    TBS 100%, 300C  Ex. Steam 4,75%,

    1100C

    Steam 130%, 300C  Kondensat 34,51%,900C 

    Sterilizer

    TBS masak 88%,

    1000C 

    TKKS 31,82%,

    900C 

    Steam 6,67%, 900C

     Berondolan 68,18%,900C 

    Berondolan terpisah dari

     biji 900CAir panas 19,29%,

    900C 

    Ampas presan 41,9%,

    500C

    Minyak kasar 41,26%,

    900C

    Steam

    1300C 

    Biji 45%,

    500C 

    Ampas 50%,

    400C 

    Air 6%,

    700C 

    Biji 99,2%,

    600C 

    Air 94%,

    300C  Cangkang 45%,300C 

    Kernel 55%,

    300C

     

    Ai r bekas

    300C 

    Kernel

    Steam 90%, Air13,85%,

    Lumpur 58,74%,900C

    Minyak 41,26%, 900C

    Lumpur 0,83%

    900C 

    Minyak 99,17%

    800C 

    Lumpur 70%

    900C Minyak 30%

    900C 

    Kotoran 0,24%

    800C Minyak 99,76%800C 

    Minyak 96,538%

    800C 

    Air 0,94%,

    800C 

    Stripping

     Digester

    Pressing

    Oil purifier

     Hopper

     Depericarper

    Silo dryer

     Nut Cracker

    CST

     Hidrocyclone

    Kernel Dryer

    Penampungan

    Sludge tank

    Sludge

    Separator

    Vacuum

    dryer

    Tangki

    Timbun

  • 8/17/2019 Flow Machinery PKS.pdf

    2/139

    Tabel LE.10 Data Perhitungan Internal Rate of Return (IRR)

    Thn Laba Sebelum Pajak Pajak Laba Sesudah Pajak Depresiasi Net Cash FlowP/F pada

    i = 22%PV pada i = 22 % P/F pada i = 23% PV pada i = 23 %

    0 - - - - -516,070,347,595 1 -516,070,347,595 1 -516,070,347,5951 136,577,369,302 40,955,710,790 95,621,658,512 3,449,254,232 99,070,912,744 0.8197 81,205,666,184 0.8130 80,545,457,515

    2 150,235,106,232 45,051,281,869 105,183,824,363 3,449,254,232 108,633,078,595 0.6719 72,986,481,185 0.6610 71,804,533,409

    3 165,258,616,855 49,556,410,056 115,702,206,800 3,449,254,232 119,151,461,032 0.5507 65,617,530,229 0.5374 64,030,079,007

    4 181,784,478,541 54,512,051,061 127,272,427,479 3,449,254,232 130,721,681,711 0.4514 59,007,647,906 0.4369 57,111,975,229

    5 199,962,926,395 59,963,256,168 139,999,670,227 3,449,254,232 143,448,924,459 0.3700 53,075,994,816 0.3552 50,953,232,276

    6 219,959,219,035 65,959,581,784 153,999,637,250 3,449,254,232 157,448,891,482 0.3033 47,750,796,843 0.2888 45,468,323,231

    7 241,955,140,938 72,555,539,963 169,399,600,975 3,449,254,232 172,848,855,207 0.2486 42,968,252,630 0.2348 40,581,745,920

    8 266,150,655,032 79,811,093,959 186,339,561,073 3,449,254,232 189,788,815,305 0.2038 38,671,584,730 0.1909 36,226,779,137

    9 292,765,720,535 87,792,203,355   204,973,517,180 3,449,254,232 208,422,771,412 0.1670 34,810,213,776 0.1552 32,344,404,785

    10 322,042,292,589 96,571,423,691 225,470,868,898 3,449,254,232 228,920,123,130 0.1369 31,339,038,223 0.1262 28,882,371,941

      11,362,858,926  -8,121,445,144

     

     

    %58,22IRR 

    %22%23x144.445.121.8.92611.362.858

    .92611.362.858%22IRR 

     

      

     

     

    Universitas Sumatera Utara

  • 8/17/2019 Flow Machinery PKS.pdf

    3/139

    0

    100

    200

    300

    400

    500

    600

    0 20 40 60 80 100 120

    Kapasitas Produksi (%)

       B   i  a  y  a   (   M   i   l  y  a  r   R  u  p   i  a   h   )

    Penjualan

    Biaya tetap

    Biaya Variabel

    Biaya produksi

     

    Universitas Sumatera Utara

  • 8/17/2019 Flow Machinery PKS.pdf

    4/139

     

    0

    100

    200

    300

    400

    500

    600

    0 20 40 60 80 100 120

    Kapasitas Produksi (%)

       B   i  a  y  a   (   M   i   l  y  a  r   R

      u  p   i  a   h   )

    Penjualan

    Biaya tetap

    Biaya Variabel

    Biaya produksi

     

    BEP = 30,39 %

    Grafik LE-1.Grafik Break Even Point ( BEP )

    Universitas Sumatera Utara

  • 8/17/2019 Flow Machinery PKS.pdf

    5/139

     NO KODE KETERANGAN NO KODE KETERANGAN

    1

    2

    3

    4

    5

    6

    7

    89

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    LR-01

    S-01

    TP-01

    HC-01

    HT-01

    P-05

    KA-01

    SP-01DP-01

    VS-01

    T-01

    P-01

    T-04

    T-02

    P-02

    T-03

    SS-01

    OP-01

    VD-O1

    LOADING RAMP

    STERILIZER

    THRESSER

    HOIST CRANE

    HOPPER TANKOS

    POMPA UMPAN BALIK SS

    DIGESTER

    SCREW PRESSDEPERICARPER

    VIBRATING SCREEN

    BAK RO

    POMPA CST

    SLUDGE TANK

    CONTINOUS SETTLING TANK

    POMPA UNTUK OIL TANK

    OIL TANK

    SLUDGE SEPERATOR

    OIL PURIFIER

    VACUUM DRYER

    20

    21

    22

    23

    24

    25

    26

    2728

    29

    30

    31

    32

    33

    34

    35

    36

    37

    38

    P-04

    ST-02

    PC-02

    FC-01

    PD-01

    VD-01

    P-06

    TS-01 NG-01

    SC-01

    HC-01

     NC-01

    P-07

    T-05

    KS-02

    B-01

    K-03

    KU-01

    KD-01

    POMPA PC

    STRAINER

    PRE CLEANER

    FIBRE CYCLONE

    POLISHING DRUM

    VACUUM DRYER

    POMPA VD-01

    SILO BIJI NUT GRADING SCREEN

    SILO CANGKANG

    HIDRO CYCLONE SEPERATOR

     NUT CYCLONE

    POMPA UNTUK T-05

    TANGKI TIMBUN CPO

    KERNEL SILO

    POMPA DEPERICARPER

    TANGKI TIMBUN PKO

    BOILER

    KERNEL DRYER

    Universitas Sumatera Utara

  • 8/17/2019 Flow Machinery PKS.pdf

    6/139

     

    KODE KETERANGAN KODE KETERANGAN KODE KETERANGAN

    TB-01

    LR-01

    ST-01

    TP-01

    HC-01

    HT-01

    P-05

    KA-01

    SP-01

    DP-01

    VS-01

    P-03

    T-01

    P-01

    L-02

    TIMBANGAN

    LOADING RAMP

    STERILIZER

    THRESSER

    HOIST CRANE

    HOPPER TANKOS

    POMPA UMPAN BALIK SS

    DIGESTER

    SCREW PRESS

    DEPERICARPER

    VIBRATING SCREEN

    POMPA SLUDGE TANK

    BAK RO

    POMPA CST

    LORI

    T-02

    P-02

    CBC

    T-03

    SS-01

    OP-01

    P-04

    P-07

    ST-02

    FC

    PC-02

    K-03

    P-04

    T-05

    T-04

    CONTINOUS SETTLING TANK

    POMPA OIL TANK

    CAKE BREAKER CONVEYOR

    OIL TANK

    SLUDGE SEPERATOR

    OIL PURIFIER

    POMPA PC-01

    POMPA T-05

    STRAINER

    FLOW CONTROL

    PRE CLEANER

    TANGKI TIMBUN PKO

    POMPA T-05

    TANGKI TIMBUN CPO

    SLUDGE TANK

    FC-01

    L-03

    PD-01

    VD-01

    P-06

    TS-01

    NG-01

    SC-01

    HC-01

    LC

    NC-01

    KS-02

    B-01

    KU-01

    KD-01

    FIBRE CYCLONE

    LORI

    POLISHING DRUM

    VACUUM DRYER

    POMPA VD-01

    SILO BIJI

    NUT GRADING SCREEN

    SILO CANGKANG

    HYDRO CYCLONE

    LEVEL CONTROL

    NUT CYCLONE

    KERNEL SILO

    POMPA DEPERICARPER

    BOILER

    KERNEL DRYER

    Universitas Sumatera Utara

  • 8/17/2019 Flow Machinery PKS.pdf

    7/139

    LAMPIRAN A

    PERHITUNGAN NERACA BAHAN

    Kapasitas Pengolahan : 30 ton TBS/jam

    Basis perhitungan : 1 jam operasi

    Satuan massa : Kilogram (kg)

    1. Sterilizer 

    Tandan buah segar (TBS) dari lori dimasukkan ke dalam rebusan atau

    sterilizer . Dalam sterilizer  TBS direbus untuk peroses sterilisasi sebelum diproses

    menjadi minyak. Temperatur perebusan 125

    0

    C – 135

    0

    C, lama perebusan 82-90menit. Kebutuhan steam  27,26%, exause steam  4,75% dan kondensat yang

    dibuang 34,51% sedangkan TBS yang masak 88% dari jumlah umpan yang

    direbus (PT. Asian Agree, 2006 ).

     Ex.Steam 4,75% TBS 100%

    4 1

    TBS masak 88%

    -TBS masak 98,27%

    -Air 1,73%

    2 5

    3

    Steam 27,26%

    -Air 100% Sterilizer

    Kondensat 34,51%-Minyak 0,55%-Kotoran 2,29%

    -Air 97,16%

     Neraca Massa:

    N M B h M k

  • 8/17/2019 Flow Machinery PKS.pdf

    8/139

     Neraca Bahan Keluar

    Alur 3:

    1. Kondensat   = 34,51% x 30.000 kg/jam = 10.353 kg/jam

      Minyak = 0,55 % x 10.353 kg/jam = 56,942 kg/jam

      Air = 97,16% x 10.353 kg/jam = 10.058,975 kg/jam

      Kotoran = 2,29% x 10.353 kg/jam = 237,084 kg/jam

    Alur 4:

    1. Exshaust steam  = 4,75% x 30.000 kg/jam = 1.425 kg/jam

    Alur 5:

    1. TBS hasil rebusan = 88% x 30.000 kg/jam = 26.400 kg/jam

      TBS masak = 98,27% x 26.400 kg/jam = 25.943,28 kg/jam

      Air = 1,73% x 26.400 kg/jam = 456,72 kg/jam

    Tabel LA.1 Neraca Massa pada Sterilizer

    Masuk (kg/jam) Keluar (kg/jam)Komposisi

    Alur 1 Alur 2 Alur 3 Alur 4 Alur 5

    Minyak

    Air

    TBS

    TBS masak

    Kotoran

    Exshaust steam

    -

    -

    30.000

    -

    -

    -

    8.178

    -

    -

    -

    -

    -

    56,942

    10.058,975

    -

    -

    237,084

    -

    -

    -

    -

    -

    -

    1.425

    -

    456,72

    -

    25.943,28

    -

    -

    Jumlah 30.000 8.178 10.353 1.425 26.400

  • 8/17/2019 Flow Machinery PKS.pdf

    9/139

    2. Stripping

    TBS masak dari sterilizer diumpankan ke stripper   drum untuk

    merontokkan buah dari tandannya dengan cara bantingan akibat dari putaran

    drum. Putaran stripper drum 33,95 rpm. Persentase tandan kosong 31,82% dan

    grondolan buah kelapa sawit 68,18% (PT. Asian Agree, 2006 ).

    -TBS 98,27%

    -Air 1,73%

    5

    Tandan kosong 31,82%

    -Minyak 0,02% Brondolan Buah kelapa sawit 68,18%

    -Brondolan 98,44%

    -Air 1,56%

    6 7Stripping-Jenjangan kosong 99,28%-Brondolan 0,7%

     Neraca Massa:

     Neraca Massa Bahan Masuk

    Alur 5:

    1. TBS hasil rebusan = 88% x 30.000 kg/jam = 26.400 kg/jam

      TBS masak = 98,27% x 26.400 kg/jam = 25.943,28 kg/jam

      Air = 1,73% x 25.943,28 kg/jam = 456,72 kg/jam

     Neraca Bahan Keluar

    Alur 6:

    1. Tandan kosong = 31,82% x 26.400 kg/jam = 8.400,48 kg/jam

      Minyak = 0,02 % x 8.400,48 kg/jam = 1,680 kg/jam

      Jenjangan kosong = 99,28% x 8.400,48 kg/jam = 8.339,997 kg/jam

      Brondolan = 0,7% x 8.400,48 kg/jam = 58,803 kg/jam

  • 8/17/2019 Flow Machinery PKS.pdf

    10/139

    Tabel LA.2 Neraca Massa pada Stripping 

    Masuk kg/jam) Keluar (kg/jam)Komposisi

    Alur 5 Alur 6 Alur 7

    Minyak

    TBS masak

    Air

    Janjangan kosong

    Brondolan

    -

    25.943,28

    456,72

    -

    -

    1,680

    -

    -

    8.339,997

    58,803

    -

    -

    280,793

    -

    17.718,727

    Jumlah 26.400 8.400,48 17.999,52

    Total 26.400 26.400

    3. Digester 

    Brondolan dari stripping diumpankan ke alat Digester, pada alat ini daging

     buah dilepaskan dari bijinya dengan cara di dalam alat pengaduk brondolan

    diremas dengan pisau pengaduk berputar sambil dipanaskan pada temperatur 90-

    950C. Kebutuhan steam 6,67% dari jumlah umpan.

    -Brondolan 98,44%

    -Air 1,56%

    Brondolan terpisah dari biji 106,67%%-Brondolan 92,6%

    -Air 7,4%

    Steam 6,67%

    -Air 100%

    7

    98  Digester

     Neraca Massa:

     Neraca Massa Bahan Masuk

    Al 7

  • 8/17/2019 Flow Machinery PKS.pdf

    11/139

    Alur 9:

    1. Brondolan terpisah dari biji = 106,67% x 17.999,52 = 19.200,088 kg/jam

      Brondolan = 92,6% x 19.200,088 kg/jam = 17.779,281 kg/jam

      Air = 7,4% x 19.200,088 kg/jam = 1.420,807 kg/jam

    Tabel LA.3 Neraca Massa pada Digester

    Masuk (kg/jam) Keluar (kg/jam)Komposisi

    Alur 7 Alur 8 Alur 9

    Brondolan

    Air

    Minyak

    Serat

    17.718,727

    280,793

    -

    -

    -

    1.200,568

    -

    -

    17.779,281

    1.420,807

    -

    -

    Jumlah 17.999,52 1.200,568 19.200,088

    Total 19.200,088 19.200,088

    4. Pressing 

    Massa adukan yang berasal dari alat pengadukan, dialirkan ke dalam alat

     pengempaan atau pengepresan (SP-01) dengan penambahan air panas  19,29%

    dari jumlah massa yang akan dipress. Hasil presan minyak kasar   58,1% dan

    ampas presan 41,9%.

    F9 = 32.000,147 kg/jam

    -Brondolan 92,6%-Air 7,4%

    F11 = 41,9%F9

    -Biji 43,79%-Air 1%

    -Serat 55,21%

    F10 = 19,29%-Air 100%

    9

    10 11 Pressing

  • 8/17/2019 Flow Machinery PKS.pdf

    12/139

     Neraca Massa:

     Neraca Massa Bahan Masuk:

    Alur 9:

    1. Brondolan terpisah dari biji = 106,67% x 17.999,52 = 19.200,088 kg/jam

      Brondolan = 92,6% x 19.200,088 kg/jam = 17.779,281 kg/jam

      Air = 7,4% x 19.200,088 kg/jam = 1.420,807 kg/jam

    Alur 10:

    F10  = 19,29% x 19.200,088 kg/jam = 3.703,697 kg/jam

      Air = 100% x 3.703,697 kg/jam = 3.703,697 kg/jam

     Neraca Massa Bahan Keluar :

    Alur 11:

    Jumlah umpan yang masuk = F9 + F10  = 19.200,088 kg/jam + 3.703,697 kg/jam

    = 22.903,785 kg/jam.

    F11 = 41,9% x 22.903,785 kg/jam = 9.596,686 kg/jam.

     

    Biji = 43,79% x 9.596,686 kg/jam = 4.202,389 kg/jam

      Air = 1% x 9.596,686 kg/jam = 95,967 kg/jam

      Serat = 55,21% x 9.596,686 kg/jam = 5.298,330 kg/jam

    Alur 12:

    F12  = 58,1% x 22.903,785 kg/jam = 13.307,099 kg/jam.

      Minyak = 41,37% x 13.307,099 kg/jam = 5.505,515 kg/jam

      Air = 45,60% x 13.307,099 kg/jam = 6.068,037 kg/jam

    Kotoran 8 21% 13 307 099 kg/jam 1 092 513 kg/jam

  • 8/17/2019 Flow Machinery PKS.pdf

    13/139

    Tabel LA.4 Neraca Bahan Pada Pressing

    Masuk (kg/jam) Keluar (kg/jam)

    Komposisi Alur 9 Alur 10 Alur 11 Alur 12

    Brondolan

    Air

    Minyak

    Kotoran

    Serat

    FFA

    Biji

    17.779,281

    1.420,807

    -

    -

    -

    -

    -

    -

    3.703,697

    -

    -

    -

    -

    -

    -

    95,967

    -

    -

    5.298,330

    -

    4.202,389

    -

    6.068,037

    5.505,515

    1.092,513

    -

    641,402

    -

    Jumlah 19.200,008 3.703,693 9.596,686 13.307,099

    Total 22.903,785 22.903,785

    5.Countinous Settling Tank (CST)

    Minyak kasar dari pressan dialirkan ke Continous Settling Tank , pada alat

    ini kotoran lumpur (Sludge) dipisahkan dari minyak berdasarkan gaya berat(gravitasi). Persentase minyak dan lumpur yang dipisahkan 41,26% dan 58,74%

    dan diperkirakan minyak yang diumpankan balik dari Sludge separator   21,18%

    dari jumlah minyak yang dipisahkan.

    F14 = F12 = 22.178,498 kg/jam

     -Minyak 41,37%-Air 45,6%-Kotoran 8,21%

    -FFA = 4,82%

    F16 = 41,26%F12

    -Minyak 95 5%F25 21 18%F14

    14

  • 8/17/2019 Flow Machinery PKS.pdf

    14/139

     Neraca Massa:

     Neraca Bahan Masuk:

    Alur 14

    F14  = 13.307,099 kg/jam.

      Minyak = 41,37% x 13.307,099 kg/jam = 5.502,515 kg/jam

      Air = 45,60% x 13.307,099 kg/jam = 6.068,037 kg/jam

     

    Kotoran = 8,21% x 13.307,099 kg/jam = 1.092,513 kg/jam

      FFA = 4,82% x 13.307,099 kg/jam = 641,402 kg/jam

    Alur 25

    F25 = 21,18% x 13.307,099 kg/jam = 2.349,173 kg/jam

     

    Minyak = 83,35% x 2.349,173 kg/jam = 2.349,173 kg/jam

      Kotoran = 1,04% x 2.349,173 kg/jam = 29,312 kg/jam

      Air = 15,61% x 2.349,173 kg/jam = 439,959 kg/jam

     Neraca Bahan Keluar:

    Alur 15

    F15 = 58,74% (F25 + F14)

    = 58,74% x (2.818,444 + 13.307) = 9.472,143 kg/jam

      Minyak = 5,9% x 9.472,143 kg/jam = 558,856 kg/jam

      Air = 6,01% x 9.472,143 kg/jam = 569,276 kg/jam

      Kotoran = 88,09% x 9.472,143 kg/jam = 8.344,011 kg/jam

    Alur 16

    F16 41 26% (F25 + F14)

  • 8/17/2019 Flow Machinery PKS.pdf

    15/139

    Tabel LA.5 Neraca Massa pada Continous Settling Tank

    Masuk (kg/jam) Keluar (kg/jam)

    Komposisi Alur 14 Alur 25 Alur 15 Alur 16

    Minyak

    Air

    Kotoran

    FFA

    5.505,515

    6.068,037

    1092,513

    641,402

    2.349,173

    439,959

    29,959

    -

    558,856

    569,276

    8.344,011

    -

    5.270,352

    27,593

    11,037

    209,710

    Jumlah 13.307,099 2.818,444 9.472,143 5.518,693

    Total 16.125,543 16.125,543

    6.Sludge Tank

    Lumpur yang masih mengandung minyak dari CST dialirkan ke sludge tank .

    Pada alat ini minyak terikut dipisahkan lasgi dari lumpur dengan gaya gravitasi.

    Komposisi lumpur dan minyak dalam sludge Tank  0,83% dan 99,17%.

    F15 

    -Minyak 5,9%

    -Air 6,01%-Kotoran 88,09%

    F24 = 99,17%-Minyak 26,35%

    -Air 70,8%

    -Kotoran 2,85%

    F23 = 0,83% F15 -Air 70%

    -Kotoran 30%

    15

    23 24Sludge Tank

     Neraca Massa:

     Neraca Bahan Masuk:

    Alur 15

  • 8/17/2019 Flow Machinery PKS.pdf

    16/139

     Neraca Bahan Keluar:

    Alur 23

    F23 = 0,83% F19 

    = 0,83% x 9.472,143 kg/jam = 78,619 kg/jam

      Air = 70% x 78,619 kg/jam = 55,033 kg/jam

      Kotoran = 30% x 78,619 kg/jam = 23,586 kg/jam

    Alur 24

    F24 = 99,17% x 9.472,143 kg/jam = 9.393,524 kg/jam

      Minyak = 26,35% x 9.393,524 kg/jam = 2.475,194 kg/jam

      Air = 70,8% x 9.393,524 kg/jam = 6.650,615 kg/jam

     

    Kotoran = 2,85% x 9.393,524 kg/jam = 267,715 kg/jam

    Tabel LA.6 Neraca Massa pada Sludge Tank

    Masuk (kg/jam) Keluar (kg/jam)

    Komposisi Alur 15 Alur 23 Alur 24

    Minyak

    Air

    Kotoran

    558,856

    569,278

    8.344,811

    -

    55,033

    23,586

    2.475,194

    6.650,615

    267,715

    Jumlah 9.472,143 78,619 9.393,524

    Total 9.472,143 9.472,143

    7. Sludge Separator

    Minyak yang dikutip dari Sludge Tank dialirkan ke sludge separator  

    melalui stainer   dan  precleaner . Pada sludge separator minyak dipisahkan lagi

  • 8/17/2019 Flow Machinery PKS.pdf

    17/139

     Neraca Massa:

     Neraca Bahan Masuk:

    Alur 24

    F24 = 9.393,524 kg/jam

      Minyak = 26,35% x 9.393,524 kg/jam = 2.475,194 kg/jam

      Air = 70,8% x 9.393,524 kg/jam = 6.650,615 kg/jam

     

    Kotoran = 2,85% x 9.393,524 kg/jam = 267,715 kg/jam

     Neraca Bahan Keluar:

    Alur 25

    F25 = 30% F24 

    = 30% x 9.393,524 kg/jam = 2.818,057 kg/jam

      Minyak 82,85% x 2.818,057 kg/jam = 2.334,760 kg/jam

      Air 15,11% x 2.818,057 kg/jam = 425,809 kg/jam

      Kotoran 2,04% x 2.818,057 kg/jam = 57,488 kg/jam

    Alur 26

    F26 = 70% F24 

    = 70% x 9.393,524 kg/jam = 6.575,467 kg/jam

      Minyak 0,9% x 6.575,467 kg/jam = 59,179 kg/jam

      Air 96% x 6.575,467 kg/jam = 6.312,448 kg/jam

      Kotoran 3,1% x 6.575,467 kg/jam = 203,840 kg/jam

    Tabel LA.7 Neraca Massa pada Sludge Separator

    Masuk (kg/jam) Keluar (kg/jam)

  • 8/17/2019 Flow Machinery PKS.pdf

    18/139

    8. Oil Purifier

    Minyak dari oil tank  ke oil purifier  untuk dipisahkan kotorannya. Komposisi

    kotoran yang dipisahkan 0,24% dan minyak yang telah dipisahkan  99,76%.

    F16 = 11.088,998 kg/jam-Minyak 95,5%

    -Air 0,5%-Kotoran 0,2%

    -FFA 3,8%

    F18 = 99,76%F16

    -Minyak 95,68%

    -Air 0,47%-Kotoran 0,17%-FFA 3,68%

    F17 = 0,24% F16 

    -Air 70%

    -Kotoran 30%

    16

    17 18Oil Purifier

     Neraca Massa: Neraca Bahan Masuk:

    Alur 16

    F16 = 5.518,693 kg/jam

      Minyak = 95,5% x 5.518,693 kg/jam = 5.279,902 kg/jam

     

    Air = 0,5% x 5.518,693 kg/jam = 27,643 kg/jam

      Kotoran = 0,2% x 5.518,693 kg/jam = 11,057 kg/jam

      FFA = 3,8% x 5.518,693 kg/jam = 210,091 kg/jam

     Neraca Bahan Keluar:

    Alur 17

    F17 = 0,24% F16 

    = 0,24% x 5.528,693 kg/jam = 13,269 kg/jam

      Air 70% x 13,269 kg/jam = 9,288 kg/jam

  • 8/17/2019 Flow Machinery PKS.pdf

    19/139

      Air 0,47 x 5.528,693 kg/jam = 25,922 kg/jam

     

    FFA 3,68% x 5.528,693 kg/jam = 202,968 kg/jam

    Tabel LA.8 Neraca Massa pada Oil Purifier

    Masuk (kg/jam) Keluar (kg/jam)

    Komposisi Alur 15 Alur 23 Alur 24

    Minyak

    Air

    Kotoran

    FFA

    5.279,902

    27,643

    11,057

    210,091

    -

    9,288

    3,981

    -

    5.277,158

    9,376

    25,922

    202,968

    Jumlah 5.518,693 13,269 5.515,424

    Total 5.518,693 5.518,693

    9. Vacuum Dryer

    Minyak dari oil purifier diumpankan ke vacuum dryer . Pada alat ini

    kandungan air pada minyak dihilangkan  0,94%. Selanjutnya minyak dikirimkan

    ke tangki timbun CPO.

    F20

     = F18

     – F19

    -Minyak 96,538%

    -Air 0,002%-Kotoran 0,15%-FFA 3,31%

    F19 = 0,94% F18 -Air 100%

    18

    20

    F18 = 11.062,384 kg/jam-Minyak 95,68%

    -Air 0,47%-Kotoran 0,17%

    -FFA 3,689%

    19Vacuum dryer

    Neraca Massa:

  • 8/17/2019 Flow Machinery PKS.pdf

    20/139

     Neraca Bahan Keluar:

    Alur 19

    F19 = 0,94% x 5.515,424 kg/jam = 51,845 kg/jam

      Air 100% x 51,845 kg/jam = 51,845 kg/jam

    Alur 20

    F20 = F18 – F19 = 5.515,424 – 51,845 = 5.463,579 kg/jam

      Minyak 96,538% x 5.463,579 kg/jam = 5.274,430 kg/jam

      Kotoran 0,15% x 5.463,579 kg/jam = 8,195 kg/jam

      Air 0,002 x 5.463,579 kg/jam = 0,109 kg/jam

      FFA 3,31% x 5.463,579 kg/jam = 180,845 kg/jam

    Tabel LA.9 Neraca Massa pada Vacuum dryer

    Masuk (kg/jam) Keluar (kg/jam)

    Komposisi Alur 18 Alur 19 Alur 20

    Minyak

    Air

    Kotoran

    FFA

    5.277,158

    9,376

    25,922

    202,968

    -

    -

    51,845

    -

    5.274,430

    8,195

    0,109

    180,845

    Jumlah 5.515,424 51,845 5.463,579

    Total 5.515,424 5.515,424

    10. Depericarper

    Ampas yang keluar dari presan dialirkan ke depericarper   untuk

  • 8/17/2019 Flow Machinery PKS.pdf

    21/139

     Neraca Massa:

     Neraca Bahan Masuk:

    Alur 11

    F11 = 9.596,686 kg/jam

      Biji = 43,79 % x 9.596,686 kg/jam = 4.202,389 kg/jam

      Air = 1% x 9.596,686 kg/jam = 95,967 kg/jam

     

    Serat = 55,21% x 9.596,686 kg/jam = 5.298,330 kg/jam

     Neraca Bahan Keluar:

    Alur 21

    F21 = 55% x 9.596,686 kg/jam = 5.278,177 kg/jam

     

    Ampas 96% x 5.278,177 kg/jam = 5.067,050 kg/jam

      Biji 4% x 5.278,177 kg/jam = 211,127 kg/jam

    Alur 22

    F22 = 45% x 9.596,686 kg/jam = 4.318,509 kg/jam

     

    Biji 96,77% x 4.318,509 kg/jam = 4.175,998 kg/jam

      Ampas 1% x 4.318,509 kg/jam = 43,185 kg/jam

      Air 2,3% x 4.318,509 kg/jam = 99,326 kg/jam

    Tabel LA.10 Neraca Massa pada Depericarper

    Masuk (kg/jam) Keluar (kg/jam)Komposisi Alur 11 Alur 21 Alur 22

    Ampas

    Biji

    5.298,330

    4.202,389

    6.067,050

    211,127

    43,185

    4.175,998

  • 8/17/2019 Flow Machinery PKS.pdf

    22/139

    11. Silo Drayer

    Biji dari  polshing drum melalui timba biji dimasukkan ke silo biji untuk

    diperam selama 18 jam dengan suhu 800C, tengah 700C dan bawah 600C. Pada

    silo drayer  air diuapkan dari biji 6%.

    F24 -Biji 99,2%-Ampas 0,8%

    F23 = 6% F22

    -Air 100%

    22

    2423

    F22 = 7.197,515 kg/jam

    -Biji 96,7%-Ampas 1%%

    -Air 2,3%

    Silo drayer

     Neraca Massa: Neraca Bahan Masuk:

    Alur 22

    F22 = 4.318,509 kg/jam

      Biji = 96,7 % x 4.318,509 kg/jam = 4.175,998 kg/jam

     

    Ampas = 1% x 4.318,509 kg/jam = 43,185 kg/jam  Air = 2,3% x 4.318,509 kg/jam = 99,326 kg/jam

     Neraca Bahan Keluar:

    Alur 23

    F

    23

     = 6% x 4.318,509 kg/jam = 259,111 kg/jam  Air 100% x 259,111 kg/jam = 259,111 kg/jam

    Alur 24

  • 8/17/2019 Flow Machinery PKS.pdf

    23/139

    Tabel LA.11 Neraca Massa pada Silo drayer

    Masuk (kg/jam) Keluar (kg/jam)Komposisi Alur 22 Alur 23 Alur 24

    Ampas

    Biji

    Air

    43,185

    4.175,998

    99,326

    -

    -

    259,111

    32,475

    4.026,923

    -

    Jumlah 4.318,509 259,111 4.059,398

    Total 4.318,509 4.318,509

    12. Nut Crackers

    Biji kelapa sawit yang telah dikeringkan pada silo drayer  diumpankan dari

    alur 24 untuk proses pemecahan. Biji kelapa sawit yang telah dipecah memilikikomposisi produk cangkang 20,94% dan inti (kernel) 79,06%.

    24 25F24-Biji 99,2%

    -Ampas 0,8%

     Nut CrackersF25-Biji 99,2%

    -Ampas 0,8%

     Neraca Massa:

     Neraca Bahan Masuk:

    Alur 22

    F24 = 4.059,398 kg/jam

     Biji = 99,2 % x 4.059,398 kg/jam = 4.026,923 kg/jam

      Ampas = 0,8% x 4.059,398 kg/jam = 32,475 kg/jam

     Neraca Bahan Keluar:

  • 8/17/2019 Flow Machinery PKS.pdf

    24/139

    Tabel LA.12 Neraca Massa pada Nut crackers

    Masuk (kg/jam) Keluar (kg/jam)Komposisi Alur 24 Alur 25

    Ampas

    Biji

    Cangkang

    Kernel

    4.026,923

    32,475

    -

    -

    -

    -

    850,038

    3.209,360

    Jumlah 4.059,398 4.059,398

    Total 4.059,398 4.059,398

    13. Hidrocyclone

    Campuran pecahan yang keluar dari nut crackers dimasukkan ke dalam

    hidrocyclone. Didalam hidrocyclone terjadi pemisahan inti dengan cangkang

     berdasarkan perbedaan berat jenis (gravitasi). Inti kernel akan naik atas

    hidrocyclone sedangkan cangkang akan turun kebagian bawah hidrocyclone. 

    F27 = F26 

    -Air 100% F28 = 45% F25

    -Cangkang 99%

    -Kernel 1% 

    F29 = 55% F25 

    -Kernel 86,25%

    -Air 13,75% 

    25

    26

    29

    27 28

     Hidrocyclone

    F25 

    -Kernel 79,06%

    -Cangkang 20,94%

    F26 = 94% F25 

    -Air 100% 

    N M

  • 8/17/2019 Flow Machinery PKS.pdf

    25/139

    Alur 26:

    F26 = 94% F25 = 94% x 4.059,398 kg/jam = 3.815,834 kg/jam

      Air = 100% x 3.815,834 kg/jam = 3.815,834 kg/jam

     Neraca Bahan Keluar:

    Alur 27

    F27 = F26 = 3.815,834 kg/jam

      Air = 3.815,834 kg/jam

    Alur 28:

    F28 = 45% F25  = 45% x 4.059,398 kg/jam = 1.826,729 kg/jam

     

    Cangkang = 99% x 1.826,729 kg/jam = 1.808,462 kg/jam

      Kernel = 1% x 1.826,729 kg/jam = 18,267 kg/jam

    Alur 29:

    F29 = 55% F25  = 55% x 4.059,398 kg/jam = 2.232,669 kg/jam

     

    Kernel = 86,25% x 2.232,669 kg/jam = 1.925,677 kg/jam

      Air   = 13,75% x 2.232,669 kg/jam = 306,992 kg/jam

    Tabel LA.11 Neraca Bahan pada hidrocycloneMasuk (kg/jam) Keluar (kg/jam)

    Komposisi Alur 25 Alur 26 Alur 27 Alur 28 Alur 29Kernel

    Cangkang

    Air

    3.209,360

    850,038

    -

    -

    -

    3.815,834

    -

    -

    3.815,834

    18,267

    1.808,462

    -

    1.925,677

    -

    306,992

  • 8/17/2019 Flow Machinery PKS.pdf

    26/139

      LA-20

     

    30 31

    29

    Kernel DrayerF30 = 13,85% F29

    Air 100%

    F31

    F29 = 3.271,115 kg/jam

    Kernel 86,25%

    -Air 13,75%

    -Air 0,1%

    -Kernel 99,9%

     Neraca Massa:

     Neraca Bahan Masuk:

    Alur 29

    F29 = 2.232,669 kg/jam

      Kernel  = 86,25 % x 2.232,669 kg/jam = 1.925,677 kg/jam

      Cangkang = 13,75% x 2.232,669 kg/jam = 306,992 kg/jam

     Neraca Bahan Keluar:

    Alur 30

    F30 = 13,85% F29 = 13,85% x 2.232,669 kg/jam = 309,225 kg/jam

      Air = 309,225 kg/jam

    Alur 31:

    F31 = F29 – F30  = 2.232,669 – 309,225 kg/jam = 1.923,444 kg/jam

      Air = 0,1% x 1.923,444 kg/jam = 1,923 kg/jam

      Kernel = 99,9% x 1.923,444 kg/jam = 1.921,521 kg/jam

    Tabel LA.14 Kernel Drayer  

    Masuk (kg/jam) Keluar (kg/jam)Komposisi

    Alur 29 Alur 30 Alur 31

     

  • 8/17/2019 Flow Machinery PKS.pdf

    27/139

    LAMPIRAN B

    PERHITUNGAN NERACA PANAS 

    Basis Perhitungan : 1 jam operasi

    Satuan : kJ

    Suhu referensi : 250C = 298 K

    Dari Perry (1997), diketahui kapasitas panas (Cp) zat cair untuk ikatan (J/ml K).

    Ikatan Cp

    -CH3

    -CH2-

    = CH-

    -CO2-

    -CH

    -COOH

    36,82

    30,38

    21,34

    60,67

    20,92

    79,91

    Sehingga diperoleh Cp untuk masing-masing senyawa:

      Cp Oktanoat  (C8H16O2) = 1 (-CH3) + 6 (-CH2-) + 1 (-COOH)

    = 1(36,82) + 6 (30,38) + 1 (79,91)

    = 36,82 + 182,28 + 79,91

    = 299,01 J/mol K

    = 2,076 kJ/kg K

    C D kt t (C10H20O2) 1 ( CH3) + 8 ( CH2 ) + 1 ( COOH)

  • 8/17/2019 Flow Machinery PKS.pdf

    28/139

  • 8/17/2019 Flow Machinery PKS.pdf

    29/139

      Cp Linolenat  (C18H34O2)= 1 (-CH3) + 10 (-CH2-) + 6(=CH-)1 (-COOH)

    = 1(36,82) + 10 (30,38) + 6 (21,34) + 1 (79,91)

    = 36,82 + 303,8 + 128,04 + 79,91

    = 548,57 J/mol K

    = 2,770 kJ/kg K

     

    Cp Minyak sawit = Cp Laurat  + Cp  Miristat  + Cp Palmitat  + Cp Stearati + 

    Cp Oleat  + Cp Linoleat + Cp Linolenat  

    = 2,102 + 2,110 + 2,117 + 2,112 + 2,073 + 2,023 + 2,77

    = 15,307 kJ/kg K.

     

    Cp Minyak inti sawit = Cp Oktanoat  + Cp Dekanoat  + Cp Laurat  +

    Cp Miristat  + Cp Palmitat  + Cp Stearat  + Cp Oleat  +

    Cp Linoleat  + Cp Linolenat. 

    = 2,076 + 2,091 + 2,102 + 2,110 + 2,117 + 2,122 + 2,073

    + 2,023 + 2,770

    = 6,866 kJ/kg.K

      Cp Kernel = Cp Minyak inti sawit + Cp abu

    = 14,474 + 0,88

    = 20,354 kJ/kg.K

    Dari Perry (1997), diketahui kapasitas untuk zat padat (J/mol.K)

    Atomil elemen E

    C 10,89

  • 8/17/2019 Flow Machinery PKS.pdf

    30/139

    = 65,34 + 75,6 + 67,1

    = 208,04 j/mol K

    = 1,284 kJ/kg.K

      Cp Pentosan (C5H8O4) = 5 (C) + 8 (H) + 4 (O)

    = 5 (10,89) + 8 (7,56) + 4 (13,42)

    = 54,45 + 60,48 + 53,68

    = 168,61 J/mol.K

    = 1,277 kJ/kg.K

      Cp Lignin (C6H12O6) = 6 (C) + 12 (H) + 6 (O)

    = 6 (10,89) + 12 (7,56) + 6 (13,42)

    = 65,34 + 90,72 + 80,52

    = 236,58 J/mol.K

    = 1,442 kJ/kg.K

     

    Cp Abu = 0,882 kJ/kg K

      Cp Acid Solvent  (C2H3O2) = 2 (C) + 3 (H) + 2 (O)

    = 2 (10,89) + 3 (7,56) + 2 (13,42)

    = 21,78 + 22,68 + 26,84

    = 71,3 J/mol.K= 1,208 kJ/kg.K

      Cp Nitrogen (N2) = 2 (N)

  • 8/17/2019 Flow Machinery PKS.pdf

    31/139

      Cp Serat (C6H10O5) = 6 (C) + 10 (H) + 5 (O)

    = 6 (10,89) + 10 (7,56) + 5 (13,42)

    = 65,34 + 75,6 + 67,1

    = 208,04 J/mol.K

    = 1,284 kJ/kg.K

     

    Cp Cangkang = Cp Selulosa + Cp Pentosan + Cp Lignin + Cp Abu + Cp Acid

    Solvent  + Cp Nitrogen + Cp air

    = 1,284 + 1,277 + 1,442 + 1,0882 + 1,208 + 1,338 + 4,1774

    = 11,6084 kJ/kg K

     

    Cp Kelapa Sawit = Cp Minyak Sawit + Cp Minyak inti Sawit + Cp

    Cangkang + Cp Serat

    = 15,307+19,474+11,6084+1,284

    = 47,6734 kJ/kg K

     

    Cp Biji = Cp Kernel + Cp Cangkang

    = 20,354 + 11,6084

    = 31,9624 kJ/kg K

  • 8/17/2019 Flow Machinery PKS.pdf

    32/139

    1.  SterilizerT = 1100C

     Ex.Steam

    T = 300C

    TBS

    T = 1000CTBS

    Air

    2

    4 1

    5

    3

    T =1300C

    SteamSterilizer

    T = 900C-Minyak-Kotoran

    -Air

    Panas Masuk :

    Alur 1 :

    Q = m x Cp x T = 30.000 kg x 47,6734 kJ/kg K x 5 K= 7.151.010 kJ

    Alur 2 :

    Q = m x Cp x T = 8.178 kg x 2,176 kJ/kg K x 105 K

    = 1.868.509,44 kJ

    Total panas masuk = 9.019.519,44 kJPanas Keluar :

    Alur 3 :

    Q = m x Cp x T

    Q Minyak = 56,942 kg x 15,307 kJ/kg K x 65 K

    = 56.654,728 kJ

    Q Air = 10.058,975 kg x 4,2164 kJ/kg K x 65 K

    = 2.756.823,042 kJ

    Q Kotoran = 237,084 kg x 0,882 kJ/kg K x 65 K

  • 8/17/2019 Flow Machinery PKS.pdf

    33/139

    Q Air = 456,72 kg x 4,2164 kJ/kg K x 75 K

    = 144.428,566 kJ

    Total panas keluar = 96.233.925,19 kJ

    Panas Masuk + Panas dibutuhkan = Panas Keluar

    Panas dibutuhkan = Panas keluar – Panas Masuk

    = 96.233.925,19 – 9.019.519,44

    = 87.214.405,75 kJ

    Entalpi steam pada 270,13 kPa, T ; 1300C = 2.173,6 kJ/kg K (Saturated Steam)

    Maka Steam yang dibutuhkan :

    m =λ 

    dQ 

    =kJ/kg2.173,6

    kJ,7587.214.405  

    = 40.124,405 kg

    Tabel LB.1 Neraca massa pada Sterilizer  

    Panas Masuk (kJ) Panas Keluar (kJ)KompoisisiAlur 1 Alur 2 Alur 3 Alur 4 Alur 5

    TBS

    Minyak

    Air

    KotoranPanas dibutuhkan

    Ex.Steam

    7.151.010

    -

    -

    --

    -

    -

    -

    1.868.509,44

    -87.214.405,75

    -

    -

    56.654,728

    2.756.823,042

    13.592,026-

    -

    -

    -

    -

    --

    502.099,463

    92.760.327,36

    -

    144.428,566

    --

    -

    Jumlah 7.151.010 89.082.915,19 2.827.069,796 502.099,463 92.904.755,93

  • 8/17/2019 Flow Machinery PKS.pdf

    34/139

    2. Stripping 

    T= 900C-Brondolan

    -Air

    T = 900C-Minyak-Jenjangan kosong

    -Brondolan

    5

    T=1000C

    -TBS

    -Air

    6 7Stripping

    Panas Masuk :

    Alur 5 :

    Q TBS = 25.943,28 kg x 47,6734 kJ/kg K x 75 K

    = 92.760.327,36 kJ

    Q Air = 456,72 kg x 4,2164 kJ/kg K x 75 K

    = 144.428,566 kJ

    Total Panas yang masuk = 92.904.755,93 kJ

    Panas keluar :

    Alur 6 :

    Q Minyak = 1,680 kg x 15,307 kJ/kg K x 65 K

    = 1.671,524 kJQ Janjangan kosong = 8.339,997 kg x 6,2924 kJ/kg K x 65 K

    = 3.411.108,813 kJ

    Q Berondolan = 58,803 kg x 47,6734 kJ/kg K x 65 K

    = 182.217,031 kJ

    Alur 7 :Q Berondolan = 17.718,727 kg x 47,6734 kJ/kg K x 65 K

    = 54.906.277,38 kJ

    Q Air = 280,793 kg x 0,882 kJ/kg K x 65 K

  • 8/17/2019 Flow Machinery PKS.pdf

    35/139

    Tabel LB.2 Neraca panas pada alat Stripping 

    Panas Masuk (kJ) Panas keluar (kJ)Kompoisisi

    Alur 5 Alur 6 Alur 7

    TBS

    Minyak

    Air

    Jenjangan kosong

    Brondolan

    92.760.327,36

    -

    -

    144.428,566

    -

    -

    1.671,524

    -

    3.411.108,813

    182.217,031

    -

    -

    16.097.863

    -

    54.906.277,38

    Panas hilang - 34.387.383,32

    Total 92.904.755,93 92.904.755,93

    3. Digester  T = 900C-Brondolan

    -Air

    7

    T = 800C-Brondolan

    -Air

    8T = 900C

    -Air 100%

    9

     Digester

    Panas Masuk :

    Alur 7:

    Q Berondolan = 17.718,727 kg x 47,6734 kJ/kg K x 65 K

    = 54.906.277,38 kJ

    Q Air = 280,793 kg x 0,882 kJ/kg K x 65 K

    = 16.097,863 kJ

    Alur 8 :

  • 8/17/2019 Flow Machinery PKS.pdf

    36/139

    Panas Keluar :

    Alur 9 :

    Q = m x Cp x T

    Q Berondolan = 17.779,281 kg x 47,6734 kJ/kg K x 65 K

    = 55.093.920,36 kJ

    Q Air = 1.420,807 kg x 4,2164 kJ/kg K x 65 K

    = 389.394,891 kJ

    Panas Masuk + Panas dibutuhkan = Panas Keluar

    Panas dibutuhkan = Panas keluar – Panas masuk

    = 55.483.315,25 – 55.251.410,11

    = 231.905,141 kJ

     Entalphi steam pada 93,956 kPa, T 900

    C = 2.283,3 kJ/kg K (Saturated steam) 

    Maka Steam yang dibutuhkan :

    m =λ 

    dQ 

    =kJ/kg2.283,3

    kJ1231.905,14 

    = 101,566 kg

    Tabel LB.3 Neraca panas pada Digester  

    Panas masuk (kJ) Panas keluar (kJ)Komposisi

    Alur 7 Alur 8 Alur 9

    BerondolanAir

    Minyak

    Serat

    54.906.277,3816.097,863

    -

    -

    -329.034,870

    -

    -

    55.093.920,36389.394,891

    -

    -

  • 8/17/2019 Flow Machinery PKS.pdf

    37/139

     4. PressingT = 900C

    -Brondolan-Air

    9

    T = 500C

    -Biji-Air

    -Serat

    T = 500C-Air 100%

    1110

    T = 900C

    -Minyak-Air

    -Kotoran

    -FFA 

    12

     Pressing

    Panas Masuk :

    Alur 9 :

    Q Berondolan = 17.779,281 kg x 47,6734 kJ/kg K x 65 K= 55.093.920,36 kJ

    Q Air = 1.420,807 kg x 4,2164 kJ/kg K x 65 K

    = 389.394,891 kJ

    Alur 10 :

    Q Air = 3.703,697 kg x 4,1840 kJ/kg K x 25 K= 387.406,706 kJ

    Total Panas yang Masuk = 55.870.721,96 kJ

    Panas Keluar :

    Alur 11 : 

    Q = m x Cp x TQ biji = 4.202,389 kg x 31,9324 kJ/kg K x 25 K

    = 3.354.809,163 kJ

    Q Air = 95,967 kg x 4,2164 kJ/kg K x 25 K

  • 8/17/2019 Flow Machinery PKS.pdf

    38/139

    Alur 12 :

    Q Minyak = 505,515 kg x 15,307 kJ/kg K x 65 K

    = 5.477.739,677 kJ

    Q Air = 6.068,037 kg x 4,2164 kJ/kg K x 65 K

    = 1.663.042,628 kJ

    Q Kotoran = 1.092,513 kg x 0,882 kJ/kg K x 65 K

    = 62.633,770 kJ

    FFA = 641,402 kg x 6,866 kJ/kg K x 65 K

    = 287.085,121 kJ

    Panas masuk = Panas keluar + Panas hilang

    Panas hilang = Panas masuk – Panas keluar

    = 55.870.721,96 – 11.025.502,63= 44.845.219,33 kJ

    Tabel LB.4 Neraca panas pada Pressing

    Panas masuk (kJ) Panas keluar (kJ)Komposisi

    Alur 9 Alur 10 Alur 11 Alur 12

    BerondolanAir

    Biji

    Serat

    Minyak

    KotoranFFA

    55.093.920,36389.394,891

    -

    -

    -

    --

    -387.406,706

    -

    -

    -

    --

    -10.115,881

    3.354.809,163

    170.076,393

    -

    --

    -1.663.042,628

    -

    -

    5.477.739,677

    62.633,770287.085,121

    Panas hilang - - 44.845.219,33

    Total 55.870.721,96 55.870.721,96

  • 8/17/2019 Flow Machinery PKS.pdf

    39/139

    5. Continous Settling Tank 

    T = 900

    C-Minyak

    -Air-Kotoran-FFA

    T = 900C

    -Minyak-Air

    -Kotoran-FFA

    T = 900C

    -Minyak-Air

    -Kotoran

    T = 900C-Minyak

    -Kotoran-Air

    14

    1625

    15

    CST

    Panas Masuk :Alur 14

    Q Minyak = 5.505,515 kg x 15,307 kJ/kg K x 65 K

    = 5.477.739,677 kJ

    Q Kotoran = 1.092,513 kg x 0,882 kJ/kg K x 65 K

    = 62.633,770 kJQ Air = 6.068,037 kg x 4,2164 kJ/kg K x 65 K

    = 1.663.042,628 kJ

    Q FFA = 641,402 kg x 8,866 kJ/kg K x 65 K

    = 287.085,121 kJ

    Alur 25 :Q Minyak = 2.349,173 kg x 15,307 kJ/kg K x 65 K

    = 2.337.321,422 kJ

    Q Kotoran = 29,312 kg x 0,882 kJ/kg K x 65 K

  • 8/17/2019 Flow Machinery PKS.pdf

    40/139

    Panas Keluar :

    Alur 15 :

    Q Minyak = 558,856 kg x 15,307 kJ/kg K x 65 K

    = 556.036,572 kJ

    Q Kotoran = 8.344,011 kg x 0,882 kJ/kg K x 65 K

    = 478.362,151 kJ

    Q Air = 569,276 kg x 4,2164 kJ/kg K x 65 K= 156.019,196 kJ

    Alur 16 :

    Q Minyak = 5.270,352 kg x 15, kJ/kg K x 65 K

    = 5.243.763,074 kJ

    Q Air = 27,593 kg x 4,2164 kJ/kg K x 65 K= 7.562,303 kJ

    Q Kotoran = 11,037 kg x 0,882 kJ/kg K x 65 K

    = 632,751 kJ

    Q FFA = 209,710 kg x 6,866 kJ/kg K x 65 K

    = 93.591,476 kJTotal panas yang keluar = 6.535.967,523 kJ

    Panas hilang = Panas masuk – Panas keluar

    = 9.950.080,878 – 6.535.967,525

    = 3.414.113,353 kJ

    Tabel LB.5 Neraca massa pada C.S.T

    Panas masuk (kJ) Panas keluar (kJ) Komposisi

    Alur 14 Alur 25 Alur 15 Alur 16

  • 8/17/2019 Flow Machinery PKS.pdf

    41/139

    6. Sludge Tank 

    T = 90

    0

    C-Minyak

    -Air

    -Kotoran

    T = 800C

    -Minyak-Air

    -Kotoran

    T = 900C

    -Air

    -Kotoran

    15

    23 24Sludge Tank

    Panas Masuk :

    Alur 15 :

    Q Minyak = 558,856 kg x 15,307 kJ/kg K x 65 K

    = 556.036,572 kJQ Kotoran = 8.344,011 kg x 0,882 kJ/kg K x 65 K

    = 478.362,151 kJ

    Q Air = 569,276 kg x 4,2164 kJ/kg K x 65 K

    = 156.019,196 kJ

    Total panas yang masuk = 1.190.417,919 kJPanas Keluar :

    Alur 23 : 

    Q Air = 55,033 kg x 4,2164 kJ/kg K x 65 K

    = 15.082,267 kJ

    Q Kotoran = 23,586 kg x 0,882kJ/kg K x 65 K= 23,586 kJ

    Alur 24 :

    Q Minyak = 2.475,194 kg x 15,307 kJ/kg K x 65 K

  • 8/17/2019 Flow Machinery PKS.pdf

    42/139

    Panas dibutuhkan = Panas Keluar – Panas Masuk

    = 4.317.197,057 – 1.190.417,919

    = 3.126.779,138 kJ

     Entalphi steam pada 70,11 kPa, T 900C = 2.283,2 kJ/kg K (Saturated steam) 

    Maka Steam yang dibutuhkan :

    m =λ 

    dQ 

    =kJ/kg2.283,2

    kJ1383.126.779, 

    = 1.369,472 kg

    Tabel LB.6 Neraca Panas pada Sludge Tank  

    Panas masuk Panas keluarKomposisi

    Alur 15 Alur 23 Alur 24

    Minyak

    Air

    Kotoran

    556.036,572

    156.019,196

    478.362,151

    -

    15.082,674

    1.352,185

    2.462.706,646

    1.822.707,451

    15.348,101

    Panas dibutuhkan 3.126.779,138 - -

    Jumlah 4.317.197,057 16.434,859 4.300.762,198

    Total 4.317.197,057 4.317.197,057

  • 8/17/2019 Flow Machinery PKS.pdf

    43/139

    7. Sludge Separator 

    T = 800C-Minyak-Air

    -Kotoran

    T = 900C-Minyak

    -Air

    -Kotoran

    T = 900C-Minyak-Air

    -Kotoran

    24

    26 25Sludge Separator

    Panas Masuk :

    Alur 24 :

    Q Minyak 2.475,194 kg x 15,307 kJ/kg K x 65 K

    = 2.462.706,646 kJQ Air = 6.650,615 kg x 4,2164 kJ/kg K x 65 K

    = 1.822.707,451 kJ

    Q Kotoran = 267,715 kg x 0,882 kJ/kg K x 65 K

    = 15.348,101 kJ

    Total panas yang masuk = 4.300.762,198 kJPanas keluar :

    Alur 26 :

    Q Minyak = 59,179 kg x 15,307 kJ/kg K x 65 K

    = 58.880,442 kJ

    Q Air = 6.312,448 kg x 4,2164 kJ/kg K x 65 K

    = 1.730.027,374 kJ

    Q Kotoran = 203,840 kg x 0,885 kJ/kg K x 65 K

    = 11.686,147 kJ

  • 8/17/2019 Flow Machinery PKS.pdf

    44/139

    Total Panas yang keluar = 4.163.742,235 kJ

    Panas Masuk + Panas dibutuhkan = Panas KeluarPanas dibutuhkan = Panas keluar – Panas masuk

    = 4.300.762,968 – 4.163.742,235

    = 137.019,963 kJ

     Entalphi steam pada 1 atm, T 900C = 2.283,2 kJ/kg K (Saturated steam) 

    Maka Steam yang dibutuhkan :

    m =λ 

    dQ 

    =kJ/kg2.283,2

    kJ963,019.137 = 60,012 kg

    Tabel LB.7 Neraca Panas pada Sludge Separator  

    Panas masuk (kJ) Panas Keluar (kJ)Komposisi

    Alur 24 Alur 25 Alur 26

    Minyak

    Air

    Abu

    2.462.706,646

    1.822.707,451

    15.348,101

    2.322.981,136

    24.411,630

    15.755,506

    58.880,442

    1.730.027,374

    11.686,147

    Panas dibutuhkan 137.019,963 - -

    Jumlah 4.300.762,198 2.363.148,272 1.800.593,963

    Total 4.300.762,198 4.300.762,198

    8. Oil Purifier T = 900C-Minyak

    -Air-Kotoran

    -FFA

  • 8/17/2019 Flow Machinery PKS.pdf

    45/139

      = 5.243.763,074 kJ

    Q Air = 27,593 kg x 4,2164 kJ/kg K x 65 K= 7.562,303 kJ

    Q Kotoran = 11,037 kg x 0,882 kJ/kg K x 65 K

    = 632,751 kJ

    Q FFA = 209,710 kg x 6,866 kJ/kg K x 65 K

    = 93.591,476 kJTotal panas masuk = 5.345.549,604 kJ

    Panas Keluar :

    Alur 17 :

    Q Air = 9,288 kg x 4,2164 kJ/kg K x 65 K

    = 2.545,525 kJQ Kotoran = 3,981 kg x 0,882 kJ/kg K x 65 K

    = 228,230 kJ

    Alur 18 :

    Q Minyak = 5.277,158 kg x 15,307 kJ/kg K x 55 K

    = 4.442.760,163 kJ

    Q Kotoran = 9,376 kg x 4,2164 kJ/kg K x 55 K

    = 454,830 kJ

    Q Air = 25,922 kg x 4,2164 kJ/kg K x 55 K

    = 6.011,364 kJ

    Q FFA = 202,968 kg x 6,866 kJ/kg K x 55 K

    = 76.646,806 kJ

    Total panas yang keluar = 4.528.646,918 kJ

    Panas masuk = Panas keluar + Panas hilang

  • 8/17/2019 Flow Machinery PKS.pdf

    46/139

    Tabel LB.8 Neraca Panas pada Oil Purifier  

    Panas Masuk (kJ) Panas Keluar (kJ)Komposisi

    Alur 16 Alur 17 Alur 18

    Minyak

    Kotoran

    Air

    FFA

    5.243.763,076

    632,751

    7.562,303

    93.591,476

    -

    2.545,525

    228,230

    -

    4.442.760,163

    454,830

    6.011,364

    76.646,806

    Panas hilang - 816.902,686

    Total 5.345.549,604 5.345.549,604

    9. Vacuum Drayer 

    T = 800C

    -Minyak

    -Air-Kotoran

    -FFA

    T = 800C-Air 100%

    18

    20

    T = 800C-Minyak

    -Air-Kotoran

    -FFA

    19

    Vacuum dryer

    Alur 18 :

    Q Minyak = 5.277,158 kg x 15,307 kJ/kg K x 55 K

    = 4.442.760,163 kJ

    Q Kotoran = 9,376 kg x 4,2164 J/kg K x 55 K= 454,830 kJ

    Q Air = 25,922 kg x 4,2164 kJ/kg K x 55 K

    = 6.011,364 kJ

  • 8/17/2019 Flow Machinery PKS.pdf

    47/139

    Panas penguapan air dihitung dengan korelasi Watson :

    0,38

    11

    12

    1

    2

    Tr 1

    Tr 1

    ΔH

    ΔH  

      

     

    Tr1 =3,647

    27380 = 0,545

    Tr2 =

    3,647

    27380 = 0,545

    H1 = Panas penguapan pada titik didih air = 2676 kJ/kg

    Hv12 = 2676 x

    38,0

    576,01

    545,01 

      

     

    = 2748,7257 kJ/kg

    Panas penguapan = m x Hv

    = 51,845 x 2748,7257 kJ = 142.507,684 kJ

    Alur 20 :

    Q Minyak = 5.274,430 kg x 15,307 kJ/kg K x 55 K

    = 4.440.463,501 kJ

    Q Kotoran = 8,195 kg x 0,882 kJ/kg K x 55 K

    = 397,539 kJ

    Q Air = 0,109 kg x 4,1774 kJ/kg K x 55 K

    = 25,044 kJ

    Q FFA = 180,845 kg x 6,866 kJ/kg K x 55 K

    = 68.292,497 kJ

    Panas Masuk + Panas dibutuhkan = Panas keluar + Panas penguapan

    8.977.873,275 + Panas dibutuhkan = 4.521.090,333 + 142.507,684

    Panas dibutuhkan = 4.314.275,258 kJ

    0

  • 8/17/2019 Flow Machinery PKS.pdf

    48/139

  • 8/17/2019 Flow Machinery PKS.pdf

    49/139

      = 67.037,072 kJ

    Q Biji = 211,127 kg x 11,684 kJ/kg K x 15 K= 37.002,118 kJ

    Alur 22 :

    Q Biji = 4.175,998 kg x 31,9624 kJ/kg K x 25 K

    = 3.336.872,962 kJ

    Q Abu = 43,185 kg x 0,882 kJ/kg K x 25 K= 952,229 kJ

    Q Air = 99,326 kg x 4,1840 kJ/kg K x 25 K

    = 10.389,450 kJ

    Total Panas Keluar = 3.452.253,831 kJ

    Panas Masuk = Panas Keluar + Panas hilang3.538.075,495 = 3.452.253,831 + Panas Hilang

    Panas Hilang = 85.821,664 kJ

    Tabel LB.10 Neraca Panas pada Depericarper  

    Panas Masuk (kJ) Panas keluar (kJ)Komposisi

    Alur 11 Alur 21 Alur 22

    Serat

    Biji

    Air

    Cangkang

    170.076,393

    3.357.960,954

    10.038,148

    -

    67.037,072

    37.002,118

    -

    -

    952,229

    3.336.872,962

    10.389,450

    -

    Jumlah 3.538.075,495 104.039,19 3.348.214,641

    Panas hilang - 85.821,664

    Total 3.538.075,495 3.538.075,495

  • 8/17/2019 Flow Machinery PKS.pdf

    50/139

    11. Silo Drayer 

    T = 600C

    -Biji

    -Ampas

    T = 700C

    -Air

    22

    T = 500C-Biji

    -Ampas

    -Air

    23 24Silo drayer

    T = 900C

    Panas Masuk : 

    Alur 22 :

    Q Biji = 4.175,998 kg x 31,9624 kJ/kg K x 25 K

    = 3.336.872,962 kJ

    Q Abu = 43,185 kg x 0,882 kJ/kg K x 25 K

    = 952,229 kJ

    Q Air = 99,326 kg x 4,1840 kJ/kg K x 25 K

    = 10.389,450 kJ

    Total Panas masuk = 3.348.214,641 kJ

    Panas keluar :

    Alur 24 :

    Q Biji = 4.026,923 kg x 31,9624 kJ/kg K x 35 K

    = 4.504.854,329 kJ

    Q Abu = 32,475 kg x 0,882 kJ/kg K x 35 K

    = 1.002,503 kJ

  • 8/17/2019 Flow Machinery PKS.pdf

    51/139

    Panas penguapan air dihitung dengan korelasi Watson :

    0,38

    11

    12

    1

    2

    Tr 1Tr 1

    ΔHΔH

      

      

     

    Tr1 =3,647

    27380 = 0,545

    Tr2 =

    3,647

    27380 = 0,545

    H1 = Panas penguapan pada titik didih air = 2676 kJ/kg

    Hv12 = 2676 x

    38,0

    576,01

    545,01 

      

     

    = 2748,7257 kJ/kg

    Panas penguapan = m x Hv

    = 259,111 x 2748 kJ

    = 712037,028 kJ

    Panas masuk + Panas dibutuhkan = Panas keluar + Panas pengupan

    3.348.214,641 + Panas dibutuhkan = 4.554.825,313 + 712.037,028

    Panas dibutuhkan = 1.918.647,7 kJ

     Entalphi steam pada 70,11kPa, T 900C = 2.283,2 kJ/kg K (Saturated steam) 

    Maka Steam yang dibutuhkan :

    m =λ 

    dQ=

    kJ/kg2.283,2

    kJ71.918.647, = 840,333 kg

    Tabel LB.11 Neraca panas pada Silo Drayer

    Panas masuk (kJ) Panas Keluar (kJ)Komponen

    Alur 22 Alur 23 Alur 24

    Biji 3 336 872 962 - 4 504 854 329

  • 8/17/2019 Flow Machinery PKS.pdf

    52/139

    12. Nut Crackers 

    24 25T = 600C-Biji

    -Ampas Nut Crackers

    T = 600C-Biji

    -Ampas

    Panas masuk :

    Alur 24 :Q Biji = 4.026,923 kg x 31,9624 kJ/kg K x 35 K

    = 4.504.854,329 kJ

    Q Abu = 32,475 kg x 0,882 kJ/kg K x 35 K

    = 1.002,503 kJ

    Total Panas masuk = 4.505.856,832 kJ

    Panas Keluar :

    Alur 25 :

    Q Kernel  = 3.209,36 kg x 20,354 kJ/kg K x 35 K

    = 2.286.315,97 kJ

    Q Cangkang = 850,038 kg x 11,6084 kJ/kg K x 35 K

    = 345.365,339 kJ

    Total panas keluar = 2.631.681,309 kJ

    Panas masuk = Panas keluar + Panas hilang

    Panas hilang = 4.505.856,832 – 2.631.681,309 = 1.874.175,523 kJ

    Tabel LB.12 Neraca Panas pada Nut Cracker

    Panas Masuk (kJ) Panas keluar (kJ)Komposisi

    Alur 24 Alur 25

  • 8/17/2019 Flow Machinery PKS.pdf

    53/139

    13. Hidrocyclone

    T = 300C

    -Air

    T = 300C

    -Cangkang

    -Kernel 

    T = 360C-Kernel

    -Air

    25

    26

    29

    27 28

    T = 28,50C-Kernel

    -Cangkang

    T = 300C

    -Air

     Hidrocyclone

    Panas masuk :

    Alur 25 :

    Q Kernel  = 3.209,36 kg x 20,354 kJ/kg K x 5 K

    = 326.616,567 kJ

    Q Cangkang = 850,038 kg x 11,6084 kJ/kg K x 5 K

    = 49.337,905 kJ

    Alur 26 :

    Q Air = 3.815,834 kg x 4,1774 kJ/kg K x 5 K

    = 79.701,325 kJ

    Total Panas masuk = 455.655,797 kJ

    Panas keluar :

    Alur 27 :

    Q Air = 18,267 kg x 4,1774 kJ/kg K x 5 K

    = 1.859,033 kJ

    Alur 28 :

    Q Kernel  = 18,267 kg x 20,354 kJ/kg K x 5 K

    = 1859,033 kJ

  • 8/17/2019 Flow Machinery PKS.pdf

    54/139

    Total Panas keluar = 388.915,399 kJ

    Panas masuk = Panas keluar + panas hilangPanas hilang = Panas masuk – Panas keluar

    = 455.655,797 – 388.915,399

    = 66.740,398 kJ

    Tabel LB.13 Neraca Panas pada Hidrocyclone 

    Panas masuk (kJ) Panas keluar (kJ)Komposisi

    Alur 25 Alur 26 Alur 28 Alur 29 Alur 27

    Kernel

    Cangkang

    Air

    326.616,567

    49.337,905

    -

    -

    -

    79.701,325

    1.859,033

    104.966,751

    -

    195.976,148

    -

    6.412,142

    -

    -

    79.701,325Jumlah 2.631.681,309 79.701,325 106.825,784 202.388,29 79.701,325

    Panas hilang - 66.740,398

    Total 455.655,797 455.655,797

    15. Kernel Drayer

    30 31

    29

    900C

     Kernel DrayerT = 600C

    Air

    T = 600C-Air

    T = 300CKernel

    -Air

    -Kernel 

    Panas masuk :

    Alur 29 :

  • 8/17/2019 Flow Machinery PKS.pdf

    55/139

      = 45.211,478 kJ

    Total Panas Keluar = 45.211,478 kJPanas penguapan air dihitung dengan korelasi Watson :

    0,38

    11

    12

    1

    2

    Tr 1

    Tr 1

    ΔH

    ΔH 

      

     

     

    Tr1 =

    3,647

    27380 = 0,545

    Tr2 =3,647

    27380 = 0,545

    H1 = Panas penguapan pada titik didih air = 2676 kJ/kg

    Hv12 = 2676 x

    38,0

    576,01

    545,01

     

     

     

     

    = 2748,7257 kJ/kg

    Panas penguapan = m x Hv

    = 309,225 x 2748 kJ

    = 849.750,3

    Alur 31 :

    Q Kernel  = 1.923,444 kg x 20,354 kJ/kg K x 35 K

    = 1.370.242,271 kJ

    Panas masuk + Panas dibutuhkan = Panas keluar + Panas penguapan

    202.388,29 + Panas dibutuhkan = 1.415.453,749 + 849.750,3

    Panas dibutuhkan = 2.062.815,73 kJ

     Entalphi steam pada 70,11 kPa, T 900C = 2.283,2 kJ/kg K (Saturated steam) 

    Maka Steam yang dibutuhkan :

    m =λ

    dQ  =

    k /k

    kJ73,815.062.2 

      LB-30

  • 8/17/2019 Flow Machinery PKS.pdf

    56/139

    Tabel LB.14 Neraca Panas pada Kernel Drayer  

    Panas masuk (kJ) Panas keluar (kJ)KomposisiAlur 29 Alur 30 Alur 31

    Kernel

    Air

    Panas penguapan

    Panas dibutuhkan

    195.976,148

    6.412,142

    -

    2.062.815,73

    -

    45.211,478

    849.750,3

    -

    1.370.242,271

    -

    -

    -Jumlah 2.265.204,049 894.961,778 1.370.242,271

    Total 2.265.204,049 2.265.204,049

  • 8/17/2019 Flow Machinery PKS.pdf

    57/139

  • 8/17/2019 Flow Machinery PKS.pdf

    58/139

    Vl = 2

    4 D

     Hs = 2

    4 D

     Hs

     

      

      D

    1

    2= 3

    2

    1 D   

    2,5 m3 = 3

    2

    1 D   

    D =3

    1

    14,3

    )25,2(

     x  = 1,1677 m = 3,8301 ft

    Hs = 2 x 3,8301 ft = 2,3354 m = 7,6624

    3.  Sterilizer 

    Fungsi : Untuk memasak tandan buah segar (TBS)

    Bahan konstruksi : Carbon steel SA-283

    Ukuran tangki :Kebutuhan kelapa sawit = 30.000 kg/jam

    Siklus perebusan = 110 menit

    Rata-rata isian lori = 2500 kg

    Kapasitas rebusan = 8 lori

    Jumlah ketel rebusan =Lori8Rebusan1KetelxLori12 = 1,5 buah = 2 buah

    Densitas () = 1340 kg/m3 = 83,482 lbm/ft3

    Kapasitas ketel rebusan per jam :

    = 8 lori x 2500 kg/lori x 2 buah xmenit110

    menit60 

    = 21.818,182 kg

    = 21,82 ton =  21,82 m3 

    Faktor keamanan = 20 %

  • 8/17/2019 Flow Machinery PKS.pdf

    59/139

    Vt = Vs + Vh = 3D4

    14π+ 3D

    8

    π= 3D

    24

    115π 

    D =3

    1

    115π

    Vtx24 

      

     = 1,203 m = 3,947 ft

    Hs = 14 D = 14 (1,203) = 16,842 m = 53,979 ft

    Hh = ½ D = ½ (1,203) = 0,602 m = 1,975 ft

    Panjang tangki = Hs + Hh = 16,842 + 0,602 = 17,444 m = 57,234 ftTebal dinding Tangki :

    Direncanakan digunakan bahan konstruksi Carbon Steel SA-283, Dari Tabel 13.1,

     Brownell & Young 1979, diperoleh data :

       Allowable working stress (s) = 12650 psi 

     Effesiensi sambungan (E) = 0,8 

      Corrosion allowance = 0,125 in 

      Tekanan hidrostatik (pH) =144

    1)ρ(Hs  =

    144

    4820,83)1979,57(    

      Tekanan operasi = 14,696 + Ph = 14,696 + 30,714 = 45,41 psi

      Faktor keamanan = 20%

      Faktor kelongaran = 5%

      Tekanan desain = 1,05 x 45,41 = 47,681 psi

    Tebal dinding selinder tangki :

    Ts = CA0,6PSE

    PR 

     

    = 125,0)9430,626,0()8,0)(12650(

    122

    947,3)9430,62(

     

      

     

     x psi

     psi

     

  • 8/17/2019 Flow Machinery PKS.pdf

    60/139

    5.  Bak Threser 

    Fungsi : Untuk menampung buah masak dari sterilizer.

    Bahan konstruksi : Stainless steel

    Jumlah : 2 buah

    Panjang = 500 cm

    Lebar = 300 cm

    Tinggi = 250 cm

    Volume bak = P x L x T

    = 500 x 300 x 250

    = 37500000 cm3  = 37,5 m

    Volume total = 37,5 m3 x 2 = 75 m3 

    6.  Penebahan (Threser) 

    Fungsi : Untuk menampung buah melepaskan /memisahkan buah dari

    tandan.

    Bahan konstruksi : Stainles steel

    Direncanakan menggunakan :

      Diameter drum = 230 cm

      Diameter as drum = 10 cm

      Kecepatan putar drum = 23 rpm

      Voltase = 380 volt /21 Ampere

      Jumlah = 5 buah

      Rata-rata isian threser = 250 ton/jam

    Kapasitas threser = 4 x 20 ton/jam = 80 ton/jam.

    M t i l b l b d l 67 %

  • 8/17/2019 Flow Machinery PKS.pdf

    61/139

    Material balance berondolan = 67 %

    Isian digester minimal ¾ bagian =4

    3x 3,4 ton x

    67

    100x

    25

    65 

    = 9,134 ton

    Kapasitas pressan/jam pressan = 5 x 9,134 ton = 45,67 ton

    Faktor kelonggaran = 20%

    Daya pada skala laboratorium (P) = 22,26

    Hp …..(Perry, 1984)

    Daya penghancur (P) = (0,7 (L-1)) x Vt x (0,5D) x P

    Dipilih kapasitas 9 ton/24 jam (Perry, 1984), sehingga diperoleh :

      Diameter = 2 ft

      Panjang = 3 ft

    P = (0,7 (2-1)) x 10,9608 x (0,53) 2 x 22,26

    = 47,251 kW

    = 47,251 x 1,341020 = 63,3645 Hp

    8.  Screw Press 

    Fungsi : untuk memisahkan minyak dari ampas dari biji.

    Didesain dengan :

      Kapasitas = 20-24 ton/jam

      Panjang = 974 cm

      Lebar = 294 cm

      Diameter ulir = 536 mm

     

    Panjang ulir = 1940 mm

      Putaran ulir = 20-28 rpm

    Spesifikasi :

    9 Vib ti S

  • 8/17/2019 Flow Machinery PKS.pdf

    62/139

    9.  Vibrating Screen 

    Fungsi : Untuk memisahkan atau menyaring minyak dan serat yang

    terdapat pada minyak kasar.

    Laju alir (F) = 13.307,099 kg/jam

    Ukuran bahan = 30 mesh

    Dimensi dibuka (a) = 1,5 in = 0,125 ft

    Ukuran tebal = 0,2 in = 0,016 ft

    Kapasitas unit (Cu) = 4

    Faktor luas buka, Foa = 100 x

    2

     

      

     

    d aa

    ……….(Perry, 1984)

    = 100 x

    2

    016,0125,0

    125,0

     

     

     

     

     

    = 78,5926

    Faktor luas lubang (Fs) = 1 ……………….(Perry, 1984)

    Kapasitas = 0,4 xFsxFoaxCu

    = 0,4 x0,1x5926,78x4

    13.307,099  

    = 16,932 ton/jam

    10. Bak R.O

    Fungsi : Untuk menampung minyak kasar yang keluar dari screening.

    Bentuk : silinder tegak dengan alas dan tutup datar.

    Bahan konstruksi : Carbon steel SA-53, Grade C 13

    D

    Volume tangki = Vt = 1 2 x 14 527 m3 = 17 432 m3

  • 8/17/2019 Flow Machinery PKS.pdf

    63/139

      Volume tangki = Vt = 1,2 x 14,527 m  = 17,432 m  

    Direncanakan perbandingan diameter dengan tinggi silinder (D : H) = 4 : 3

    V =4

    1D2H

    17,432 =4

    1D2    

      

      D

    4

    3= 3πD

    16

    D = 3,094 m = 10,151 ft

    H = 2,321 m = 7,615 ft

    Tebal Dinding Tangki :

    Direncananakan digunakan bahan konstruksi Carbon steel SA-53, Grade

    C, Dari Brownelll & Young 1979, diperoleh data :

      Allowable working stress (s) = 12650 psi

     

    Effisiensi sambungan (E) = 0,8

      Corrosion allowance = 0,125 ft

      Tekanan Hidrostatis (Ph) =144

    1)ρ(Hs =

    144

    068,57)1615,7(    

    = 2,622

     

    Faktor keamanan = 20 %

      Faktor kelonggaran = 5 %

      Tekanan operasi = 14,696 + 2,622 = 17,318 psi

      Tekanan desain = 1,05 x 17,318 = 18,184 psi

    Tebal dinding silinder tangki :

    t = CA0,6PSE

    PR 

     

    1210,151

     psi)(18,184

     

     

    Kondisi operasi : 800C

  • 8/17/2019 Flow Machinery PKS.pdf

    64/139

    Kondisi operasi : 80 C

    Data :

      Densitas cairan () = 870,6 kg/m3 = 54,2383 lbm/ft3………..(Perry, 1997)

      Viskositas () = 20 cP = 0,0145 lbm/ft.dtk …………(Kirk Othmer, 1967)

      Laju alir massa (F) = 13.307,099 kg/jam = 8,150 lbm/det

      Laju alir volume (Q) =ρ

    F =

    3lbm/ft54,2383

    lbm/det8,15 = 0,150 ft3/det

      Diameter optimum, De = 3,9 x Q0,45 x 0,13…………(Timmerhaus, 1980)

    = 3,9 x (0,150)0,45 x (0,0145)0,13 

    = 0,958 in

    Digunakan pipa dengan spesifikasi:

      Ukuran pipa nominal = 2 in

      Schedul pipa = 80

      Diameter dalam (ID) = 1,939 in = 0,1616 ft

      Diameter luar (OD) = 2,375 in = 0,1979 ft

      Luas penampang (a1) = 0,02050 ft2 

      Bahan konstruksi = comercial steel

    Kecepatan linier, v = ft/det317,7ft0,02050

    /detft0,15

    a

    Q2

    3

    1

     

    Bilangan Reynold, NRE = 

        Dv 

    =0,0145

    ft)1616ft/det)(0,)(7,317lbm/ft(54,2383

    3

     

     NRE = 4.422,955

    Instalasi pipa:

    L4 = 8,5 ft

  • 8/17/2019 Flow Machinery PKS.pdf

    65/139

      L4  8,5 ft

      1 buah protecting pipe exit (k = 1 Appendix C-2c dan C-2d, Foust, 1980)

    L5 = 8,5 ft

    Panjang pipa total (L) = 20 + 4,2016 + 9,696 + 8,5 + 8,5 = 50,8976 ft

    Faktor gesekan,

    F =1616)2(32,2)(0,

    (50,8976),317)(0,0095)(7

    2gcD

    ΣLfv 22 = 2,487 ft lbf/lbm

    Tinggi pemompaan, z = 15 ft

    Static head, z.gc

    g = 15 ft.lbf/lbm

    Velocity head,2gc

    Δv2

    = 0

    Pressure head,ρ

    ΔP= 0

    Ws  = z.gc

    g+

    2gc

    Δv2+ρ

    ΔP + F

    = 15 + 0 + 0 + 2,487 = 17,487 ft.lbf/lbm

    Tenaga pompa, P =550

    Ws.Q.ρ=

    550

    )487,17)(15,0)(2383,54(= 0,259 Hp

    Untuk efesiensi pompa 80%, maka:

    Tenaga pompa yang dibutuhkan = Hp0,3230,8

    0,259  

    12. 

    CST (Countinous Settling Tank) 

    Fungsi : Untuk memisahkan minyak dari endapan.

    Komponen Massa (Kg) Densitas (kg/m3) Volume (m

    3)

  • 8/17/2019 Flow Machinery PKS.pdf

    66/139

    Komponen Massa (Kg) Densitas (kg/m ) Volume (m )

    Minyak 7.854,688 912 8,613

    Kotoran 1081,361 1542 0,701

    Air 6.097,349 995,647 6,124

    FFA 641,402 905 0,709

    Total 16.125,543 - 16,147

     campuran =147,16

    543,125.16= 998,671 kg/m3 = 62,347 lb/ft3 

    Volume minyak kasar = 3647,177819,913

    543,125.16m

    m

       

    Faktor keamanan = 20 %

    Volume tangki = 1,2 x 17,647 = 21,176 m3 

    Direncanakan : Tinggi silinder : Diameter (Hs : D) = 4 : 3

    Tinggi head : Diameter (Hh : D) = 1 : 4

    Sehingga :

    Vs =  Hs D2

    4

     

     =  

      

      D D 3

    4

    4

     =3

    4 D 

     

    Vh =  Hh D2

    4

     =

     

      

      D D

    4

    1

    4

    2   = 3

    16 D

      

    Vt = Vs + Vh = 3

    4 D

      + 3

    16 D

      =

    48

    19 3 D  

    D =3

    1

    19

    48 

      

      

    Vt  x= 2,573 m = 8,442 ft

    4 4

      Allowable working stress (s) = 12650 psi

  • 8/17/2019 Flow Machinery PKS.pdf

    67/139

    g ( ) p

      Effisiensi sambungan (E) = 0,8

      Corrosion allowance = 0,125 ft

      Tekanan Hidrostatis (Ph) =144

    1)ρ(Hs =

    144

    068,57)1367,13(    

    = 4,901 psi

      Faktor keamanan = 20 %

     

    Faktor kelonggaran = 5 %

      Tekanan operasi = 14,696 + 4,901 = 19,597 psi

      Tekanan desain = 1,05 x 19,597 = 20,577 psi

    Tebal dinding silinder tangki :

    t = CA0,6PSE

    PR 

     

    =20,577)x(0,6 psi)(0,8)(12750

    122

    8,422 psi)(20,577

     

      

     

     

    = 0,227 in

    13. Oil Tank

    Fungsi : Untuk menampung minyak yang bebas sludge dari tangki

     pemisah.

    Bentuk : Silinder tegak dengan alasellipsoidal.

    Jumlah : 1 unit

    Bahan konstruksi : Carbon steel SA-283, Grade C .

    Komponen Massa (Kg) Densitas (kg/m3) Volume (m

    3)

    Volume minyak kasar = 30396693,518.5

    mm

  • 8/17/2019 Flow Machinery PKS.pdf

    68/139

    Volume minyak kasar = 039,67819,913

    m  

     

    Faktor keamanan = 20 %

    Volume tangki = 1,2 x 9,944 = 11,933 m3 

    Direncanakan : Tinggi silinder : Diameter (Hs : D) = 4 : 3

    Tinggi head : Diameter (Hh : D) = 1 : 4

    Sehingga :

    Vs =  Hs D 2

    4

      =

     

      

      D D

    3

    4

    4

    2   = 3

    4 D

      

    Vh =  Hh D 2

    4

     =

     

      

      D D

    4

    1

    4

    2   = 3

    16 D

      

    Vt = Vs + Vh =3

    4 D

     

     +3

    16 D

     

     = 48

    19 3 D 

     

    D =3

    1

    19

    48 

      

      

    Vt  x= 1,753 m = 5,752 ft

    Hs =  D3

    4 = )753,1(

    3

    4 = 2,337 m = 7,668 ft

    Hh =  D4

    1 = )753,1(

    4

    1= 0,438 m = 1,437 ft

    Tinggi tangki = Hs + Ht = 2,337 + 0,438 = 2,775 m = 9,105 ft

    Tebal dinding tangki :

    Direncanakan digunakan bahan konstruksi Carbon steel SA-53, Grade C, Dari

    Tabel 13.1, Broenell & Young 1979, diperoleh data :

      Allowable working stress (s) = 12650 psi

      Effisiensi sambungan (E) = 0,8

    Tebal dinding silinder tangki :

  • 8/17/2019 Flow Machinery PKS.pdf

    69/139

    t = CA0,6PSE

    PR 

     

    =18,803)x(0,6 psi)(0,8)(12750

    122

    6,039 psi)(18,803

     

      

     

    + 0,125

    = 0,192 in

    14. Sludge Tank 

    Fungsi : Untuk menampung sludge hasil pemisahan tangki pemisah yang

    mengandung minyak..

    Bentuk : Silinder tegak dengan alas ellipsoidal.

    Jumlah : 1 unit

    Bahan konstruksi : Carbon steel SA-283, Grade C .

    Komponen Massa (Kg) Densitas (kg/m3) Volume (m

    3)

    Minyak 558,856 912 0,613

    Kotoran 8.344,811 1542 5,412

    Air 569,278 995,647 0,572

    Total 9.472,143 - 6,597

     campuran = 597,6

    143,472.9

    = 1.435,826 kg/m

    3

     = 89,638 lb/ft

    3

     

    Volume minyak kasar = 3366,107819,913

    143,472.9m

    m

       

    Vh = HhD 2 

    =  

     

    DD12  = 3D

     

  • 8/17/2019 Flow Machinery PKS.pdf

    70/139

    Vh  Hh D4

     

     

     D D44

     16

     D  

    Vt = Vs + Vh = 3

    4 D

      + 3

    16 D

      =

    48

    19 3 D  

    D =3

    1

    19

    48 

      

      

    Vt  x= 2,155 m = 7,071 ft

    Hs =  D34  = )155,2(

    34  = 2,873 m = 9,426 ft

    Hh =  D4

    1 = )155,2(

    4

    1= 0,539 m = 1,768 ft

    Tinggi tangki = Hs + Ht = 2,873 + 0,539 = 3,412 m = 11,195 ft

    Tebal dinding tangki :

    Direncanakan digunakan bahan konstruksi Carbon steel SA-53, Grade C, Dari

    Tabel 13.1, Brownell & Young 1979, diperoleh data :

      Allowable working stress (s) = 12650 psi

      Effisiensi sambungan (E) = 0,8

      Corrosion allowance = 0,125 ft

      Tekanan Hidrostatis (Ph) =144

    1)ρ(Hs =

    144

    0306,63)1426,9(    

    = 3,339 psi

      Faktor keamanan = 20 %

      Faktor kelonggaran = 5 %

     

    Tekanan operasi = 14,696 + 3,39 = 18,035 psi

      Tekanan desain = 1,05 x 18,035 = 18,937 psi

    Tebal dinding silinder tangki :

    15. Sludge Separator 

  • 8/17/2019 Flow Machinery PKS.pdf

    71/139

    Fungsi : Untuk memisahkan minyak dengan lumpur yang berasal dari sludge tank.

    Jenis : Alfa-Laval Separator

    Diirencanakan menggunakan 2 buah Alfa-Laval Seperator dengan kapasitas 16

    ton/jam.

    16. Oil Purifier 

    Fungsi : Untuk memurnikan minyak yang berasal dari oil tank.

    Jenis : Alfa-Laval Separator

    Direncanakan menggunakan 2 buah Alva-Laval Separator dengan kapasitas 9

    ton/jam.

    17. Vacuum Drayer 

    Fungsi : Untuk mengeringkan minyak yang keluar dari oil purifier .

    Jenis : Single fluid pneumatic nozzles spray drayer dengan sistem vacuum.

    Jumlah : 1 unit

    Suhu umpan masuk (t1) = 700C = 1580F

    Suhu umpan masuk (t2) = 750C = 1670F

    Suhu umpan masuk (T1) = 800C = 1760F

    Suhu umpan masuk (T2) = 800C = 1760F

    Fluid Panas Kondisi Fluid dingin Selisih

    T1 = 1760F Temperatur yang lebih tinggi t1 = 167

    0F t = 90F

    T2 = 1760F Tempertaur yang lebih tinggi t2 = 158

    0F t = 90F

    LMTD =

    2

    12

    t

    t t =

    )19

    (l

    )918(   = 12,9851 0F

    Diameter maksimum tetesan yang keluar nozzel :

  • 8/17/2019 Flow Machinery PKS.pdf

    72/139

    Xm = 3 Xve ………………………………….(Pers. 12.33 Perry, 1997)

    = 3 x 232,0794 m

    = 696,2382 m = 0,0023 ft

    Volume chamber :

    Q =

    mD

    ΔtVKf x10,983

    3

    2

    Ds

    tρ ………(Pers. 12.68, Perry, 1997)

    Dimana :

    Q = Laju perpindahan panas = 1028665,888 kJ/jam

    = 9755764,415 Btu/jam

    Kf = Konduktivitas thermal = 0,0143 Btu/jam ft 0F

    V = Volume Drayer chamber (ft3)

    t = Temperatur driving force = LMTD = 12,9851 0F

    Dm = Diameter maksimum tetesan = 0,0023 ft

    s = Densitas cairan = 57,1493 lbm/ft3

    t = Densitas gas pengering pada kondisi keluar

    = 58,8944 lb/ft3  ………………………….(Perry, 1973)

    Ds = Diameter nozzel = 0,4 mm = 0,0013 ft …..(Perry, 1997)

    9755764,415 =1493,57

    8944,58)0013,0(

    )0023,0(

    9851,120143,098,102

    3

    2

     xV  x x 

    Vt = 902,787 ft3 = 56,1533 m3 

    Tinggi dan diameter drayer chamber :

    Direncanakan drayer chamber beralas ellipsoidal dengan slope 600C dan tutup

    elipsoidal dengan :

    Vt = Vs + Vh = 35

     D 

     + 3 D 

     =79 3 D 

     

  • 8/17/2019 Flow Machinery PKS.pdf

    73/139

    8 30 120

    D =3

    1

    79

    120 

      

      

    Vt  x=

    3

    1

    79

    3935,451120 

      

      

     x = 2,9731 m = 24,3868 ft

    Hs =  D2

    5 = )9731,2(

    2

    5 = 7,4327 m = 24,3686 ft

    Hh =  D5

    1

     = )9731,2(5

    1

    = 1,4865 m = 4,8773 ft

    Tinggi drayer = Hs + Ht = 7,4327 + 1,4865 = 8,9192 m = 29,2638 ft

    Ukuran tangki :

    Data :

      Massa steam  = 1889,574 kg/jam

     

    Densitas steam pada 800C = 965,321 kg/m3 = 60,1395 lbm/ft3 

      Volume steam =steamDensitas

    steamMassa=

    321,965

    574,1889= 1,957 m3 

      Faktor kemanan = 20 %

      Volume tangki = 1,2 x 1,957 = 2,348 m3 

    Direncanakan : ~ Tinggi silinder : diameter (Hs : D) = 3 : 1

    ~ Tinggi head : diameter (Hs : D) = 1 : 4

    Vs =  Hs D2

    4

     = )3(

    4

    2 D D

     = 3

    4

    3 D

      

    Vh = 3

    24

     D 

     

    Vt = Vs + Vb = 3

    8

    5 D

     + 3

    30 D

     =

    120

    79 3 D  

    1 1

  • 8/17/2019 Flow Machinery PKS.pdf

    74/139

    = 3,9 x (0,062)0,45 x (57,0668)0,13 

    1 888 i

  • 8/17/2019 Flow Machinery PKS.pdf

    75/139

    = 1,888 in

    Digunakan pipa dengan spesifikasi:

      Ukuran pipa nominal = 2 in

      Schedul pipa = 80

      Diameter dalam (ID) = 1,939 in = 0,1616 ft

      Diameter luar (OD) = 2,375 in = 0,1979 ft

      Luas penampang (a1) = 0,02050 ft2 

      Bahan konstruksi = comercial steel

    Kecepatan linier, v = ft/det024,3ft0,02050

    /detft0,062

    a

    Q2

    3

    1

     

    Bilangan Reynold, NRE =  

        Dv

     

    =0,0145

    ft)1616ft/det)(0,)(3,024lbm/ft(57,0668 3 

     NRE = 9.295,771

    Instalasi pipa:

     

    Panjang pipa lurus L1 = 45 ft

      2 buah gate fully open (L/D = 13, Appendix C-2a, Foust, 1980)

    L2 = 2 x 13 x 0,1616 ft = 4,2016 ft

      3 buah standart elbow 900 (L/D = 30, Appendix C-2a, Foust,1980)

    L3 = 3 x 30 x 0,1616 ft = 14,544 ft

     

    1 buah inward protecting pipe intrance (k = 0,78, Appendix C-2c dan C-

    2d, Foust, 1980)

    L4 = 4 ft

    Static head, z.gc

    g = 15 ft.lbf/lbm

  • 8/17/2019 Flow Machinery PKS.pdf

    76/139

    gc

    Velocity head,2gc

    Δv2= 0

    Pressure head,ρ

    ΔP= 0

    Ws  = z. gcg

    + 2gc

    Δv2

    + ρ

    ΔP

     + F

    = 15 + 0 + 0 + 0,599 = 15,599 ft.lbf/lbm

    Tenaga pompa, P =550

    Ws.Q.ρ=

    550

    )0668,57)(062,0)(599,15(= 0,103 Hp

    Untuk efesiensi pompa 80%, maka:

    Tenaga pompa yang dibutuhkan = Hp0,1290,8

    0,103  

    19. Strainer (ST-02)

    Fungsi : Untuk memisahkan serabut yang masih terdapat dalam sludge

    sebelum diolah pada sludge separator.

    Jenis : Alfa-Laval

    Jumlah piringan = 100 buah

    Daya = 15 Hp

    Tekanan = 3 Kpa

    Putaran = 1455 rpm

    Direncanakan menggunakan Alva-Laval dengan kapasitas 4,5 ton/jam.

    21. Storage Tank (Tangki Timbun)

    Fungsi : Sebagai tempat untuk menyimpan CPO

  • 8/17/2019 Flow Machinery PKS.pdf

    77/139

    Fungsi : Sebagai tempat untuk menyimpan CPO.

    Bentuk ; Silinder Vertikal dengan alas datar dan elipsoidal.

    Bahan konstruksi : Carbon steel

    Kondisi penyimpanan : P = 1 atm ; T = 600C

    Komposisi tangki

    Komponen Massa (kg) Densitas (Kg/m3) Volume (m3)

    Minyak

    Air

    Kotoran

    FFA

    5.274,430

    8,195

    0,109

    180,845

    891

    995,647

    993

    908

    5,919

    0,008

    0,0001

    0,199

    Total 5.463,579 - 6,126

      Densitas campuran =campuranvolume

    campuranmassa  =

    126,6

    579,463.5 

    = 891,867 kg/m3 = 55,679

     Volume minyak sawit = 6440,891

    579,463.5

     = 6,128

      Volume minyak sawit untuk 1 hari

    = 6,128 m3/jam x 1 hari x 24 jam/hari = 147,072 m3 

      Faktor kemanan = 20 %

      Volume tangki = 1,2 x 147,072 m3 = 176,486 m3 

    Direncanakan : ~ Tinggi silinder : Diameter (Hs : D) = 4 : 3

    ~ Tinggi head : Diameter (Hs : D) = 1 : 4

    Sehingga :

    D =3

    1

    9

    24 

      Vt  x

    =3

    1

    9

    486,17624 

       x

     = 5,312 m = 17,428 ft

  • 8/17/2019 Flow Machinery PKS.pdf

    78/139

    9

        9

       

    Hs =  D3

    4 = )312,5(

    3

    1= 7,083 m = 23,239 ft

    Hh =  D4

    1 = )312,5(

    4

    1= 1,328 m = 4,357 ft

    Tinggi tangki = Hs + Hh = 7,083 + 1,328 = 8,411 m = 27,596 ft

    Tebal dinding Silinder Tangki :

    Direncanakan digunakan bahan konstruksi Carbon steel SA-53, Grade C, Dari

    Tabel 13.1, Broenell & Young 1979, diperoleh data :

      Allowable working stress (s) = 12650 psi

      Effisiensi sambungan (E) = 0,8

     

    Corrosion allowance = 0,125 ft

      Tekanan Hidrostatis (Ph) =144

    1)ρ(Hs =

    144

    068,57)1239,23(    

    = 8,579 psi

      Faktor keamanan = 20 %

     

    Faktor kelonggaran = 5 %

      Tekanan operasi = 14,696 + 8,579 = 23,275 psi

      Tekanan desain = 1,05 x 23,275 = 24,439 psi

    Tebal dinding silinder tangki :

    ts = CA

    0,6PSE

    PR 

     

    =24 439)(0 6i)(0 8)(12750

    122

    176,486 psi)(24,439

     

      

     

     

    Data :

    Densitas cairan () = 891 kg/m3 = 55 5984 lbm/ft3 (Perry 1997)

  • 8/17/2019 Flow Machinery PKS.pdf

    79/139

      Densitas cairan () 891 kg/m   55,5984 lbm/ft ………..(Perry, 1997)

      Viskositas () = 25 cP = 0,0168 lbm/ft.dtk …………(Kirk Othmer, 1967)

      Laju alir massa (F) = 5.274,430 kg/jam = 3,283 lbm/det

      Laju alir volume (Q) =ρ

    F =

    3lbm/ft54,2383

    lbm/det3,283 = 0,059 ft3/det

      Diameter optimum, De = 3,9 x Q0,45 x 0,13…………(Timmerhaus, 1980)

    = 3,9 x (0,059)0,45 x (55,5984)0,13 

    = 1,840 in

    Digunakan pipa dengan spesifikasi:

      Ukuran pipa nominal = 2 in

      Schedul pipa = 80

      Diameter dalam (ID) = 1,939 in = 0,1615 ft

      Diameter luar (OD) = 2,375 in = 0,1979 ft

      Luas penampang (a1) = 0,02050 ft2 

      Bahan konstruksi = comercial steel

    Kecepatan linier, v = ft/det878,2ft0,02050

    /detft0,059

    a

    Q2

    3

    1  

    Bilangan Reynold, NRE = 

        Dv 

    =0,0168

    ft)1616ft/det)(0,)(2,878lbm/ft(54,2383 3 

     NRE = 1539,165

    Instalasi pipa:

    Panjang pipa lurus L1 = 25 ft

      1 buah protecting pipe exit (k = 1 Appendix C-2c dan C-2d, Foust, 1980)

    L5 = 10 ft

  • 8/17/2019 Flow Machinery PKS.pdf

    80/139

    Panjang pipa total (L) = 25 + 4,2016 + 14,544 + 4 + 4 = 55,889 ft

    Dari gambar 14.1 Timmerhaus, 1991 untuk bahan commercial steel є  =

    0,00077 diperoleh f = 0,014.

    Faktor gesekan,

    F =

    1616)2(32,2)(0,

    (55,889)870)(0,014)(2,

    2gcD

    ΣLfv 22 = 0,623 ft lbf/lbm

    Tinggi pemompaan, z = 10 ft

    Static head, z.gc

    g = 10 ft.lbf/lbm

    Velocity head,2gc

    Δv2= 0

    Pressure head,ρ

    ΔP= 0

    Ws  = z.gc

    g+

    2gc

    Δv2

    ΔP + F

    = 15 + 0 + 0 + 0,623 = 15,623 ft.lbf/lbm

    Tenaga pompa, P =550

    Ws.Q.ρ =550

    )623,10)(059,0)(5984,55( = 0,079 Hp

    Untuk efesiensi pompa 80%, maka:

    Tenaga pompa yang dibutuhkan = Hp0,0790,8

    0,063  

    23.  Nut Crackers 

    Fungsi : Untuk memecah biji

    Bahan konstruksi : Stainles steel

      LC-25

    Kecepatan kritis =2

    1

    6,76

     

     D

    =2

    1

    3

    6,76

     

     = 44,2263 rpm

  • 8/17/2019 Flow Machinery PKS.pdf

    81/139

        D 3   

    Daya pada skala laboratorium (Ne) = 22,26 Hp …………(Perry, 1984)

    Diambil efesiensi = 70%

    Kecepatan Mill (Nm) = 0,7 x 44,2263 = 30,9584 rpm

    Kapasitas (K) = BC x Nm x D x 2,2046 x 10-3  ………..(Perry, 1984)

    = 0,85 x 30,9584 x 3 x 2,2046 x 10-3 

    = 0,174 ton = 174 kg

    Daya penghancur (P) = (0,7 x L – 1 ) x k x (0,5 D)2 x 22,26

    = (0,7 x 2-1)x 0,174 x (0,5 x 3) 2 x 22,26

    = 0,75 kW = 0,75 x 1,3402 Hp

    = 1,0057 Hp

    24.  Depericarper (D-01)

    Fungsi : Untuk memisahkan serabut dengan biji.

    Direncanakan menggunakan depericarper dengan kapasitas 3 ton/jam.

    25.  Polishing drum (PD-01)

    Fungsi : untuk membersihkan serabut halus yang menempel pada biji.Panjang : 480 cm

    Lebar : 100 cm

    Putaran : 18 rpm

    26.  Kernel Silo (KS-01)

    Fungsi : untuk memeram biji sampai kering agar lebih mudah untuk dipecah.

    Bentuk : Kerucut tegak

    Kapasitas tangki : 4.175,998 kg/jam

    LAMPIRAN D

    SPESIFIKASI PERALATAN UTILITAS

  • 8/17/2019 Flow Machinery PKS.pdf

    82/139

    SPESIFIKASI PERALATAN UTILITAS

    1. Pompa Air Sumur Bor (L-411)

    Fungsi : untuk memompakan air sumur bor ke bak pengendapan.

    Jenis : Pompa sentrifugal

    Jumlah : 1 buah

    Bahan konstruksi : comercial steel 

    Kondisi operasi:

    -Temperatur : 300C

    Densitas air () = 995,68 kg/m3 = 62,16 lbm/ft3…………..(Perry, 1997)

    Viskositas () = 0,8007 cP = 1,937 lbm/ft.jam……………(Kirk Othmer, 1967)-Laju alir massa (F) = 366.395,019 kg/jam = 224,375 lbm/det

    Laju alir volume (Q) =ρ

    F =

    3lbm/ft62,16

    lbm/det224,375 = 3,610 ft3/det

    Diameter optimum, De = 3,9 x Q0,45 x 0,13…………(Timmerhaus, 1980)

    = 3,9 x (3,610)

    0,45

     x (62,16)

    0,13

     = 11,88 inDigunakan pipa dengan spesifikasi:

    Ukuran pipa nominal = 10 in

    -  Schedul pipa = 40

    -  Diameter dalam (ID) = 10,020 in = 0,8346 ft

    -  Diameter luar (OD) = 10,75 in = 0,8954 ft

    -  Luas penampang (a1) = 0,5475 ft2 

    -  Bahan konstruksi = comercial steel 

    Dari Appendix C-1, Foust, 1980, untuk bahan pipa comercial steel dan diameter

     pipa 10,020 in diperoleh /D = 0,00030

  • 8/17/2019 Flow Machinery PKS.pdf

    83/139

    Dari Appendix C-3, Foust, 1980, untuk NRe  = 635.786,364 dan /D = 0,00030

    diperoleh f = 0,016

    Instalasi pipa:

    -  Panjang pipa lurus L1 = 150 ft

    1 buah gate fully open (L/D = 13, Appendix C-2a, Foust, 1980)

    L2 = 1 x 13 x 0,8346 ft = 10,8498 ft

    - 2 buah standart elbow 900 (L/D = 30, Appendix C-2a, Foust,1980)

    L3 = 2 x 30 x 0,8346 ft = 50,076 ft

    - 1 buah inward protecting pipe intrance (k = 0,78, Appendix C-2c dan C-2d,

    Foust, 1980)

    L4 = 11 ft

    - 1 buah protecting pipe exit (k = 1 Appendix C-2c dan C-2d, Foust, 1980)

    L5 = 14 ft

    Panjang pipa total (L) = 150 + 10,8498 + 50,076 + 11 + 14 = 235,9258 ft

    Faktor gesekan,

    F = 0,8346)2(32,174)(

    (235,9258)594)(0,016)(6,

    2gcD

    ΣLfv 22

    = 3,056 lbf/lbm

    Tinggi pemompaan, z = 30 ft

    Static head, z.gc

    g = 30 ft.lbf/lbm

    Velocity head,

    2gc

    Δv2= 0

    Pressure head,ρ

    ΔP= 0

    2. Bak Pengendapan (H-410)

    Fungsi: tempat penampungan sementara air sumur bor

  • 8/17/2019 Flow Machinery PKS.pdf

    84/139

    Laju alir (F) = 366.395,019 kg/jam

    Kapasitas untuk kebutuhan () = 1 hari

    Faktor kemanan = 20%

    Densitas air () = 995,68 kg/m3 

    Tinggi bak = t

    Jumlah bak (n)= 1

    Misalkan:

    Panjang bak = 10t

    Lebar bak = 6t

    Volume bak (Vb) = p x l x t

    = 10t x 6t x t = 60t3 

    Volume bak (Vb) =nxρ

    1)(fk xθxF    

    =1xkg/m995,68

    1,2x24jam/harixhari1xkg/jam9366.395,013

     

    = 10.597,960 m3 

    Volume bak (Vb) = 60t3 

    Tinggi bak (t) = m611,560

    10.597,96

    60

    Vb1/31/3

     

      

      

      

      

    Panjang bak (p) = 10 x t = 10 x 5,611 m = 56,11 m

    Lebar bak (l) = 6 x t = 6 x 5,611 m = 33,666 m

    3 Clarifier (H-420)

    Densitas Al2(SO4)3  = 2,71 gr/ml………………….……………(Perry,1997)

    Densitas Na2CO3  = 2,533 gr/ml………………….……………(Perry,1997)

  • 8/17/2019 Flow Machinery PKS.pdf

    85/139

    Densitas air = 0,99568 gr/ml………………….…………(Perry, 1997)

    Reaksi koagulasi:

    Al2(SO4)3 + 3Na2CO3 + 3H2O 2Al(OH)3 + 2Na2SO4 + 3CO3 

    Perhitungan:

    Kecepatan terminal pengendapan:

    Menurut hukum Stokes: 

    Us = 

        

    18

    )( 2gDp p……………………………………………….(Ulrich, 1984)

    Dimana: Us = Kecepatan terminal pengendapan, cm/det

    s = Densitas partikel campuran pada 300C

     = Densitas larutan pada 300C

    Dp = Diameter partikel = 0,002 cm ………….…………..(Perry, 1997)

    g = Percepatan gravitasi = 980 gr/cm.det

     = Viskositas larutan pada 300C = 0,0345 gr/cm.det

    Densitas larutan,

     =

    2533

    893,9

    2710

    320,18

    68,995

    019,395.366

    232,423.366

    = 995,721 kg/m3 = 62,167 lb/ft3 

    Densitas partikel :

    s =

    2533893,9

    271032,18

    893,932,18

    = 2.564,818 kg/m3 = 2,565 gr/cm3 

    Sehingga:

    Sehingga : D =  

      

     410.4

    Q 1/2

  • 8/17/2019 Flow Machinery PKS.pdf

    86/139

    D =

    2/1

    410.4

    102,0 

      

     

    = 15,969 m = 52,394 ft

    Tinggi clarifier  :

    Ht =2

    3D =

    2

    3(15,394) = 23,954 m = 78,591 ft

    Waktu pengendapan:

    t =Us

     Ht =

    cm/det0,0087

    cm/1m100xm23,954  = 275.333,333 detik x 1jam/3600 detik

    = 7,648 jam

    Direncanakan digunakan bahan konstruksi carbon steel SA-53, grade B dari

    Brownell & Young, Item I, Appendix D, 1979, diperoleh data:

    -  Allowble working stress (S) = 12750 Psi

    -  Effesiensi sambungan (E) = 0,8

    -  Faktor korosi = 1/8 in …………………..(Timmerhaus, 1980)

    -  Tekanan hidrostatis, Ph =

    144

    123,62)1591,78(   = 33,474 psi

    -  Tekanan desain, P = 1,2 x (14,7 + 33,474) = 57,809 psi

    Tebal dinding clarifier :

    t = CA

    1,2P-SE2

    PD  

    = psi)(57,8091,2 psi)(0,8)(12.7502

    t)ft)(12in/f 41 psi)(52,39(57,809

     + 0,125 = 1,788 in

    4. Tangki pelarut Alum (M-421)

    Fungsi: Membuat larutan alum (Al2(SO4)3

  • 8/17/2019 Flow Machinery PKS.pdf

    87/139

    Bentuk: Silinder tegak dengan alas dan tutup datar

    Bahan konstruksi: Plate steel SA-167, tipe 304

    Kondisi pelarutan: - Temperatur : 300C

    - Tekanan : 1 atm

    (Al2(SO4)3 yang digunakan 30 ppm

    (Al2(SO4)3 yang digunakan berupa larutan 30% (% berat)

    Laju alir (Al2(SO4)3 = 18,320 kg/jam

    Densitas (Al2(SO4)3 30% = 1.363 kg/jam = 85,093 lbm/ft3……..……(Perry, 1997)

    Kebutuhan perancangan = 30 hari

    Faktor keamanan = 20%

    Perhitungan:

    Ukuran tangki:

    Volume larutan, V1 = 3kg/m1.363x0,3

    hari30x jam/hari24xkg/jam18,32 = 32,258 m3 

    Volume tangki (Vt) = 1,2 x 32,258 m3 = 38,710 m3 

    Direncanakan perbandingan diameter dengan tinggi silinder tangki, D : H = 2 : 3

    V =4

    1πD2H

    38,710 m3 =4

    1 πD2

    2

    3D

    38,710 m3 =83  πD3 

    D = 3,015 m

    M k D 3 015 9 892 f

    -  Allowble working stress (S) = 18.750 psi

    -  Effesiensi sambungan (E) = 0,8

    F kt k i 1/8 i (Ti h 1980)

  • 8/17/2019 Flow Machinery PKS.pdf

    88/139

    Faktor korosi = 1/8 in …………………..(Timmerhaus, 1980)

    -  Tekanan hidrostatik, ph =144

    093,85)1830,14(    = 8,172 psi

    -  Faktor keamanan tekanan = 20%

    -  Tekanan desain, P = 1,2 x (14,7 + 8,172) psi = 27,446 psi

    Tebal dinding silinder tangki:

    t = CA1,2P-SE2

    PD  

    t = psi)1,2(27,446 psi)(0,8)2(18750

    in/ft)ft)(12 psi)(9,892(27,446

    + 0,125 in

    t = 0,234 in

    Dari tabel 5.4 brownell & Young, 1979 dipilih tebal tangki 1/2 in.

    Daya pengaduk:

    Dt/Di = 3, Baffel = 4 …………………………….…………..….(Brown, 1978)

    Dt = 9,892 ft

    Di = 3,297 ft

    Kecepatan pengadukan, N = 1 rpsViskositas Al2(SO4)3 30% = 6,27 x 10

    -4 lbm/ft.det………….(Kirk Othmer, 1967)

    Bilangan reynold,

     NRE = 

      2

     D N  

    = 4

    2

    10.27,6)297,3)(1)(093,85( = 1475245,127

    Dari gambar 3.3-4 (Geankoplis,1983)untuk Nre  = 1475245,13 diperoleh Npo =

    0 32

  • 8/17/2019 Flow Machinery PKS.pdf

    89/139

    Dari Brownell & Young, Item 4, Appendix D, diperoleh data:

    -  Allowble working stress (S) = 18.750 psi

    Effesiensi sambungan (E) = 0 8

  • 8/17/2019 Flow Machinery PKS.pdf

    90/139

    Effesiensi sambungan (E) = 0,8

    -  Faktor korosi = 1/8 in …………………..(Timmerhaus, 1980)

    -  Tekanan hidrostatik, ph =144

    093,85)1794,10(    = 5,788 psi

    -  Faktor keamanan tekanan = 20%

    -  Tekanan desain, P = 1,2 x (14,7 + 5,788) psi = 24,586

    Tebal dinding silinder tangki:

    t = CA1,2P-SE2

    PD  

    t = psi)1,2(24,586 psi)(0,8)2(18750

    in/ft)ft)(12 psi)(8,636(24,586

    + 0,125 in = 0,210

    Dari tabel 5.4 brownell & Young, 1979 dipilih tebal tangki ¼ in.

    Daya pengaduk:

    Dt/Di = 3, Baffel = 4 …………………………….…………..….(Brown, 1978)

    Dt = 8,636 ft

    Di = 2,879 ft

    Kecepatan pengadukan, N = 1 rpsViskositas Al2(SO4)3 30% = 3,69 x 10

    -4 lbm/ft.det………….(Kirk Othmer, 1967)

    Bilangan reynold,

     NRE =μ

    D Nρ 2……………………………………………(Geankoplis, 1983)

    = 4

    2

    10.69,3)879,2)(1)(845,82( = 1860900,985

    Dari gambar 3.4-4,Geankoplis,1983, untuk Nre  = 1860900,985 diperoleh Npo =

    0 35

    6. Pompa Bak Pengendapan (L-421)

    Fungsi : untuk memompakan air sumur bor ke bak pengendapan.

    Jenis : Pompa sentrifugal

  • 8/17/2019 Flow Machinery PKS.pdf

    91/139

    Jenis : Pompa sentrifugal

    Jumlah : 1 buah

    Bahan konstruksi : comercial steel 

    Kondisi operasi:

    -Temperatur : 300C

    Densitas air () = 995,68 kg/m3 = 62,16 lbm/ft3…………..(Perry, 1997)

    Viskositas () = 0,8007 cP = 1,937 lbm/ft.jam……………(Kirk Othmer, 1967)


Recommended