July 2012 Page 1 of 51 DATA CENTERS AND RELATED FACILITIES Table of Contents Page 1.0 SCOPE ................................................................................................................................................... 3 1.1 Changes ............................................................................................................................................ 3 2.0 LOSS PREVENTION RECOMMENDATIONS ....................................................................................... 3 2.1 Introduction ........................................................................................................................................ 3 2.2 Construction and Location ................................................................................................................. 4 2.2.1 General .................................................................................................................................... 4 2.2.2 Walls ........................................................................................................................................ 5 2.2.3 Doors and Windows ................................................................................................................ 5 2.2.4 Penetrations ............................................................................................................................ 5 2.2.5 Ceilings .................................................................................................................................... 5 2.2.6 Floors ....................................................................................................................................... 5 2.2.7 Cables ..................................................................................................................................... 5 2.2.8 Cable Raceways and Routing Assemblies ............................................................................. 6 2.2.9 Heating, Ventilation, and Air Conditioning Systems (HVAC) .................................................. 6 2.2.10 Insulation ............................................................................................................................... 6 2.2.11 Earthquake ............................................................................................................................. 6 2.2.12 Windstorm .............................................................................................................................. 7 2.2.13 Flood/Storm Water Runoff ..................................................................................................... 7 2.3 Occupancy ....................................................................................................................................... 7 2.4 Protection ........................................................................................................................................... 7 2.4.1 General .................................................................................................................................... 7 2.4.2 Portable Fire Extinguishers ..................................................................................................... 8 2.4.3 Data Processing Equipment Room ........................................................................................ 8 2.4.4 Raised Floor/Above-Ceiling Areas Containing Cables ........................................................... 9 2.4.5 Detection: Design Specifications ............................................................................................. 9 2.4.6 Suppression: Design Specifications ...................................................................................... 11 2.5 Equipment and Processes .............................................................................................................. 16 2.5.1 Servers, Mainframes, and Supercomputers .......................................................................... 16 2.5.2 Hot/Cold Aisle Containment and Hot Collar Systems ........................................................... 17 2.5.3 Tape Cartridge Storage ......................................................................................................... 17 2.5.4 Mobile/Modular Data Centers .............................................................................................. 20 2.5.5 Control Rooms ..................................................................................................................... 21 2.5.6 Process Control Rooms ........................................................................................................ 21 2.5.7 Diagnostic Equipment .......................................................................................................... 23 2.6 Inspection, Testing, and Maintenance ............................................................................................. 24 2.6.1 Facilities ................................................................................................................................. 24 2.6.2 Fire Protection ...................................................................................................................... 25 2.7 Human Element ............................................................................................................................... 25 2.7.1 Emergency Response Team (ERT) ...................................................................................... 25 2.7.2 Disaster Recovery Plan ......................................................................................................... 25 2.7.3 Business Continuity Plan ...................................................................................................... 26 2.7.4 Security .................................................................................................................................. 26 2.7.5 Flood Emergency Response Plan ........................................................................................ 26 2.8 Utilities ............................................................................................................................................. 26 2.8.1 General .................................................................................................................................. 26 2.8.2 Primary Power Systems ........................................................................................................ 27 2.8.3 Backup Power Systems ........................................................................................................ 28 FM Global Property Loss Prevention Data Sheets 5-32 ©2005-2012 Factory Mutual Insurance Company. All rights reserved. No part of this document may be reproduced, stored in a retrieval system, or transmitted, in whole or in part, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without written permission of Factory Mutual Insurance Company.
Transcript
Page 1: Fmds0532 Data Centers

July 2012Page 1 of 51

DATA CENTERS AND RELATED FACILITIES

Table of ContentsPage

1.0 SCOPE ................................................................................................................................................... 31.1 Changes ............................................................................................................................................ 3

2.0 LOSS PREVENTION RECOMMENDATIONS ....................................................................................... 32.1 Introduction ........................................................................................................................................ 32.2 Construction and Location ................................................................................................................. 4

2.2.1 General .................................................................................................................................... 42.2.2 Walls ........................................................................................................................................ 52.2.3 Doors and Windows ................................................................................................................ 52.2.4 Penetrations ............................................................................................................................ 52.2.5 Ceilings .................................................................................................................................... 52.2.6 Floors ....................................................................................................................................... 52.2.7 Cables ..................................................................................................................................... 52.2.8 Cable Raceways and Routing Assemblies ............................................................................. 62.2.9 Heating, Ventilation, and Air Conditioning Systems (HVAC) .................................................. 62.2.10 Insulation ............................................................................................................................... 62.2.11 Earthquake ............................................................................................................................. 62.2.12 Windstorm .............................................................................................................................. 72.2.13 Flood/Storm Water Runoff ..................................................................................................... 7

2.3 Occupancy ....................................................................................................................................... 72.4 Protection ........................................................................................................................................... 7

2.4.1 General .................................................................................................................................... 72.4.2 Portable Fire Extinguishers ..................................................................................................... 82.4.3 Data Processing Equipment Room ........................................................................................ 82.4.4 Raised Floor/Above-Ceiling Areas Containing Cables ........................................................... 92.4.5 Detection: Design Specifications ............................................................................................. 92.4.6 Suppression: Design Specifications ...................................................................................... 11

2.5 Equipment and Processes .............................................................................................................. 162.5.1 Servers, Mainframes, and Supercomputers .......................................................................... 162.5.2 Hot/Cold Aisle Containment and Hot Collar Systems ........................................................... 172.5.3 Tape Cartridge Storage ......................................................................................................... 172.5.4 Mobile/Modular Data Centers .............................................................................................. 202.5.5 Control Rooms ..................................................................................................................... 212.5.6 Process Control Rooms ........................................................................................................ 212.5.7 Diagnostic Equipment .......................................................................................................... 23

2.6 Inspection, Testing, and Maintenance ............................................................................................. 242.6.1 Facilities ................................................................................................................................. 242.6.2 Fire Protection ...................................................................................................................... 25

2.7 Human Element ............................................................................................................................... 252.7.1 Emergency Response Team (ERT) ...................................................................................... 252.7.2 Disaster Recovery Plan ......................................................................................................... 252.7.3 Business Continuity Plan ...................................................................................................... 262.7.4 Security .................................................................................................................................. 262.7.5 Flood Emergency Response Plan ........................................................................................ 26

2.8 Utilities ............................................................................................................................................. 262.8.1 General .................................................................................................................................. 262.8.2 Primary Power Systems ........................................................................................................ 272.8.3 Backup Power Systems ........................................................................................................ 28

FM GlobalProperty Loss Prevention Data Sheets 5-32

©2005-2012 Factory Mutual Insurance Company. All rights reserved. No part of this document may be reproduced,stored in a retrieval system, or transmitted, in whole or in part, in any form or by any means, electronic, mechanical,photocopying, recording, or otherwise, without written permission of Factory Mutual Insurance Company.

Page 2: Fmds0532 Data Centers

2.8.4 Power-Down of Data Processing Equipment and HVAC Systems ....................................... 292.8.5 Heating, Ventilation, and Air Conditioning (HVAC) ............................................................... 30

3.0 SUPPORT FOR RECOMMENDATIONS ............................................................................................. 303.1 Construction and Location ............................................................................................................. 30

3.1.1 General .................................................................................................................................. 303.1.2 Penetrations .......................................................................................................................... 313.1.3 Cables ................................................................................................................................... 313.1.4 Insulation ............................................................................................................................... 313.1.5 Earthquake ............................................................................................................................ 31

3.2 Protection ......................................................................................................................................... 313.2.1 General .................................................................................................................................. 313.2.2 Data Processing Equipment Rooms .................................................................................... 323.2.3 Raised Floor/Above-Ceiling Areas Containing Cable ........................................................... 323.2.4 Detection ............................................................................................................................... 323.2.5 Suppression ........................................................................................................................... 34

3.3 Equipment and Processes .............................................................................................................. 353.3.1 Servers, Mainframes, and Supercomputers .......................................................................... 353.3.2 Hot/Cold Aisle Containment and Hot Collar Systems ........................................................... 363.3.3 Tape Cartridge Storage ......................................................................................................... 373.3.4 Mobile/Modular Data Center ................................................................................................. 373.3.5 Control/Process Control Rooms ............................................................................................ 373.3.6 Diagnostic Equipment ........................................................................................................... 38

3.4 Utilities ............................................................................................................................................. 383.4.1 General .................................................................................................................................. 383.4.2 Primary Power Systems ........................................................................................................ 383.4.3 Backup Power Systems ........................................................................................................ 383.4.4 Power-Down of Data Processing Equipment and HVAC Systems ....................................... 393.4.5 Heating, Ventilation, and Air Conditioning (HVAC) ............................................................... 413.4.6 Uptime Institute Tier Classification ........................................................................................ 41

3.5 Loss History ..................................................................................................................................... 423.5.1 NFPA ..................................................................................................................................... 42

4.0 REFERENCES ..................................................................................................................................... 434.1 FM Global ........................................................................................................................................ 43

4.1.1 FM Approvals ........................................................................................................................ 434.2 Other Standards ............................................................................................................................ 43

APPENDIX A GLOSSARY OF TERMS ..................................................................................................... 44APPENDIX B DOCUMENT REVISION HISTORY ..................................................................................... 47APPENDIX C PERFORMANCE TEST PROCEDURES FOR VEWFD SYSTEMS .................................... 48APPENDIX D CLEAN AGENTS .................................................................................................................. 50APPENDIX E BIBLIOGRAPHY .................................................................................................................. 50

List of FiguresFig. 1. Conceptual layout of data center facility ............................................................................................ 4Fig. 2. Very early warning fire detection (VEWFD); air-aspirating type ....................................................... 10Fig. 3. Schematic of preaction valve with test discharge line ..................................................................... 13Fig. 4. Typical server cabinet and rack arrangement .................................................................................. 16Fig. 5. Conceptual view of cold aisle containment system .......................................................................... 18Fig. 6. Conceptual view of hot aisle containment system ........................................................................... 18Fig. 7. Conceptual view of hot collar containment system .......................................................................... 19Fig. 8. Power distribution schematic for data center equipment ................................................................ 27

List of TablesTable 1. Sprinkler System Operation Sequence .......................................................................................... 34Table 2. Power-Down of Data Processing Equipment and HVAC Systems ................................................ 40Table 3. Tier Requirements Summary .......................................................................................................... 42Table 4. Heated-Wire Test Parameters ......................................................................................................... 48Table 5. Design Concentrations for Clean Agents ...................................................................................... 50Table 6. Design Concentrations for Clean Agents with an Energized Electrical Hazard ............................. 50

5-32 Data Centers and Related FacilitiesPage 2 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 3: Fmds0532 Data Centers

1.0 SCOPE

This data sheet contains property loss prevention recommendations for data centers and their critical systemsand equipment. This data sheet also identifies the hazards associated with these facilities and recommendsrisk-mitigation solutions from a property protection and business continuity perspective.

Related facilities covered in this data sheet include control rooms, process control rooms, and diagnosticequipment. Where the term “data center” is used in this document, facilities that have similar electronicequipment are also intended.

This data sheet does not cover the following:

• Telecommunication and broadcast facilities; refer to Data Sheet 5-14,Telecommunications

• Motor control centers and switchgear rooms; refer Data Sheet 5-19, Switchgear and Circuit Breakers.

1.1 Changes

July 2012. This data sheet has been completely rewritten. Major changes include the following:

1. Changed the title from Electronic Data Processing Systems to Data Centers and Related Facilities.

2. Added hot/cold aisle containment systems and protection recommendations.

3. Added the recommendation for the protection of foam insulation beneath raised floors in the dataprocessing equipment room.

4. Added guidance on using clean agent fire extinguishing systems and water mist systems.

5. Added protection recommendations for modular data centers.

6. Added protection recommendations for process control rooms, control rooms, and diagnostic equipment.Recommendations in the specific sections for process control rooms, control rooms, and diagnosticequipment when identified will supersede those for data centers.

7. Added recommendations for redundancy of certain critical utility systems: heating, ventilation and airconditioning (HVAC) systems, chillers, and ventilation.

8. Updated the section on automatic power-down to include powering down and de-energizing dataprocessing equipment and HVAC systems.

9. Deleted the recommendation for automatic smoke control and removal systems.

2.0 LOSS PREVENTION RECOMMENDATIONS

2.1 Introduction

A data center consists of an equipment room, utilities, and support infrastructure. See Figure 1 for aconceptual layout.

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 3

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 4: Fmds0532 Data Centers

The following represents our best advice loss prevention recommendations directed at new data centersand related facilities.

Particular attention should be given to using noncombustible construction materials, plenum rated wires/cables, plenum rated raceways/routing assemblies, non-fire-propagating hot/cold aisle containment materialsand noncombustible filters and insulation. Fire detection and suppression options are provided.

2.2 Construction and Location

2.2.1 General

2.2.1.1 Construct data centers of noncombustible materials. Plastic materials, including those of fire-retardantcomposition, can produce large quantities of smoke and should not be used.

2.2.1.2 If plastic materials are used, ensure they are specification tested to FM Approval Standard 4910,Cleanroom Materials Flammability Test Protocol, (FM4910 plastics). Specification-tested products are listedin the Building Materials section of the Approval Guide, an online resource of FM Approvals.

2.2.1.3 Protect data centers against external fire exposure. Do not allow combustible material to exposethe building or the air intake(s) for the building. Provide blank masonry walls or other suitable protection whenthere is unfavorable exposure or the potential for vandalism from outside the building (refer to Data Sheet1-20, Protection Against Exterior Fire Exposure).

2.2.1.4 Do not locate data centers in multistory buildings with inadequately sprinklered or unsprinkleredspaces.

2.2.1.5 Do not locate data centers and critical systems/equipment of the facility below grade-level areas.

2.2.1.6 Locate data centers so they are not exposed to damage by any hazardous process, storage, corrosiveor ignitable liquid or vapor, industrial pollutants, or mechanical equipment such as overhead cranes.

2.2.1.7 Do not locate roof drains, domestic water lines, or other liquid piping that is not essential for operationsin data processing equipment rooms.

2.2.1.8 For existing locations, where liquid piping is present in the room, provide containment and/or leakdetection with alarm notification at a constantly attended location.

Fig. 1. Conceptual layout of data center facility

Data center equipment room

Tapemedia

storage

Controlroom

Offices

Lobby & security

Storage &maintenance

Battery UPSroom

Diesel generatorsand/or rotary UPS

Mechanical room(air handlers, chillers,electrical panels, etc.)

CRAC

CRAC

CRAC

CRAC

CRAC

CRAC

5-32 Data Centers and Related FacilitiesPage 4 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 5: Fmds0532 Data Centers

2.2.2 Walls

2.2.2.1 Provide one-hour fire-resistance-rated interior walls, partitions, and floors in accordance with DataSheet 1-21, Fire Resistance of Building Assemblies, for the following:

• data processing equipment rooms

• battery power rooms

2.2.2.2 Provide fire-resistance-rated interior walls, partitions, and floors for power equipment rooms (standbygenerator and ac power) in accordance with Data Sheet 5-23, Emergency and Standby Power Systems.

2.2.2.3 Provide openings in maximum foreseeable loss (MFL) fire walls, fire partitions, and floors inaccordance with Data Sheet 1-23, Fire Barriers and Protection of Openings.

2.2.2.4 Use the Limiting Factors in Data Sheet 1-22, Maximum Foreseeable Loss, to limit the maximumexposure from property loss and business interuption.

2.2.3 Doors and Windows

2.2.3.1 Minimize interior windows and doors to the data processing equipment room. When required, providetempered or wired glass for windows and minimum ¾ hour fire rated doors.

2.2.3.2 Where doors are held open intermittently or permanently, provide an electromechanical orelectromagnetic holding mechanism interlocked to close the door on smoke detector actuation.

2.2.4 Penetrations

2.2.4.1 Seal openings in fire-rated floors and walls through which pipes, wires, and cables pass with an FMApproved or listed penetration seal with a fire-resistance rating equivalent to the rating of the wall or floor.

2.2.4.2 Provide a leakage-rated penetration seal with a rating as low as possible, but not exceeding7 ft3/min/ft2 (2.1 m3/min/m2) in addition to the fire-resistance rating for equipment room penetrations (seeSection 3.1.2).

2.2.4.3 When new construction or modifications are in progress, install temporary FM Approved fire-stoppenetration seals, e.g. bricks, plugs, cushions, for protection when work is stopped at night and duringweekends.

2.2.4.4 Seal openings in fire-rated floors and walls through which HVAC duct(s) pass with an FM Approvedfire damper with a fire-resistance rating equivalent to the rating of the wall or floor.

2.2.4.5 Provide smooth or protected electrical cable openings in floors (e.g., grommets, cable glands) toprevent damage to the cables.

2.2.5 Ceilings

Construct suspended ceilings of Class I materials; see Data Sheet 1-12, Ceilings and Concealed Spaces.

Limit the maximum height of ceilings in data centers to 30 ft (9 m). (See Section 2.4.6.1.3 and Section 3.2.5.1.)

2.2.6 Floors

Construct floors, raised floors, and structural supporting members for a raised floor of noncombustiblematerials.

2.2.7 Cables

2.2.7.1 Install all grouped cables and cable trays (power and data) in accordance with Data Sheet 5-31, Cableand Bus Bars.

2.2.7.2 Use communication and data cable (e.g., coaxial and fiber optic) that meet one of the following criteria:

• FM Approved Group 1-4910, or

• FM Approved Group 1, or

• Plenum rated cable listed to Underwriters Laboratories (UL) Standard 910, or

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 5

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 6: Fmds0532 Data Centers

• Cable that has a maximum flame spread distance of 5 ft (1.5 m) or less when tested in accordance withNFPA 262

2.2.7.3 Separate power cable from communication/data cable by keeping the power cable in a separate cabletray/raceway or routing assembly.

2.2.7.4 Remove abandoned or spare cables that are not in service and are not intended for future service.

2.2.8 Cable Raceways and Routing Assemblies

2.2.8.1 Use cable raceways and routing assemblies made of noncombustible materials whenever possible.

2.2.8.2 When cable raceway and routing assemblies must be constructed of plastic, use one of the following:

A. FM Approvals 4910 specification tested plastics listed in the Building Materials section of the ApprovalGuide (FM4910 plastics), or

B. Plenum-rated plastic raceways listed to Underwriters Laboratory (UL) Standard 2024.

2.2.9 Heating, Ventilation, and Air Conditioning Systems (HVAC)

Provide heating, ventilation, and air conditioning (HVAC) systems in accordance with Data Sheet 1-45, AirConditioning and Ventilation Systems.

2.2.9.1 Filters

Provide heating, ventilation, and air conditioning (HVAC) filters that are listed to Underwriters Laboratories(UL) Standard 900.

2.2.10 Insulation

2.2.10.1 Provide building insulation and elastomeric materials installed on the building and on the floorbeneath a raised floor in accordance with Data Sheet 1-57, Plastics in Construction.

2.2.10.2 Provide pipes and ducts using insulation with one of the following:

A. Noncombustible insulating materials (e.g., foil-wrapped fiberglass or mineral fiber wool), or

B. FM Approved insulation (Approved to FM Approvals Standard 4924)

2.2.11 Earthquake

The following recommendations apply to FM Global 50-year through 500-year earthquake zones as shownin Data Sheet 1-2, Earthquakes.

2.2.11.1 Retain a consulting firm specializing in earthquake design and evaluation. Review all aspects offacility construction design as well as process and building service equipment for local code compliance andapplicable recommendations of Data Sheet 1-2, Earthquakes.

2.2.11.2 Design fire protection systems in accordance with Data Sheet 2-8, Earthquake Protection forWater-Based Fire Protection Systems.

2.2.11.3 Design anchoring and bracing of equipment (such as server racks, mainframes, automated tapelibraries, and CRAC units) to resist the largest of the following seismic design loads:

A. A minimum horizontal acceleration (G factor) of 0.5

B. The design load required by local code

C. The design load recommended in Data Sheet 1-2, Earthquakes

2.2.11.4 Design raised floors to resist a seismic design load for the larger of either a minimum horizontalacceleration (G factor) of 0.5, or the local code.

2.2.11.5 In FM Global seismic areas, anchor pedestals with bolts to resist the above-mentioned forces. Donot glue down pedestals to the concrete floor. This is particularly important if large, heavy equipment isinstalled on the raised floor.

5-32 Data Centers and Related FacilitiesPage 6 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 7: Fmds0532 Data Centers

2.2.11.6 Provide water piping in or above data centers and related facilities with earthquake bracing designedto resist a seismic design load for the larger of the following:

A. A minimum horizontal acceleration (G factor) of 0.5

B. The design load required by local code

C. The design load recommended in Data Sheet 1-2, Earthquakes

2.2.11.7 Provide shims between batteries and between batteries and racks to prevent shifting of batteries.

2.2.11.8 Anchor diesel generator batteries and fuel tanks to resist a seismic design load for the larger of eithera minimum horizontal acceleration (G factor) of 0.5, the local code or applicable recommendations of FMGlobal Data Sheet 1-2, Earthquakes.

2.2.12 Windstorm

2.2.12.1 Design buildings for wind forces in accordance with Data Sheet 1-28, Wind Design, and Data Sheet1-29, Roof Deck Securement and Above-Deck Roof Components. Design towers in accordance with DataSheet 1-8, Antenna Towers and Signs.

2.2.12.2 Minimize exterior windows and doors to the data center. When required, provide them in accordancewith Data Sheet 1-28, Wind Design.

2.2.13 Flood/Storm Water Runoff

2.2.13.1 Do not locate a data center, critical systems/equipment of the facility, or related facilities in portionsof buildings subject to flood damage from the 500-year flood level per Data Sheet 1-40, Flood.

2.2.13.2 Protect data centers, critical systems/equipment of the facility, and related facilities against stormwater runoff in accordance with Data Sheet 1-40, Flood.

2.2.13.3 Provide water-removal capability for all below-grade areas subject to flooding from storm water runoffor sewer backup.

2.2.13.4 Provide automatic-starting sump pumps with an alarm to a constantly attended area.

2.2.13.5 Connect electric-powered sump pumps to the backup power supply.

2.3 Occupancy

2.3.1 Locate new data processing equipment with packaging awaiting installation in storage and stagingareas separate from data processing equipment rooms (i.e., where fire involving the storage will not exposecritical equipment).

2.3.2 Where storage and staging areas are not available, limit in-process storage in data processingequipment rooms to two pallet loads on the floor (not stacked), and locate them so they do not exposeequipment, batteries, or power cables.

2.3.3 Remove waste materials from areas exposing critical equipment as soon as possible, but no later thanat the end of each shift.

2.3.4 Do not store combustible materials in electrical or HVAC rooms.

2.4 Protection

2.4.1 General

2.4.1.1 Provide automatic sprinkler protection throughout all building spaces associated with this occupancyfor the appropriate hazard classification in accordance with Data Sheet 3-26, Fire Protection Water DemandFor Nonstorage Sprinklered Properties, and/or the hazard-specific data sheet.

2.4.1.2 Install fire detection in areas that are adjacent to the data processing equipment room and criticalsystems/equipment of the facility (e.g., offices, hallways, storage areas/rooms, loading docks).

2.4.1.3 Install fire detection in accordance with Data Sheet 5-48, Automatic Fire Detection.

2.4.1.4 Install fire alarm systems in accordance with Data Sheet 5-40, Fire Alarm Systems.

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 7

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 8: Fmds0532 Data Centers

2.4.1.5 Provide automatic interlocks and power-down to de-energize data processing equipment and HVACsystems in accordance with Section 2.8.4 and the type of protection system.

2.4.2 Portable Fire Extinguishers

2.4.2.1 Provide either carbon dioxide or clean agent portable fire extinguishers listed for energized electricalhazards to protect electronic equipment in accordance with Data Sheet 4-5, Portable Fire Extinguishers.

A. Use a maximum floor area of 3,000 ft2 (280 m2) per portable fire extinguisher.

B. Use a maximum travel distance of 75 ft (23 m).

2.4.2.2 Provide portable fire extinguishers suitable for ordinary combustible materials and energized electricalfires in accordance with Data Sheet 4-5, Portable Fire Extinguishers, when both hazards are present.

A. Use a minimum rating of 2-A (NFPA 10 rating and classification).

B. Use a maximum floor area of 3,000 ft2 (280 m2) per portable fire extinguisher with a 2-A rating, and1,500 ft2 (140 m2) per each additional “A” rating to a maximum of 11,250 ft2 (1045 m2).

C. Use a maximum travel distance of 75 ft (23 m).

2.4.2.3 Do not use dry chemical fire extinguishers in data processing equipment rooms with data processingequipment or electronic equipment.

2.4.2.4 Locate a portable fire extinguisher at the entrance of the processing equipment room. Locate additionalfire extinguishers based upon the above recommendations for area per extinguisher and travel distance.

2.4.2.5 Locate a sign adjacent to or verify the adequacy of the labeling on the portable fire extinguisher toidentify the type of fire that it is suitable for extinguishing.

2.4.2.6 Provide training on the selection and safe use of portable fire extinguishers to staff working in thearea.

2.4.3 Data Processing Equipment Room

2.4.3.1 Provide FM Approved very early warning fire detection (VEWFD) in the data processing equipmentroom and HVAC return air systems.

2.4.3.2 Install the very early warning fire detection (VEWFD) in accordance with Section 2.4.5.

2.4.3.3 Provide one of the following fire protection systems to protect the data processing equipment roomstructure:

A. An automatic wet or preaction sprinkler system throughout the data center, designed in accordancewith Section 2.4.6.1.

B. An automatic FM Approved water mist system listed specifically for Light Hazard Occupancies, designedin accordance with Section 2.4.6.2.

C. An FM Approved clean agent fire extinguishing system designed in accordance with Section 2.4.6.3,if all of the following conditions are met:

1. Construction is noncombustible.

2. Equipment enclosures are metal.

3. There is scant and controlled use of paper, and other combustibles in the room.

4. There is no storage of plastic cassettes within the room. Note: This includes all combustible media(e.g., tape reels).

5. Automatic power-down is provided to the room and equipment (except to emergency lighting) uponsmoke detection.

6. Shutdown and/or damper of ventilation systems that use return or make-up air are provided.

Note: ″Scant″ is defined as a quantity and distribution of combustibles that, in a worst-case fire scenario,could be successfully extinguished using only one portable fire extinguisher.

5-32 Data Centers and Related FacilitiesPage 8 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 9: Fmds0532 Data Centers

2.4.4 Raised Floor/Above-Ceiling Areas Containing Cables

2.4.4.1 Provide FM Approved very early warning fire detection (VEWFD) below raised floors and inabove-ceiling areas that contain cables in accordance with Section 2.4.5.

2.4.4.2 Detection systems below the raised floor space may be omitted under either of the followingconditions:

A. When only FM Approvals Group 1, Group 1-4910, or UL-listed plenum-rated cables are present (referto Data Sheet 5-31, Cables and Bus Bars)

B. When VEWFD detection is provided in the room and/or at the return for air re-circulated from the raisedfloor into the room.

2.4.4.3 When an intelligent VEWFD spot-type smoke detector is used below a raised floor, ensure it ismounted in the proper orientation as indicated in its FM Approval listing.

2.4.4.4 Protect grouped cables and cable trays in accordance with Data Sheet 5-31, Cable and Bus Bars.

2.4.4.5 Fire protection for cables is not needed when the types of cables identified in Section 2.2.7.2 are used.

2.4.4.6 Protect elastomeric materials installed on the floor and supports beneath a raised floor in accordancewith the relevant recommendations in Data Sheet 1-57, Plastics in Construction.

2.4.4.7 Provide an automatic fire protection system:

• below noncombustible raised floors or in above-ceiling spaces when propagating cables are present.

• below a raised floor area when it is made of combustible construction.

2.4.4.8 Provide one of the following fire protection systems:

A. Automatic extended coverage (EC) nonstorage sprinkler protection designed to deliver a density of0.2 gpm/ft2 (8 mm/min) over 2500 ft2 (232 m2) within the raised floor space and/or above-ceiling spaces.

1. When designed as a wet pipe system, use automatic EC nonstorage sprinklers with a temperaturerating of 165°F (74°C) on a maximum 130 ft2 (12 m2) spacing.

2. When designed as a dry pipe system, use automatic EC nonstorage sprinklers with a temperaturerating of 280°F (140°C) on a maximum 130 ft2 (12 m2) spacing.

3. Reduce the linear spacing of extended coverage (EC) nonstorage sprinklers in accordance withObstructions to Discharge Pattern of Pendent and Upright Nonstorage Sprinklers in Data Sheet 2-0,Installation Guidelines for Automatic Sprinklers, to account for the specific deflector to floor distance.

B. An FM Approved inert gas clean agent fire extinguishing system designed in accordance with Section2.4.6.3.

C. An FM Approved water mist system specifically listed for raised floor protection designed in accordancewith Section 2.4.6.2.

2.4.4.9 Arrange the fire protection system to be actuated by smoke detection in accordance with Section2.4.5.

2.4.4.10 Provide a ready means of access in proximity to the detectors, sprinklers, and fire extinguishingsystem nozzles in the raised floor or above-ceiling space containing cables.

2.4.5 Detection: Design Specifications

Install fire detection per Data Sheet 5-48, Automatic Fire Detection, in conjunction with the followingrecommendations.

2.4.5.1 For data processing equipment areas/rooms, provide FM Approved VEWFD systems installed inaccordance with the recommendations in this section and the manufacturer’s instructions.

2.4.5.2 Use one of the following FM Approved VEWFD systems, as appropriate for the characteristics ofthe occupancy:

A. Air aspirating

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 9

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 10: Fmds0532 Data Centers

B. Intelligent high-sensitivity spot detection; photoelectric type

2.4.5.3 Transmit fire alarms to a central supervisory station or other constantly attended location.

2.4.5.4 Install the fire alarm control panel for fire detection in accordance with Data Sheet 5-40, Fire AlarmSystems.

2.4.5.5 Air Aspirating Detection (see Figure 2)

2.4.5.5.1 Where a single level of detection is used, install a sensor or port in an area no larger than 200 ft2

(18.6 m2) .

A. The sensors or ports do not need to be located in the center of the bay.

B. Do not locate sensors or ports within 3 ft (0.9 m) of HVAC supply outlets.

2.4.5.5.2 Where two levels of detection are used, install a sensor or port in an area no larger than 400 ft2

(37.2 m2) for both levels.

2.4.5.5.3 Provide two levels of detection where cable trays impede the flow of smoke to the ceiling.

A. Locate one level of detection below the cable trays and one level at the ceiling.

B. Stagger the sensors or ports between each level.

2.4.5.5.4 Install sensors or ports to monitor the return air.

A. Locate sensors or ports at the return air inlet of each HVAC unit.

B. Locate sensors or ports so each covers an area no greater than 4 ft2 (0.4 m2) of the return opening.

2.4.5.5.5 Ensure minimum sensitivity settings are above ambient airborne levels for alert and alarm conditions.

2.4.5.5.6 For air sampling VEWFD, do not exceed a transport time of 60 seconds from the most remote portto the detection unit.

2.4.5.5.7 Conduct smoke tests (see Appendix C) when the VEWFD system is installed to verify smokedetectors are properly located with regard to air flow within the protected area, including ventilation andstratification within the protected area.

2.4.5.6 Intelligent High-Sensitivity Spot Smoke Detection

2.4.5.6.1 Use FM Approved intelligent high-sensitivity spot smoke detectors of the photoelectric type.

Fig. 2. Very early warning fire detection (VEWFD); air-aspirating type

SSR METHOD

86.062 VERTICALLY

SHEAR 30º

ROTATE -30º

EXHAUST AIR VENT

DETECTION FOR EXHAUST AIR

DATA EQUIPMENT

AIR HANDLING

UNIT

AIR SAMPLING GRID

AIR SAMPLING

DETECTORS

DETECTION FOR AHU INTAKE

EXHAUST

AIR PLENUM

5-32 Data Centers and Related FacilitiesPage 10 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 11: Fmds0532 Data Centers

2.4.5.6.2 Provide two FM Approved intelligent high-sensitivity spot smoke detectors in each protected spaceor zone for initiation of the protection system.

2.4.5.6.3 Install the FM Approved intelligent high-sensitivity spot smoke detectors in accordance with themanufacturer’s specification for spacing based upon the air movement (e.g., air changes per minute/hourin the protected space or zone).

2.4.5.6.4 Provide an annunciator panel at the fire alarm control panel arranged to indicate first- andsecond-stage alarm signals from intelligent high-sensitivity spot detectors.

2.4.6 Suppression: Design Specifications

The reliability of a protection system is a function of the complexity of the system and the number of interactingcomponents for its operation.

2.4.6.1 Automatic sprinklers

2.4.6.1.1 Provide one of the following types of automatic sprinkler protection listed in order of preferencebased upon reliability and maintenance (i.e., annual trip test; refer to Section 3.2.5.1):

A. Wet system

B. Non-interlocked preaction system

C. Single-interlocked preaction system

D. Double-interlocked preaction system

2.4.6.1.2 Provide quick response (QR) sprinklers with design demands, hose demands, and duration inaccordance with the recommendations in Data Sheet 3-26, Fire Protection Demand for NonstorageSprinklered Properties, for Hazard Category 1 (HC-1) up to a 30 ft (9 m) ceiling. (Refer to Section 3.2.5.1.)

2.4.6.1.3 When the following hazards are present, provide sprinkler design demands, hose demands, andduration in accordance with the recommendations in Data Sheet 3-26 for Hazard Category 2 (HC-2) up to a30 ft (9 m) ceiling (refer to Section 3.2.5.1):

A. Propagating (non-plenum-rated) communication/data cables in vertical bundles greater than 3 in. (76mm) in diameter

B. Propagating power cables, raceways if more than two tiers high

C. Data processing equipment constructed of combustible material

D. Raceways constructed of combustible plastic

2.4.6.1.4 Provide protection for hot/cold aisle containment systems in accordance with Section 2.5.2.

2.4.6.1.5 Install sprinkler systems in accordance with Data Sheet 2-0, Installation Guidelines for AutomaticSprinklers, and the recommendations included herein for this Section.

2.4.6.1.6 Provide linear and area spacing of sprinklers in accordance with the recommendations in DataSheet 2-0, Installation Guidelines for Automatic Sprinklers, for the designated hazard category up to a 30 ft(9 m) ceiling.

2.4.6.1.7 When using an automatic sprinkler protection, preaction type, for a single-interlock, non-interlock,or double-interlock system throughout the data center, provide it in accordance with the followingrecommendations:

A. Install in accordance with the applicable recommendations for a preaction sprinkler system in DataSheet 2-0, Installation Guidelines for Automatic Sprinklers.

B. Activate the preaction valve with smoke detectors and control panel in accordance with Data Sheet5-48, Automatic Fire Detection, in addition to the following:

1. Provide two independent VEWFD smoke detection systems if both a preaction sprinkler systemand clean agent fire extinguishing system are installed.

2. Do not use heat detectors or standard-response smoke detectors for actuation of the preactionsprinkler system.

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 11

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 12: Fmds0532 Data Centers

3. Provide one of the following VEWFD detection methods in accordance with Section 2.4.5:

• Air-aspirating smoke detection

• Intelligent high-sensitivity spot detection

4. Annunciate an alert condition in a constantly attended location when the alert setting for the VEWFDdetection has activated.

5. Provide a local visual and/or audible alarm within the protected area when an action condition isactivated.

6. Provide an alarm signal to the building fire alarm control panel area when an alarm condition is activated.

7. Arrange the control valve for all preaction types of sprinkler systems to actuate upon:

• the second alarm level or earlier for air-aspirating detection.

• the second alarm for intelligent high-sensitivity spot detection.

C. When using a non-interlock or single-interlock preaction sprinkler system arrangement base thesprinkler demand on a wet system.

D. When using a double-interlock preaction sprinkler system, base the sprinkler design demand on a drysystem.

E. Install an alarm valve for the sprinkler systems protecting the data center equipment room separatefrom other sprinkler systems.

F. For a sprinkler system with a preaction valve, provide a 2 in (50 mm) diameter test discharge line locatedabove (downstream from) the preaction sprinkler valve assembly (see Figure 3) for trip testing of thepreaction valve.

1. Install a normally closed indicating valve with supervision on the test discharge line.

2. Install a normally open indicating valve with supervision on the system riser above (downstreamfrom) the intake for the test discharge line.

G. Install the fire alarm control panel for the preaction sprinkler in accordance with the applicablerecommendations in Data Sheet 5-40, Fire Alarm Systems.

2.4.6.2 Water Mist Systems

2.4.6.2.1 An automatic water mist system FM Approved for protection of HC-1 (Light Hazard) occupanciesmay be used to protect data centers.

2.4.6.2.2 Use wet systems with automatic nozzles only.

2.4.6.2.3 Install water mist systems in accordance with the applicable recommendations in Data Sheet 3-26,Fire Protection Demand for Nonstorage Sprinklered Properties, for Water Mist Systems.

2.4.6.2.4 Use FM Approved water mist systems for the protection of the data processing equipment roomonly when non-propagating cables are located below the raised floor.

2.4.6.2.5 Do not use water mist systems for protection of the data processing equipment room whenpropagating cables are located in servers, cable trays, and cable raceways.

2.4.6.2.6 For high-pressure water mist systems, use the supply pump specified in the FM Approval listing.

2.4.6.2.7 Provide an automatic interlock for shutdown of the ventilation system in the protected area (seeSection 2.8.4).

2.4.6.2.8 Locate nozzles with respect to continuous and discontinuous obstructions in accordance with theFM Approval listing.

2.4.6.2.9 When a low-pressure water mist system is supplied by the building sprinkler system, install aseparate water flow switch for the water mist system.

5-32 Data Centers and Related FacilitiesPage 12 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 13: Fmds0532 Data Centers

2.4.6.2.10 When protection of the area below the raised floor is provided by a water mist system, providean FM Approved automatic water mist system specifically listed for protection of “computer room subfloors”(see Section 2.4.4.)

2.4.6.2.11 Provide an automatic interlock for shutdown of the ventilation system in the protected raised floorarea.

2.4.6.2.12 Install water mist systems in accordance with all applicable recommendations in Data Sheet 4-2,Water Mist System, and the manufacturer’s design, installation, and operation manual listed with their FMApproval.

2.4.6.3 Clean Agent Fire Extinguishing Systems: Design Specifications

2.4.6.3.1 An FM Approved clean agent fire extinguishing system can be provided under the followingconditions:

• when located in a building without automatic sprinkler protection, with noncombustible construction, andnot containing combustibles (see Section 2.4.3.3).

• for protection below raised floors; inert gas system only (see Section 2.4.4).

• to protect data processing equipment within the data processing equipment room and raised floor tosupplement automatic sprinkler or water mist system protection (see Section 2.5.1 and 2.5.2).

2.4.6.3.2 Construct the physical building envelop in accordance with Section 2.2 to maintain the designconcentration of clean extinguishing agent for whichever is the longer duration: 10 minutes, or until theenergized equipment can be de-energized.

Fig. 3. Schematic of preaction valve with test discharge line

To sprinklers

Normally openindicating valvewith supervision,for testing purposes

Indicating watersupply valve

To air ornitrogensupply

Pre-actionvalve

Checkvalve

Watersupply

Normally closedindicating valvewith supervision,for testing purposes

Testdischargeline

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 13

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 14: Fmds0532 Data Centers

2.4.6.3.3 Provide an FM Approved clean agent fire extinguishing system with automatic actuation from FMApproved VEWFD detection, manual operation, and emergency mechanical manual operation.

2.4.6.3.4 Verify the FM Approved clean agent fire extinguishing system is in accordance with design andinstallation recommendations in Data Sheet 4-9, Clean Agent Fire Extinguishing Systems, and themanufacturer’s design, installation, and operation manual listed with their FM Approval.

2.4.6.3.5 When a halocarbon clean agent fire extinguishing system is used, provide clean agent fire protectionsystems in both the data processing equipment room and below the raised floor (see Section 3.2.5.3).

2.4.6.3.6 For the protection of data processing equipment (e.g., servers, electrical equipment, batteries, andcables; refer to Section 2.8.4):

• When the electrical equipment and/or cables are de-energized, provide the design concentration for anordinary combustible (Class A) fire in accordance with the system’s FM Approval listing.

• When the electrical equipment and/or cables are not immediately de-energized, but have a time delaypower disconnect, provide the design concentration for an energized electrical fire (Class C) identifiedfor the specific extinguishing agent in Appendix D.

2.4.6.3.7 For the protection of the data center provide the design concentration for an ordinary combustible(Class A) fire in accordance with the system’s FM Approval listing (see Section 2.4.3.3).

2.4.6.3.8 Provide the proper clearance of the discharge nozzle(s) from the sidewall(s) of a containment systemor other obstructions (e.g., cable trays) in accordance with the manufacturer’s design, installation andoperation manual listed for FM Approval (see Section 2.5.2).

2.4.6.3.9 When used in conjunction with a preaction sprinkler system, actuate the clean agent fireextinguishing system using FM Approved intelligent high-sensitivity spot smoke detection system in a matrixor counting configuration.

2.4.6.3.10 Design and install FM Approved VEWFD detection for the actuation of the clean agent fireextinguishing system(s) in accordance with Data Sheet 5-48, Automatic Fire Detection, and themanufacturer’s design, installation, and operation manual listed for FM Approval.

2.4.6.3.11 Do not use standard response smoke detectors for the actuation of clean agent fire extinguishingsystems.

2.4.6.3.12 When a clean agent fire extinguishing system is actuated by air-aspirating VEWFD:

A. Annunciate all alert conditions to a constantly attended location.

B. Provide a local visual and/or audible alarm within the protected area when an action condition isactivated.

C. Provide an alarm signal to the building fire alarm control panel area when an alarm condition is activated.

D. At the alarm condition, arrange for the following to occur:

1. Shut down HVAC systems that:

• use outside make-up air (external from protected room).

• protect only below the raised floor or only above ceiling space.

• use ventilation between multiple zones.

2. Automatically close fire and smoke dampers, as appropriate.

3. Power down data processing equipment as appropriate (see Section 2.8.4).

4. Discharge the clean agent after a non-recycling time delay not exceeding 30 seconds.

2.4.6.3.13 When a clean agent fire extinguishing system is actuated by intelligent high-sensitivity spot smokedetection:

A. From activation of an alert condition or pre-alarm, annunciate notification in a constantly attendedlocation.

5-32 Data Centers and Related FacilitiesPage 14 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 15: Fmds0532 Data Centers

B. From activation from the first detector, provide local visual and/or audible alarm within the protectedarea.

C. From activation of the second detector arrange for the following to occur:

1. Shut down HVAC systems that:

• use outside make-up air (external from protected room).

• protect only below the raised floor or only above ceiling space.

• use ventilation between multiple zones.

2. Close fire and smoke dampers from activation of the second detector.

3. Power down data processing equipment as appropriate (see Section 2.8.4).

4. Discharge the clean agent after a non-recycling time delay not exceeding 30 seconds.

2.4.6.3.14 For HVAC systems that do not introduce makeup (outside) air, the ventilation does not need tobe shut down when both of the following are provided:

A. Sufficient clean agent is provided for the volume of HVAC system ducts and components open to theprotected space as part of the total hazard volume.

B. Sufficient clean agent is provided to compensate for leakage or makeup (outside) air from the protectedspace envelope during the hold time.

2.4.6.3.15 Provide permanently connected clean agent supply cylinder(s) as a reserve for the clean agentfire extinguishing system when:

• providing sole protection of the data center or data processing equipment room (see Section 2.4.3).

• providing simultaneous protection of multiple data processing equipment rooms.

2.4.6.3.16 Install the fire alarm control panel in accordance with Data Sheet 5-40, Fire Alarm Systems.

2.4.6.3.17 Provide an FM Approved releasing device that is electrically compatible with the clean agent fireextinguishing system actuation device and interfaces with the smoke detection, fire extinguishing systemreleasing device, and fire alarm system.

2.4.6.3.18 Provide audible and visual alarms to give a positive warning of a pending discharge of the cleanagent fire extinguishing system.

2.4.6.3.19 Locate abort switch(es), when provided, within the interior of the room and near a means of egress.

A. Provide a type that requires positive manual pressure to prevent discharge of the clean agent fireextinguishing system.

B. Provide manual and emergency manual controls to cancel the abort function to allow discharge of theclean agent fire extinguishing system.

C. Provide both distinctive audible and visual indication of the clean agent fire extinguishing system inabort mode.

D. Provide a placard that identifies the abort switch and purpose.

2.4.6.3.20 Conduct a door fan test in accordance with Data Sheet 4-9, Clean Agent Fire ExtinguishingSystems, subsequent to the clean agent fire extinguishing system installation to verify the clean agentconcentration will be maintained at the design concentration for the recommended retention time and notover-pressurize the enclosure. Modify the protected space envelope and repeat the test until acceptableresults are attained.

2.4.6.3.21 Provide a plan and means to ventilate the protected area from the discharge of the clean agentand byproducts of decomposition without contamination to other equipment and areas.

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 15

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 16: Fmds0532 Data Centers

2.5 Equipment and Processes

2.5.1 Servers, Mainframes, and Supercomputers

2.5.1.1 Equipment

2.5.1.1.1 Use equipment and replacement parts that are listed to safety standards for their intended purposeby a nationally recognized testing laboratory (NRTL).

2.5.1.1.2 Provide server enclosures (e.g., cabinets) and racks constructed of noncombustible materials. SeeFigure 4 for a typical server cabinet and rack arrangement.

2.5.1.1.3 Provide blanking plates constructed of metal when used in server racks to route air flow in theequipment racks or containment system.

2.5.1.1.4 Provide proper grounding for equipment in accordance with Data Sheet 5-10, Protective Groundingfor Electric Power Systems and Equipment, and the manufacturer’s instructions.

2.5.1.2 Protection

2.5.1.2.1 When it is essential to reduce equipment damage from an incipient fire to minimum possible levels,or to facilitate the return to service, provide an FM Approved clean agent fire extinguishing system withdetection to protect the data equipment within the data processing equipment room. This is to supplementthe automatic sprinkler or water mist system protection protecting the facility or raised floor.

2.5.1.2.2 Install the clean agent fire extinguishing system in accordance with the applicable recommendationsin Section 2.4.6.3.

2.5.1.2.3 Install FM Approved very early warning fire detection (VEWFD) to actuate the clean agent fireextinguishing system in accordance with Section 2.4.5.

Fig. 4. Typical server cabinet and rack arrangement

5-32 Data Centers and Related FacilitiesPage 16 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 17: Fmds0532 Data Centers

2.5.2 Hot/Cold Aisle Containment and Hot Collar Systems

2.5.2.1 Provide containment systems constructed of one of the following:

A. Noncombustible materials, or

B. Plastics that have been specification tested to FM Approval Standard 4910, or

C. FM Approved plastic interior wall finish materials that have been specification tested to FM ApprovalStandard 4882 for use in smoke sensitive occupancies.

Specification-tested products are listed in the Building Material section of the Approval Guide.

2.5.2.2 If a ceiling is installed as a portion of the hot/cold aisle containment system, install automatic sprinklersbeneath it.

2.5.2.4 Provide sprinkler protection with a minimum density of 0.2 gpm/ft2 (8 mm/min) over 2500 ft2 (230m2), including a 250 gpm (950 L/min) hose allowance.

2.5.2.5 The following are not alternatives to providing sprinklers below the ceiling or within the containmentsystem:

A. Using containment panels mounted with fusible links.

B. Automatic releases on curtains and panels.

2.5.2.6 When hot collar systems are used (see Figure 7), evaluate sprinkler locations for obstructions inaccordance with Data Sheet 2-0, Installation Guidelines for Automatic Sprinklers.

2.5.2.7 If the data processing equipment room has been provided with an FM Approved air-aspirating VEWFDsystem, no detection is needed beneath the containment ceiling.

2.5.2.8 When containment systems are added to existing sever racks and the data processing equipmentroom has been equipped with FM Approved standard response spot-type smoke detection, provide smokedetection beneath the containment ceiling.

2.5.2.9 Verify the FM Approved detection within the containment system (hot aisle) is listed for the ambienttemperature of its location.

2.5.2.10 If a clean agent fire extinguishing system is installed for the containment system, provide thefollowing:

A. The proper clearance of the discharge nozzle(s) from the sidewall(s) of the containment system isprovided in accordance with the manufacturer’s design, installation, and operation manual listed for FMApproval.

B. The proper clean agent design concentration within the volume of the containment system.

C. The proper clean agent design concentration surrounding the containment system(s).

Figures 5 and 6 provide conceptual views of cold aisle and hot aisle containment systems. Figure 7 providesa conceptual view of a hot collar containment system. Note: There are other containment configurations usedto control the cooling of servers.

2.5.3 Tape Cartridge Storage

2.5.3.1 Automated Tape Cartridge Storage Units

2.5.3.1.1 Use tape cartidge cassettes constructed of:

• Noncombustible materials, or

• Plastics that have been specification tested to FM Approval Standard 4910. Specification-tested productsare listed in the Building Material section of the Approval Guide.

2.5.3.1.2 When tape cartridges are constructed of combustible materials, provide all of the following:

A. An FM Approved very early warning fire detection (VEWFD) system in the cabinet in accordance withSection 2.4.5.

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 17

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 18: Fmds0532 Data Centers

B. An interlock with smoke detection to de-energize the electrical service to the cabinet.

C. Protection from one of the following within each unit:

1. Automatic sprinkler protection per Section 2.4.6.1 in accordance with protection being provided bythe ceiling sprinkler system.

Fig. 5. Conceptual view of cold aisle containment system

CRAC

Hot aisle

Servercabinets

(side view)

Servercabinets

(side view)

Loose seal barrierfor pressure balance

Hot aisleColdaisle

Fig. 6. Conceptual view of hot aisle containment system

CRACCold aisle

Servercabinets

(side view)

Servercabinets

(side view)

Loose seal barrierfor pressure balance

Cold aisle

Hot aisle

5-32 Data Centers and Related FacilitiesPage 18 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 19: Fmds0532 Data Centers

2. A clean agent fire extinguishing system with extended discharge in accordance with Section 2.4.6.3.

3. A carbon dioxide fire extinguishing system, if the automated tape cartridge storage unit is anunoccupiable enclosure or space.

a. The carbon dioxide system is to be designed and installed in accordance with data sheet 4-11N,Carbon Dioxide Fire Extinguishing Systems.

b. Use a minimum 50% design concentration for the hazard.

2.5.3.2 Tape Cartridge Storage Rooms

2.5.3.2.1 Provide a separate room for tape cassette storage with minimum 1 hour fire rated walls that spanfrom slab to slab. Ensure any doors and windows to this room have a minimum ¾-hour fire rating.

2.5.3.2.2 Provide automatic sprinkler protection in accordance with the recommendations for solid piledstorage of unexpanded plastics in Data Sheet 8-9, Storage of Class 1, 2, 3, 4 and Plastic Commodities.

2.5.3.2.3 When it is essential to limit damage to an incipient fire, provide an FM Approved clean agent fireextinguishing system with detection to protect the tape storage room. This is to supplement the automaticsprinkler in protecting the facility. Install the clean agent fire extinguishing system in accordance with Section2.4.6.3.

2.5.3.2.4 To further minimize the potential for a serious incident:

• control access to the cassette storage room (e.g., lock doors).

• back up cassettes to an off site location.

2.5.3.2.5 Provide fire hose connections for rooms containing movable aisle storage. Locate connections forfire hoses to reach all sections of the movable storage units.

Fig. 7. Conceptual view of hot collar containment system

CRAC

Servercabinets

(side view)

Servercabinets

(side view)

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 19

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 20: Fmds0532 Data Centers

2.5.4 Mobile/Modular Data Centers

2.5.4.1 Construction

2.5.4.1.1 Build the structure, exterior enclosure, and interior surfaces using noncombustible materials. If themobile/modular data center is insulated, provide noncombustible or FM Approved Class 1-rated insulation.

2.5.4.1.2 Structurally connect containers when configured in a vertical array.

2.5.4.2 Exposures

2.5.4.2.1 Interior Installations

When the mobile/modular data center is installed in a building, provide automatic sprinkler protection forthe hazards associated with the enclosing building construction, the exterior of the mobile/modular datacenter, and other contents in the enclosing building in accordance with the applicable occupancy-specific datasheet.

2.5.4.2.2 Exterior Installations

When a mobile/modular data center is exposed to weather conditions, design, construct, install, and operatemodules to meet the recommendations in applicable natural hazards data sheets, including, but not limitedto, the following:

• Data Sheet 1-28, Wind Design

• Data Sheet 1-34, Hail

• Data Sheet 1-54, Roof Loads for New Construction

• Data Sheet 5-11, Lightning and Surge Protection for Electrical Systems

• Data Sheet 9-18, Prevention of Freeze-Ups

• Data Sheet 9-19, Wildland Fire/Bushfire Exposure

2.5.4.2.3 Natural Hazards

For both interior and exterior installations, design, construct, install, and operate modules to meet therecommendations in applicable natural hazards data sheets, including, but not limited to, the following:

• Data Sheet 1-40, Flood.

• Data Sheet 1-2, Earthquakes.

In addition to adhering to the recommendations in Data Sheet 1-2, Earthquakes, provide the following:

A. Seismic restraint to the data processing equipment and utilities in the mobile/modular data center forthe forces identified in Data Sheet 1-2.

B. Seismic anchoring of the mobile/modular data center exterior enclosure to the surface (ground, floor,or other mobile/modular data centers).

2.5.4.3 Fire Detection

Provide very early warning fire detection (VEWFD) systems in mobile/modular data centers per Section 2.4.5.

2.5.4.4 Fire Protection

2.5.4.4.1 Provide protection for mobile data centers using one of the following:

A.Clean agent fire extinguishing system actuated by VEWFD detection, or

B. Automatic sprinklers inside the mobile/modular data center per Section 2.4.6.1.

2.5.4.4.2 Provide protection for any specific hazard(s) in a equipment module in accordance with theapplicable data sheet (e.g. emergency diesel generators).

2.5.4.5 Equipment Power-Down

Provide automatic interlocks and power-down to de-energize equipment in accordance with Section 2.8.4.

5-32 Data Centers and Related FacilitiesPage 20 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 21: Fmds0532 Data Centers

2.5.5 Control Rooms

This section provides recommendations for monitoring operations, network operations centers, broadcast,and other similar control rooms.

2.5.5.1 Materials

Use noncombustible materials to construct control rooms.

2.5.5.2 Cables

2.5.5.2.1 Use FM Approvals Group 1 or plenum-rated cable in accordance with Section 2.2.7.

2.5.5.2.2 Protect grouped cables and cable trays in accordance with Data Sheet 5-31, Cable and Bus Bars.

2.5.5.2.3 Seal all cable and signal wire penetrations with FM Approved penetration seals with fire ratingsequal to those of the surrounding construction.

2.5.5.3 Protection

2.5.5.3.1 Provide sprinkler design demands, hose demands, and duration in accordance with therecommendations for an HC-1 hazard category in Data Sheet 3-26, Fire Protection Demand for NonstorageSprinklered Properties.

2.5.5.3.2 Provide automatic smoke detection in the following places:

A. In control rooms, including control panels that extend to or near the ceiling

B. Beneath raised floors and above suspended ceilings that contain a significant quantity of combustiblegrouped cables

C. In large cabinets with either combustible construction or combustible cables

2.5.5.3.3 Install FM Approved smoke detection in accordance with Data Sheet 5-48, Automatic Fire Detection.

2.5.6 Process Control Rooms

The following recommendations apply to Process Control Rooms and take precedence over the precedingrecommendations.(see Appendix A, Glossary of Terms; Process Control Room)

2.5.6.1 Natural Hazards

Design and construct process control rooms to meet the recommendations in applicable natural hazardsdata sheets, including, but not limited to, the following:

• Data Sheet 1-2, Earthquakes

• Data Sheet 1-28, Wind Design

• Data Sheet 1-34, Hail

• Data Sheet 1-40, Flood

• Data Sheet 5-11, Lightning and Surge Protection for Electrical Systems

2.5.6.2 Exposures

2.5.6.2.1 Locate process control rooms and associated significant equipment rooms outside areas exposedto the effects of explosion hazards. If this cannot be done, provide pressure-resistant construction designedfor shelter-in-place and design windows and doors in accordance with Data Sheet 1-44, Damage LimitingConstruction.

2.5.6.2.2 Protect process control rooms and associated equipment rooms against external fire exposuresin accordance with Data Sheet 1-20, Protection against Exterior Fire Exposure.

2.5.6.3 Location and Construction

2.5.6.3.1 Locate process control rooms and associated equipment rooms so they are not exposed to damagefrom corrosive or ignitable liquid, flammable vapor, or mechanical equipment such as overhead cranes.

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 21

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 22: Fmds0532 Data Centers

2.5.6.3.2 For elevated process control rooms and associated equipment rooms exposed to a fire hazard,provide fireproofing for the structural support steel suitable for the exposure (minimum 1 hour).

2.5.6.3.3 Construct process control rooms and associated equipment rooms using only noncombustiblematerials. This includes, but is not limited to, suspended ceilings, raised floors, partition walls, pipe and HVACinsulation materials, and HVAC filters.

2.5.6.3.4 Provide a minimum 1-hour fire rated separation between process control rooms and adjacent areas,including equipment rooms.

2.5.6.3.5 Where redundant process control systems are provided, locate each system’s controls, equipment,and cabling in a separate fire-rated area.

2.5.6.3.6 Provide separate areas for locker rooms, lunchrooms, kitchens, meeting rooms, offices, etc.

2.5.6.3.7 Seal openings in fire-rated floors and walls through which pipes, wires, and cables pass with anFM Approved or listed penetration seal with a fire resistance rating equivalent to the rating of the floor or wall.

2.5.6.3.8 Route roof drains, domestic water lines and other liquid lines around process control rooms andassociated equipment rooms. In multistory buildings, seal the floor above to be liquid-tight. When pipingcannot be routed away from these areas, provide containment (e.g., concentric piping) or a collection pan andleak detection with alarm notification to a constantly attended location.

2.5.6.3.9 Provide floor drains beneath raised floors if water or other liquids can collect.

2.5.6.4 Utilities

2.5.6.4.1 Provide permanently connected uninterruptible power supplies (UPS) and emergency powersystems to permit operation until a safe power-down can be accomplished. Install UPS in accordance withData Sheet 5-23, Emergency and Standby Power Systems.

2.5.6.4.2 Provide and install grouped cables and cable trays in accordance with Data Sheet 5-31, Cableand Bus Bars.

2.5.6.4.3 Provide a reliable instrument air system where pneumatic air controls are used (e.g., an independentinstrument air compressor with N+1 backup or suitably designed air receiver).

2.5.6.4.4 Provide proper grounding for equipment in accordance with the following:

• Data Sheet 5-10, Protective Grounding for Electric Power Systems and Equipment

• Data Sheet 5-11, Lightning and Surge Protection for Electrical Systems

• Manufacturer’s instructions

2.5.6.5 Protection

2.5.6.5.1 When combustible construction or combustible loading is present, provide one of the followingprotection systems:

A. A wet or preaction automatic sprinkler system.

1. Use design demands, hose demands, and duration in accordance with Data Sheet 3-26, FireProtection Demand for Nonstorage Sprinklered Properties, for a:

a. process control room based upon a Hazard Category 1 (HC-1) up to a 30 ft (9 m) ceiling.

b. input/output (I/O) room based upon a Hazard Category 2 (HC-2) up to a 30 ft (9 m) ceiling.

2. Provide automatic quick response (QR) sprinklers with a temperature rating of 165°F (74°C) on130 ft2 (12 m2) spacing.

B. A clean agent fire extinguishing system that:

1. meets the recommendations in Section 2.4.3.3(C) and 2.5.6.5.4.

2. is designed and installed in accordance with the manufacturer’s instructions and Data Sheet 4-9,Clean Agent Fire Extinguishing Systems.

2.5.6.5.3 Protect data centers associated with process control rooms in accordance with Section 2.4.

5-32 Data Centers and Related FacilitiesPage 22 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 23: Fmds0532 Data Centers

2.5.6.5.4 Interlock the fire protection system activation to de-energize process control equipment and to powerdown HVAC systems only when proven to be safe by a process hazard analysis or equivalent evaluation.

2.5.6.5.5 Protect emergency generators in accordance with Data Sheet 5-23, Emergency and Standby PowerSystems.

2.5.6.5.6 Protect grouped cables and cable trays in accordance with Data Sheet 5-31, Cable and Bus Bars.

2.5.6.5.7 Install fire protection systems in accordance with Data Sheet 2-0, Installation Guidelines forAutomatic Sprinklers, and the applicable special protection system data sheet.

2.5.6.5.8 Provide FM Approved smoke detection below raised floors and above ceiling areas with cables.Very early warning fire detection systems are preferred.

2.5.6.5.9 Install smoke detection in accordance with Data Sheet 5-48, Automatic Fire Detection.

2.5.6.5.10 Provide carbon dioxide or clean agent portable fire extinguishers listed for energized electricalhazards to protect electronic equipment in accordance with Data Sheet 4-5, Portable Fire Extinguishers. Donot use dry chemical fire extinguishers in areas with electronic equipment.

2.5.6.6 Human Element

2.5.6.6.1 Provide documented pre-incident plan and emergency response procedures. Use Data Sheet 10-1,Pre-Incident Planning with the Public Fire Service, as a resource.

2.5.6.6.2 Provide emergency response personnel with, at a minimum, written procedures for and authorizationto:

• interrupt electrical power at the ignition source

• notify the fire service

• operate extinguishing equipment.

2.5.6.6.3 Provide the fire service with a general description of the facilities and processing equipment.

2.5.6.6.4 Give the fire service a walkthrough of the facility to address all the orientation and information issues.

2.5.6.6.5 Develop a detailed written disaster recovery plan in accordance with Data Sheet 10-5, DisasterRecovery Planning. Annually review and test the plan to ensure it is up-to-date and functional.

2.5.6.6.6 For security reasons, admit only authorized personnel into the process control room and other criticalareas.

2.5.6.6.7 Conduct regular housekeeping inspections to achieve the following:

A. Potential ignition sources are controlled (e.g., smoking, hot work, temporary heaters, cookingequipment).

B. The accumulation of combustible materials is prevented.

C. Ordinary combustibles are not stored inside or behind control cabinets.

D. Necessary spare parts, manuals, etc. are kept in normally closed metal cabinets.

2.5.7 Diagnostic Equipment

The recommendations in this data sheet for diagnostic equipment are intended for protection of theequipment.

2.5.7.1 Locate and protect the diagnostic equipment from flood and storm water runoff in accordance withSection 2.2.13.

2.5.7.2 Do not locate roof drains, domestic water lines, or other liquid piping that is not essential for operationsin the diagnostic equipment room.

2.5.7.3 Provide automatic wet sprinkler protection throughout the building in which the diagnostic equipment(e.g., magnetic resonance imaging [MRI], computerized axial tomography [CAT] scan, Cyclotron) is locatedin accordance with the appropriate occupancy per Data Sheet 3-26, Fire Protection Demand for NonstorageSprinklered Properties.

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 23

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 24: Fmds0532 Data Centers

2.5.7.4 Provide FM Approved smoke detection in accordance with Data Sheet 5-48, Automatic Fire Detection.

2.5.7.5 Provide an automatic sprinkler system, wet or preaction, throughout diagnostic equipment areas.

2.5.7.5.1 Provide sprinkler design demands, hose demands, and duration for hazard category 1 (HC-1) upto a 30 ft (9 m) ceiling in accordance with the recommendations in Data Sheet 3-26, Fire Protection Demandfor Nonstorage Sprinklered Properties.

2.5.7.5.2 Use FM Approved sprinklers constructed of non-ferrous material.

2.5.7.5.3 Provide automatic quick response (QR) sprinklers with a temperature rating of 165°F (74°C).

2.5.7.5.4 Provide sprinkler spacing in accordance with Data Sheet 2-0, Installation Guidelines for AutomaticSprinklers.

2.5.7.5.5 Install nonferrous piping (e.g., copper, stainless steel, CPVC plastic) for the automatic sprinklersystem with dielectric fittings in the diagnostic equipment area.

2.5.7.5.6 When plastic pipe is used, install as follows:

A. Use FM Approved CPVC pipe with a wet sprinkler system.

B. Verify the diagnostic equipment hazard is similar to a Hazard Category 1 (HC-1) occupancy as identifiedin Data Sheet 3-26, Fire Protection Demand for Nonstorage Sprinklered Properties.

C. In accordance with the recommendations for CPVC pipe in Data Sheet 2-0, Installation Guidelinesfor Automatic Sprinklers.

2.5.7.5.7 If installing a preaction sprinkler system, install it in accordance with Section 2.4.6.1.

2.5.7.6 Provide protection of a control room for diagnostic equipment in accordance with Section 2.5.5.

2.5.7.7 Provide portable fire extinguishers in accordance with Section 2.4.2 and this section.

2.5.7.7.1 When magnetic diagnostic equipment is present, provide the following:

A. Use a portable fire extinguishers with non-magnetic construction.

B. Verification the magnetic force rating of the portable fire extinguisher is compatible with the maximummagnetic force of the diagnostic equipment such that it does not pose a magnetic hazard.

C. Verification the portable fire extinguisher is located no less than the manufacturer’s minimum specifieddistance from the magnetic diagnostic equipment.

2.6 Inspection, Testing, and Maintenance

2.6.1 Facilities

2.6.1.1 Housekeeping

Provide regular housekeeping inspections with the following goals:

A. Potential ignition sources are controlled (e.g., smoking, hot work, temporary heaters, cookingequipment).

B. The accumulation of combustible materials is prevented.

C. Ordinary combustibles are not stored inside or behind control cabinets.

D. Necessary spare parts, manuals, etc. are kept in normally closed metal cabinets.

2.6.1.2 Penetrations

Verify the integrity of penetration sealing on a minimum yearly basis.

2.6.1.3 Filters

Clean or replace HVAC filters on a regular schedule and as needed to maintain efficiency and prevent dustand lint accumulations (See Data Sheet1-45, Air Conditioning and Ventilation Systems).

5-32 Data Centers and Related FacilitiesPage 24 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 25: Fmds0532 Data Centers

2.6.2 Fire Protection

2.6.2.1 Inspect and test the various fire protection system(s) in accordance with the applicablerecommendations in Data Sheet 2-81, Fire Protection System Inspection, Testing and Maintenance and OtherFire Loss Prevention Inspections.

2.6.2.2 Use a test discharge line (see Figure 3) to verify operation of the preaction valve of the sprinklersystem to ensure the preaction system piping is arranged to keep water from entering the piping system.During the test, close the trip test cutoff indicating valve on the system riser and open the indicating valveon the discharge test line. Actuate the preaction system in conjunction with smoke detection system.Immediately following the test, return the system to normal position. Use FM Global’s Red Tag Permit Systemwhen the trip test cutoff indicating valve is closed, and follow the precautions for fire protection being outof service described in Data Sheet 2-81. When disabling the detection system for other testing of the preactionsprinkler system this is regarded as an impairment of fire protection.

2.6.2.3 Test the VEWFD system annually to verify proper operation in accordance with the applicablerecommendations of Data Sheet 5-48, Automatic Fire Detection, and Appendix C (reference for typical testmethod.)

2.6.2.4 Inspect the integrity of the enclosure protected by a clean agent fire extinguishing system to determineif:

• changes have occurred that could change volume, hazard, or both.

• penetrations have occurred that could lead to extinguishing agent leakage.

2.6.2.4.1 If an administrative control program is used to document the enclosure integrity, inspect theenclosure every 36 months. If an administrative control program is not used, inspect at least once every 12months.

2.6.2.4.2 Use a blower door fan unit to verify extinguishing agent concentration will be maintained ifuncertainty exists about the integrity of the enclosure.

2.6.2.5 Maintain the fire protection system(s) in accordance with the applicable recommendations in DataSheet 2-81, Fire Protection System Inspection, Testing and Maintenance and Other Fire Loss PreventionInspections.

2.6.2.6 Manage impairments identified by periodic inspections, periodic testing and maintenance inaccordance with the recommendations in Data Sheet 2-81, Fire Protection System Inspection, Testing andMaintenance and Other Fire Loss Prevention Inspections.

2.7 Human Element

2.7.1 Emergency Response Team (ERT)

2.7.1.1 Provide emergency response personnel with, at minimum, procedures for and authorization to:

• interrupt electrical power at the ignition source.

• notify the fire service.

• operate extinguishing equipment.

2.7.1.2 Provide the fire service with a general description of the facilities, data processing equipment andrelated equipment.

2.7.1.3 Give the fire service a walkthrough of the facility to address all the orientation and information issues.

2.7.1.4 Provide the fire service with a general description of the data center equipment and how it is poweredup and powered down (see Section 2.8.4 and Section 3.4.4).

2.7.1.5 Use Data Sheet 10-1, Pre-Incident Planning with the Public Fire Service, as a resource.

2.7.2 Disaster Recovery Plan

2.7.2.1 Develop a detailed written disaster recovery plan for the data center based upon a complete lossof facility and services.

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 25

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 26: Fmds0532 Data Centers

2.7.2.2 Develop the disaster recovery plan based on the applicable recommendations in Data Sheet 10-5,Disaster Recovery Planning.

2.7.2.3 Annually review and test the plan to ensure it is up-to-date and functional.

2.7.3 Business Continuity Plan

2.7.3.1 Develop a detailed written business continuity plan based on a complete loss of facilities or services.The plan should address the following:

• Executive management support

• Utilization/relocation of personnel

• Facilities, equipment

• IT/telecom

• Suppliers

• Clients

• Plan implementation and testing

2.7.3.2 Annually review and test the plan to ensure it is up to date and functional.

2.7.4 Security

2.7.4.1 Establish a procedure and method, such as card access, to verify that an individual entering the facilityis authorized to do so.

2.7.4.2 Admit only authorized personnel to the data center and other critical areas (e.g., cartridge storagerooms, UPS rooms, switchgear). Keep these areas secured with locks or electronic key systems.

2.7.4.3 Protect spare electronic components, such as circuit boards, from theft (see Data Sheet 9-16, Burglaryand Theft).

2.7.4.4 Verify authorized personnel have access (e.g., master key, passcode) to equipment protected bylocks in order to gain access in the event of a fire.

2.7.4.5 Install an FM Approved Level 1 or better intrusion alarm system for data and record storage roomsif these areas are provided with emergency doors exiting outside the secure area.

2.7.4.6 Install an FM Approved Level 2 or better intrusion alarm system if previous experience indicates thisneed (see Data Sheet 9-16, Burglary and Theft).

2.7.4.7 Provide the alarm system with line supervision or a loud local alarm and provide a response levelthat meets FM-15 per Data Sheet 9-16, Burglary and Theft.

See Data Sheet 9-16, Burglary and Theft, for additional details regarding the recommendations above, andfor additional recommendations related to the installation of an intrusion alarm system.

2.7.5 Flood Emergency Response Plan

For locations where the predicted 500-year flood will result in onsite flooding, develop a detailed written floodemergency response plan (FERP)for the data center and related facilities using the applicablerecommendations in Data Sheet 10-2, Emergency Response.

2.8 Utilities

2.8.1 General

Continuous, clean, and uninterrupted power and cooling is the lifeblood of any data center, especially onethat operates 24 hours a day, 7 days a week.

See Figure 8 for a representative schematic configuration of the power distribution for data center equipment.

5-32 Data Centers and Related FacilitiesPage 26 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 27: Fmds0532 Data Centers

2.8.2 Primary Power Systems

2.8.2.1 Have a qualified engineering firm perform a regional power supply reliability study as part of the siteselection process for a new data center facility.

A. Focus the study on the number, duration, and cause of major system outages to the proposed siteover a minimum 10-year period.

B. Consider future load growth and the utility’s plans to address the growth.

2.8.2.2 Provide a reliable source of power to the data center.

2.8.2.3 Provide, protect, test, and maintain transformers in accordance with Data Sheet 5-4, Transformers.

2.8.2.4 Provide switchgear and circuit breakers in accordance with Data Sheet 5-19, Switchgear and CircuitBreakers.

Fig. 8. Power distribution schematic for data center equipment

UPS: uninterruptible power supplyATS: automatic transfer switchPDU: power distribution units (typically a dry step down transformer andcircuit breakers)Power Strip: mounted in the equipment cabinets/racks and consists of electricaloutlets that data equipment is plugged into receptacle

Utility power

Emergencygenerator

ATS

UPS

PDU PDU PDU Workstations

HVAC

Power strip Power stripPower strip

Power strip Power strip

Power strip Power strip

Switch gear

Non-UPSprotectedequipment

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 27

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 28: Fmds0532 Data Centers

2.8.2.5 Provide lightning and surge protection for power supplies to data center systems in accordance withData Sheet 5-11, Lightning and Surge Protection for Electrical Systems.

2.8.2.6 Provide grounding for data centers in accordance with Data Sheet 5-10, Protective Grounding forElectric Power Systems and Equipment, and in conformance with the manufacturer’s instruction. Where signsof inadequate single-point grounding have been observed, provide improvements following a study by aqualified consultant. See Data Sheet 5-20, Electrical Testing, for symptoms of inadequate grounding.

2.8.3 Backup Power Systems

Provide an uninterruptible power supply (UPS) to ensure the reliability and quality of power for data centersystems whose interruption may cause significant business interruption or related financial loss that could notbe made up completely after data center operation is resumed (see Data Sheet 5-23, Emergency andStandby Power).

2.8.3.1 Battery Uninterruptible Power Systems (UPS)

2.8.3.1.1 Locate central UPS battery rooms in minimum one-hour fire-rated rooms.

2.8.3.1.2 Provide HVAC systems separate from those of the data center equipment areas. Provide ventilationto prevent hydrogen buildup as follows:

A. For flooded lead-acid, flooded nickel-cadmium (NiCd), and valve-regulated lead acid (VLRA) batteries,design ventilation systems to limit the maximum concentration of hydrogen to 1.0% of the total volumeof the room, or

B. Provide continuous ventilation at a rate of not less than 1 cfm/ft2 (0.0051 m3/s/m2) of floor area of theroom.

2.8.3.1.3 Install a hydrogen detection system to alarm at a constantly attended location in the event ofventilation failure.

2.8.3.1.4 Maintain and test battery systems in accordance with Data Sheet 5-19, Switchgear and CircuitBreakers.

2.8.3.1.5 When batteries are located on upper floors, seal all floor penetrations within 10 ft (3 m) of the batteryrack.

2.8.3.1.6 Do not use absorbent battery acid pillows for permanent acid spill protection unless required bythe local authorities.

2.8.3.1.7 Use battery acid containment pillows to control the cleanup of battery acid spills when they occur.

2.8.3.1.8 To reduce the possibility of thermal runaway, provide valve-regulated lead acid (VRLA) batterieswith an automatic battery-monitoring system.

A. Provide the automatic battery-monitoring system with an alarm to transmit to a constantly attendedlocation.

B. Provide an automatic battery-monitoring system able to monitor at least two of the following:

1. Battery temperature

2. Battery voltage

3. Float current

4. Conductance

C. Provide automatic controls to accomplish at least one of the following if there are indications ofconditions leading to a thermal runaway:

1. For constant voltage float operation, reduce the voltage below the threshold that will sustain thermalrunaway.

2. For constant current float operation, reduce the current below the threshold value.

3. Disconnect battery from charger or rectifier.

5-32 Data Centers and Related FacilitiesPage 28 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 29: Fmds0532 Data Centers

4. Turn off the rectifiers or chargers.

2.8.3.1.9 Provide noncombustible construction for the battery enclosure.

2.8.3.1.10 Provide ventilation in the battery enclosure cabinet to control ambient temperature and preventhydrogen buildup using one of the following methods:

A. Limit the maximum concentration of hydrogen to 1% of the total volume of the cabinet during theworst-case event of a simultaneous “boost” charging of all the batteries in the cabinet; or

B. When calculations are not available to confirm the ventilation rate, provide continuous ventilation at arate of not less than 1 cfm/ft2 (0.0051 m3/s/m2) of floor area covered by the cabinet.

2.8.3.1.11 Ventilate the room in which the cabinets are installed per Section 2.8.3.1.2.

2.8.3.1.12 Provide one of the following protection systems:

A. An automatic quick response (QR) sprinkler system designed to deliver a density of 0.2 gpm/ft2

(6 mm/min) over an area of 2,500 ft2 (230 m2) with a hose stream demand of 250 gpm (950 L/m) for aduration of 60 minutes. Use automatic sprinklers with a temperature rating of 165°F (74°C).

B. An inert gas fire extinguishing system designed and installed in accordance with Section 2.4.6.3.

2.8.3.2 Rotary Uninterruptible Power Systems (UPS)

Provide maintenance and testing in accordance with Data Sheet 5-20, Electrical Testing.

2.8.3.3 Diesel Generators

2.8.3.3.1 Locate diesel generators and fuel supplies in accordance with Data Sheet 5-23, Emergency andStandby Power Systems.

2.8.3.3.2 Provide fire detection and protection in accordance with recommendations for fuel storage, fuelpiping, and diesel generator protection in Data Sheet 5-23, Emergency and Standby Power Systems.

2.8.3.3.3 To prevent accidential use, permanently cap old fuel line(s) to diesel fuel tank(s) if not connectedto the tank.

2.8.3.3.4 When work is performed on fuel lines or fuel filters, use lock-out tag-out procedures on fuel pumpssupplying fuel to diesel generator day tanks to prevent accidental starting of pumps and discharge of fuelwhile the area is unattended.

2.8.3.3.5 Provide noncombustible soundproofing materials when soundproofing materials are required.

2.8.4 Power-Down of Data Processing Equipment and HVAC Systems

The recommendations provided for the power-down of data processing equipment and HVAC systemsremove the potential for re-ignition and minimize the circulation of smoke to sensitive electronic equipment.

2.8.4.1 Power-Down Method

2.8.4.1.1 Provide automatic or automatic-with-time-delay power disconnect control(s) separately or togetherto:

A. De-energize all electrical power to the data processing equipment in the room or designated zone(s),except power to lighting, in the event of sprinkler, water mist system, and/or clean agent fire extinguishingsystem operation.

B. De-energize all dedicated heating, ventilation, and air conditioning (HVAC) systems for the dataprocessing equipment serving the room or designated zone(s), as appropriate, in the event of sprinkler,water mist system and/or clean agent fire extinguishing system.

2.8.4.1.2 For areas protected by a clean agent fire extinguishing system and with sprinkler protection, initiationof an automatic or automatic with time delay power-down sequence should be no later than the alarm fordischarge of the clean agent fire extinguishing system.

2.8.4.1.3 For locations without sprinkler protection where only a clean agent fire extinguishing systeminstalled, provide automatic de-energizing of the data processing equipment upon detection.

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 29

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 30: Fmds0532 Data Centers

2.8.4.1.4 Verify activation of an HVAC disconnecting control will cause all required fire/smoke dampers toclose, if not already activated by the smoke detection system.

2.8.4.1.5 Provide a manual disconnect control(s) in addition to the recommendation for automatic powerdown in Section 2.8.4.1.1.

2.8.4.1.6 Locate the manual disconnect control(s) at readily accessible locations in case of fire to authorizedpersonnel and emergency responders without exposure to the hazard.

2.8.4.1.7 When an automatic power-down of data processing equipment is not installed, provide signs ateach entrance warning that data processing equipment will remain energized upon activation of the fireprotection system(s) until a time-delayed or manual power-down is complete.

2.8.4.2 Power-Down Procedures

Develop a power-down procedure for de-energizing data and HVAC equipment to reduce damage andcontamination from smoke. (See Section 3.4.4.2 for items to consider for inclusion.)

2.8.5 Heating, Ventilation, and Air Conditioning (HVAC)

A. Ventilation

1. Provide N+1 redundancy for key ventilation system components, such as large make-up air fans.

2. Provide an independent HVAC system(s), including separate air-handling units and ducts, for the datacenter equipment area(s). Provide a positive pressure of at least 0.5 inch (13 mm) water gauge inthe data processing equipment rooms related to adjacent areas.

B. Cooling

1. Provide N+1 redundancy for chillers.

2. Provide chilled water piping arranged in a loop with valves capable of dual feeding air handlers inthe event of a pipe failure for critical applications.

3. Provide leak detection for:

• chilled water piping at air handlers.

• liquid-cooled data processing equipment.

4. Do not route HVAC and piping ducts servicing other building areas through the data center processingequipment rooms or record storage rooms.

5. Do not locate air handlers or HVAC liquid piping above data processing equipment rooms.

2.8.5.1 Smoke Management Systems

2.8.5.1.1 If a smoke management system is to be installed, retain a competent and experienced firm to designthe system in accordance with site-specific performance goals.

2.8.5.1.2 When installed, design smoke management systems to include the smoke control and removalrecommendations identified in Data Sheet 1-45, Air Conditioning and Ventilating Systems.

3.0 SUPPORT FOR RECOMMENDATIONS

3.1 Construction and Location

3.1.1 General

Data centers are complex facilities with both active and passive fire protection equipment and systems, alongwith critical support equipment to keep the facility operational. A total building commissioning program maybe warranted to assist in the quality control for construction and operational functionality of the occupancy.The following provide guidance in the development of a commissioning program:

• NFPA 3, Recommended Practice for Commissioning and Integrated Testing of Fire Protection and LifeSafety Systems

5-32 Data Centers and Related FacilitiesPage 30 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 31: Fmds0532 Data Centers

• American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) CommissioningGuideline 0-2005.

Location of data centers below grade are susceptible to water egress (surface, storm, and/or flooding), whichshould be avoided.

3.1.2 Penetrations

Fire-resistance-rated penetration seals do not prevent the passage of smoke until the seal expands whenexposed to heat from the fire. A penetration seal with a leakage-rating will limit the passage of smoke beforethe seal is exposed to high temperatures. Laboratory leakage tests are conducted at ambient and at 400°F(204°C).

3.1.3 Cables

Cables listed to UL 910 are marked with an identification code.

3.1.4 Insulation

For moisture/condensation control reasons, elastomeric and neoprene rubber are sometimes placed on theunderfloor of the raised floor space.

3.1.5 Earthquake

Earthquake requirements and testing for telecommunications equipment are described in NEBSRequirements: Physical Protection, Telcordia Technologies GR-63-CORE. Equipment is not listed or labeled,so it cannot be determined whether equipment has been tested to these requirements.

The NEBS standard is based on testing the equipment using a synthesized waveform and earthquakeresponse spectra for the purposes of confirming equipment functionality as well as overall restraint of theequipment cabinet/rack.

3.2 Protection

3.2.1 General

A. Aerosol Generator Fire Extinguishing System Units

Aerosol generator fire extinguishing system units are not clean agent systems as defined by Data Sheet4-9, Clean Agent Fire Extinguishing Systems. Some products are thermally actuated, so they would notprovide equipment protection in accordance with FM Global recommendations for this type of occupancy,even if used with sprinkler protection.

Those products that are listed by Underwriters Laboratories have specified limitations associated with theproduct category. In particular, they are intended for total flooding applications of normally unoccupied oruninhabitable spaces and the potential effects of aerosol extinguishing agent discharge residue on sensitiveequipment and other objects have not been investigated.

B. Oxygen Reduction Systems

An oxygen reduction system (ORS) is a fire protection system in which combustible materials are protectedby actively maintaining lower oxygen concentration than that in normal air by specialized conditioningequipment.

FM Global has conducted research on the subject of material flammability in reduced oxygen environment(Xin and Khan, 2007). The results show that many commonly used materials such as wood, plastics andfabrics can burn at an oxygen level below 12% by volume. Since this oxygen level is not only expensiveto actively maintain, but also beyond the range of human health requirements without using specializedprocedures, oxygen reduction systems are not recommended to replace sprinklers as the primary means offire protection or as a special protection system for equipment.

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 31

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 32: Fmds0532 Data Centers

3.2.1.1 Portable Fire Extinguishers

Portable carbon dioxide fire extinguishers typically in the 10-15 lb (4.5-6.8 kg) capacity, or a Class “C” usingthe NFPA 10, Standard For Portable Fire Extinguishers, classification and rating number system, forenergized electrical fires in electrical and electronic equipment in the data processing equipment and servicerooms fulfill the recommendation in Section 2.4.2.

In considering whether the typical capacity of the fire extinguisher for an energized electrical fire needs tobe increased or decreased, the following items should be evaluated:

• Size of the electrical equipment

• Configuration of the electrical equipment that influences distribution of the extinguishing agent

• Effective discharge range of the fire extinguisher

• Amount of combustible material involved (Class A per NFPA 10)

• Installation of a clean agent fire extinguishing system for protection of the electrical equipment

De-energizing electrical equipment eliminates the potential for an arcing hazard if the portable fire extinguisheraccidentally comes into physical contact with the energized equipment or brings any conductive part withinarcing distance.

A 2-1/2 gal (9.5 L) water or clean agent portable fire extinguisher (2-A rating per NFPA 10 classification andrating) for areas containing even limited amounts of ordinary combustibles is appropriate.

The travel distance of 75 ft [23 m] is based upon an ordinary (moderate) level of combustibles, such as paperand plastics. The travel distance may be decreased to improve accessibility of the portable fire extinguisherfor protection of the electrical equipment.

Dry chemical extinguishers should not be used on electrical or electronic equipment and should not evenbe present in a data processing equipment room. The dry chemical extinguishing powder is corrosive toelectronic circuitry. If such an extinguisher was discharged in an area containing electronic equipment, driftingof the very lightweight powder would likely result in the need to clean/recondition all of the equipment in thearea.

3.2.2 Data Processing Equipment Rooms

The type of fire detection and fire protection system chosen should be based upon an evaluation of thecomplete occupancy. The level of protection should consider, at a minimum, the building construction andcontents, building infrastructure, equipment materials of construction, and exposures.

3.2.3 Raised Floor/Above-Ceiling Areas Containing Cable

The FM Approved water mist system listed specifically for raised floors can protect an area 16.4 by 32.8 ft(5 by 10 m) in area and 20 in. (0.5 m) high. The principle for fire extinguishment uses both water and nitrogenas the extinguishing agent. For larger areas, basic units can be installed next to each other along the longside of the unit. The system is FM Approved based on the following:

• Openings in the subfloor do not exceed 1% of the floor area for floor areas 540 ft2 (50 m2) and less, and0.75% for larger floor areas, and

• The width of the data processing equipment room does not exceed 33 ft (10 m), and

• Ventilation is automatically shut off and equipment shutdown begins on system actuation.

• The system is to be designed to provide 10 minutes of protection.

3.2.4 Detection

3.2.4.1 Very early warning fire detection (VEWFD) systems detect smoldering or off-gassing typicallygenerated from an overheating condition or from low-energy fires. VEWFD systems detect incipient fires incritical areas before flame or even noticeable smoke develops. VEWFD may use aspirating (air-samplingdetectors) or high-sensitivity, intelligent, spot sensor/detectors. Detectors used to accomplish VEWFD arelisted as being capable of providing alarm initiation at threshold levels that are more sensitive thanconventional smoke detectors.

5-32 Data Centers and Related FacilitiesPage 32 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 33: Fmds0532 Data Centers

3.2.4.2 For aspirating smoke detectors, typically, multiple smoke level thresholds can be used to perform aprogressive response to a potential fire that minimizes business impact:

• Level 1 (Alert): Notify constantly attended location.

• Level 2 (Action): Local alarm in protected area; initiate data transfer (re-route data to alternate data centerequipment room or data center).

• Level 3 (Fire 1): Initiate fire alarm to building.

• Level 4 (Fire 2): Initiate suppression (or interlocked preaction sprinkler system or stage one on adouble-interlock system).

3.2.4.3 For intelligent high-sensitivity spot smoke detectors the obscuration sensitivity levels can beprogrammed similar to an aspirating smoke detector. The control panel used with an intelligent high-sensitivityspot smoke detector, typically, has fewer levels of notification with a reduced progressive response.

3.2.4.4 Obscuration sensitivity levels for an air-aspirating smoke detector is programmed by software at theVEWFD control panel. Programmed obscuration levels should be verified for acceptance from submittedplans. Propriety methods (e.g., a lap-top computer or portable handheld device with software) are availablefrom the VEWFD manufacturer and require the installer/service person to assist in the validation. In somecases an auxiliary system monitor is used that allows the obscuration levels to be directly verified.

3.2.4.5 When evaluating the use of aspirating smoke detection versus intelligent high-sensitivity spot smokedetection, the specific requirements for the occupancy need to be considered, including the following:

• Progressive response notification

• Local identification of the event

• Type of fire protection system(s) provided

• Number of fire protection systems and/or zones provided

3.2.4.6 The location of the smoke detectors or sensors should be based on an engineering survey of thearea to be protected. Factors such as air flow, proximity to air handling system diffusers, and other physicalfeatures of the installation need to be taken into account.

Smoke tests can be run to verify the air flow within the protected area favors the smoke detectors. Testingshould be performed with all racks, servers, and other support equipment in full operation. In addition, it isimportant to have the HVAC running at normal capacity. The heat generated from the server racks andsubsequent air movement from them and the HVAC will impact smoke stratification and VEWFD responseand obscuration readings.

Extension of ceiling spot detectors or sensors downward into the flow path of sheared air (using photoelectricunits to prevent false alarms) should be considered where strong ventilation currents cause air at the ceilingto remain relatively stagnant.

Additional general guidance on the placement of detectors can be found in Data Sheet 5-48, Automatic FireDetectors, and in ANSI/NFPA 72, National Fire Alarm Code.

Dilution of smoke can occur within a large room and high air flow, do not exceed the recommended spacingin Section 2.4.5.1.

3.2.4.7 A series of tests was carried out in 1998 by one of the leading telephone companies to comparethe effectiveness of various types of fire detection systems in electronic communication equipment areas.It was found that the aspirating VEWFD system detected all of the materials burned, including tests in whichmaterial was burned within the frame. The latter could not be detected by any other detector used. Theprojected beam detector was able to detect all fires outside of the equipment frames. The time to detectionwas roughly comparable to the most sensitive standard spot-type smoke detector.

The lack of one feature was considered important for standard spot-type detectors. This feature was theability to set the detector at more than one alarm point; for example, an aspirating VEWFD detector can beset for a multiple number of pre-alarm points before the detector actually alarms. The one photoelectricstandard spot detector tested alarmed in still air and under all of the air flow conditions tested for all of thematerials tested. Some types of ionization spot detectors performed better than others. The ionization

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 33

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 34: Fmds0532 Data Centers

detectors did not detect some plastics fires. They also did not detect some fires where the air flow was frombelow the floor or when air flow was from ceiling-mounted diffusers to a low exit point.

3.2.4.8 Ambient temperatures in a hot aisle could be in the range of 100°F (38°C) or more, which may bethe maximum or in excess of the operable temperature for the detector.

3.2.4.9 The use of a time delay is to allow for the evacuation of personnel from the protected area/room.

3.2.5 Suppression

3.2.5.1 Automatic Sprinkler Systems

Install wet pipe sprinklers versus pre-action sprinkler systems whenever possible. Pre-action sprinklersystems are inherently less reliable than wet sprinkler systems due to the significantly higher levels ofinspection, testing, and maintenance required. Closely examine the concerns with a wet-pipe sprinkler systembefore installing an alternative.

Table 1 describes the introduction of water into the sprinkler piping for wet, non-interlocked, single-interlockedand double-interlocked sprinkler systems. Further detail is included in the Glossary of Terms for each sprinklersystem type.

Table 1. Sprinkler System Operation Sequence

Sprinkler SystemType Detection Activation Function1 Sprinkler Activation Supervision2

Wet Not Applicable N/A Water discharges. Not ApplicableNon-interlocked

preactionWater fills piping. Or Water fills piping and

discharges.Yes

Single-interlockedpreaction

Water fills piping. N/A w/detection, waterdischarges.

Yes

w/o detection, nowater in piping.

Double-interlockedpreaction

Water does not entersystem; monitors

sprinkler supervisorypressure.

And System fills only ifdetection and

sprinkler is activated.

Yes

1 Action needed for sprinkler piping to fill with water.2 The system piping is pressurized with air or nitrogen to supervise the integrity of the sprinkler piping network. If the system piping or asprinkler is damaged, the supervisory pressure is reduced and a low air supervisory alarm is activated. Supervision is also one portion ofthe releasing operation for double interlocked preaction systems.

In general the lower the room ceiling height the more effective the fire protection systems will be. The limiton data center ceiling heights to 30 ft (9.1m) is intended to allow sprinkler protection to activate promptlythereby reducing fire, smoke, and water damage. The ceiling height limitation also constrains the roomvolume such that clean agent fire extinguishing system sizes and clean agent distribution remain practical.

3.2.5.2 Water Mist Systems

No general design methodology exists for water mist systems. Fire control performance is not consistentbetween manufacturers of water mist systems. The characteristics of drop-size distribution, nozzle spacing,spray angle, installation parameters, and other characteristics are determined from full-scale fire testing toreplicate a specific hazard application. Therefore, only an FM Approved water mist system listed for thespecific hazard application can provide acceptable protection.

The performance characteristics of water mist systems will differ based upon their design principle. A watermist system could be low-pressure, single or dual fluid; or high-pressure, single or dual fluid. Do notinterchange the supply pump units on different model systems, even from the same manufacturer.

A dual fluid system in which the compressed air or nitrogen mixed with the water was integral in evaluatingthe performance for fire extinguishment. Therefore, each supply pump unit needs to be used with its specificmodel of water mist system.

FM Approved water mist systems for Light Hazard Occupancy are tested with no ventilation.

5-32 Data Centers and Related FacilitiesPage 34 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 35: Fmds0532 Data Centers

3.2.5.3 Clean Agent Fire Extinguishing Systems

3.2.5.3.1 Even when there is no cabling below the raised floor (or no air flow), the extinguishing agent willeventually leak to the lowest point in the room, which is below the raised floor. If there is no extinguishing agentdischarged in the space below the raised floor, a dilute concentration will develop in the room. Thatconcentration may not be sufficient to provide extinguishment and may produce greater amounts ofextinguishing agent decomposition.

3.2.5.3.2 When protecting only the space below a raised floor, during and after a discharge, a portion ofthe extinguishing agent under the raised floor will migrate into the room above it. If any fire is present in theelectrical equipment above the raised floor, the extinguishing agent would be at a level below the designextinguishing concentration. If the extinguishing agent is a halocarbon, considerable decomposition of theextinguishing agent could occur, and additional contamination may result from it.

3.2.5.3.3 Where a second smoke detector actuation or second-level alarm will result in discharge of a totalflooding clean agent fire extinguishing system, operating procedures should specify that all nonessentialpersonnel evacuate the area/room. This will prevent the unfavorable situation of personnel exiting througha door after the fire extinguishing agent discharge has begun. Continuous opening of exit door(s) during orafter the discharge will allow some of the extinguishing agent to escape, possibly causing the concentrationin the protected area/room to drop below levels needed for fire extinguishment.

3.2.5.3.4 Always label and differentiate fire alarm pull stations and emergency power-down controls to avoidconfusion.

3.2.5.3.5 When using an abort switch for clean agent fire extinguishing systems, the choice of location shouldconsider the ability of the operator to be aware of any changes in conditions for the protected area/room.

3.2.5.3.6 Clean agents discharged from the nozzle require a certain length of distance to vaporize. If the cleanagent comes in contact with a surface, e.g. cable trays, containment system walls, obstructions, before theclean agent is vaporized, frosting can occur. This will result in a delivered concentration less than the designconcentration for protection of the room and/or enclosure.

3.3 Equipment and Processes

3.3.1 Servers, Mainframes, and Supercomputers

3.3.1.1 Nationally recognized testing laboratories (NRTLs) that evaluate equipment to electrical safetystandards include the following:

• Underwriters Laboratory (UL)

• Intertek

• VDE Testing Institute

• TÜV

Electrical safety standards that help reduce the risks of fire, or arcing with equipment include the following:

A. Underwriters Laboratories (UL)

• UL 478, Standard for Electronic Data-Processing Units and Systems

• UL 1950, Standard for Safety of Information Technology Equipment

• UL 60950, Safety of Information Technology Equipment

• UL 60950-1, Information Technology Equipment - Safety - Part I: General Requirements

B. British Standard Institute (BSI)

• BS EN 60950-1:+A12 Information technology equipment. Safety. General requirements.

3.3.1.2 Where signs of inadequate single-point grounding have been observed, a qualified electrician or otherqualified consultant should study the installation, and appropriate diagnostic and corrective actions shouldbe taken. See Data Sheet 5-20, Electrical Testing, for symptoms of inadequate grounding.

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 35

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 36: Fmds0532 Data Centers

Further detailed grounding information (design and installation) can be obtained from IEEE 1100 1992,Recommended Practice for Powering and Grounding Sensitive Electronic Equipment.

3.3.1.3 Servers

A server is a piece of data processing equipment, computer, or device (see Figure 7) that manages networkresources. Servers are the backbone of the internet. They serve up information in the form of text, graphics,and multimedia to online data processing equipment that request data. A blade server is designed forhigh-density computing.

3.3.1.4 Mainframes

Mainframes are powerful computers used primarily by corporate and government organizations for criticalapplications, bulk data processing, industry and consumer statistics, search function capability, and financialtransaction processing. The term originally referred to large cabinets that housed the central processing unitand main memory of early computers. Today the term is used to distinguish high-end commercial machinesfrom less-powerful units. IBM mainframes (zSeries, System z9, System z10 and zEnterprise) dominate themajority of the mainframe market.

3.3.1.5 Supercomputers

Used in the sciences, engineering, defense intelligence, weather forecasting, etc. They utilize massive parallelprocessing; for example, 5,800 processors and more than a trillion bytes of RAM.

3.3.1.6 Clean agent fire extinguishing systems are provided to limit the thermal and nonthermal damagedue to a fire originating within the room at an incipient stage.

3.3.2 Hot/Cold Aisle Containment and Hot Collar Systems

3.3.2.1 Hot/cold aisle containment (see Figures 5, 6, and 7), particularly at the ceiling, presents challengesto fire protection in data processing centers. Among the concerns for this occupancy are:

• Shielding and obstruction of ceiling sprinklers

• Shielding and obstruction of smoke detection systems

• Failure of gaseous extinguishing agents to properly penetrate the equipment beneath the containment

• Introduction of plastic combustibles into the room

3.3.2.2 FM4910 plastics limit fire spread, smoke damage, and damage from the corrosive byproducts of fire.Currently, FM4910 plastics are limited to rigid sheet materials; there are no FM4910 flexible plastics at thistime.

3.3.2.3 The use of flexible plastics for containment is not recommended partly because flexible plastics includeplasticizers, which create more corrosive smoke when burned. If flexible plastics are used for containment,the thinnest material available should be used.

3.3.2.4 Releasing device assemblies (fusible links, thermal mechanical links and mechanisms) for removableof curtains and aisle containment materials used with containment systems need to be listed by a NationalRecognized Testing Laboratory (NRTL), e.g. FM Approvals, in a fire protection application. At this time noreleasing device assemblies are listed since there is not a NRTL Standard. Further research and testing isrequired to understand the capability of activating these releasing devices without impacting the response timeof the protection system to perform effectively. Usage of these devices increases the complexity to provideproper protection compared to providing additional sprinklers or clean agent nozzles.

3.3.2.5 When the room has a clean agent fire extinguishing system that is activated by a VEWFD detectionsystem, take into consideration the location of the nozzles from which the clean agent will be discharged;the nozzles should not be blocked from the containment system.

Also, take into consideration the design concentration for the protection of the containment system volumeindependent of the data processing equipment room in order for the proper concentration to be delivered inboth areas.

3.3.2.6 Consider the type of air-handling unit design, if the extinguishing agent will continue to flow to allcontainment aisles, there is no need to install sprinklers beneath the containment ceiling. The cooling air in

5-32 Data Centers and Related FacilitiesPage 36 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 37: Fmds0532 Data Centers

a data processing equipment room is typically circulated in a closed loop from the air-handling unit (AHU)to below the raised floor to the equipment, into the return air ducts, and back to the equipment. Some designsinclude single pass airflow such that all cooling comes from the outside and exits the building without anyrecirculation. Also, some designs include the options for anything between single pass to total recirculation,depending on conditions.

3.3.2.7 When evaluating the need for detection beneath a containment ceiling, keep in mind that standard-response, spot-type smoke detectors under containment ceilings and within containment curtains may besignificantly impaired due to their reliance on air-flow velocity and positioning. An air-sampling, VEWFDsystem is more advantageous.

3.3.3 Tape Cartridge Storage

An automated tape library is a hardware device that contains multiple tape drives for reading and writingdata, access ports for entering and removing tape cartidges and a robotic device for mounting anddismounting the tape cartridges without human intervention. The tape cartridges are usually constructed ofa plastic material and can be numerous within the tape library. When constructed of combustible materialare a possible fuel source. The robotic devices are electrically powered and can be considered as an ignitionsource. Hence, the recommendations for detection and suppression within the automated tape libraryequipment. Some manufacturers of tape library systems are IBM, Oracle (Storagetek) and Quantum.

The virtual tape library (VTL) combines traditional tape backup methodology with disk technology to createbackup and recovery features.

By backing up data to disks instead of tapes, VTL often increases performance of both backup and recoveryoperations. In some cases, the data stored on the VTL’s disk array is exported to other media, such asphysical tapes.

The VTL disk storage is not designed to be removable. Since the disk storage is always connected to powerand data sources, it is exposed to potential impact from data center interruptions.

3.3.4 Mobile/Modular Data Center

Mobile/modular data centers allow for substantial economies of scale and have been designed with moreefficient use of energy, including considerations regarding the external environment. Fabrication techniquescan be used to reduce manufacturing costs.

Modular data centers are designed for rapid deployment, energy efficiency, and high-density computing todeliver data center capacity at a lower cost than with traditional construction methods, and to significantlyreduce construction and equipment installation times.

In 2004, APC developed the InfraStruXure Express, an on-demand, mobile data center truck with integratedpower, cooling and racks. It was primar ily used for disaster recovery and temporary or transitional ITprojects. Sun Microsystems first introduced their Blackbox data center container solution in 2007 and initiatedthe concept of a mobile data center. Google and Microsoft have continued to develop their own modulardata center designs. Microsoft deployed in their new Chicago data center up to 220 modular data centercontainers within a building.

3.3.5 Control/Process Control Rooms

The recommendations in this data sheet are intended to supplement the recommendations in data sheetsthat cover the use of control rooms or process control rooms including the following:

• Data Sheet 1-53, Anechoic Chambers

• Data Sheet 1-62, Cranes

• Data Sheet 5-15, Electric Generating Stations

• Data Sheet 6-10, Process Furnaces

• Data Sheet 7-25, Molten Steel Production

• Data Sheet 7-38, Loss Prevention in Ethanol Production Facilities

• Data Sheet 7-72, Reformer and Cracking Furnaces

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 37

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 38: Fmds0532 Data Centers

• Data Sheet 7-43, Loss Prevention in Chemical Plants

• Data Sheet 7-77, Testing Internal - Combustion Engines

• Data Sheet 7-79, Fire Protection for Combustion Turbines

• Data Sheet 7-96, Printing Plants

• Data Sheet 7-101, Steam Turbines and Electric Generators

• Data Sheet 11-1, Electric Power Generation - Steam Cycle

3.3.6 Diagnostic Equipment

The recommendations in this data sheet are intended to supplement the recommendations in the applicabledata sheet for which the diagnostic equipment is installed (e.g., hospitals, clinics, and office buildings).

3.4 Utilities

3.4.1 General

Data center power delivery design typically use ac power distributed to the facility at 600 V ac or 480 V ac.This power is then stepped down to 208 V ac or 120 V ac for distribution to racks for use by servers andother computer hardware equipment.

UPS and energy storage systems, such as batteries or flywheels, are used to isolate equipment from powerinterruptions or other disturbances. This setupusually involves converting incoming ac power to dc for energystorage. The dc power is then converted back to ac for the facility distribution grid and routed to powerdistribution units (PDUs) for distribution to equipment in racks.

Inside the servers and other hardware, such as storage and networking units, power supplies convert ac(at 208/120 V ac) to dc voltage needed for the digital electronics.

Valve-regulated lead acid (VRLA) batteries can be located in self-enclosed metal units similar to switchgearequipment and are not always labeled to apply the proper recommendations.

The use of inefficient power conversion devices from both outside and within equipment result in a largeloss of useful electrical power, as well as directly increasing the energy required to remove the heat produced.With this in mind, research is being conducted on delivering power to computational and network equipmentin a data center using dc power.

3.4.2 Primary Power Systems

The average IT Load for an enterprise facility is 2.2 MW. Mega data centers of 5 MW or more are the exceptionand not the rule in terms of the average facility.

3.4.3 Backup Power Systems

3.4.3.1 Battery UPS

In the event of battery electrolyte leakage, the sealing of floor penetrations will prevent electrolyte fromentering the penetration opening and impacting the floor space below.

A battery failure could ignite the fabric of battery acid absorbent pillows that are not FM Approved or listed,and result in fire spread across the surface of the bags, directly exposing the batteries. Depending on thematerial of construction, a multiple number of batteries may be involved.

There are currently no FM Approved battery acid absorbent pillows tested to FM Approvals Class 4955,Flammability of Absorbent Battery Acid Spill Containment Pillows.

3.4.3.2 Rotary UPS

A typical rotary UPS consists of a motor-generator set coupled to a flywheel and a diesel engine through asynchronous clutch. During normal operations, the motor is supplied from the public utility power grid anddrives the generator and flywheel. The generator is used to provide clean power to the system.

5-32 Data Centers and Related FacilitiesPage 38 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 39: Fmds0532 Data Centers

When there is public utility power grid interruption, the mechanical inertia of the flywheel keeps the generatorspinning while the diesel engine starts and runs up to speed. There is enough inertia in the flywheel to allowthe generator to operate without interruption until the diesel generator takes over.

There is also a hybrid rotary UPS system; instead of a diesel engine, a static UPS is used to drive the motorduring power outages.

3.4.4 Power-Down of Data Processing Equipment and HVAC Systems

3.4.4.1 Electrical power is an ignition source in data centers. When power continues to be provided to nearbycombustibles, the it has the capacity to re-ignite a fire, even if the flames are initially extinguished bywater-based or gaseous fire protection.

Automatic de-energizing of data processing equipment removes a possible re-ignition source, improves theeffectiveness of clean agent fire extinguishing systems, and minimizes damage to exposed electronic circuits.This can be initiated by interfacing automatically with a smoke detection system or a water flow switch for thesprinkler system.

Power-down of the HVAC system(s) warrants the following considerations:

• HVAC power-down upon smoke detection may prevent heat and/or smoke from being drawn into dataprocessing equipment.

• Allowing retention of the clean agent concentration when make-up air is introduced to the data processingequipment room.

• HVAC power-down upon smoke detection may cause elevated ambient temperatures within the data center.Sustained elevated temperatures may cause damage to the data processing equipment. The possibledamage may vary as a function of the exposure, data processing equipment design, and materials ofconstruction.

A single disconnect control integrated to de-energize and interlock both data processing equipment and HVACsystems is preferred but is a condition of the previous considerations.

For areas/rooms protected by only a clean agent fire extinguishing system, initiation of an automatic orautomatic with time delay power-down of the data processing equipment sequence should occur at the alarmfor discharge of the clean agent fire extinguishing system as recommended in Section 2.8.4. Depoweringof the HVAC will be dependent upon the system design for incoming air which may dilute the concentrationof extinguishing agent.

For areas/rooms protected by automatic sprinkler systems, initiation of an automatic power-down of the dataprocessing equipment sequence should occur from any type of smoke detection or the water flow alarmfor the sprinkler system as recommended in Section 2.8.4.

For areas/rooms protected by a clean agent fire extinguishing system and with sprinkler protection, initiationof an automatic or automatic with time delay power-down sequence should occur at the alarm for dischargeof the clean agent fire extinguishing system as recommended in Section 2.8.4.

For areas/rooms protected by a water mist system, initiation of an automatic power-down sequence to theHVAC equipment should occur:

• When protecting the data center room from any type of smoke detection or the water flow alarm for thewater mist system.

• When protecting the raised floor from any type of smoke detection. Also provide depowering of the dataprocessing equipment.

Initiation of an automatic or automatic-with-time-delay power-down in accordance with Table 2.

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 39

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 40: Fmds0532 Data Centers

Table 2. Power-Down of Data Processing Equipment and HVAC Systems

Protection TypePower-Down of Data Processing Equipment Power-Down of HVAC System

Detection Water Flow Detection Water FlowSprinklers X or X X or XClean agent fireext. sys.

X X1

Sprinklers w/ cleanagent fire ext. sys.

X X

Water mist sys.(room)

X X

Water mist sys.(raised floor)

X X

1Depowering of the HVAC system will be dependent upon the system design for incoming air, which may dilute the concentration ofextinguishing agent.

Note: Power to the lighting system within the data processing equipment room can remain energized to aidmanual firefighting activities.

The purpose of a manual disconnect control is to preemptively initiate the de-energizing or “soft” power-downsequence of data processing equipment and/or the HVAC system from the automatic power-down.

3.4.4.2 Power Down Procedure

In the power-down procedure, the following items are suggested:

A. The functions of disconnect controls (e.g., emergency power off [EPO] switch/button, remote manual,ventilation switch/button) for powering down or de-energizing the data processing equipment and/or HVACsystem in the data center.

B. When to use the manual remote override disconnect control for de-energizing data processingequipment and/or HVAC system.

C. The location of the manual control(s), remote manual control(s), and disconnect control(s) for poweringdown the data processing equipment and/or HVAC system.

D. Where multiple zones are used, identify the data processing equipment or HVAC system associatedwith each zone.

E. The impact from the activation of operating individual data processing equipment power switches.

F. A description for the emergency response team (ERT) and public fire service of the data processingequipment and HVAC systems within the building and how they are powered and isolated or de-energized.Include all sources of power, including commercial power, rectifiers, batteries, and generators to the firearea.

G. Pre-planning of the previous items with the local fire service.

For automatic power-down with time delay, the procedure should addresses the following when clean agentfire extinguishing systems are installed:

A. Manual power-down will be completed in a maximum of 10 minutes as part of the soft switch process,at which time automatic depowering of the data processing equipment is initiated.

B. The clean agent fire extinguishing system is qualified to account for continuous ventilation during thetime delay (see Section 2.4.6.3).

C. The design concentration for energized data processing equipment is to be maintained at a minimumuntil the controlled or automatic “soft” shut down is complete.

The data processing equipment manufacturer should be contacted for assistance in the powering down ofdata processing equipment and the appropriate initiating device to interface for automatic power down.

3.4.4.3 Manual Disconnect Controls

For manual disconnect controls:

5-32 Data Centers and Related FacilitiesPage 40 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 41: Fmds0532 Data Centers

A. Group by function and/or zone the disconnect control(s) for the de-energizing and interlock of dataprocessing equipment power and/or HVAC systems, respectively.

B. Identify the disconnect control(s) for the de-energizing and interlock of data processing equipment powerand/or HVAC systems, respectively.

C. Use a disconnect control with a tamper-proof design.

D. Provide signal supervision at the fire alarm control panel of electrical interlocks and power-down devicesthat de-energize data processing equipment.

E. Clearly identify circuit breakers as to the zone(s)/portion(s) of the data center they control.

Sprinklers: The objective of automatic sprinkler systems in data centers is to control a fire; that is, to limitfire propagation to a small area beyond the region of the ignition and initial fire, and to reduce the heat releaserate to a sufficiently low level that the number of sprinklers that activate is less than the design area tomaintain sufficient pressure in the water supply. If the electrical power is not interrupted as recommended,reignition of a fire from the continued delivery of electrical power is eliminated by the cooling effect of water.The power can be eventually interrupted in a controlled manner with coordination of final manual fireextinguishment by the local fire service.

Clean Agent Fire Extinguishing Systems: The objective of clean agent fire extinguishing systems in datacenters is to limit the extent and severity of damage to data processing equipment, and reduce the associatedbusiness interruption to a much lower level than results from sprinkler protection alone. If a clean agent fireextinguishing system is provided, sprinklers in the same space are not expected to activate because theclean agent fire extinguishing system is activated by smoke detection that is much more sensitive thansprinklers. Clean agent fire extinguishing systems are designed to maintain an adequate concentration ofagent in the protected space for only a limited period of time (typically 10 min.). This is a reflection of thepractical limitations in constructing rooms to be as airtight as possible, which industry experience has shownto be exponentially more difficult with longer “hold times.”

Once the agent concentration is reduced to below the required level, if the ignition source has not beenremoved by shutting off the power to the data processing equipment of fire origin, the fire will reignite anycombustibles. This concentration reduction occurs either by natural seepage of the extinguishing agentthrough cracks in the building over a short time after initial agent release, or when the doors are opened toadmit emergency response team or fire service personnel. Therefore, power down must be accomplishedwithin this timeframe to prevent reignition. If a clean agent fire extinguishing system is the only fire protectioninstalled in the space (i.e., there are no sprinklers) and the energized data processing equipment is notpowered down, an uncontrolled fire will result, with fire propagation to the limit of combustibles.

3.4.5 Heating, Ventilation, and Air Conditioning (HVAC)

HVAC equipment is a frequent source of liquid leakage; locating it above critical equipment increases theexposure to that equipment (this is not intended to apply to equipment mounted on the roof).

3.4.6 Uptime Institute Tier Classification

The Uptime Institute, Inc. is an independant company devoted to maximizing efficiency and uninterruptibleavailability in data centers and information technology organizations. The Institute has developed the TierClassification System for rating the concurrent maintainability and fault tolerance of data center facilities (seeTable 3):

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 41

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 42: Fmds0532 Data Centers

Table 3. Tier Requirements Summary

Tier I Tier II Tier III Tier IVActive CapacityComponents toSupport IT Load

N N+1 N+1 N after any failure

Distribution Paths 1 1 1 active and 1alternate

2 simulataneouslyactive

ConcurrentlyMantainable

No No Yes Yes

Fault Tolerancesingleevent)

No No No Yes

Compartmentalization No No No YesContinuous Cooling

(*load densitydependent)

No No No Yes

A Tier 1 basic data center has non-redundant capacity components and a single, non-redundant distributionpath servicing the computer equipment. The site is susceptible to distribution from both planned andunplanned activities. The site infrastructure must be completely shut down to perform preventive maintenanceand repair work.

A Tier II data center has redundant capacity components and a single, non-redundant distribution path servingthe computer equipment. The site is susceptible to distribution from both planned and unplanned events.Redundant capacity components can be removed from service on a planned basis without causing any ofthe data processing equipment to be shut down.

A Tier III data center has redundant capacity components and multiple independent distribution paths servicingthe data processing equipment. Each and every capacity component and element in the distribution pathscan be removed from service on a planned basis without impacting any of the data processing equipment.Planned site infrastructure maintenance can be performed by using the redundant capacity components anddistribution paths to work on the remaining equipment.

A Tier IV data center has multiple, independent, physically isolated systems that each has redundant capacitycomponents and data, independent, diverse, active distribution paths simultaneously servicing the dataprocessing equipment. A single failure of any capacity system, capacity component, or distribution elementwill not impact the data processing equipment. The site infrastructure maintenance can be performed byusing the redundant capacity components and distribution paths to safely work on the remaining equipment.

For additional details, see the Uptime Institute’s, LLC “Data Center Site Infrastructure Tier Standard:Topology”, Uptime Institute Professional Services, LLC, 2012.

3.5 Loss History

3.5.1 NFPA

A study by NFPA in 2004 concluded that properties wholly dedicated to computer or telecommunicationsactivities are a comparatively small part of the United States fire problem. In this study, electronic equipmentareas included computer areas, data processing centers, control centers, radar rooms, telephone equipmentrooms, and telephone booths. The main conclusions of this survey included the following:

• A large number of fires in electronic equipment rooms do not begin with the electronic equipment or evenwith any equipment.

• The leading cause of fires in electronic equipment areas involves electrical distribution equipment (e.g.,wiring, cables, cord, plugs, outlets, overcurrent protection devices), but not electronic equipment.

• In most cases, fire damage is limited to the object of origin.

The results of this study are consistent with FM Global loss experience.

5-32 Data Centers and Related FacilitiesPage 42 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 43: Fmds0532 Data Centers

4.0 REFERENCES

4.1 FM Global

Data Sheet 1-2, EarthquakesData Sheet 1-8, Antenna Tower and SignsData Center 1-12, Ceiling and Concealed SpacesData Sheet 1-20, Protection Against Exterior Fire ExposureData Sheet 1-28, Wind DesignData Sheet 9-13, Evaluation of Flood ExposureData Sheet 1-40, FloodData Sheet 2-0, Installation Guidelines for Automatic SprinklersData Sheet 2-8, Earthquake Protection for Water-Based Fire Protection SystemsData Sheet 2-81, Fire Protection System Inspection, Testing and Maintenance and other Fire Loss PreventionInspectionsData Sheet 3-0R, Hydraulics of Fire Protection SystemsData Sheet 3-7, Fire Protection PumpsData Sheet 3-26, Fire Protection Water Demand for Nonstorage Sprinklered PropertiesData Sheet 4-2, Water Mist SystemsData Sheet 4-9, Clean Agent Fire Extinguishing SystemsData Sheet 4-11, Carbon Dioxide Extinguishing SystemsData Sheet 5-4, TransformersData Sheet 5-10, Protective Grounding for Electric Power Systems and EquipmentData Sheet 5-11, Lightning and Surge Protection for Electrical SystemsData Sheet 5-14, TelecommunicationsData Sheet 5-20, Electrical TestingData Sheet 5-23, Emergency and Standby Power SystemsData Sheet 5-31, Cables and Bus BarsData Sheet 5-40, Fire Alarm SystemsData Sheet 5-48, Automatic Fire DetectionData Sheet 9-16, Burglary and TheftData Sheet 9-17, Protection Against Arson and Other Incendiary FiresData Sheet 10-1, Pre-Incident Planning with the Public Fire ServiceData Sheet 10-2, Emergency ResponsesData Sheet 10-5, Disaster Recovery Planning

Xin, Y. and M. M. Khan. “Flammability of combustible materials in reduced oxygen environment.” Fire SafetyJournal 42 (2007) pp. 536-547.

4.1.1 FM Approvals

Class Number 3972, Test Standard for Cable Fire PropagationClass Number 4910, Cleanroom Materials Flammability Test ProtocolClass Number 4924, Approval Standard for Pipe InsulationClass Number 5420, Approval Standard for Carbon Dioxide Extinguishing SystemsClass Number 5600, Approval Standard for Clean Agent Fire Extinguishing SystemsClass Number 5560, Approval Standard for Water Mist Systems

4.2 Other Standards

American Society of Testing Materials (ASTM). Standard Method of Surface Burning Characteristics ofBuilding Materials. ASTM E84. 2010

British Standard Institute (BSI). Fire protection for electronic equipment installations - Code of practice. BS6266:2011.

British Standard Institute (BSI); European Norm. Communication cables. Specifications for test methods.Environmental test methods. A horizontal integrated fire test method. BS-EN-50289-4-11, 2002.

Deutsches Institut für Normung e.V. (DIN). Testing of combustible materials; response to ignition by a smallflame. DIN 53438, 1984

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 43

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 44: Fmds0532 Data Centers

Deutsches Institut für Normung e.V. (DIN). Fire Behaviour of Building Materials and Building Components.DIN 4102, 2009.

Institute of Electrical and Electronics Engineers (IEEE). Recommended Practice for Powering and GroundingSensitive Electronic Equipment. IEEE Std 1100 1992, 1992.

National Fire Protection Association (NFPA). National Electrical Code. NFPA 70, 2011, Article 645.

National Fire Protection Association (NFPA). Protection of Information Technology Equipment. NFPA 75,2013.

National Fire Protection Association (NFPA). Fire Protection of Telecommunications Facilities. NFPA 76,2012.

National Fire Protection Association (NFPA). Special Analysis Package Computer Equipment and ComputerAreas. Fire Analysis and Research Division, NFPA. 2001.

National Fire Protection Association (NFPA). Standard Method of Test of Surface Burning Characteristicsof Building Materials. NFPA 255, (Withdrawn 2009).

National Fire Protection Association (NFPA). Standard Method of Test for Flame Travel & Smoke of Wiresand Cables for use in Air - Handling Spaces. NFPA 262, 2011.

National Fire Protection Association (NFPA). Clean Agent Fire Extinguishing Systems. NFPA 2001, 2012.

Turner, W. P., et. al. Tier Classifications Define Site Infrastructure Performance. Uptime Institute. 2008.

Underwriters Laboratories (UL). Tests for Flammability of Plastic Materials for Parts in Devices andApplications. UL 94, 2010.

Underwriters Laboratories (UL). Test for Surface Burning Characteristics of Building Materials. UL 723, 2010.

Underwriters Laboratories (UL). Test Performance of Air Filter Units. UL 900, 2007.

Underwriters Laboratories (UL). UL Standard for Safety for Flame-Propagation and Smoke-Density Valuesfor Electrical and Optical-Fiber Cables used in Spaces Transporting Environmental Air. UL 910 (Withdrawn2001).

Underwriters Laboratories (UL). Test Methods for Determining the Combustibility of Characteristics of PlasticsUsed in Semi-Conductor Tool Construction. UL 2360, 2004.

Underwriters Laboratories (UL). Information Technology Equipment - Safety - Part 1: General Requirements.UL 60950-1, 2007.

Underwriters Laboratories (UL). Information Technology Equipment - Safety - Part 21: Remote PowerFeeding. UL 60950-21, 2003.

APPENDIX A GLOSSARY OF TERMS

Automated Tape Library (ATL): An enclosed storage and retrieval system that moves recorded electronicdata (e.g., cassettes) between storage and server equipment.

Air-Aspirating Detection: See Very Early Warning Fire Detection (VEWFD)

Business Continuity: A strategic approach to business as a whole, involving the development of a responseto safeguard the entire business by managing the impact of a disruption to achieve the company’s businessobjectives for survival, regardless of the cause of the disruption. By implication, the development of the BCPrequires a much deeper understanding of the business, the criteria for business survival, the continuitystrategies available, and the resources necessary to implement the continuity response.

CRAC: Computer room air conditioner that uses refrigerant and a compressor. Cooling of the air in the datacenter is accomplished by airflow over the evaporation coils where the refrigerant is being directly expanded.

Cold Aisle: The aisle in front of the airflow intakes on the server racks where HVAC cooling airflow iscontrolled.

Co-Location: Rental to third parties of disk space, provision of web-hosting services on a server, or segmentedareas with individual tenants that control their own equipment.

5-32 Data Centers and Related FacilitiesPage 44 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 45: Fmds0532 Data Centers

Control Room: A room serving as an operations center where a facility, service, or equipment can be remotelymonitored by electronic equipment and controlled by personnel. The control room is used in network,command and control, and other control application operations.

Cloud Computing: A model for enabling convenient, on-demand network access to a shared pool ofconfigurable computing resources (e.g., networks, servers, storage, applications, and services) that can berapidly provisioned and released with minimal management effort or service provider interaction.

Data Center: A facility used to house data processing equipment and associated components, such astelecommunications and storage systems. It generally includes redundant or backup power supplies,redundant data communications connections, environmental controls (e.g., HVAC, fire suppression) andsecurity devices.

Data Processing Equipment Room: A room mostly occupied with data processing equipment such as servers,tape cartridge storage, printers, etc.

Disaster Recovery: Activities necessary to respond to an incident at a location to restore normal operationsafter a major diaster or specific scenario. DRPs are therefore written to establish the necessary actions totake during and immediately after an anticipated event to expedite the resumption of normal operations.

Disconnect Control: A device that controls the interface of the disconnecting means of power by a pathway,relay, or equivalent method.

Double-Interlock Preaction System: A sprinkler system that is located downstream of a preaction valve andis equipped with closed-type sprinklers. The preaction valve is arranged to open only after the actuation ofboth a sprinkler and a detection system that is supervising the area being protected by the preaction sprinklersystem. Most double-interlock sprinkler systems have either an electric or a pneumatic means ofaccomplishing these two activating conditions.

Hot Aisle: The aisle at the rear of the server racks into which air is directed after being heated by passingthrough the data processing equipment for return to the HVAC equipment.

Hot/Cold Aisle Containment: Physical barriers provided in the immediate vicinity of air-cooled server racksthat separate hot air exhausted from the data processing equipment from the cooler supply air into theequipment racks. Containment is typically provided above and at both ends of a hot or cold aisle, in wholeor in part.

Hot Air Collar: An assembly used to duct heated exhaust air from an enclosure(s), cabinet(s,) or rack(s) ofthe data processing equipment to the return air path of the HVAC system.

Input/Output (I/O) Room: The room where the electronic hardware is wired to interface from the control roomwith the field/process devices. Discrete I/O devices have switches for inputs and relay outputs (e.g., operatesolenoid valves or pump motors). Analog I/O devices have process variable inputs, and variable controlleroutputs.

Intelligent High-Sensitivity Spot Detection: See Very Early Warning Fire Detection (VEWFD).

Manual Disconnect Control: A means to preemptively initiate the de-energizing or “soft” power-down sequenceof data processing equipment and/or the HVAC system.

Mobile/Modular Data Center: An enclosed construction unit or prefabricated container (e.g., ISO shippingcontainer) containing data processing equipment (e.g., servers, storage, networking, software management)and/or supporting utility systems (e.g. power, power conditioning, HVAC) intended to be configured on amodular basis either as a standalone unit or several units combined in an array to provide data centerfunctions.

N+1: Need plus one, a redundancy concept where operational capacity is met by one or more componentsor systems, plus one additional component or system adequate to enable continued operations in the eventof a failure of one component or system in the base configuration.

Non-Interlock Preaction System: A sprinkler system that is located downstream of a preaction valve and isequipped with closed-type sprinklers. The preaction valve is arranged to open upon either the operation of asprinkler or the actuation of a detection system that is supervising the area being protected by the preactionsprinkler system.

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 45

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 46: Fmds0532 Data Centers

Nonpropagating or Group 1 cable:1. Cable with a fire propagation index (FPI) of less than 10 when tested in the FM Global fire propagationapparatus.2. Cable that, when tested in accordance with the FM 3972 Vertical Tray Test, does not have flame spreadmore than 5 ft (1.5 m) beyond the 60 kW fire exposure.3. Cable that has passed UL 910 or NFPA 262 tests.

Plenum-Rated Cable: Considered non-fire propagating and equivalent to FM Approved Group 1 cable.

Preaction Sprinkler System: A sprinkler system that is located downstream of a preaction valve and isequipped with closed-type sprinklers (i.e., sprinklers equipped with a thermal sensing element and an orificecap).

Preaction Valve: An automatic water control valve, typically installed on a sprinkler system riser, specificallydesigned to hold back water from passing through it until certain conditions have been met, such as activationof a detection system supervising the area protected by the preaction sprinkler system or by pressure dropdownstream of the valve. It is connected upstream of a preaction sprinkler system.

Process Control Room: A cutoff and/or isolated room in which personnel are available 24/7 to operate aprocess from a central or remote location. The process control room is typically integrated with an input/outputroom and/or cable spreading room to control the function of equipment. Process control is extensively usedin industry and commonly enables mass production of continuous processes such as, paper, pharmaceuticals,chemicals, and electric power as well as other industrial processes. Process control rooms/technical spacesmay be unattended and operated remotely.

Propagating cable:1. Cable with a fire propagation index (FPI) of more than 10 when tested in the FM Global fire propagationapparatus.2. Cable that, when tested in accordance with the FM 3972 Vertical Tray Test, has a flame spread greaterthan 5 ft (1.5 m) beyond the 60 kW fire exposure.3. Cable that has not been tested or has not passed UL 910 or NFPA 262 tests.

Raceway: An closed channel of metal or nonmetallic materials designed for holding wires, cables or busbars.

Rack: Device for holding data center equipment, most commonly used to hold multiple servers. Also calleda cabinet.

Routing Assembly: A single channel or connected multiple channels, as well as associated fittings, forminga structure system that is used to support, route, and protect wires and cables.

Server: Data processing equipment that serves information to computers that connect to it. When usersconnect to a server, they can access programs, files, and other information from the server. Common serversare web servers, mail servers, and LAN servers.

Server Farm: A collection of computer servers usually maintained by an enterprise to accomplish server needsfar beyond the capability of one machine. Server farms often have backup servers that can take over thefunction of primary servers in the event of a primary server failure. Server farms are typically co-located withthe network switches and/or routers that enable communication between the different parts of the clusterand the users of the cluster. The computers, routers, power supplies, and related electronics are typicallymounted on racks in a server room or data center.

Shelter-in-place: A building space designed and constructed to provide protection to occupants in a naturalor other disaster. The space may be structurally reinforced to resist the highest forces anticipated (e.g. wind,impact, blast pressure, heat, etc.) and will provide breathable air for the expected duration of the emergency.

Single-Interlock Preaction System: A sprinkler system that is located downstream of a preaction valve andis equipped with closed-type sprinklers. The preaction valve is arranged to open upon the actuation of adetection system that is supervising the area being protected by the preaction sprinkler system.

Soft Power-down: A disconnect control that triggers a sequence of data processing equipment commandsfollowed by de-energizing such that an orderly power-down is necessary to minimize data processingequipment damage.

5-32 Data Centers and Related FacilitiesPage 46 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 47: Fmds0532 Data Centers

Tape Library: In data storage, a tape library is a collection of magnetic tape cartridges and tape drives. Anautomated tape library is a hardware device that contains multiple tape drives for reading and writing data,access ports for entering and removing tapes and a robotic device for mounting and dismounting the tapecartridges without human intervention.

Unoccupiable Enclosure or Space: An enclosure or space that has dimensions and physical characteristicssuch that it cannot be entered by a person.

Valve-Regulated Lead Acid Batteries (VRLA): Batteries esigned to minimize gas emissions and eliminateelectrolyte maintenance by recombination of internally generated oxygen and hydrogen to conserve water.A resealable valve is intended to vent gases not recombined, hence the term ″valve-regulated.” The electrolytein a VRLA cell is ″immobilized″ by the use of a highly porous fibrous mat between the plates or by the useof a gelling agent to thicken the electrolyte.

Very Early Warning Fire Detection (VEWFD): Detectors using xenon or laser light detection chambers canbe considered VEWFD detectors. These detectors maybe spot-type or air-sampling type detection systems.VEWFD detectors are an order of magnitude more sensitive than conventional smoke detectors, and canbe set to alarm at smoke obscuration levels below 0.02%/ft (0.06%/m). Conventional smoke detectors alarmat 1% to 3%/ft (3.3% to 9.8%/m).

Zone: A distinct area, created by a physical barrier or division of open space, from the total area of a dataprocessing equipment room that is segmented into dedicated power and/or HVAC systems for the dataprocessing equipment.

APPENDIX B DOCUMENT REVISION HISTORY

July 2012. This data sheet has been completely rewritten. Major changes include the following:

1. Changed the title from Electronic Data Processing Systems to Data Centers and Related Facilities.

2. Added hot/cold aisle containment systems and protection recommendations.

3. Added the recommendation for the protection of foam insulation beneath raised floors in the dataprocessing equipment room.

4. Added guidance on using clean agent fire extinguishing systems and water mist systems.

5. Added protection recommendations for modular data centers.6.

Added protection recommendations for process control rooms, control rooms, and diagnostic equipment.Recommendations in the specific sections for process control rooms, control rooms, and diagnosticequipment when identified will supersede those for data centers.

7. Added recommendations for redundancy of certain critical utility systems: heating, ventilation and airconditioning (HVAC) systems, chillers, and ventilation.

8. Updated the section on automatic power-down to include powering down and de-energizing dataprocessing equipment and HVAC systems.

9. Deleted the recommendation for automatic smoke control and removal systems.

May 2005. The revisions are based on a change in Data Sheet 5-31, Cables and Bus Bars. The changecombines FM Approved Group 2 and Group 3 cable along with cables that have not been tested by FM Globaland considers these as cables that can ‘‘propagate’’ fire. ‘‘Nonpropagating’’ cable does not require protection.Nonpropagating cable is either (a) FM Approved Group 1, (b) UL-910 plenum rated or (c) cable with amaximum flame spread distance of 5 ft (1.5 m) when tested in accordance with NFPA 262, Standard Methodof Test for Flame Travel and Smoke of Wires and Cables for use in Air Handling Spaces.

January 2005. Reference to the future use of Halon 1301 and 1211 systems for protection of computer andcomputer related equipment has been replaced with a recommendation for the use of clean agent systemsinstalled in accordance with Data Sheet 4-9, Clean Agent Fire Extinguishing Systems.

September 2004. Recommendation 2.4.2.1.2 was modified to allow the use of light hazard water mist systemsFM Approved for open area protection.

September 2002. Recommendation for protection of subfloor areas of the computer room has been revisedto include the use of FM Approved Clean Agent fire extinguishing systems and water mist systems.

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 47

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 48: Fmds0532 Data Centers

January 2001. The document has been reorganized to provide a consistent format.

September 2000. The document has been reorganized to provide a consistent format.

May 1999. The recommendation for grounding of computer systems was revised. Also, guidance for fireprotection of Group 2 cables that are randomly laid (unbundled across the floor) was modified.

June 1993. Data Sheet 5-32 has been completely rewritten.

APPENDIX C PERFORMANCE TEST PROCEDURES FOR VEWFD SYSTEMS

Performance tests for VEWFD systems are intended to simulate the small amounts of smoke that wouldbe created in the early stages of a fire in a data processing equipment room. If an actual fire were to producethe amounts of smoke produced by these tests, data center companies would want to be alerted by the firealarm system. The tests represent a good balance between the desire to use smoke sources that arerepresentative of the types of fires that have occurred in data processing equipment rooms and the desireto minimize the introduction of smoke that can cause damage to operating data processing equipment in thearea/room.

Objectives

Performance tests are intended to meet the general objectives listed below:

A. The tests are intended to be repeatable. A consistent quantity, temperature, and color of smoke areproduced each time the test is performed.

B. The test equipment can be quickly set up in actual data center facilities.

C. Testing is intended to prevent or minimize the potential for smoke damage to data processing equipmentin the room (little or no corrosive products of combustion should be produced).

Heated Wire Test

This test uses an electrically overloaded PVC-coated wire to simulate the early stages of a fire. Although aPVC wire is used, hydrogen chloride vapor is unlikely to be produced in quantities significant enough to beof concern, due to the relatively low temperatures reached. If the current is applied for a longer time, or if thewire sample is shorter than stated, small quantities of hydrogen chloride can be generated. In either event,a clearly perceptible odor that should dissipate in a short time is produced by the test. Table 4 describestwo heated wire tests.

Table 4. Heated-Wire Test Parameters

ParameterModified BS 6266 Test:1 m Wires in Parallel North American Wire Test

Wire Specs Wire is very flexible due to strandedconstruction and highly plasticized

insulation.

A single strand of 22 AWG copperwire, insulated with PVC to a radial

thickness of 1.1 mm (0.041 in.). Thiswire is stiffer than the BSI wire due tothe single-strand construction and theminimally plasticized PVC insulation.

Smoke Characterization More visible smoke than the 2 m testor the single wire 1 m test but still

very light smoke. Due to the highertemperature in the wires, a small

amount of HCI vapor will beproduced.

More visible smoke than the BSI wiretests but still very light. A minor

amount of HCI is produced but for ashorter duration than the BSI wires

tests.

Test Period 60 seconds 30 secondsElectrical Load Constant voltage -6.0 volts dc, current

varies from 0 to 30 amperes duringthe test due to changing resistance in

the wire.

Constant current of 28 amperes.Voltage varies from 0 to 18 volts dc

during test due to changing resistancein the wire.

Pass/Fail Criteria ″Alert″ or ″pre-alarm″ signal within 120 seconds of the end of the period.

5-32 Data Centers and Related FacilitiesPage 48 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 49: Fmds0532 Data Centers

A. Test Apparatus

The test apparatus consists of the following:

1. Wire. Table D.1 lists options for wire selection and test parameters for the users to select. Test wireshould be cut cleanly to the length specified in Table 4.

2. Wire Mounting. The wire should be arranged by placing it on a noncombustible, nonconductive board,or suspending it on a noncombustible, nonconductive support. The wire should be arranged so thatthere are no kinks or crossovers where localized higher temperature heating can occur.

3. Power Supply and Leads. A regulated dc power supply should be capable of supplying a currentof 0 to 30 amperes at 0 to 18 volts dc (i.e., Kenwood Model XL6524E-D). The lead wires between thepower supply and the test wire (s) should be 10AWG, 3.25 m (10.66 ft) long to avoid unacceptablevoltage drop.

4. Stop Watch. A stop watch or clock accurate to 1 second should be used.

B. Test Procedure

1. The test should be performed in the room in which the detection system is installed, with all normalventilation fans (e.g., fans internal to equipment, room ventilation fans) operating. Testing should alsobe performed with the fans turned off to simulate the potential for fan cycling and/or a power failure.This does not preclude testing required by NFPA 72.

2. Detector Programming. The detector alarm sensitivity setting (i.e., pre-alarm or alarm) used duringthe test should be identical to those used during normal operation of the detection system. Alarmverification or time delay features should be disabled during the test to permit the detector responseto be annunciated immediately upon activation.

This testing is intended to verify that the detectors or sensor will ″see″ smoke in sufficient concentrationsto reach the specified alarm levels. Because the test produces a small amount of smoke for a briefperiod of time (i.e., a puff of smoke), the use of the alarm verification or time delay features would likelyresult in the detector or sensor not reaching the specified alarm levels. In a ″real world″ fire, the smokewould continue to be produced as the fire grows, permitting the detector or sensor to reach alarm.If these features are disabled during the testing, they should be enabled at the conclusion of the testingbefore leaving the room.

3. Test Locations. Test locations should be selected by considering the airflow patterns in the roomand choosing challenging locations for the tests (i.e., both low airflow and high airflow can bechallenging). If possible, the locations and elevations of the test apparatus should be varied to simulatethe range of possible fire locations in the room. Locations where the smoke will be drawn directly intothe data processing equipment cooling ports or fans should be avoided. Locations where the smokewill be entrained into the air exhausting from an equipment cabinet are acceptable.

4. Preparation. The test wire should be prepared by carefully removing not more than 0.6 in. (12 mm)of the insulation from each end. The wire should be mounted on the insulating material so that thereare no kinks or crossovers in the wire.

5. Setting. The power supply should be set to supply either a constant voltage or constant current asshown in Table 4.

6. Connection. The ends of the test wire(s) should be connected to the power supply leads.

7. Test. When all other preparations are complete, the power supply should be switched on for a periodshown in Table 4. After the appropriate current application time, the power supply should be turnedoff, and the test results should be observed and recorded. To avoid burns, the wire should not betouched during the test, or for 3 minutes after turning the power supply off. If the wire is located closeto HVAC registers or equipment exhaust ports, the airflow can cool the wire and result in inadequateproduction of smoke. In this event, either the apparatus should be repositioned or the wire should beshielded from the airflow.

8. Test Sequence. The test should be repeated at least three times for each HVAC condition, with thetest apparatus placed in a different location in the room each time. If possible, the elevation of thetest apparatus should be varied.

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 49

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 50: Fmds0532 Data Centers

9. Pass/Fail Criteria. The pass or fail criteria for the VEWFD system should be as indicated in Table4.

APPENDIX D CLEAN AGENTS

Clean agents listed in Tables 5 and 6 are typically used for electronic equipment applications. Theconcentrations given for ordinary combustibles (Class A) and ignitable liquids (Class B) are accepted byNFPA 2001 based on their listing with the system manufacturer. The ignitable liquids (Class B) concentrationsare provide as a comparative reference to the other hazard concentrations.

For cables that could be de-energized, the design concentration required for an ordinary combustible (ClassA) would be used. Although electronic data processing equipment cannot be expected to be de-energizedquickly based upon certain risk factors. NFPA 2001 has recognized that a higher agent concentration shouldbe used for low energy faults (480 volts) by adding a safety factor of 1.35, determined by concensus, tothe ordinary combustible (Class A) extinguishing concentration.

FM Global Research has conducted testing that indicates still higher concentrations are needed for higherenergy arcing faults. This testing was used to determine the clean agent concentrations in Table 6. The arcingconcentrations given in Table 6 are for information only. They have not been listed in Data Sheet 4-9, CleanAgent Fire Extinguishing Systems, at this time. This is due to the effect of the type of fault and power level(energy augmented combustion) has on the ability to attenuate the energized source. However, it is anindication that higher design concentrations for energized electrical equipment are expected and a functionof the power level.

If the fault is not de-energized before clean agent concentration is dissipated, reignition is expected. Thesehigher concentrations need to be reviewed for restrictions when used in normally occupied areas.

Table 5. Design Concentrations for Clean Agents

Extinguishing AgentMinimum Class A Design

Concentration from Manual, percent1Minimum Class B Design

Concentration from manual, percent2

FK-5-1-12 (NOVEC 1230) 4.2 5.8HFC-125 (FE-25) 8.0 11.0

HFC-227ea (FM-200/FE-227)3 6.25, 7.0 8.7, 9.0IG-541 (INERGEN) 34.2 40.6

IG-55 (Argonite, ProInert) 37.9 39.11 The minimum design concentration for ordinary combustible materials (Class A) can be used for an electrical ignition (Class C) sourcewith de-energizing of the source upon clean agent fire extinguishing system actuation.2 Ignitable liquids (Class B) design concentrations are based upon heptane as the fuel.3 The lower design concentration of the two is the result of a retest by the manufacturer.

Table 6. Design Concentrations for Clean Agents with an Energized Electrical Hazard

Extinguishing Agent NFPA 2001, Energized Class C, percent1

FK-5-1-12(NOVEC 1230) 4.7HFC-125 (FE-25) 9.0

HFC-227ea(FM-200/FE-227) 7.0, 7.8IG-541 (INERGEN) 38.5

IG-55 (Argonite, ProInert) 42.71 Up to 480 volts.

APPENDIX E BIBLIOGRAPHY

British Standard Institute (BSI). Fire protection for electronic equipment installations - Code of practice, BS6266:2011.

Curtis, Peter M. Maintaining Mission Critical Systems in a 24/7 Environment. 2nd edition. Hoboken: JohnWiley & Sons, Inc, 2011.

National Fire Protection Association (NFPA). Protection of Information Technology Equipment, NFPA 75,2009.

5-32 Data Centers and Related FacilitiesPage 50 FM Global Property Loss Prevention Data Sheets

©2005-2012 Factory Mutual Insurance Company. All rights reserved.

Page 51: Fmds0532 Data Centers

National Fire Protection Association (NFPA). Fire Protection of Telecommunications Facilities, NFPA 76, 2009.

Rath, John. Data Center Knowledge Guide to Modular Data Centers, October 2011.

Uptime Technologies, LLC. Data Center Site Infrastructure Tier Standard: Topology. Uptime InstituteProfessional Services, LLC, 2012.

Xtralis. Telecommunications and Data Processing Facilities - Design Guide, July 2007.

Data Centers and Related Facilities 5-32FM Global Property Loss Prevention Data Sheets Page 51