+ All Categories
Home > Documents > FMANZ Breakfast Auckland an FM perspective for managing the growing commercial property portfolio

FMANZ Breakfast Auckland an FM perspective for managing the growing commercial property portfolio

Date post: 06-Jan-2016
Category:
Upload: altessa
View: 33 times
Download: 4 times
Share this document with a friend
Description:
FMANZ Breakfast Auckland an FM perspective for managing the growing commercial property portfolio. Making Journeys Better. Information courtesy of DTZ, AIAL commercial property maintenance service provider. Property Team. FM need to get involved with: Deal Makers - Opex - PowerPoint PPT Presentation
Popular Tags:
9
FMANZ Breakfast Auckland an FM perspective for managing the growing commercial property portfolio
Transcript
Page 1: FMANZ  Breakfast Auckland an FM perspective for managing the growing commercial property portfolio

FMANZ BreakfastAuckland

an FM perspective for managing the growing commercial property portfolio

Page 2: FMANZ  Breakfast Auckland an FM perspective for managing the growing commercial property portfolio

Making Journeys Better

Page 3: FMANZ  Breakfast Auckland an FM perspective for managing the growing commercial property portfolio

Information courtesy of DTZ, AIAL commercial property maintenance service provider

Page 4: FMANZ  Breakfast Auckland an FM perspective for managing the growing commercial property portfolio

GM

Project Delivery (2)

FM (1)Admin (1)

Asset Managers

(3)

Deal Makers (2)

Property Team

Page 5: FMANZ  Breakfast Auckland an FM perspective for managing the growing commercial property portfolio

• FM need to get involved with:

• Deal Makers- Opex- R&M schedule (lessor v lessee)- Find what is being agreed eg tenant

spec (are there any unusual requests)

• Project Delivery- Base build spec- Maintenance spec- PM

- Design stage - Consultants , Architects, Electrical, Mechanical, Hydraulic, Fire

Page 6: FMANZ  Breakfast Auckland an FM perspective for managing the growing commercial property portfolio

• -Project Delivery cont

- Build stage - Head contractor- Check the sub contractor list - Attend PCG mtgs, beginning , when

req’d, 1- 2 mths before PC- PC – Handover- Introduce maint service provider - Defects/warranty period- BIM, Contract docs, As-builts- Engineers seismic report/certification

Page 7: FMANZ  Breakfast Auckland an FM perspective for managing the growing commercial property portfolio

• Asset Management- Asset Management Planning (AMP)- Long Term Financial Planning- Capex/Opex budgets

• Maintenance Service Provider- Involve them at key points

- Sub contractors list- PC, Handover – trades intro- Get call centre set up with contact info- As-builts – online or CD- GIS

Page 8: FMANZ  Breakfast Auckland an FM perspective for managing the growing commercial property portfolio

• Sustainability- Company Policy/Mandate- Electricity, Water, Waste- Have input

• Greenstar/NABERS

Page 9: FMANZ  Breakfast Auckland an FM perspective for managing the growing commercial property portfolio

Communication

ProcessStructure

Conclusion ......


Recommended