel• 5052 H32 aluminum• Pre-punched, modular configuration• Powder-coat finish after fabrication

Communication Modem• Digital cellular technology• No additional monthly charges

Contactors• Sized for 30, 60, or 100 amplighting loads

• Electrically held• 120 volt coil

Ground Bar• 15 grounding terminals provided• Holds size #14 to #4 gauge wires

Internal Control Wiring• Fuse holder 600 volt 30 amp IEC type• Control terminal blocks mountedto DIN rail

• Plug-in wire harnesses formultiple cabinets (if required)

Contactor Module Options

Rated Lighting Capacity Wire Size Range *

30 amp – 1st (upper) position 3-10 AWG 1 1

30 amp – remaining positions 6-14 AWG 5 11

60 amp 2-10 AWG 6 12

100 amp 250 mcm – 8 AWG 3 6

* Stranded cable, single conductor, without cable end

New Lighting Systems

7

Control and Monitoring Cabinet

F3F3L1L1 NN F2F2F1F1 131211G

(Small Enclosure shown)

Maximum PerSmall Cabinet

Maximum PerLarge Cabinet

Page 8: Flexible control and solid management of your facility ... · maximize your available resources and make solid decisions about managing and expanding your facilities. Control-Link

Retrofit of Existing Lighting Systems

8

Control Cabinet

Technical Features

Assembled Cabinet• Entire assembly UL 508 LISTED (Industrial ControlEquip.) #E204954

• Meets FCC Part 15 Class A• Factory wired, programmed, and tested• Controls up to 8 zones per cabinet• Operating temperature -20°Cto +60°C (-4°F to +140°F)

• Internal time clock with battery back-up• Database memory protected from power outagesor fluctuations

• Typical enclosure and component weight: 28 lbs.Project specific details available upon request.

Enclosures• NEMA Type 4, 5052 H32 aluminum enclosure• Powder-coat finish after fabrication• External mounting feet• Lockable door• Door grounded enclosure

0.44"15.75"

9.88"8.63"

11.06"

12.01"

15.75"

16.99"

Enclosure

Control-Link® System

ControlCabinet

Manual Switches

(To existingcontactors)

Retrofit System: On-Site Equipment OverviewThe Control-Link Control System provides reliable, costeffective control of your existing recreational facility lightingand other electrically-operated equipment.

Your factory-built and tested Control-Link equipment includes

• Digital cellular communication equipment• Control cabinet(s)• Remote Manual Switches cabinet

Optional Equipment• Schedule Override cabinet

Supplied by Contractor• Main disconnect (electrical distribution panel), conduit, andpower wiring

• 120 volt control circuit(s)• Transformer if 120 volt supply not available• Mounting hardware for cabinets• Conduit and NEMA Type 4 hubs

Antenna

Page 9: Flexible control and solid management of your facility ... · maximize your available resources and make solid decisions about managing and expanding your facilities. Control-Link

Retrofit of Existing Lighting Systems

9

20B50403020A

10

The on-site Control Cabinetoperates your existing sportsfacility’s lights and equipment,allowing you to manage yourschedules and facility usage fromyour home, office, or anywhere.

On/Off Control ModuleReceives and stores schedulesfrom Control-Link Central tooperate your equipment andverifies schedules were carriedout.

Contactor Switching ModuleSwitches your equipment on/offbased on schedules stored inthe control module.

CommunicationModem ModuleReliable, high-speed integratedcommunication system providestwo-way communication toControl-Link Central™.

Control Cabinet

ManualSwitches Cabinet(connections behind

switches)

Control CabinetTechnical FeaturesPanel• 5052 H32 aluminum• Pre-punched, modular configuration• Powder-coat finish after fabrication

Communication Modem• Digital cellular technology• No additional monthly charges

Internal Control Wiring• Control terminal blocks mountedto DIN rail

• Plug-in wire harnesses formultiple cabinets

Manual Off-On-Auto Switch Detail(Remote Manual Switches Cabinet)

Zone 1

OFFON

AUTO

Page 10: Flexible control and solid management of your facility ... · maximize your available resources and make solid decisions about managing and expanding your facilities. Control-Link

16.99"15.75"

12.00"15.75"

0.44"

11.69"9.88"8.63"

AUTOOFF

ZONE 1ON

AUTOOFF

ZONE 1ON

AUTOOFF

ZONE 1ON

AUTOOFF

ZONE 1ON

AUTOOFF

ZONE 1ON

AUTOOFF

ZONE 1ON

AUTOOFF

ZONE 1ON

AUTOOFF

ZONE 1ON

Manual Switches Cabinet

The on-site Schedule Override touchscreen enables your user groups toextend play or turn the lights off early.Offers easy-to-use LCD screen and useraccess code protection.

The remote Manual Switchescabinet comes standard with theRetrofit System for operating yourexisting facility lighting.

Optional for the Control andMonitoring system,it provides for special switchingrequirements or for more convenientOff-On-Auto switch location formaintenance staff. Lockable cabinethelps prevent tampering for outdoormounted equipment.

Schedule Override Cabinet

Technical FeaturesRemote ManualSwitches Cabinet• NEMA Type 4, 5052 H32aluminum enclosure

• Operating temperature -20°Cto +60°C (-4°F to +140°F)

• Powder-coat finishafter fabrication

• External mounting feet• Lockable, latching assembly• Door electrically bondedto enclosure

• Locate up to 300 feet fromControl Cabinet

• Typical enclosure andcomponent weight 33 lbs.Project specific detailsavailable upon request.

Manual Off-On-Auto Switches• Factory wired to terminal blocks• Mounted to maintainNEMA 4 rating

• Legend plate clearlyidentifies zone

Remote Manual Switches Cabinet

Technical FeaturesSchedule Override Cabinet• NEMA Type 3R, 5052 H32aluminum enclosure

• Powder-coat finishafter fabrication

• External mounting feet• Magnetic lock, disengageswhen schedule operating

• Operating temperature -20°C to+60°C (-4°F to +140°F)

• Four-digit user access code• Locate up to 175 feet fromControl & Monitoring cabinet

Optional Schedule Override Cabinet

7.20"16.67"

12.66"

12.00" 0.44"

13.92"

10

Page 11: Flexible control and solid management of your facility ... · maximize your available resources and make solid decisions about managing and expanding your facilities. Control-Link

11

What Our Customers Have to Say

Usage Data is Great“It’s been great. It’s ten times better than anything we’vetried before. The field usage data is great. Our monthlyreports needed for financial planning are more accurate andeasy to do. That makes setting user fees much easier. Thecustomer service we continue to get from Musco is excellent.I know I can call them anytime, from anywhere, and they’reright there to help, 24 hours a day, 7 days a week.”

Judy FlynnFormer Recreation SupervisorCity of Corona, California

Neighbors Appreciate Control Link“We used to get calls from neighbors every once in a while thatthe lights had been left on, and someone would have to goout in the middle of the night to turn them off. Neighbors havecalled us saying how much they appreciate the lights being ononly when someone is actually using the field.”

Scott WhitakerPark & Recreation DirectorCity of Carrollton, Texas

Easy to Operate“Musco’s Control and Monitoring System is definitely amore proactive approach than our previous system. Whenthere is a problem, the monitoring system allows a warrantyspecialist to immediately notify us. This is a huge asset, asproblems are resolved right away. The system is userfriendly, very efficient, and easy to operate. Using a phoneto call Control-Link Central is much easier than our previoussystem, which required a laptop to dial in and make changesto a particular facility. The simplicity of this system is veryrefreshing.”

Joe RossRecreation ProgrammerCity of Rialto, Recreation and Community ServicesRialto, CA

Customer Service Second to None“We enjoy the great customer service. The staffanswering the phones are so polite and we reallyappreciate that. We value being able to monitor the usageof the facilities through the website. Control-Link helpsensure that field lights are turned off when they aresupposed to be. We no longer receive calls at 1:00 in themorning that the lights were left on. The monitoringsystem has also been impressive. We received a callduring the day that there was a problem with one of thefixtures. After checking the fuses, we replaced one andthe system was back to go. The problem was resolvedbefore we would have even been aware there was aproblem.”

Stephen CookeSports Manager, Greenville County Recreation Dept.Assistant District Administrator SC District 7 Little LeagueGreenville, SC

Corona Park, California

Carrollton Sports Complex, Texas

Page 12: Flexible control and solid management of your facility ... · maximize your available resources and make solid decisions about managing and expanding your facilities. Control-Link

Light-Structure Green™

Outdoor: New Lighting Applications

Still engineered as 5 Easy Pieces™, Light-Structure Greenoffers unequaled performance for your budget,for the environment.

Reduces operating costs by 50%Cuts wasted spill light by 50% or moreEliminates 100% of your maintenance costs for 25 yearsProvides Constant Light™

SportsCluster Green™

Outdoor & Indoor: Retrofit Applications

A modular photometric unitfactory aimed and tested toperform from your choice ofstructures — makes retrofitof old equipment easy.

Reduces operating costs by 50%Cuts wasted spill light by 50% or moreEliminates 100% of your maintenance cost for 10 yearsProvides Constant Light™

Light-Pak™

Indoor: New and Retrofit Applications

Energy-efficient indoor sportslighting that operates at yourchoice of two energy levelsfor improved cost control.

Saves energy costsover alternative systems

Musco Systems to Meet Your Sports-Lighting Needs

Patents Pending©1998, 2007 Musco LightingB-505-10

100 1st Avenue West / PO Box 808Oskaloosa, Iowa 52577641/673-0411 • Fax: 641/673-4852

800/825-6030

www.musco.come-mail: l [email protected]


Recommended