Drainage Renewal 7 Jamison Rd, Blaxland AWP 2013/14 (completed on February 2014) Project Cost: $ 15,800 Constructed 20meters of Rock-lined channel, 8meters of Grass Swales, well- graded Rock-lined basin and returfed the whole backyard. February 2012 February 2012 February 2014 February 2014 February 2014 February 2012
Transcript

Drainage Renewal – 7 Jamison Rd, Blaxland

AWP – 2013/14 (completed on February 2014)

Project Cost: $ 15,800

Constructed 20meters of Rock-lined

channel, 8meters of Grass Swales, well-

graded Rock-lined basin and returfed the

whole backyard.

February 2012 February 2012

March 2012 February 2014

February 2014

February 2014

February 2012