1
2
3
4a4b
5
5
7
8
9
6
10
11
11
12
13
14
17
15
15
8
16
17
2 Maj2007
FloorLine Panels - overview
1. Floorgrating(aluminium) 2. Mouldingstrip(Santoprene) 3. Guideprofile(aluminium) 4a. Finnedpipe,flow(copper) 4b. Finnedpipe,return(copper) 5. Velcrotape 6. Flexiblepipes 7. Motor 8. Fan(aluminium)
9. Bearingblock(aluminium/brass) 10. Fancoupling(plastic) 11. Pipefixture(aluminium) 12. Installationprofile(aluminium) 13. Panelend(aluminium) 14. CHMmotorcontrolprint 15. Motorconnection 16. Connectioncableandterminals 17. Adjustmentblocks(aluminium)
Maj2007 3
FloorLinePanel-overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page2
Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page3
Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page4
Unpackingthepanel. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page5
Positioningofinstallationfittings. . . . . . . . . . . . . . . . . . . . . . . . . . . page6
Installingthepanel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page6
Checkingthejoints. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page8
Powerconnection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page8
Adjustingthepanel. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page9
Openingtheguideprofile. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page9
Connectingseveralpanelsinseries. . . . . . . . . . . . . . . . . . . . . . . . . page11
Diagram:ControlwithTWWroomthermostat . . . . . . . . . . . . . . page13
Diagram:ControlviaexternalCTSsignal. . . . . . . . . . . . . . . . . . . . page14
Operatingconditions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . page15
Contents
ReadtheseinstallationinstructionscarefullybeforeinstallingtheConvecFloorLinepanel.
TheinstallationofFloorLinepanelsisdividedintopre-installationandfinalinstallation.
Pre-installationcomprisesinstallationoffittingsandanyshut-offvalvesconnectedtotheheatingsystemaswellaselectricwiring.
Finalinstallationcomprisesthepanelitself,whichshouldbeinstalledaslateinthebuildingprocessaspossibletoprovidethebestprotectionofmechanicalpartsagainstdustandpaintresidue,aswellasshocks,impactsandotherdamage.
Installation ductThepanelsaresuppliedwithself-jointingrubberstrips,which“absorb”smallinaccuraciesintheinstallationduct.
Toachievethevisuallybestresult,itisnecessarytoobservethemeasurementsoftheinstallationductaspreciselyaspossible,particularlytheductwidthof139mm(seepage6).
AdjustmentsTheFloorLinepanelsareequippedwithintegratedadjustmentscrews,whichenableaccurateadjustmentofthepanelheighttoalignwiththefloorlevel.
Pleaseensurethatalladjustmentscrewsarerestingonthebasetoachievemaxi-mumstability.
4 Maj2007
NB!Allelectricalandplumbingworkmustbecarriedoutbyauthorisedelectriciansandplumbers.
Introduction
Before installationBeforeinstallationofthepanelthefol-lowingshouldbecompleted:
Systempipes,flowandreturn
ExternalwiringforCHR/BMSand powersupply
Check!Measurementsoftheinstal- lationductandleveloffinalfloor
Check!Panelnumber
•
•
•
•
Maj2007 5
Unpacking the panel 1/3
Checkthepanelnumberonthebox.
Breakthesealonthebox.
Unpacking the panel 2/3
Openthebox.
Liftthegratingsoffthepanelandplacethemontheopenedpartofthebox.
NB!Avoidmixinggratingsfromdifferentpanelsastheyarecuttoindividualdimensions.
Removethepanelfromthebox.
Unpacking the panel 3/3
Underthepanelisaprotectivesheetofstrongcardboard.Usethistoprotectthepanelagainstdust,impacts,etc.
6 Maj2007
Positioning of installation fittings 1/2
139 ± 1 mm
63 - 73 mm
Checkthattheinstallationductmeetsthespecifieddimensions.Iftheductisdeeperthan73mm,astablesupportmustbecre-atedforthepanel.
Ductlengthcanbecalculatedasfollows:•Panelsshorterthan6000mm:thelengthequalstotalpanellength+5mm.•Panelslongerthan6000mm:theductisextendedfurther1mmpermeterpanel.
Positioning of installation fittings 2/2 65 mm
½“
Fixtheenclosedinstallationfittingtothebaseoftheinstallationduct.
Connectthesystempipes.
NB!Checkthattheflowandreturnpipesarecorrectlypositioned.
Installing the panel 1/4
1.Flow2.Return3.Flexiblepipes4.Terminal5.Motor
Maj2007 7
Installing the panel 2/4
LowertheFloorLinepanelintotheinstallationduct.
Installing the panel 3/4
Attachtheflexiblepipestotheinstallationfittings.
NB! Theenclosedgasketsmustbeused.
Installing the panel 4/4
Tightenthejointswithamoderatetorque.
YouarerecommendedtouseanNV24openringspanner(orderno.088H4821).
8 Maj2007
Checking the joints 1/1
Aftertightening,pressurisethesystemandcheckforpossibleleaks.
Power connection 1/2
ConnectcablesfromtheCHRroomthermostat(orBMSsystem)andfromthe24Vpowersupply.
Power connection 2/2
Wiringmustbecarriedoutaccordingtotheelectricalcurcuitdiagramsonpage13-14.
Maj2007 9
Adjusting the panel 1/2
Adaptthepaneltothefloorheightusingtheintegratedadjustingscrewslocatedatsuitableintervalsalongthefulllengthofthepanel.
Usea2.5mmAllenkey.
NB!Onaccountofthepanel’sloadstrength,itisimportantforalladjustingscrewstobeadjustedcorrectly.
Adjusting the panel 2/2
Putthefloorgratinginplaceandcheckthatitisalignedwiththefloorsurface.
Opening the guide profile 1/4
Removethefloorgratingfromthepanel.
10 Maj2007
Opening the guide profile 2/4
Releasetheguideprofilefromthepipefixturebypullingsightly.
Repeatthisalongthefulllengthofthepanel.
Opening the guide profile 3/4
Theguideprofilecannowbeliftedtogiveaccesstothebaseofthepanel.
Opening the guide profile 4/4
Whentheguideprofileisclosed,secureitwithlightpressureontheVelcropads.
Maj2007 11
Connecting several panels in series 1/5 A
Pushthepanelstogether.Thejointblocks(A)ensureprecisepaneljointing.
Extendtheflexiblepipestoreachthefittingsonthenextpanel.
Connecting several panels in series 2/5
Togiveroomforthermalexpansion,pullthepanels2mmapart.
Connecting several panels in series 3/5
1
1
2
2
Insertgasketsbetweentheflexiblepipesandthefittingsbeforefastening.
12 Maj2007
Connecting several panelsin series 4/5
TightentheflexiblepipeswithanNV24ringspanner.
NB!Alwaysholdthepipeinplaceinthepanelwithmultigrippliers.
Connecting several panelsin series 5/5
Aftertightening,pressurisethesystemandcheckforleaks.
24Vdc0Vdc24Vdc0VdcHeat/CoolRPM(0-10V)H.valve+H.valve-
CHR
24Vdcmax.1.1A
Powersupply(22-28Vdc)
Panels in series
Stand-alone (ST) panel
1
2
3
4
5
6
7
8
9
10
1 2 3 4 5 6
24 Vdc
GND
24 Vdc
GND
H/C
RPM
HV +
HV -
CV +
CV -
Maj2007 13
System with CHR room thermostat
ACHRcancontrolupto10Convecpan-elsinthesameroom.AConvecpanelcanbesuppliedwithavalvetocontrolflowthroughthepanel.
Wiring
SuppliedfromfactoryTDMpowersupply
CHRroomthermostat
CHMmotorcontrolCHR
roomthermostat
TDMpowersupply
TDMpowersupply
CHRroom
thermostat
NB!CHRroomthermostatsandCHMmotorcontrolhaveacommon“0”.
1
2
3
4
5
6
7
8
9
10
24 Vdc
GND
24 Vdc
GND
H/C
RPM
HV +
HV -
CV +
CV -
0-10V0
14 Maj2007
System with BMS controlAConvecpanelcanbecontrolleddirectlyfromaBMSsystembya0-10Vsignal.Controlofmin.andmax.fanspeedisperformedbytheBMSsystem.However,theCHMmotorcontrolwillcontinueto
Wiring
SuppliedfromfactoryTDM
powersupply
BMSsystem
CHMmotorcontrol
BMSsystem
TDMpowersupply
TDMpowersupply
performthepanelcontrol,e.g.stoppingthemotorifblockedorthecontrolofanydecentralizedvalves.NB! Watersupplyvalvesareconnectedtocoolingoutputs9and10.
24Vdc0Vdc24Vdc0VdcHeat/CoolRPM(0-10V)
C.valve+C.valve-
BMSsystem
24Vdcmax.1.1A
Powersupply(22-28Vdc)
Panels in series
Stand-alone (ST) panel
Maj2007 15
Operating conditions
Operatingpressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10bar
Testpressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13bar
Storagetemperature . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -10-60°C
Watertemperature . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-85°C
Waterquality . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .VDI2035