+ All Categories
Home > Documents > FlexiMultiradio Installation

FlexiMultiradio Installation

Date post: 16-Oct-2015
Category:
Upload: reza-rtwo
View: 339 times
Download: 1 times
Share this document with a friend
Description:
Nokia Flexi Multiradio Installation
Popular Tags:
237
RA22714EN01GLA0 Flexi Multiradio BTS GSM/EDGE Installation 1 For internal use only RA22714EN01GLA0 1 © N okia Siemens Networks Flexi Multiradio BTS GSM/EDGE Installation
Transcript
  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    1

    For internal use onlyRA22714EN01GLA01 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGEInstallation

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    2

    For internal use onlyRA22714EN01GLA02 Nokia Siemens Networks

    Nokia Siemens Networks AcademyLegal notice

    Intellectual Property RightsAll copyrights and intellectual property rights for Nokia Siemens Networks training documentation, product documentation and slide presentation material, all of which are forthwith known as Nokia Siemens Networks training material, are the exclusive property of Nokia Siemens Networks. Nokia Siemens Networks owns the rights to copying, modification, translation, adaptation or derivatives including any improvements or developments. Nokia Siemens Networks has the sole right to copy, distribute, amend, modify, develop, license, sublicense, sell, transfer and assign the Nokia Siemens Networks training material. Individuals can use the Nokia Siemens Networks training material for their own personal self-development only, those same individuals cannot subsequently pass on that same Intellectual Property to others without the prior written agreement of Nokia Siemens Networks. The Nokia Siemens Networks training material cannot be used outside of an agreed Nokia Siemens Networks training session for development of groups without the prior written agreement of Nokia Siemens Networks.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    3

    For internal use onlyRA22714EN01GLA03 Nokia Siemens Networks

    Objectives (1/2)

    After completing this module, the participant will be able to:

    Theory: Describe the general work order of installing Flexi Multiradio BTS GSM/EDGE Describe the installation option for Flexi Multiradio BTS GSM/EDGE List the installation tools needed for Flexi Multiradio BTS GSM/EDGE Explain the installation order for stack, wall and pole installation option Explain the installation order of cabinet for outdoor and cabinet for indoor installation option Describe how to install the modules for different installation options Identify the installation of optional items. Identify the interfaces and connectors of the Flexi Multiradio BTS GSM/EDGE modules and

    Transport sub-modules in respect to configuration Describe the cabling principle for different installation options Explain the feederless solution for Flexi Multiradio BTS GSM/EDGE Describe the antenna system for Flexi BTS GSM/EDGE Describe the example of installation of common configuration for different installation options.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    4

    For internal use onlyRA22714EN01GLA04 Nokia Siemens Networks

    Objectives (2/2)

    After completing this module, the participant will be able to: . (Contd)

    Practical: Checking the content delivery and optional items based on specific installation option Install the module for Flexi Multiradio BTS GSM/EDGE based on specific installation option

    and configuration. Install the optional items needed for Flexi Multiradio BTS GSM/EDGE Flexi Multiradio BTS GSM/EDGE Module and Transport Module Cabling Examine for correctly installed the Flexi Multiradio BTS GSM/EDGE for stack, wall, pole,

    indoor and outdoor cabinet installation options based on checking list Demonstrate correctly install, route cables and optical fibers on the Flexi Multiradio BTS

    GSM/EDGE

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    5

    For internal use onlyRA22714EN01GLA05 Nokia Siemens Networks

    Content

    Preparation of Flexi Multiradio BTS GSM/EDGE installation

    Flexi Multiradio BTS GSM/EDGE Installation Option

    Flexi Multiradio BTS GSM/EDGE Stack, Wall, and Pole (SWP) Installation

    Flexi Multiradio BTS GSM/EDGE with Flexi Cabinet for Indoor (FCIA) Installation

    Flexi Multiradio BTS GSM/EDGE with Flexi Cabinet for Outdoor (FCOA) Installation

    Flexi Multiradio BTS GSM/EDGE Feederless Solution

    Flexi Multiradio BTS GSM/EDGE Optional Items/Modules Installation

    Cabling Principles for Flexi Multiradio BTS GSM/EDGE Installation

    Installation tools and torque values for Flexi Multiradio BTS GSM/EDGE

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    6

    For internal use onlyRA22714EN01GLA06 Nokia Siemens Networks

    Content

    Preparation of Flexi Multiradio BTS GSM/EDGE installation

    Flexi Multiradio BTS GSM/EDGE Installation Option

    Flexi Multiradio BTS GSM/EDGE Stack, Wall, and Pole (SWP) Installation

    Flexi Multiradio BTS GSM/EDGE with Flexi Cabinet for Indoor (FCIA) Installation

    Flexi Multiradio BTS GSM/EDGE with Flexi Cabinet for Outdoor (FCOA) Installation

    Flexi Multiradio BTS GSM/EDGE Feederless Solution

    Flexi Multiradio BTS GSM/EDGE Optional Items/Modules Installation

    Cabling Principles for Flexi Multiradio BTS GSM/EDGE Installation

    Installation tools and torque values for Flexi Multiradio BTS GSM/EDGE

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    7

    For internal use onlyRA22714EN01GLA07 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGEInstallation

    Preparation of Flexi Multiradio BTS GSM/EDGE installation

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    8

    For internal use onlyRA22714EN01GLA08 Nokia Siemens Networks

    1. Check the tools2. Unpack the delivery and handle the modules3. Fix adapter mechanics to the plinth (wall & pole installations)4. Install the plinth (stack, wall & pole installations) or cabinet5. Ground the plinth or cabinet6. Install the casings to the plinth7. Install transmission sub-module8. Install the modules 9. Install optional modules10. Connect the cables11. Connect external power feed12. Install module front covers

    Preparation of Installation General work order

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    9

    For internal use onlyRA22714EN01GLA09 Nokia Siemens Networks

    When handling the modules, always use the antistatic wrist strap as shown in the figure below. The cabinet must be grounded, otherwise the antistatic wrist strap will not work. Refer to Grounding the BTS section.

    ESD ANTI-STATIC WRIST STRAPS SHOULD BE WORN WHEN

    HANDLING ANY UNIT WHICH DISPLAYS THE ESD LOGO

    ESD ANTI-STATIC WRIST STRAPS SHOULD BE WORN WHEN

    HANDLING ANY UNIT WHICH DISPLAYS THE ESD LOGO

    Preparation of InstallationHandling the modules and unpacking the delivery

    NOTE: wrist strap not included in the Flexi EDGE BTS deliveries

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    10

    For internal use onlyRA22714EN01GLA010 Nokia Siemens Networks

    Content

    Preparation of Flexi Multiradio BTS GSM/EDGE installation

    Flexi Multiradio BTS GSM/EDGE Installation Option

    Flexi Multiradio BTS GSM/EDGE Stack, Wall, and Pole (SWP) Installation

    Flexi Multiradio BTS GSM/EDGE with Flexi Cabinet for Indoor (FCIA) Installation

    Flexi Multiradio BTS GSM/EDGE with Flexi Cabinet for Outdoor (FCOA) Installation

    Flexi Multiradio BTS GSM/EDGE Feederless Solution

    Flexi Multiradio BTS GSM/EDGE Optional Items/Modules Installation

    Cabling Principles for Flexi Multiradio BTS GSM/EDGE Installation

    Installation tools and torque values for Flexi Multiradio BTS GSM/EDGE

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    11

    For internal use onlyRA22714EN01GLA011 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGEInstallation

    Flexi Multiradio BTS GSM/EDGE Installation Option

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    12

    For internal use onlyRA22714EN01GLA012 Nokia Siemens Networks

    Pole installation

    Stacked installation

    Flexi Multiradio BTS GSM/EDGE Installation Option

    Wall installation

    Nokia, 3rd party BTS cabinet or SSS installation

    Up to 200* meters

    Urban feederless site application

    * Up to 40KM with Single mode fiber

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    13

    For internal use onlyRA22714EN01GLA013 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE Installation Option - Tower or mast installation

    BTS modules installed on top of mast or tower

    A pole installationsBTS modules installed on base of mast or tower

    A stack or outdoor cabinet installation

    LTE space and optional BBU in cabinet

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    14

    For internal use onlyRA22714EN01GLA014 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE Installation Option - Other installation options

    Street furniture installation Hidden installation

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    15

    For internal use onlyRA22714EN01GLA015 Nokia Siemens Networks

    OBSAI interface: No additional optical converters Removes coverage losses introduced by long

    feeder runs CAPEX savings in antenna system equipment and

    installation work Target signal strength can be achieved with lower

    power level which means savings in OPEX RF parts mounted next to antennas (no MHAs

    needed)

    Up to 200* meters

    RRH Application : Wide Area Rooftop

    RF parts

    Fiber, DC

    System module, BBU

    Rural Mast Top Site (RFM)

    * Up to 40KM with Single mode fiber

    Sector 1Sector 2

    Sector 3

    Sector 1

    Flexi Multiradio BTS GSM/EDGE Installation Option - Feederless Site Solution

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    16

    For internal use onlyRA22714EN01GLA016 Nokia Siemens Networks

    Content

    Preparation of Flexi Multiradio BTS GSM/EDGE installation

    Flexi Multiradio BTS GSM/EDGE Installation Option

    Flexi Multiradio BTS GSM/EDGE Stack, Wall, and Pole (SWP) Installation

    Flexi Multiradio BTS GSM/EDGE with Flexi Cabinet for Indoor (FCIA) Installation

    Flexi Multiradio BTS GSM/EDGE with Flexi Cabinet for Outdoor (FCOA) Installation

    Flexi Multiradio BTS GSM/EDGE Feederless Solution

    Flexi Multiradio BTS GSM/EDGE Optional Items/Modules Installation

    Cabling Principles for Flexi Multiradio BTS GSM/EDGE Installation

    Installation tools and torque values for Flexi Multiradio BTS GSM/EDGE

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    17

    For internal use onlyRA22714EN01GLA017 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGEInstallation

    Flexi Multiradio BTS GSM/EDGE Stack, Wall, and Pole (SWP) Installation

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    18

    For internal use onlyRA22714EN01GLA018 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE Stack, Wall, and Pole (SWP) Installation General Procedure

    Content of Delivery

    Clearances

    Installing the Plinth

    Grounding the plinth

    Installing the casings

    Installing the modules

    Grounding the modules

    Cabling

    Power up and commissioning

    the BTS

    Installing module front

    covers

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    Che

    ckin

    gIn

    stal

    latio

    n

    Cab

    ling

    Com

    mis

    -si

    onin

    gFr

    ont

    pane

    l

    Start

    Plint on the floor, wall, or pole

    Grounding Principle

    Casing installation principle

    Module installation principle

    Grounding principleInstallation example

    Cable routing and cable ties

    External power

    Internal power cablesAntenna cables

    Optical cablesTransmission & alarm cable

    Finish

    General procedure of Flexi Multiradio BTS GSM/EDGE Stack, Wall, and Pole (SWP) Installation :

    1. Unpack and check the delivery.2. Check Clearance3. Installing the plinth

    For wall or pole installation, the adapter mechanics must be fixed to the plinth beforehand. But its not applicable if you are installing version FMFA v.104 of the plinth

    The procedure of installing the plinth could be of of following: Anchoring the plinth on the floor. Mounting the plinth on a wall. For mounting the plinth on the pole, see:

    Mounting the plinth on a pole with VMPB or Mounting the plinth on the pole with FPKA

    4. Grounding the plinth5. and 6. Installing the casings, modules, and cable entries

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    19

    General procedure of Flexi Multiradio BTS GSM/EDGE Stack, Wall, and Pole (SWP) Installation: (contd)

    5. and 6. Installing the casings, modules, and cable entriesRecommended work order:

    a) If Flexi Power Module (FPMA), Flexi Power DC/DC Module 24V (FPDA), or Flexi Power Rectifier Module (FPRx) install directly on top of the plinth.

    See the instruction on Installing Flexi Multiradio BTS GSM/EDGE Optional Items: Installing Flexi Power Module (FPMA) Principles for installing FPRx in Flexi Multiradio BTS

    configurations Install the back covers for the casings

    b) Install the empty casings and install the modules by sliding into the casing. See one of the following:

    Installing modules on the floor (stack) Mounting the modules on a wall Mounting the modules on a pole

    Then install the transmission sub-modulec) Install cable entriesd) If one or any optional modules installed, see the following instructions in

    document Installing Flexi Multiradio BTS GSM/EDGE Optional Items: Installing Flexi Power Module (FPMA) Installing Flexi Power DC/DC Module 24V (FPDA) Installing Flexi Mounting Auxiliary Brackets (FMAA) Installing Flexi System External Alarm (FSEB), FSEB interface

    signals and connector pin assignments. Installing Flexi System External OVP (FSEC) Installing Location Measurement Unit (LMUB) Outdoor

    Instructions for installing modules in Flexi Mounting Shields: Installing Flexi Mounting Shield 6U (FMSA) Installing Flexi Mounting Shield 18U (FMSB)

    c) Install cable entries

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    20

    General procedure of Flexi Multiradio BTS GSM/EDGE Stack, Wall, and Pole (SWP) Installation: (contd)

    7. and 8. Grounding the modules and connecting cablesCabling principles:

    Cabling principles in stacked, wall and pole installation Cable clamps in stacked, wall and pole installation Optional cable tunnels Internal power cabling principles for System Module (ESMB/C)

    The order to connect the cables is as follows:a) Grounding cablesb) 48 V DC power feedc) Internal power cablesd) Antenna jumper cablese) Optical cables (OPT)f) Transmission cables. See one of the following:

    Connecting FIEA, FIPA, FIQx and FIYx transmission cableswithout optical transceiver

    Connecting FIQx and FIYx transmission cables with optical transceiver

    Connecting FIFA transmission cablesg) Optional cables. See the following instructions in document Installing

    Multiradio BTS GSM/EDGE Optional Items: Flexi Power Alarm (FPA) cables External alarms and controls (EAC) cables Synchronisation cables Local management port (LMP) cables Location Management Unit (LMU) cables Optional Rx Out (RxO)

    h) In stack or pole installation, install side cable tunnels (optional). See Installing optional side cable tunnels in document Installing MultiradioBTS GSM/EDGE Optional Items:

    9. Power up and Commissioning10. Installing module front covers

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    21

    For internal use onlyRA22714EN01GLA021 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationContent of Delivery System Module (ESMB/ESMC)

    2M10 Cableterm (25/35 mm2) Ring

    1Pull-out tool

    2B10 washer

    1Bag Reclosable (15 0 x 2 25/ 20 0 x 260) 0.1 mm

    2M10 Hex Nut

    ESMC

    ESMB

    Version

    2AWG Single cable terminal lug rubber boots

    472059

    472109

    1Flexi Multiradio BTS GSM/EDGE Syst em ModuleSystem Module

    QuantityProduct Code

    Contents of deliveryDelivery

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    22

    For internal use onlyRA22714EN01GLA022 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationContent of Delivery Transmission Sub-Module

    4 71719AFlexi tra nsmission sub-module (FIYA) PW 100Base-T ethernet (RJ48) +4xE1/T1 symmetrical 120/100 ohm (RJ5) + optional opticalGE (SFP)

    4 70248AFlexi transmission interface E1/T1 symmetricalsubmodule (FIPA)

    4 71607AFlexi transmission sub-module (FIQA)PW 100Base-T ethernet (RJ48) +4xE1/T1 symmetrical 120/100 ohm (RJ5) + optional opticalGE (SFP)

    Flexi trasnsmission interface Flexbus sub-module (FIFA)

    Flexi transmission interface E1submodule (FIEA)

    Version

    4Screws (preinstalled)

    4 71007A

    4 70247A

    1Transmission sub-module

    System Module

    Quantity

    Product Code

    Contents of delivery

    DeliveryTransmission Submodule

    FIPA

    FIEA

    FIFA

    FIQA

    FIYA

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    23

    For internal use onlyRA22714EN01GLA023 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationContent of Delivery RF Module

    RF Modu le Cable Set:

    19952 81Power cable 2 m

    19948 07Optical cab le 2 m

    4 72166AFXFA Fle xi Multi-radio RFM 1900

    4 72142AFXCA Flexi Multi-radio RFM 8 50

    4 72143AFXDJ Flexi Mult -iradio RFM 90 0

    FXEA Flexi Multi-radio RFM 180 0

    FXDA Flexi Multi-radioRFM900

    Version

    24707 457Optical tranceivers(SFP**)

    4 72084A

    4 72083A

    1Flexi MultiradioBTS GSM/EDGE Radio Frequency Module*

    RF Module

    Quantity

    Pro-duct Code

    Contents of delivery

    Delivery

    SFP optical transceiver* RF Module with fan assembly and without the casings** SFP=Small Form factor PluggableSFP IP rating = IP55 with connector rubber gaskets

    Optical cable, 2m

    Power cable, 2m

    RF Module (FXxA)

    RF Module

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    24

    For internal use onlyRA22714EN01GLA024 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationContent of Delivery Plinth and Module Casing

    2M5 x 12 screws

    FMFA

    Ver-sion

    12M5 x 8 screws

    2Fixin g plate fo r the casing

    Flexi Mounting Kit f or Floor, Wall, and Po le

    Plint h delivery

    QuantityProduct Code

    Contents of delivery

    Delivery

    2M5 x 6 screws

    6 (2 loose,4 pre-installed)

    Cage nuts

    2Maintena ncestrap s

    13 U rear cover

    4M5 x 10 screws

    1Groun ding cable

    EMHA

    Ver-sion

    13 U fron t cove r

    23 U ca ble entrie s

    14 70316A

    Flexi BTS Mo dulecasing (3U)

    Module casing

    QuantityProduct Code

    Contents of delivery

    Delivery

    One FMFA, Optional plinth for installation.

    Always Used with casings

    Two casings Two EMHA, Optional 3U

    casing and mounting covers front and back

    One ESMB, System Module One transmission sub-module

    3-sector RF module

    Plinth

    Module Casing

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    25

    For internal use onlyRA22714EN01GLA025 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationContent of Delivery Pole Mounting Kit (optional)

    6Module fixing screws

    2Bolt re strainer

    FPKA

    Version

    2Assembling bolts

    2Aluminiumcastings

    4 71649AFlexi Pole Mounting Kit

    Pole mounting kit(optional)

    Quan-tity

    Product Code

    Contents of delivery

    Delivery

    Check List Deliveries are complete. Equipment is not damaged.

    Pole Mounting Kit (optional)

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    26

    For internal use onlyRA22714EN01GLA026 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationClearances

    Wall installation

    Stack installation

    Wall installation

    Note: In a stack, the

    minimum side clearance is 75 mm(3 in.).

    The recommended clearance for hand tying is 150mm (5.9 in.)

    Check List Site meets the

    minimum clearances.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    27

    For internal use onlyRA22714EN01GLA027 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstalling the Plinth Plinth on the floor

    Plinth on the floor

    1. Check the clearances around the plinth.

    2. Turn the rear stopper.3. Place the plinth on the

    floor, grounding points facing forward.

    4. Bolt on the floor with 4 bolts, 12 mm (0.47 in.) in diameter. Tighten to 49.0 Nm (36.1 ft-lb)

    PurposeThe plinth is mandatory when the modules are not mounted in an optional cabinet or 19 rack.Before you startWhen choosing the location for the plinth, take into consideration the required maintenance space. For fan maintenance from the back, 500 mm (19.7 in.) back space with side access is required.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    28

    For internal use onlyRA22714EN01GLA028 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstalling the Plinth Plinth on the floor

    Other options for anchoring the plinth are

    No wall nearby

    Minimum clearance on the back side

    PurposeThe plinth is mandatory when the modules are not mounted in an optional cabinet or 19 rack.Before you startWhen choosing the location for the plinth, take into consideration the required maintenance space. For fan maintenance from the back, 500 mm (19.7 in.) back space with side access is required.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    29

    For internal use onlyRA22714EN01GLA029 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstalling the Plinth Plinth on the Wall

    1. Mark screw locations according to the holes in the plinth and drill holes.2. Fix the mounting screws on the wall and mount the plinth.3. Tighten the upper mounting screws.4. Tighten the lower mounting screws to a torque value of 49 Nm.

    Note that the space required between plinths is 100 mm (3.4 inches).

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    30

    For internal use onlyRA22714EN01GLA030 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstalling the Plinth Plinth on the Wall

    If second plinth installed, required space between the plinths is 100 mm.

    One mounting plinth per two modules is installed on a wall.

    Ground

    Antenna

    CAUTION: Install the modules with front panels facing left or right. Do not install modules so that the front panels face up or down.

    If you are going to install Flexi Power Module (FPMA), it should be installed on the same plinth with the ESMB system module

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    31

    For internal use onlyRA22714EN01GLA031 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstalling the Plinth Mounting kit for Plinth on the Pole

    There are two pole mounting kits available for mounting the plinth and modules on a pole:

    Pole Mounting Kit (VMPB), for pole between 60 mm (2.4 in.) and 120 mm (4.7 in.) in diameter

    Flexi Pole Mounting Kit(FPKA), for pole between 60 mm (2.4 in.) and 300 mm (11.8 in.) in diameter

    Pole Mounting Kit (VMPB)

    Flexi Pole Mounting Kit (FPKA)

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    32

    For internal use onlyRA22714EN01GLA032 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstalling the Plinth Mounting Plinth on the Pole with FPKA (1/2)

    The Flexi Pole Mounting Kit (FPKA) can be used with poles : between 60 mm (2.4 in.) and 120 mm (4.7 in.) in diameter. The most commonly used size is 80 mm (3.1 in.).

    The FPKA can replace the VMPB Pole Mounting kit in installations where the pole diameter is less than 120 mm (4.7 in.).

    The product code of Flexi Pole Mounting Pole (FPKA) is 471649A. The maximum allowed weight on the FPKA is 160 kg (352.7 lbs). However, each

    FMFA can support a maximum weight of 50 kg (110.23 lbs).

    2Bolt M10 x120 105 mm thread ISO 4762 (DIN912)

    6Bolt M8 x 202Bolt restrainer1FPKA bracket strainer

    FPKA BracketItem

    1Quantity

    FPKA delivery contentsFlexi Pole Mounting Kit (FPKA)

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    33

    For internal use onlyRA22714EN01GLA033 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstalling the Plinth Mounting Plinth on the Pole with FPKA (2/2)

    1. Fix the upper mounting bracket on the pole. Attach the mounting bracket screws (M10) on the bracket. Tighten screws to 30 Nm.

    2. Fix one side of the lower pole mounting bracket on the plinth with mounting screws (M8). Tighten screws to 20 Nm.

    3. Lift the plinth on the pole and fit it to the mounting screws of the pole mounting bracket. Tighten screws (M8) to 20 Nm.

    4. Place the counterpart of the lower pole mounting bracket in its place. Tighten screws (M10) to 30 Nm.

    5. If a second plinth is required, install it on the other side of the pole mounting bracket.

    6. Ground the plinth to the site main ground.

    1 2

    3 4

    5 6

    30 NmNote that the length of mounting screws depends on the diameter of the pole.

    Check List

    Plinth is installed according to instructions.

    Plinth is level.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    34

    For internal use onlyRA22714EN01GLA034 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstalling the Plinth Mounting Plinth on the Pole with VMPB

    The Flexi Pole Mounting Kit (VMPB) can be used for poles: between 60 mm (2.4 in.) and 300 mm (11.8 in.) in diameter

    The VMPB is required for poles greater than 120 mm (4.7 in.) in diameter. The product code of Pole Mounting Kit (VMPB) is 469978A. The maximum allowed weight on the VMPB is 160 kg (352.7 lbs). However, each

    FMFA can support a maximum weight of 50 kg (110.23 lbs).

    4M10x300 bolts4M10x200 bolts

    4Washers

    2Mounting blocks8M8x25 bolts4M10x120 bolts

    Pole Mounting Kit (VMPB)Item

    1Quantity

    FPKA delivery contents Blocks

    M10x120 bolts M8x25 bolts

    M10x200 bolts M10x300 boltswasher

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    35

    For internal use onlyRA22714EN01GLA035 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstalling the Plinth Mounting Plinth on the Pole with VMPB

    There are 3 different lengths of bolts available and 4 places for bolts in the pole mounting brackets.

    When attaching the brackets to the pole, use the shortest possible bolts and the holes whose distance is the closest to the pole diameter. See the table and figure for more details.

    A plinth is required for mounting the modules on a pole. In pole installation, the maximum number of modules on a plinth is two.

    3300211 - 255

    4300256 - 300

    212095 - 125

    1200126 - 165

    2200166 - 210

    60 - 90

    Pole diameter

    (mm)1120

    Hole number*Bolt length (mm)

    * Hole numbering is presented in the figure below

    If the configuration has more than two modules, additional plinths must be installed.

    Max two 3HU modules.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    36

    For internal use onlyRA22714EN01GLA036 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstalling the Plinth Mounting Plinth on the Pole with VMPB

    Note: with two plinths on opposite sides, the upper adapter still has to be up facing a similar adapter on the other side.

    12

    34

    7

    Detail explanation of each step, can be seen on notes page

    5

    6

    Steps1. Fix the upper mounting bracket on the pole and attach the mounting screws on bracket.

    Make sure that the mounting screws in the upper mounting bracket are in the lower edge of the bracket.

    2. Fix one half of the lower mounting bracket on the plinth with the mounting screws. Make sure that the mounting screws in the lower mounting bracket are in the upper edge of the bracket.

    3. Lift the plinth on the pole and fit it to the pole mounting bracket's mounting screws.4. Tighten the mounting screws.5. Place the counterpart of the lower pole mounting bracket in its place and tighten the

    screws.6. Make sure that the plinth is not twisted. When the plinth is in a correct position,

    tighten the 3 screws in the lower bracket of the adapter mechanics.7. If a second plinth is required, install it on the other side of the pole mounting bracket.

    a) Fix the adapter mechanics on the plinth as described in step 1 above.b) Fix mounting screws on the upper pole mounting bracket.c) Lift the plinth on the pole, fit it to the pole mounting bracket's mounting screws

    and tighten the screws.d) Insert the lower fixing screws to fix the plinth on the lower pole mounting

    bracket. Tighten the mounting screws.e) Make sure that the plinth is not twisted. When the plinth is in a correct position,

    tighten the remaining 2 screws in the lower bracket of the adapter mechanics.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    37

    For internal use onlyRA22714EN01GLA037 Nokia Siemens Networks

    In a pole installation, one plinth can have a maximum of two modulesinstalled. If the configuration has more than two modules, additional plinths must be installed.

    Two plinths can be installed on one pair of mounting brackets (on opposite sides of the pole).

    The modules must be installed with front panels facing left or right. Do not install modules so that the front panels face up or down.

    Installation order varies by configuration. See the figure.

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstalling the Plinth Example installation on Pole

    FXxAFXxAFXxA

    ESMB/ESMC*

    ESMB/ESMC

    FPMA/FPDA

    FXxA FXxA

    ESMB/ESMC*

    3+3+3 (60 W) . 12+12+12 (15 W) configuration on a pole without FPDA/FPMA)

    2+2+2 (60 W) . 12+12+12 (10 W) configuration on a pole with FPDA/FPMA

    Note :

    * ESMC is used if number of TRX more than 18 (up to 36) per BCF

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    38

    For internal use onlyRA22714EN01GLA038 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationGrounding the plinth

    1. Ground the plinth to the site main ground. Tighten to 8.0-10.0 Nm (5.9-7.37 ft-lb)

    2. Connect the wrist strap.

    Check List

    Local grounding (earthing) regulations are followed. Antistatic wrist strap is used when handling modules. Plinth is grounded.

    Grounding the plinth (FMFA v. 104 or higher)

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    39

    For internal use onlyRA22714EN01GLA039 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstalling Casing on Stack

    Note: The casings are pre-installed with back covers. In Earthquake Zone 4, the maximum number of

    modules for stack installations is five. In Earthquake Zone 4, install side fixing plates on

    the casings In Earthquake Zone 2, the maximum allowed height

    for a stack is 22U. In pole and wall installations, the maximum

    modules per plinth is two. In pole and wall installations, maintenance straps

    must be installed in the casings. M5 X 6 screws should be secured with thread

    locking compound in pole and wall installations

    1

    2

    3

    4

    1. Align the holes of the first casing bottom with the fixing studs on the plinth

    2. Push the casing back until it stops.3. Attach the casing to the plinth with M5 X 6

    mm screws (6150188). Tighten to 3.5-4.2 Nm (2.58-3.10 ft-Ib)

    4. Install the remaining casings as required by the configuration

    Check List Back covers are properly installed. Fixing screws are tightened. Optional: In pole and wall installations,

    maintenance straps are installed in the front covers.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    40

    For internal use onlyRA22714EN01GLA040 Nokia Siemens Networks

    Note:Line up the locating marks in the module to help aligning the holes with fixing studs.

    1

    3

    Line up thelocating marks

    Line up thelocating marks

    24

    7

    Line up thelocating marks 10

    8

    6

    9

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstalling Casing mounting casing/module on a wall/pole

    1

    2 34

    5

    6

    8

    9

    10

    Detail explanation of each step, can be seen on notes page

    TIP: You can pre-assemble the plinth with two modules on the ground and then lift the entire plinth. This is the easiest method especially in pole installation.

    You can also install the casings into the plinth first and then slide the modules in the casings:

    Steps1. Align the holes on the first module's bottom with the fixing studs on the plinth.

    Tip : Line up the locating marks in the module to help aligning the holes with fixing studs.2. Push the module back until it stops.3. Attach the module casing to the plinth with screws.4. Connect the module grounding cable between the module front panel and the

    plinth.5. Align the holes on the second module's bottom with the fixing studs on the first

    module. Tip :Line up the locating marks in the module to help aligning the holes with fixing studs.

    6. Push the module back until it stops.7. Attach the module casings to each other with screws and spring washers. Secure

    the screws with glue.8. Connect the module grounding cable between the module front panel and the

    plinth.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    41

    For internal use onlyRA22714EN01GLA041 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstalling Casing Lifting Standalone BTS

    Plinth can be pre-assembled with two modules on the ground and then lift the entire plinth.

    This is the easiest method especially in pole installation.

    However, user can lift and mount the plinth first and then install the modules and connect cables, similarly as in stack installation.

    Lifting a standalone BTS

    Steps:

    1. Attach the lifting eye bolts to the attachment points in the plinth. Lifting eye bolts (M12) are not included in the delivery. You can order the LEKA kit separately from your NSN supplier.

    2. Attach the hoisting belt or the rope to the lifting eye bolts. Attach the hoisting belt or rope so that the angle between the belt or rope and the plinth is minimum 60. The distance between the plinth and the belt or rope is minimum 400 mm (15.6 in.).

    3. Lift the BTS carefully to the desired installation height.4. Mount the BTS.5. Remove the lifting equipment.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    42

    For internal use onlyRA22714EN01GLA042 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstalling Modules

    Note: In pole and wall installations, install the maintenance

    strap for back covers. In pole and wall installations, screws are secured

    with thread locking compound.

    1. Slide the RF module and the System Module into the casings.

    2. Attach the module(s) to the casing with M5 X 10 mm screws. Tighten to 3.5-4.2 Nm (2.58-3.10 ft-Ib).

    3. Install the transmission sub-module to the System Module. Tighten to 2.7-3.3 Nm (1.99-2.43 ft-Ib).

    4. Install the cable entries on both casings. Torque 3.5 to 4.2 Nm.

    1

    2

    3 4

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    43

    For internal use onlyRA22714EN01GLA043 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstalling Modules on wall (1/2)

    23

    5

    6

    4

    7

    9

    10

    1. If the Power Module (FPMA) or Power DC/DC 24V Module (FPDA) is installed, attach the back covers to the casings.

    2. Align the holes on the first casings bottom with the fixing studs on the plinth.

    3. Push the casing back until it stops.4. Attach the casing to the plinth with M5 x 6

    mm (0.2 in.) screws (6150188) using thread-locking compound and tighten.

    5. Align the holes on the second casings bottom with the fixing studs on the first casing.

    6. Push the casing back until it stops.7. Attach the casings to each other with M5 x 6

    mm (0.2 in.) screws using thread-locking compound and tighten

    8. Repeat steps 2-7 to install the remaining casings to separate plinths.

    9. Slide the module into the casing.10. Attach the module(s) to the casing with M5 x

    25 mm (1.0 in.) screws and tighten.

    Steps of installing module on wall:1. If the Power Module (FPMA) or Power DC/DC 24V Module (FPDA) is installed, attach the back

    covers to the casings.2. Align the holes on the first casings bottom with the fixing studs on the plinth.3. Push the casing back until it stops.4. Attach the casing to the plinth with M5 x 6 mm (0.2 in.) screws (6150188) using thread-locking

    compound (medium strength, non-permanent) between 3.5-4.2 Nm (2.58-3.10 ftlb).5. Align the holes on the second casings bottom with the fixing studs on the first casing.6. Push the casing back until it stops.7. Attach the casings to each other with M5 x 6 mm (0.2 in.) screws (6150188) using thread-

    locking compound and tighten 3.5-4.2 Nm (2.58-3.10 ftlb).8. Repeat steps 2-7 to install the remaining casings to separate plinths.9. Slide the module into the casing.10. Attach the module(s) to the casing with M5 x 25 mm (1.0 in.) screws and tighten between 3.5-

    4.2 Nm (2.58-3.10 ftlb).

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    44

    For internal use onlyRA22714EN01GLA044 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstalling Modules on wall (2/2)

    13 13 13

    11. Attach the fixing plates across the module casings on both sides of the modules and fix with 6 screws and spring washers and tighten between 3.5-4.2 Nm (2.58- 3.10 ftlb).

    12. Repeat steps 9-11 to install the remaining modules.

    13. Attach the cable entries to the casings with two M5 x 10 mm (0.2 in.) screws (6150240) and tighten between 3.5-4.2 Nm (2.58-3.10 ftlb).

    a) Fix the screws (do not tighten yet).b) Attach the cable entry to the casing.c) Tighten the screws.

    11

    Steps of installing module on wall: (contd)

    11. Attach the fixing plates across the module casings on both sides of the modules and fix with 6 screws and spring washers and tighten between 3.5-4.2 Nm (2.58- 3.10 ftlb).

    12. Repeat steps 9-11 to install the remaining modules.

    13. Attach the cable entries to the casings with two M5 x 10 mm (0.2 in.) screws (6150240) and tighten between 3.5-4.2 Nm (2.58-3.10 ftlb).

    a) Fix the screws (do not tighten yet).

    b) Attach the cable entry to the casing.

    c) Tighten the screws.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    45

    For internal use onlyRA22714EN01GLA045 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstalling Modules on pole (1/2)

    1. If the Power Module (FPMA) or Power DC/DC 24V Module (FPDA) is installed, attach the back covers to the casings.

    2. Align the holes on the first casings bottom with the fixing studs on the plinth.

    3. Push the casing back until it stops.4. Attach the casing to the plinth with M5 x 6

    mm (0.2 in.) screws (6150188) using thread-locking compound and tighten.

    5. Align the holes on the second casings bottom with the fixing studs on the first casing.

    6. Push the casing back until it stops.7. Attach the casings to each other with M5 x 6

    mm (0.2 in.) screws using thread-locking compound and tighten

    8. Repeat steps 2-7 to install the remaining casings to separate plinths.

    9. Slide the module into the casing.10. Attach the module(s) to the casing with M5 x

    25 mm (1.0 in.) screws and tighten.

    2

    3

    4

    5

    6

    7

    Steps of installing module on wall:1. If the Power Module (FPMA) or Power DC/DC 24V Module (FPDA) is installed, attach the back

    covers to the casings.2. Align the holes on the first casings bottom with the fixing studs on the plinth.3. Push the casing back until it stops.4. Attach the casing to the plinth with M5 x 6 mm (0.2 in.) screws (6150188) using thread-locking

    compound (medium strength, non-permanent) between 3.5-4.2 Nm (2.58-3.10 ftlb).5. Align the holes on the second casings bottom with the fixing studs on the first casing.6. Push the casing back until it stops.7. Attach the casings to each other with M5 x 6 mm (0.2 in.) screws (6150188) using thread-

    locking compound and tighten 3.5-4.2 Nm (2.58-3.10 ftlb).8. Repeat steps 2-7 to install the remaining casings to separate plinths.9. Slide the module into the casing.10. Attach the module(s) to the casing with M5 x 25 mm (1.0 in.) screws and tighten between 3.5-

    4.2 Nm (2.58-3.10 ftlb).

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    46

    For internal use onlyRA22714EN01GLA046 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstalling Modules on wall (2/2)

    11. Repeat steps 9-10 to install the remaining modules.12. Attach the cable entries to the casings with two M5 x 10 mm (0.2 in.) screws

    (6150240) and tighten between 3.5-4.2 Nm (2.58-3.10 ftlb).a) Fix the screws (do not tighten yet).b) Attach the cable entry to the casing.c) Tighten the screws.

    12 1212

    Steps of installing module on wall: (contd)

    11. Repeat steps 9-11 to install the remaining modules.

    12. Attach the cable entries to the casings with two M5 x 10 mm (0.2 in.) screws (6150240) and tighten between 3.5-4.2 Nm (2.58-3.10 ftlb).

    a) Fix the screws (do not tighten yet).

    b) Attach the cable entry to the casing.

    c) Tighten the screws.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    47

    For internal use onlyRA22714EN01GLA047 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstalling Modules Installing transmission sub-module

    1. Align the transmission sub-module in the System Module using the slots on the sides. Push the sub-module in place.

    2. Fix the transmission sub-module with 4 x M4 screws using the TORX head screw. Tighten at 2.7-3.3 Nm (1.99-2.43 ft-lb).

    The FIQx, FIYx and FIFA sub-modules are installed the same way as the FIPA and FIEA.

    Installing FIPA/FIEA

    Purpose:

    The transmission sub-module is installed in the System Module (ESMB/C). The submodule is chosen based on the transmission requirements of each site. The transmission sub-module can be installed before or after the System Module is installed.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    48

    For internal use onlyRA22714EN01GLA048 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstalling Modules Example for 1+1+1 (60 W) up to 6+6+6 (10 W)

    Stack

    Wall Pole

    Check List

    Module back covers and cable entries are installed.. Screws are tightened to the specified torque value..

    For a 1+1+1 up to 6+6+6 configuration, you need the following modules:

    one System Module (ESMB/C) one transmission sub-module

    (FIxx) one RF Module (FXxx)

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    49

    For internal use onlyRA22714EN01GLA049 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationGrounding the Modules

    1. Connect the grounding cable to the module front panel.

    2. Route the grounding cable through the cable entry.

    3. Connect the other end of the cable to the plinth.

    4. Repeat steps 1-3 with all the modules. Tighten to 3.5-4.2 Nm (2.58-3.10 ft-Ib).

    Check List

    Modules are grounded. Grounding connections are tightened to the correct torque values.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    50

    For internal use onlyRA22714EN01GLA050 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationGrounding the Modules Example for 1+1+1 (60 W) up to 6+6+6 (10 W)

    Example of grounding of the module for stack, wall, and stack installation

    Stack

    Wall Pole

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    51

    For internal use onlyRA22714EN01GLA051 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationCabling cable entry & cable clamp

    1. Route the cables through cable entries.

    2. Fix to cable tie points with cable ties.

    Caution: Incorrect cables and seals may not provide secured environmental protection.Use only tested IP65 class cables with seals provided by Nokia Siemens Networks.

    Cable entry

    Cable Clamp

    The strain relief of cables in stacked floor, wall or pole installation is done with cable clamps attached on the side of the casing.The cables are fixed with standard cable ties, except for power supply cables. The fixing of power supply cables is done with special isolating cable clamps, which come with the casing delivery.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    52

    For internal use onlyRA22714EN01GLA052 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationCabling external power cables

    1. Install the cable clamp on the side of the casing.

    2. Remove the black rubber boots, nuts, washers and cable lugs from the terminals.

    3. Strip about 2 cm (.8 in) of insulation from the (+) and (-) DC cables.

    4. Insert the stripped end of each cable into a cable lug and crimp.

    5. Pull each cable through a rubber boot.6a.Connect the (-) crimped wire to the (-)

    connector pole, insert washer, and tighten the nut. Connect the (+) crimped wire to the (+) connector pole, insert washer, and tighten the nut.

    6b.Torque the M10 nuts (max 14 Nm).7. Pull the black rubber boots over the lugs.8. Route the cable through the external cable

    entry.9. Route the power cables through the cable

    clamp, attach and tighten the cable clamp screws with a T10 TORX screwdriver.

    External power cables

    12

    34

    5

    6a

    6b 7 8 9

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    53

    For internal use onlyRA22714EN01GLA053 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationCabling example of external power cables for 1+1+1 up to 6+6+6

    External power cables in a 1+1+1 up to 6+6+6 stack configuration

    without (a) and with (b) EAC

    (a)

    (b)

    External power cables in a 1+1+1 up to 6+6+6 wall and pole configuration

    Note: The allowed 48 V DC cable cross-section size for the

    System Module (ESMB/C) is 21- 35 mm2 (0.82-1.37 sq. in. or 4-2 AWG) that can be used.

    Nokia Siemens Networks recommends to locally source the exact lug sizes when the DC cable thickness is 25 mm2 (4 AWG or 0.98 in2) or less.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    54

    For internal use onlyRA22714EN01GLA054 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationCabling internal power cables

    1. Remove the connector seal on the module to uncover the connector.

    2. Connect the cable to the System Module.

    3. Push the connector seal firmly in place.

    4. Connect the other end of the internal power cable to the RF Module. Push the cable connector seal firmly in place.

    Internal power cables

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    55

    For internal use onlyRA22714EN01GLA055 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationCabling example of internal power cables for 1+1+1 up to 6+6+6

    Internal power cables in a 1+1+1 up to 6+6+6 stack

    configurationInternal power cables in a 1+1+1 up to 6+6+6 wall and pole configuration

    1Number

    995281Cable

    PWR (System Module) - PWR IN (RF Module)From-to

    Connecting internal power cables for a 1+1+1 up to 6+6+6 configuration

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    56

    For internal use onlyRA22714EN01GLA056 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationCabling antenna cabling

    1. Remove the connector seal on the module to uncover the connector.

    2. Remove seals from the antenna connectors. Store the connector seals for later use.

    3. Connect the cable to the antenna connectors.

    4. Route the antenna cables through the cable entry.

    5. Tighten the connector with a torque wrench set to 25 Nm.

    6. Repeat the previous steps for all antenna cables required for your configuration.

    Antenna cabling

    12

    3

    Purpose: Jumper cables are connected to the antenna connectors in the front panel of the RF Module (FXxx) and the other end of the

    jumper cables are carefully connected to the respective feeder cables. The number of cables used depends on the configuration.

    While connecting the antenna jumper cables, consider the following guidelines: Connect the antenna cables starting from the module closest to the plinth. It is recommended to the start connecting the jumper cable from ANT (Tx/Rx) connector closest to the direction of routing.

    For example, in stack installations,

    If you are routing all jumper cables to the right, then the order to be followed isANT 1, ANT 3, ANT5, ANT 2, ANT 4 and ANT 6.

    If you are routing all jumper cables to the left, then the order to be followed is ANT 5, ANT 3, ANT1, ANT 6, ANT 4 and ANT 2.

    If you are routing 3 jumpers cable to the left and right, the order to be followed is ANT 1, ANT 2 and ANT 3 to the right and ANT 4, ANT 5 and ANT 6 to the left of the RF Module.

    Antenna jumper cables can be routed out the left side, right side, or both sides. However, access to the optical and internal power cables during maintenance and expansion is easier when all antenna jumper cables are routed to the right.

    To avoid cabling rework, check that the unit powers on before tying down the cables.

    Follow these guidelines when selecting antenna jumper cables: 1/2" or 3/8" jumper cables are permitted One end of the jumper cable must be right angle male for connection to modules (other end depends on site configuration) 1/2" feeder cable can be connected directly to the modules if a right angle male connectoris used. The maximum allowed

    feeder cable is 1/2" with right angle connectors. The length should be determined based on the Flexi Multiradio BTS installation option (for example pole, wall, cabinet, 3rd

    party cabinet) and the distance of the BTS from the antenna feeder line. Antenna jumper cables must be rated IP65.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    57

    For internal use onlyRA22714EN01GLA057 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationCabling example antenna cabling for 1+1+1 up to 6+6+6 (1/2)

    Antenna jumper cables in 1+1+1 up to 6+6+6 2UD configuration with unchained RF Modules in stack routed toward the right

    Antenna jumper cables in 1+1+1 up to 6+6+6 2UD configuration with unchained RF Modules in stack routed toward the left

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    58

    For internal use onlyRA22714EN01GLA058 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationCabling example antenna cabling for 1+1+1 up to 6+6+6 (2/2)

    Antenna jumper cables in 1+1+1 up to 6+6+6 2UD configuration with unchained RF Modules in stack routed to left and right

    Antenna jumper cables in 1+1+1 up to 6+6+6 2UD wall and pole configuration

    Note : Antenna jumper cables can be routed out the left side, right side, or both sides for stack installation For wall and pole installation, antenna jumber must be routed to the lower side of module

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    59

    For internal use onlyRA22714EN01GLA059 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationCabling transmission cables

    1. Remove the connector seal(s) from the connector.

    2. Route the cable through the cable entry.

    3. Pull back the connector seal covering the cable (Flexbus connector excluded).

    4. Connect the cable to the appropriate connector.

    5. Push the cable connector seal firmly in place.

    6. Repeat the previous steps for all cables.

    7. Make sure the that all the connector seals are properly installed.

    Transmission cables

    12

    3

    45

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    60

    For internal use onlyRA22714EN01GLA060 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationCabling example connecting transmission cables for 1+1+1 up to 6+6+6 using FIEA, FIPA, FIQA and FIYA without optical transceiver

    Transmission cables in a 1+1+1 up to 6+6+6 stack configuration

    Transmission cables in a 1+1+1 up to 6+6+6 wall and Pole

    configuration

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    61

    For internal use onlyRA22714EN01GLA061 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationCabling example connecting transmission cables for 1+1+1 up to 6+6+6 using FIFA

    Note that a Flexbus Jumper cable must be used to interconnect the FIFA Flexbus interface and the Flexbuscable from the outdoor unit.

    1

    2 3

    4

    1. Route the Flexbus Jumper cable through the cable entry and connect the Flexbus Jumper cable to FIFA, Flexbus 1 interface.

    2. Connect the Flexbus Jumper cable to Flexbus cable (from the outdoor unit).

    3. Add weatherproof protection tape on the Flexbus Jumper Cable and Outdoor Flexbus cable connection.

    4. If there is Flexbus 2 in use, repeat the steps and connect the Jumper cable to Flexbus 2 interface.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    62

    For internal use onlyRA22714EN01GLA062 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationCabling optical cabling (1/2)

    Optical cabling

    1 2

    4 7

    1. Remove connector seal from OPT1 connector in ESMB/C.

    2. Remove protective cap from optical transceiver and insert it into OPT1 in ESMB/C.

    3. Route optical cable through cable entry.

    4. Uncover the connector. Pull back the optical cable connector seal to uncover the connector.

    5. Remove protective plugs.6. Clean connectors with 99% alcohol

    and swabs.7. Connect optical cable to optical

    transceiver in ESMB/C.8. . Contd

    Contd8Caution: Overbending optical fiber cables damages the cables and can detach or damage the connectors. Do not bend optical fiber cables to a radius smaller than the minimum radius of 70 mm (3 inches).

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    63

    For internal use onlyRA22714EN01GLA063 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationCabling optical cabling (2/2)

    Optical cabling

    8

    8. Push connector seal firmly.9. Repeat steps 1-8 to connect

    optical transceiver and optical cable to OPT1 of FXxx.

    10.Ensure all connector seals are properly installed.

    Check List

    DC power cables are connected and the cable clamp is in place.

    Connector seals are firmly in place. All cables are connected according to the

    configuration. BTS external cables or cables between the

    modules on different plinths are routed via cable entries.

    Connector seals are firmly in place. To avoid cabling rework, check that the unit

    powers on before tying down the cables.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    64

    For internal use onlyRA22714EN01GLA064 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationCabling example of connecting optical cables for 1+1+1 up to 6+6+6

    Optical cables in 1+1+1 up to 6+6+6 stack configuration

    Optical cables in 1+1+1 up to 6+6+6 wall and pole configuration

    1Number

    994807DCable

    OPT1 (System Module) - OPT1 (RF Module)From-to

    Connecting optical cables for a 1+1+1 up to 6+6+6 configuration

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    65

    For internal use onlyRA22714EN01GLA065 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationPowering up and commissioning the BTS

    1. Power up the site and check the LEDs.

    2. Commission the BTS.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    66

    For internal use onlyRA22714EN01GLA066 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstalling module front covers

    1. Fix the maintenance strap. (Pole or wall only) Attach the first and second snap hooks of the maintenance strap to the front cover.Attach the third snap hook of the maintenance strap to the external cable entry.

    2. Place the cover on top of the module front panel.3. Fix the screws. Tighten the screws to 2.0 - 2.5 Nm (1.5-1.8 ft-Ib)

    Maintenance strap Module front covers

    1 11

    2

    3

    Check List Module front panel covers are installed.

    PurposeModule back and front covers complete IP65 protection for core modules. Back and front covers are required for safety reasons, in all installations including indoor installations.

    Note: The front panels of the modules are hot during operation. If Flexi Multiradio BTS modules are not installed in a cabinet, front covers must be used during operation for safety reasons and should only be removed temporarily for maintenance.Rotating fan blades can cause personal injury. If Flexi Multiradio BTS modules are not installed in a cabinet, back covers must be used during operation for safety reasons and should only be removed temporarily for maintenance.

    Before start:When there is no risk of dropping the covers, safety catches are not needed.

    To avoid cabling rework, check that the unit powers on before tying down the cables.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    67

    For internal use onlyRA22714EN01GLA067 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstalling module back covers

    3U casings comes with back covers preinstalled. Install the back covers before installing the modules. In case its not installed, here is the procedure:

    1. Attach the first and second snap hooks of the safety catch to the back cover.

    2. Attach the third snap hook of the safety catch to the rear of the casing.3. Install the back cover in the rear of the module and fix the screws (TORX

    T25). Tighten to 2.0 - 2.5 Nm (1.5-1.8 ft-lb).

    Installing back cover

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    68

    For internal use onlyRA22714EN01GLA068 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationRemoving modules with the pull-out tool (for maintenance only)

    1. Remove the front covers and cable entries.2. Remove the module screws.3. Hook the pull-out tool through the hole in front of the module.4. Pull until the unit comes loose.

    Removing System Module with the pull-out tool

    Cautions: Do not completely remove the module or carry it with the pull-out tool.

    4

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    69

    For internal use onlyRA22714EN01GLA069 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstallation Checklist (1/4)

    Delivery is complete and undamaged. Site meets the minimum clearances. Adapter mechanics are installed (for wall and pole

    installation) Plinth is installed according to the instructions. Plinth is grounded. Transmission sub-module is installed according to the

    instructions. If power modules (FPDA or FPMA) are used, back covers

    are installed on them. Modules are installed according to the instructions. Cable entries are installed.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    70

    For internal use onlyRA22714EN01GLA070 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstallation Checklist (2/4)

    One module per casing is grounded to the plinth. External power cables are connected. Internal power cables are connected. Optical cables are connected. Antenna jumper cables are connected. Transmission cables and sub-modules are connected, and

    in case the FIQA/FIYA is used in the PWE mode and the PW traffic is transmitted via Gigabit Ethernet, the optical transceiver is installed.

    Optional cables (EAC, Synchronisation, Site support interface, FPA interface, LMP, LMU cables) are connected.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    71

    For internal use onlyRA22714EN01GLA071 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstallation Checklist (3/4)

    BTS external cables or cables between the modules on different plinths are routed via cable entries.

    Cables between the modules on the same plinth are routed via internal cable entries.

    All boots and caps are properly connected and IP-sealed. Cables used are provided by Nokia Siemens Networks

    (excluding site grounding, external power and antenna jumper cables).

    Screws are tightened to the specified torque value.Note: In pole and wall installations, screws are secured with thread locking compound.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    72

    For internal use onlyRA22714EN01GLA072 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE SWP InstallationInstallation Checklist (4/4)

    Only IP65 class cables with seals provided by Nokia Siemens Networks are used.

    BTS is switched on and all units are ready. Module front covers are installed. Site is clean and installation completed.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    73

    For internal use onlyRA22714EN01GLA073 Nokia Siemens Networks

    Content

    Preparation of Flexi Multiradio BTS GSM/EDGE installation

    Flexi Multiradio BTS GSM/EDGE Installation Option

    Flexi Multiradio BTS GSM/EDGE Stack, Wall, and Pole (SWP) Installation

    Flexi Multiradio BTS GSM/EDGE with Flexi Cabinet for Indoor (FCIA) Installation

    Flexi Multiradio BTS GSM/EDGE with Flexi Cabinet for Outdoor (FCOA) Installation

    Flexi Multiradio BTS GSM/EDGE Feederless Solution

    Flexi Multiradio BTS GSM/EDGE Optional Items/Modules Installation

    Cabling Principles for Flexi Multiradio BTS GSM/EDGE Installation

    Installation tools and torque values for Flexi Multiradio BTS GSM/EDGE

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    74

    For internal use onlyRA22714EN01GLA074 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGEInstallation

    Flexi Multiradio BTS GSM/EDGE with Flexi Cabinet for Indoor (FCIA) Installation

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    75

    For internal use onlyRA22714EN01GLA075 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE with Flexi Cabinet for Indoor (FCIA) General Procedure

    Contents of Delivery

    Clearances

    Changing the door opening

    direction

    Lifting the cabinet

    Installing the cabinet

    Grounding the cabinet

    Installing the Modules

    Cabling Principles

    Routing cabinet external cabling

    Installing Checklist

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    Che

    ckin

    g

    Cab

    ling

    Che

    ck-

    list

    Start

    Lifting the cabinet with rope

    Lifting the cabinetWith handles

    Anchoring the cabinet

    Recommended Installation order

    Installation example

    Finish

    Minimum Clearance

    Fixing points

    Cab

    inet

    Inst

    alla

    tion

    Mod

    ule

    Inst

    alla

    tion

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    76

    For internal use onlyRA22714EN01GLA076 Nokia Siemens Networks

    Flexi Cabinet for Indoor (FCIA) InstallationContents of Delivery

    Site package 2

    Site package 1822083Guide

    plates (30 pcs)

    Version

    6332594Loose cage nuts (28 pcs)

    Cage nuts (62 pcs)

    6490006Cabinet key

    470152AANokia Flexi Cabinet for Indoor (FCIA)

    Product Code

    Contents of delivery

    Delivery

    Check List Delivery is complete. Equipment is not damaged.

    1800

    600600

    Flexi Cabinet for Indoor (FCIA)

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    77

    For internal use onlyRA22714EN01GLA077 Nokia Siemens Networks

    Flexi Cabinet for Indoor (FCIA) InstallationClearance

    Minimum clearances

    Fixing points

    NOTE: Maintenance space is not included.

    Check List Site meets the minimum clearances.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    78

    For internal use onlyRA22714EN01GLA078 Nokia Siemens Networks

    Flexi Cabinet for Indoor (FCIA) InstallationChanging the door opening direction (1/2)

    1. Remove the ground wire and hinge pins, and detach the door.

    2. Loosen the hinge screws and remove the hinges.

    3. Install the hinges on the opposite side of the cabinet.

    4. contd

    1 2

    3

    NOTE: If changing the handedness of the door is not needed, skip next step

    Principle of changing the door opening direction

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    79

    For internal use onlyRA22714EN01GLA079 Nokia Siemens Networks

    Flexi Cabinet for Indoor (FCIA) InstallationChanging the door opening direction (2/2)

    4. Remove the door lock-plate.5. Install the door lock-plate on the

    opposite side of the cabinet.6. Flip the door end-to-end.7. Mount the door on the opposite side.

    Reinstall the ground wire after attaching the hinge pins.

    Principle of changing the door opening direction (contd)

    4

    5

    6

    Check List Door opening direction and

    magnetic sensor is changed.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    80

    For internal use onlyRA22714EN01GLA080 Nokia Siemens Networks

    Flexi Cabinet for Indoor (FCIA) InstallationLifting the Cabinet

    Lifting the cabinet with a rope Lifting the cabinet with WLHA handles

    1. Align the handle screw holes with the four M5 screw holes on the side of the cabinet.

    2. Fix the handles to the cabinet with four M5 screws provided with the kit.

    3. Lift the cabinet carefully to the desired installation location.

    4. Remove the lifting equipment.

    1. Attach the 4 x M12 lifting eye bolts to the lifting points.

    2. Attach the hoisting belt or rope to the lifting eye bolts.

    3. Lift the cabinet carefully to the desired installation location.

    4. Remove the lifting equipment.

    1

    2

    1

    2

    Minimum 500 mm (19.6 in.)

    TIP: It is possible to lift the cabinet with modules installed and internal cabling completed.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    81

    For internal use onlyRA22714EN01GLA081 Nokia Siemens Networks

    Flexi Cabinet for Indoor (FCIA) InstallationInstalling the cabinet

    Anchoring the cabinet 1. Mark the anchoring bolt holes with the help of the drilling template.

    2. Drill the anchoring bolts holes on the base.

    3. Attach the anchoring bolts to the base.

    4. Position the cabinet on the anchoring bolts.

    5. Fix the nuts on the anchoring bolts.6. Check that the cabinet is level.7. Tighten the nuts properly

    (recommended 49.0Nm (36.1 ft-lb)).

    Note that the cabinet should be attached to the base with M10 or M12 anchor bolts, nuts, and washers (4 pcs each). The recommended anchor bolt length is 60 mm (2.36 inches). Anchor bolts and nuts are not provided with the Flexi BTS delivery and must be acquired locally.

    Check List Cabinet is

    anchored according to instructions.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    82

    For internal use onlyRA22714EN01GLA082 Nokia Siemens Networks

    Flexi Cabinet for Indoor (FCIA) InstallationGrounding the cabinet (1/2)

    1. Make sure the grounding cable is fixed to the site grounding point.

    2. At the top of the cabinet, remove the screw and star washer.

    3. Strip approx. 2 cm (0.79 in.) of the main ground cable.

    4. If this is a NEBS installation, bring the mating surfaces of all unplated ground connections to a bright finish, using emerycloth -(or other suitable method). Then coat the exposed ground cable conductor with antioxidant.

    5. .. Contd

    Side view of Cabinet

    A

    B

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    83

    For internal use onlyRA22714EN01GLA083 Nokia Siemens Networks

    Flexi Cabinet for Indoor (FCIA) InstallationGrounding the cabinet (2/2)

    1. Insert the stripped end of the cable into a cable shoe lug and crimp.

    2. Fit the lug to the grounding point in the cabinet and fix with a star washer and screw. Tighten M5 to 3.5-4.2 Nm (2.58-3.10 ft-lb). Tighten M8 to 8.0-10.0 Nm (5.9-7.37 ft-lb).

    Top view of Cabinet

    Check List Cabinet is correctly grounded.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    84

    For internal use onlyRA22714EN01GLA084 Nokia Siemens Networks

    Flexi Cabinet for Indoor (FCIA) InstallationInstalling Modules (1/2)

    Recommended Installation Order

    1 2 3

    4

    1. Push the front part of the guide plate in place first, and then the back part.

    2. Fix the cage nuts according to the configuration.

    3. Slide the first module in.4. Fix the module to the cabinet

    with screws.5. Repeat for each subsequent

    module.

    Check List Modules are installed according to

    instructions.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    85

    For internal use onlyRA22714EN01GLA085 Nokia Siemens Networks

    Flexi Cabinet for Indoor (FCIA) InstallationInstalling Modules (2/2)

    Installation Example

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    86

    For internal use onlyRA22714EN01GLA086 Nokia Siemens Networks

    Flexi Cabinet for Indoor (FCIA) InstallationCabling Principles

    Cabling Principles

    Check List Cables are correctly routed. Cables are correctly connected.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    87

    For internal use onlyRA22714EN01GLA087 Nokia Siemens Networks

    Flexi Cabinet for Indoor (FCIA) InstallationInstallation Checklist

    Delivery is complete and undamaged. Cabinet is anchored according to instructions. Cabinet is grounded. Modules are installed according to instructions. External antenna feeder cables are connected. Cables are routed, connected and tied correctly. External transmission cables are connected. External power feed cable is connected. All cable rubber seals are firmly in place. Cables are routed downwards from modules. Cabinet door is closed and locked.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    88

    For internal use onlyRA22714EN01GLA088 Nokia Siemens Networks

    Content

    Preparation of Flexi Multiradio BTS GSM/EDGE installation

    Flexi Multiradio BTS GSM/EDGE Installation Option

    Flexi Multiradio BTS GSM/EDGE Stack, Wall, and Pole (SWP) Installation

    Flexi Multiradio BTS GSM/EDGE with Flexi Cabinet for Indoor (FCIA) Installation

    Flexi Multiradio BTS GSM/EDGE with Flexi Cabinet for Outdoor (FCOA) Installation

    Flexi Multiradio BTS GSM/EDGE Feederless Solution

    Flexi Multiradio BTS GSM/EDGE Optional Items/Modules Installation

    Cabling Principles for Flexi Multiradio BTS GSM/EDGE Installation

    Installation tools and torque values for Flexi Multiradio BTS GSM/EDGE

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    89

    For internal use onlyRA22714EN01GLA089 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGEInstallation

    Flexi Multiradio BTS GSM/EDGE with Flexi Cabinet for Outdoor (FCOA) Installation

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    90

    For internal use onlyRA22714EN01GLA090 Nokia Siemens Networks

    Flexi Multiradio BTS GSM/EDGE with Flexi Cabinet for Outdoor (FCOA) General Procedure

    Contents of Delivery

    Clearances

    Changing the door opening

    direction

    Lifting the cabinet

    Installing the cabinet

    Grounding the cabinet

    Installing the Modules

    Cabling Principles

    Routing cabinet external cabling

    Installing Checklist

    1

    2

    3

    5

    6

    7

    8

    9

    10

    11

    Che

    ckin

    g

    Cab

    ling

    Che

    ck-

    list

    Start

    Lifting the cabinet with rope Lifting the cabinetWith handles

    Anchoring the cabinet

    Recommended Installation order

    Installation example

    Finish

    Minimum Clearance

    Fixing points

    Cab

    inet

    Inst

    alla

    tion

    Mod

    ule

    Inst

    alla

    tion

    Routing the cables through cabinet bottom

    Routing the cables through cabinet roofRemoving the

    roof

    4

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    91

    For internal use onlyRA22714EN01GLA091 Nokia Siemens Networks

    Flexi Cabinet for Outdoor (FCOA) InstallationContents of Delivery (1/2)

    00049229FCOA Cabinet Quick Guide (1 pcs)

    Site package 2822546Dummy panel (10 pcs)

    6150287Screws M5x12 (2 pcs)

    6150747Screws K30x24 (4 pcs)

    6401026Cable clamp (2 pcs)

    822133Support rail (24 pcs)

    6332594Loose cage nut (12 pcs)

    6497988Lock latch (1 pcs)

    824774Knock-out plate (2 pcs)

    Site package 1

    6490006Cabinet key (1 pcs)

    6332594Cage nuts (56 pcs)

    104

    Ver-sion

    Contd.

    822990Air Guide plate (2 pcs)

    00044699Drilling template

    470142AFCOAFlexi OD Cabinet

    Product Code

    Contents of delivery

    Delivery

    Check List Delivery is complete. Equipment is not damaged.

    Flexi Cabinet for Outdoor (FCOA)

    1550

    770770

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    92

    For internal use onlyRA22714EN01GLA092 Nokia Siemens Networks

    Flexi Cabinet for Outdoor (FCOA) InstallationContents of Delivery (2/2)

    CS71362114 batteries with accessoriesPowersafe battery 48V, 62 Ah

    CS71362.034 batteries with accessoriesPowersafe battery 48V, 92 Ah

    466289ALEKALifting eye bolts (4 pcs)Lifting eye bolts kit

    469554AWLHALifting handles (2 pcs)Lifting handle kit

    471020AFMBABattery kit

    469956AWPMCWideband Power Unit

    469955AWPUCPower Distribution UnitMIBBU delivery (Power-One)

    469950AWPMBWideband Power Unit

    471424AFSEBFlexi System External AlarmExternal alarm delivery

    470144AFCDAFlexi Cabinet Fire DetectorFire detector delivery

    Customer specific lock + key

    469784AWPUBPower Distribution UnitMIBBU delivery (Eltek)

    470145AFCSAFlexi Cabinet Site Support ModuleSite support delivery

    CS7000000FPRAFlexi Power RectifierFlexi Power Rectifier delivery

    FCFA

    Version

    470146AFlexi Cabinet Air filterAir filter delivery

    Optional items.contd

    Product Code

    Contents of deliveryDelivery

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    93

    For internal use onlyRA22714EN01GLA093 Nokia Siemens Networks

    Flexi Cabinet for Outdoor (FCOA) InstallationClearance

    Minimum clearances Fixing points

    Check List Site meets the minimum clearances.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    94

    For internal use onlyRA22714EN01GLA094 Nokia Siemens Networks

    Flexi Cabinet for Outdoor (FCOA) InstallationChanging the door opening direction (1/2)

    1

    23

    NOTE: If changing the handedness of the door is not needed, skip next step

    Principle of changing the door opening direction

    1. Detach the wind stopper from the door and cabinet.

    2. Detach the grounding cable from the door.

    3. Remove the hinge pins and detach the door.

    4. Remove the hinge screws and hinges from the cabinet

    5. .contd

    4 Check List Door opening direction and

    magnetic sensor is changed.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    95

    For internal use onlyRA22714EN01GLA095 Nokia Siemens Networks

    Flexi Cabinet for Outdoor (FCOA) Installation Changing the door opening direction (2/2)

    5. Remove the door lock-plate.6. Move the hinges to the new location in the cabinet.7. Flip the door upside down and install it to the cabinet using the hinge pins.8. Thread the wind stopper to the guiding slot in the cabinet and then attach it to the door.9. Detach the grounding cable from the cabinet and attach it to the new location. 10. Attach the grounding cable to the door.11. Move the magnetic proximity sensor magnet part from the bottom of the door to the

    top.

    Principle of changing the door opening direction (contd)

    5

    6

    6

    78

    79

    10

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    96

    For internal use onlyRA22714EN01GLA096 Nokia Siemens Networks

    Flexi Cabinet for Outdoor (FCOA) Installation Removing the Roof

    1. Open the cabinet door.2. Pull the roof forward.3. Lift the roof up keeping it level.

    TIP: It is possible to lift the cabinet with modules installed and internal cabling completed.

    1

    2

    3

    NOTE: You do not need to loosen or remove any screws when removing the roof.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    97

    For internal use onlyRA22714EN01GLA097 Nokia Siemens Networks

    Flexi Cabinet for Outdoor (FCOA) Installation Lifting the Cabinet

    Lifting the cabinet with a rope Lifting the cabinet with WLHA handles

    1. Attach the lifting handles with four screws each.

    2. Lift the cabinet to the desired location.3. Remove the lifting handles..

    1. Attach the 4 x M12 lifting eye bolts to the lifting points.

    2. Attach the hoisting belt or rope to the lifting eye bolts.

    3. Lift the cabinet carefully to the desired installation location.

    4. Remove the lifting equipment.

    12

    TIP: It is possible to lift the cabinet with modules installed and internal cabling completed.

    3

    WARNING: The cabinet is heavy. Additional personnel or lifting equipment may be needed when the cabinet is moved, unpacked, or lined up. In addition, follow any local regulations applicable to the installation.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    98

    For internal use onlyRA22714EN01GLA098 Nokia Siemens Networks

    Flexi Cabinet for Outdoor (FCOA) Installation Installing the cabinet

    Anchoring the cabinet 1. Mark the anchoring bolt holes with the help of the drilling template.

    2. Drill the anchoring bolts holes on the base.

    3. Attach the anchoring bolts to the base.

    4. Position the cabinet on the anchoring bolts.

    5. Fix the nuts on the anchoring bolts.

    6. Check that the cabinet is level.7. Tighten the nuts properl

    (recommended 50Nm (36.87 ft -Ib)).

    8. Make sure that any water will run off the installation location.

    Check List Cabinet is anchored according to

    instructions.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    99

    For internal use onlyRA22714EN01GLA099 Nokia Siemens Networks

    Flexi Cabinet for Outdoor (FCOA) Installation Grounding the cabinet

    1. Make sure the grounding cable is fixed to the site grounding point.

    2. Guide the cable through the cable entry (see section 10)

    3. Strip approx. 2 cm (0.79 in.) of the main ground cable.

    4. Insert the stripped end of the cable into a cable shoe lug for two M5 thread bolts or a M8 thread bolt and crimp.

    5. Fit the lug to the grounding point in the cabinet and fix with a star washer and nut.

    Grounding Points

    Check List Cabinet is correctly grounded.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    100

    For internal use onlyRA22714EN01GLA0100 Nokia Siemens Networks

    Flexi Cabinet for Outdoor (FCOA) Installation Installing Modules (1/2)

    11. Remove the fixing studs from the

    module casings.2. Remove the cable support plates and

    their fixing screws from the casings.3. Loosen the module core fixing screws.4. Detach the cage nuts and support

    plates behind them from the module. Caution: Make sure that the module

    core does not slip out of the casing.1. Fix the guide plates (from the site

    pack).2. If the cage nuts are not in their correct

    locations by default, move them as required by your configuration.

    3. Remove the unnecessary preinstalled cage nuts, if applicable.

    4. Slide the module into the cabinet.5. Fix the module to the cabinet with core

    fixing screws.6. Repeat for each subsequent module.7. Install dummy panels into the empty

    slots.

    Installing the Flexi Multiradio, LTE or WCDMA modulesRecommended installation order

    22

    3 3 45

    6

    9

    8

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    101

    For internal use onlyRA22714EN01GLA0101 Nokia Siemens Networks

    Flexi Cabinet for Outdoor (FCOA) InstallationInstalling Modules (2/2)

    Installation example,starting from the bottom

    Installing the Flexi Multiradio, LTE or WCDMA modules contd

    NOTE: The appearance of the modules may vary depending on the product or module type.NOTE: Dummy panels are needed to ensure proper cabinet cooling.

    Check List Modules are installed according to

    instructions. Dummy panels are installed according to

    instructions.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    102

    For internal use onlyRA22714EN01GLA0102 Nokia Siemens Networks

    Flexi Cabinet for Outdoor (FCOA) Installation Installing Modules (1/2)Installing the Flexi EDGE Modules

    Recommended installation order

    1. Fix the guide plates (from the site pack) inside the cabinet.2. If the configuration is not a 1+1+1/ 2+2+2 or 3+3+3/4+4+4 with the System module in the

    horizontal rack, fix the cage nuts (from the site pack) inside the cabinet according to the configuration. The cabinet has U-markings printed on the side rails in 1U increments. Check the markings to determine the starting place for module installation.

    3. Slide the first module in.4. Fix the module to the cabinet with screws. Tighten to 3.5-4.2 Nm(2.58-3.10 ft-lb).5. Repeat for each subsequent module.6. Install dummy panels into the empty slots.

    1

    2 3

    4

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    103

    For internal use onlyRA22714EN01GLA0103 Nokia Siemens Networks

    Flexi Cabinet for Outdoor (FCOA) Installation Installing Modules (2/2)

    Installation example,starting from the bottom

    Installing the Flexi EDGE modules contd

    NOTE: The appearance of the modules may vary depending on

    the product or module type. Dummy panels are needed to ensure proper cabinet

    cooling. If the air guide plate in the vertical rack is not required for

    the configuration, it should be removed. The air separator plate is required if the System Module

    or the System Extension Module are installed in the vertical left rack. Otherwise, use dummy panels in the empty slots.

    Check List Modules are installed according to

    instructions. Dummy panels are installed according to

    instructions.

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    104

    For internal use onlyRA22714EN01GLA0104 Nokia Siemens Networks

    Flexi Cabinet for Outdoor (FCOA) Installation Cabling Principles (1/2)

    Check List Cables are correctly routed. Cables are correctly connected.

    Flexi Multiradio, LTE or WCDMA cabling principles

    Triple RF Modules:Routing cables throughthe bottom cable entry

    Triple RF Modules:Routing cables through

    the entries on the cabinet roof

    Single or Dual RF Modules:Routing cables throughthe bottom cable entry

    Single or Dual RF Modules:Routing cables through

    the entries on the cabinet roof

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    105

    For internal use onlyRA22714EN01GLA0105 Nokia Siemens Networks

    Flexi Cabinet for Outdoor (FCOA) Installation Cabling Principles (2/2)

    Check List Cables are correctly routed. Cables are correctly connected.

    Flexi EDGE cabling principles

    Routing cables throughthe bottom cable entry

    Routing cables through the top cable entry

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    106

    For internal use onlyRA22714EN01GLA0106 Nokia Siemens Networks

    Flexi Cabinet for Outdoor (FCOA) Installation Routing cabinet external cabling (1/4)

    Routing the cables through cabinet bottom 1. Remove 2 pcs of right hand side M5x12 cable entry fixing screws (6150287) and take the whole panel, including the cable entries, out of the cabinet.

    2. Remove the left and right M5x6 fixing screws (6150188) and remove the entry block. If only one entry block is needed leave the other one fixed in place.

    3. Route the cables through the bottom and entry box front hole. Do not fix the cables outside of the cabinet.

    TIP: For easier installation, do not fix cables outside the cabinet.

    This allows cables to be moved freely.4. Route the cables through the

    opening on the sheet metal panel.5. Remove the blocking plugs from

    the entry block. Pull the plugs to remove them from the block.

    Keep the plugs fore later use.

    12

    3 4

  • RA22714EN01GLA0

    Flexi Multiradio BTS GSM/EDGE Installation

    107

    For internal us


Recommended