+ All Categories
Home > Documents > For personal use only · 3/21/2012  · Knysna Newcastle Madadeni Paarl Saldanha Vredenburg Welkom...

For personal use only · 3/21/2012  · Knysna Newcastle Madadeni Paarl Saldanha Vredenburg Welkom...

Date post: 26-Aug-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
12
ASX Announcement 21 March 2012 Investor Presentation The attached presentation outlines the Company’s activities in: Iron ore exploration in South Africa, and Metallurgical coal in Swaziland, It has been prepared for formal release at the Mines and Money conference in Hong Kong on 21 March 2012. Investors seeking more information on Midwinter should contact: Adrian Griffin Managing Director T: +618 9322 6451 The information contained in the report relates to Exploration Results of projects owned by Midwinter Resources NL and is based on information compiled or reviewed by Mr Adrian Griffin, an employee of the Company and a Member of the Australasian Institute of Mining and Metallurgy. Mr Griffin has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person, as defined in the 2004 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Griffin has given consent to the inclusion in the report of the matters based on his information in the form and context in which it appears. For personal use only
Transcript
Page 1: For personal use only · 3/21/2012  · Knysna Newcastle Madadeni Paarl Saldanha Vredenburg Welkom Pietermaritzburg Germiston Witbank Barberton Piet Retief ... AREA OF NEW APPLICATIONS

   

 

ASX Announcement 21 March 2012 

 

Investor Presentation  

 The attached presentation outlines the Company’s activities in:  

Iron ore exploration in South Africa, and 

Metallurgical coal in Swaziland,   It has been prepared  for  formal  release at  the Mines and Money conference  in Hong Kong on 21 March 2012.   

  Investors seeking more information on Midwinter should contact:  Adrian Griffin           Managing Director         T: +618 9322 6451          The information contained in the report relates to Exploration Results of projects owned by Midwinter Resources NL and is based on information compiled or reviewed by Mr Adrian Griffin, an employee of the Company and a Member of the Australasian Institute of Mining and Metallurgy. Mr Griffin has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person, as defined in the 2004 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Griffin has given consent to the inclusion in the report of the matters based on his information in the form and context in which it appears. 

 

For

per

sona

l use

onl

y

Page 2: For personal use only · 3/21/2012  · Knysna Newcastle Madadeni Paarl Saldanha Vredenburg Welkom Pietermaritzburg Germiston Witbank Barberton Piet Retief ... AREA OF NEW APPLICATIONS

1 1

DEVELOPING RAW MATERIALS IN AFRICA FOR THE FERROUS METALS INDUSTRY

ADRIAN GRIFFIN +61 418 927 [email protected]

www.midwinterresources.com.au

ApRIl 2012 For

per

sona

l use

onl

y

Page 3: For personal use only · 3/21/2012  · Knysna Newcastle Madadeni Paarl Saldanha Vredenburg Welkom Pietermaritzburg Germiston Witbank Barberton Piet Retief ... AREA OF NEW APPLICATIONS

22 3

This presentation has been prepared by Midwinter Resources NL (‘Midwinter’ or ‘the Company’) in connection with providing general and background information on the Company.

This presentation should not be relied upon as a representation of any matter that an advisor or potential investor should consider in evaluating Midwinter. The Company and its related bodies corporate or any of its directors, agents, officers or employees do not make any representation or warranty, express or implied, as to endorsement of the Company, or the accuracy or completeness of any information, statements or representations contained in this presentation, and they do not accept any liability whatsoever (including in negligence) for any information, representation or statement made in or omitted from this presentation.

This document may contain certain forward-looking statements that involve known and unknown risks, delays and uncertainties not under the Company’s control, which may cause actual results, performance or the achievements of Midwinter to be materially different from the results, performance or expectations implied by these forward-looking statements. The Company makes no representation or warranty, express or implied, as to or endorsing the accuracy or completeness of any information, statements or representations contained in this presentation with respect to Midwinter. Actual results, actions and developments may differ materially from those expressed or implied by the statements in this presentation.

This presentation does not constitute an offer of securities in the Company; nor should this presentation be relied upon by any advisor or potential investor in making an investment decision in Midwinter. Any decision to purchase or subscribe for any shares in Midwinter should only be made after making independent enquiries and seeking appropriate financial advice.

The information in this presentation that relates to the iron projects is based on information compiled by Mr Adrian Griffin, a Member of the Geological Society of Australia and of the Australasian Institute of Mining and Metallurgy. Mr Griffin has sufficient experience that is relevant to the styles of mineralisation, types of deposits and exploration activities undertaken to qualify as a Competent Person, as defined in the 2004 edition of the Australasian Code for Reporting of Mineral Resources and Ore Reserves. Mr Griffin consents to inclusion in the report of the information in the form and context in which it appears. The information relating to the coal project is extracted from Midwinter’s ASX releases and from information in the public domain.

Subject to any continuing obligations under applicable law and the Listing Rules of the ASX Limited, Midwinter does not undertake any obligation to publicly update or revise any of the forward looking statements in this presentation or any changes in events, conditions or circumstances on which any such statements are based.

MIDWINTER RESOURCES NLMidwinter Resources NL (ASX:MWN) (‘Midwinter’ or ‘the Company’) is a dedicated developer of ferrous metal feed materials with a focus on iron deposits in Africa.

Company struCture Shares on issue 30,000,042Market capitalization $4,500,000 Cash available $1,600,000Controlled land position 3,000 km2

Enterprise value $2,900,000

Company planMidwinter plans to capitalize on the development of raw materials for the iron and steel industry in areas in which there is:• developingdomesticsteelproductionoranexportopportunity;• establishedorplannedinfrastructure;• anabundanceofnaturalresourceinputs,including:

– coal – gas – limestone – water, and• theabilitytotakeadominantsupplyposition.

The Company has progressed its aims by establishing a dominant position in the Limpopo Iron Province (comparable in area to Australia’s Hamersley Basin). Those aims have been further progressed by an agreement to acquire coal assets in Swaziland and the discovery of limestone deposits in South Africa. The Swaziland coal deposits, which have a long production history, already have established markets, having been used in the production of ferrochrome and ferromanganese.

Initial exploration by Midwinter in Limpopo has resulted in the successful location of buried magnetite deposits in the form of high metamorphic-grade banded iron formations (BIF), from which it is possible to produce high-grade iron concentrates at a coarse grind size.

There are significant benefits associated with iron deposits from which concentrates low in impurities and with a coarse grain size can be extracted. These include:• reducedplantfootprint;• reducedcapitalandoperatingcosts;• improvedenergyefficiency;• improvedmarketability,and• abroadercustomerbase.

These benefits can be further enhanced by the production of value-added products (pellets, pig iron or steel) and by reducing input costs via control of other major raw material inputs; in particular, limestone and coal.

Proof-of-concept investigations on the first of the available deposits at Northern Lights (Figure 1) clearly confirm what past operators have concluded – that iron concentrates of high quality can be produced from the Limpopo Iron Province deposits, those concentrates being characterized by:• liberationwithcoarsegrind;• ironrecovery85-90%;• Fe69.9%,and• SiO2<2.5%,Al2O3<1.5%,P<0.01%.

DIsClaImer

2 3

For

per

sona

l use

onl

y

Page 4: For personal use only · 3/21/2012  · Knysna Newcastle Madadeni Paarl Saldanha Vredenburg Welkom Pietermaritzburg Germiston Witbank Barberton Piet Retief ... AREA OF NEW APPLICATIONS

44 5

Krugersdorp

Orkney

Kenhardt

De Aar

Upington

Kenhardt

Hotazel

SishenVryheid

Ladysmith

Kroonstad

Orkney

Bethlehem

Bohlokong NewcastleMadadeniWelkom

Pietermaritzburg

Barberton

Piet Retief

Richards Bay - 90 Mtpa

River View

Mkuze

Ulundi

Stanger

Xai-Xai

Amanzimtoti

Musina(Messina)

Kimberley

Johannesburg

Klerksdorp

(Pietersburg)

MafikengMaputo - 10 Mtpa

Gaborone

Bloemfontein

e r g

Ra n g e

B O T S W A N A

ZIMBABWE

SWAZILAND

LESOTHO

MOZAMBIQUE

I N

DI A

N

OC

EA

N

Delagoa Bay

Orange

Orange

Caled

onHarts

Molo

poBuffalo

Limpopo

Limpopo

Save

Olifant

s

25° 30°

25°

30°S O U T H A F R I C ADurban - 70 Mtpa

Volksrust

Vereeniging

Witbank

S O U T H A F R I C A

SOUTH AFRICA

Orkney

CarnarvonWilliston

Kenhardt

Strand

Umtata

Beaufort West

Victoria West

Worcester

Heidelberg

CalviniaKlawer

CarnarvonWilliston

De AarAliwal North

Middelburg

Queenstown

StellenboschStrand

Grahamstown

Bitterfontein

SpringbokNababeep

Port Nolloth

Graaff- Reinet

Port Elizabeth

Upington

Kenhardt

Hotazel

SishenVryheid

Ladysmith

Kroonstad

Orkney

Bethlehem

Bohlokong

George

Knysna

NewcastleMadadeni

Paarl

SaldanhaVredenburg

Welkom

Pietermaritzburg

Germiston WitbankBarberton

Piet RetiefVolksrust

Krugersdorp

Richards Bay - 90 Mtpa

River View

Mkuze

Ulundi

Stanger

Vereeniging

Oudtshoorn

Oranjemund

Keetmanshoop

Karasburg

Lüderitz

Mossel bay

Xai-Xai

Alesander Bay

East London

Port Alfred

Port St Johns

Port Shepstone

Amanzimtoti

Musina(Messina)

Kimberley

Johannesburg

Klerksdorp

Nelspruit

Polokwane(Pietersburg)

Bisho

Mafikeng

Cape Town

Maputo - 10 Mtpa

Gaborone

Maseru

Mbabane

Bloemfontein

Pretoria

Cape of Good Hope

D r a k e n s b e r g

Ra n g e

Cape Agulhas

Cape St. Francis

N A M I B I A

B O T S W A N A

ZIMBABWE

SWAZILAND

LESOTHO

MOZAMBIQUE

Table Bay

Saldanha Bay

SO

UT

H A

TL

AN

TI C

OC

E A N

Mossel Bay

I N

DI A

N

OC

EA

N

Delagoa Bay

Orange

Sun days Great Fish

Great Kei

Orange

Caled

on

Harts

Molo

po

Orange

Buffalo

Algoa Bay

Limpopo

Limpopo

Save

Olifant

s

Saint Helena Bay

False B

ay

0 100

0 100 200

200 mi

300 km

.

20° 25° 30°

25°

30°

35° 20° 25° 30° 35°

25°

30°

35°

S O U T H A F R I C ADurban - 70 Mtpa

Uitenhage

National capitalProvincial capitalTown, villageMajor airport

International boundary

Power stationsand power grid

Project area

Potential Banded Iron Formations

Ports

Coal fields

Main roadRailroad

LEGEND

Iron-ore occurrences

PretoriaNelspruit

Polokwane

Maseru

AREA OF NEW APPLICATIONS3000 km2 over 600 km of

interpreted BIF strike

NORTHERN LIGHTS

MPAKA COAL PROJECT MbabaneGermiston

Figure 1 – location of Midwinter’s Northern Lights Project, Limpopo Iron Province and the Mpaka Metallurgical Coal Project.

For

per

sona

l use

onl

y

Page 5: For personal use only · 3/21/2012  · Knysna Newcastle Madadeni Paarl Saldanha Vredenburg Welkom Pietermaritzburg Germiston Witbank Barberton Piet Retief ... AREA OF NEW APPLICATIONS

66 7

Northern Lights Project

100%

Capricorn Iron (Pty) Ltd (South Africa) 30%

Capricorn Iron Pty Ltd(Guernsey)

70%

Midwinter Resources NL(Australia)

49% expanding to 100%

Nkgapu Investments (Pty) Ltd (South Africa)

experIenCeD management team

adrian griffin – managing DirectorEarlyinhiscareer(1970stoearly’80s),AdrianworkedinironwithBHP.Apioneerinthelateriticnickel industry in Western Australia, he has from the 1990s held board positions with a number of public companies. Adrian’s management experience encompasses exploration, financing, development,commissioningandtheproductionofawiderangeofmineralcommodities.Hewas a founding director of Washington Resources Ltd, Empire Resources Ltd, Reedy Lagoon Corporation,NorthernMineralsLtd,HodgesResourcesLtd,PotashWestNLandFerrumCrescentLtd,thelatteralsoaniron-oredeveloperintheRSA.Adrian,whowasinadditionCEOofSouthAfricandiamondproducerDwykaResourcesLtdseveralyearsago,wasappointedCEOofMidwinter in 2011.

martin pyle – non-executive ChairmanMartin has been involved in the resources industry in Australia for 23 years. Working as a corporate finance executive with a number of prominent broking firms, he has been responsible for the generation and execution of equity raisings, mergers and acquisitions, as well as operating in corporate advisory and research capacities. Currently, Martin is chairman of Syndicated Metals Ltd, managing director of Aurora Minerals Ltd, an executive director of Desert Energy Ltd and a non-executive director of Eleckra Mines Ltd.

Bryan Dixon – non-executive DirectorAcharteredaccountant,Bryanhasextensiveexperienceintheminingsector,includingthemanagementoflistedcompanies.Hisfinancingandcorporateexpertiseencompassesprojectacquisition and development. Previously employed by KPMG, Resolute Ltd, Société Générale and ArchipelagoResourcesPlc,BryaniscurrentlymanagingdirectorofASX-listedBlackhamResourcesLtdandanon-executivedirectorofHodgesResourcesLtd.

philip miolin – non-executive DirectorPhilip,whoholdsaBachelorofArtsdegreeandaGraduateDiplomainEducation,isasessionallectureratCurtinUniversityandactivelyengagedinthearts.Hishistoryofinvolvementintheresources sector is extensive, as is his history of investment in Australian mining stocks.

David seymour – non-executive DirectorDavid has more than 25 years’ experience, at an executive level, in investment banking and equities.Hespent10yearsasadirectorofcapitalmarketswithUBSandhasalsoheldpositionsas treasurer and general manager with other financial institutions. David’s expertise includes equity/capital raisings, due diligence, risk management and ASX regulatory requirements.

Corporate struCture

MidwinterisaB.E.E.compliantSouthAfricanexplorer.Ithasbeneficialownershipof70%ofCapricorn Iron (South Africa) through the structure detailed in Figure 2.

Figure 2 – Midwinter corporate structure and ownership of South African assets.

Since Midwinter entered into the agreement to acquire the Northern Lights Project by way of purchasing equity in Capricorn Iron P/L (Guernsey), there have been significant advances in relation to expanding the Company’s South African iron-ore portfolio. These have been achieved by way of tenement applications by Capricorn Iron (Pty) Ltd (South Africa), designed to secure a dominant position in the Limpopo Iron Province. Midwinter is also pursuing opportunities elsewhere in Africa.

MIDWINTER RESOURCES NL MIDWINTER RESOURCES NLF

or p

erso

nal u

se o

nly

Page 6: For personal use only · 3/21/2012  · Knysna Newcastle Madadeni Paarl Saldanha Vredenburg Welkom Pietermaritzburg Germiston Witbank Barberton Piet Retief ... AREA OF NEW APPLICATIONS

88 9

MIDWINTER’S NORTHERN LIGHTS PROJECT, SOUTH AFRICAgeologICal ConCeptThe Northern Lights Project was acquired on the basis that:• itislocatedwithinanextensiveiron-oreprovince;• low-resolutionmagneticsurveysindicatedextensivemagnetichighs;• thosemagnetichighswereinterpretedasburiedBIF,and• explorationonlocalburieddepositshasbeensuccessful.

In 2010 Midwinter was granted Prospecting Rights and pending applications over some of the prospective ground. The Company undertook a high-resolution magnetic survey over that ground to improve upon the magnetic data then available, as well as developing test targets and determining whetherthemagneticresponseresultedfromburiedBIF.ResultsareshowninFigure3.

Figure 3 shows Midwinter’s aeromagnetic survey over currently granted tenure, plus the location of some of the drilled cross-sections (at right).

Areas the subject of granted tenure and with prospective magnetic signatures were developed as drill targets to confirm the presence of magnetite as a source of the anomalism. Unfortunately, theareaofavailableaccessshowedmagneticanomalism,whichsuggestedrelativelythinBIF with complex and discontinuous structures. Nevertheless, drilling commenced in 2010 to prove the model while further applications were being processed. The areas drilled, which were characterized by continuous sand cover, had little or no outcrop.

10NLR027

Base of s trong oxidation

10NLR026

S ub outcrop

102m

72m

108m

Base of total oxidation

102m

10NLR030

10NLR029

10NLR028

OutcropOutcrop

102mBIF

Gneiss

7452

950

mN

7452

950

mN

7452

950

mN

7452

950

mN

7452

950

mN

7452

950

mN

7452

950

mN

7452

950

mN

7452

950

mN

7453

000

mN

7453

000

mN

7453

000

mN

7453

000

mN

7453

000

mN

7453

000

mN

7453

000

mN

7453

000

mN

7453

000

mN

7453

050

mN

7453

050

mN

7453

050

mN

7453

050

mN

7453

050

mN

7453

050

mN

7453

050

mN

7453

050

mN

7453

050

mN

-50 m

7452

850

mN

7452

850

mN

7452

850

mN

7452

850

mN

7452

850

mN

7452

850

mN

7452

850

mN

7452

850

mN

7452

850

mN

7452

900

mN

7452

900

mN

7452

900

mN

7452

900

mN

7452

900

mN

7452

900

mN

7452

900

mN

7452

900

mN

7452

900

mN

-100 mHAA 2

CROSS SECTION LOOKING WESTALONG 606675mE

Base of moderate oxidation

90m

77m

54m

42m

KRANSVALLEI PROSPECTSECTION LOOKING ENE

50 m0

-50 m

-100 m

616507mE7450035mN

616487mE7450064mN

616478mE7450075mN

616458mE7450116mN

616474mE7450090mN

72m

Gneissic complex

BIF

Colluvium

BIF (interpreted)

Base of total oxidation

MIDWINTER’S NORTHERN LIGHTS PROJECT, SOUTH AFRICA

12NLR 044

102m

150m

HALLA PROSPECT

CROSS SECTION 631100mE

LOOKING WEST

12NL

R042

12NL

R042

12NLR 04312NLR 046

132m

12NLR 045

B a s e o f o x i d a t i o n

132m132m

Gneissic complex

BIF

Colluvium

BIF (interpreted)

74

48

60

0 m

E

74

48

65

0 m

E7

44

86

50

mE

74

48

70

0 m

E

- 50 m

74

48

55

0 m

E- 100 m

(including granite,amphibolite & serpentinite)

For

per

sona

l use

onl

y

Page 7: For personal use only · 3/21/2012  · Knysna Newcastle Madadeni Paarl Saldanha Vredenburg Welkom Pietermaritzburg Germiston Witbank Barberton Piet Retief ... AREA OF NEW APPLICATIONS

1010 11

proof-of-ConCept exploratIon Proof-of-concept exploration at Northern Lights has identified the potential to expand Midwinter’s exploration to the widespread iron occurrences throughout Limpopo Province. These occurrences, although noted by government geological surveys, have undergone little exploration to date, the exceptions being:• Moonlight–Iscor/FerrumCrescent;• DeLoskop–Iscor,and• Zandrivierspoort–Iscor/Kumba/Arcelor.

Thelattertwodeposits,extensivelyexploredbyIscorinthe1980sand’90s,containover600milliontonnes(‘Mt’)ofmineralization.Bothliewelltothesouthofthemostprospectiveareas,asindicatedbytheabundanceofinterpretedBIFshowninFigure4(seepages12and 13).

Midwinter reviewed open-file magnetic data, regional geological map sheets and remote-sensing imagery to identify priority areas for new Prospecting Right applications and, where appropriate, the target areas were ground-checked to verify the presence of magnetite mineralization. This work led to a series of priority applications being lodged with the South African DMR in the first half of 2011. Accepted applications are shown in yellow in Figure 4. It is of particular interest that, in general terms, the amount of cover decreases from west to east as topographic relief increases.ThisresultsinBIFoutcroppinginmanyareas,enhancingMidwinter’sabilitytodefinedrill targets without the prerequisite of aeromagnetic surveys. Examining the iron formations in outcrops has the distinct advantage of allowing the Company to determine the geometry of the target zones prior to drilling. Indeed, in many locations within the eastern half of the areas under application, the iron formation is configured as dip slopes, which have little overburden (see Figure 5).

Thus, not only does the geometry of the iron formations in the eastern half of Midwinter’s Northern Lights Project enhance the potential of the area but access to infrastructure is also improved, since railways traverse some of the deposits.

It is likely that the number of occurrences already identified within the Midwinter application areas in Limpopo Province, together with occurrences yet to be discovered, will provide a range of deposits optimal in terms of the principal parameters for commercialization of iron ore there. Those parameters include:• minimizationofbulk-haulagecosts;• reducedstrippingratios,whichreduce

mining costs;• bestaccesstoinfrastructure,and• superiormetallurgicalcharacteristics,to

optimize processing costs:• coarseliberation;• ironrecovery85-90%;• Fe69.9%,and• SiO2<2.5%,Al2O3<1.5%,P<0.01.

Midwinter is confident that, with the application of sound geological principles, the outcome will be significant not only for the Company but for its stakeholders, including Nkgapu Investments and local communities, as well as local governments and the government of the RSA.

Figure 5 – banded iron formation with little overburden forming dip slope.

MIDWINTER’S NORTHERN LIGHTS PROJECT, SOUTH AFRICA

MIDWINTER’S NORTHERN LIGHTS PROJECT, SOUTH AFRICA

For

per

sona

l use

onl

y

Page 8: For personal use only · 3/21/2012  · Knysna Newcastle Madadeni Paarl Saldanha Vredenburg Welkom Pietermaritzburg Germiston Witbank Barberton Piet Retief ... AREA OF NEW APPLICATIONS

1212 13

Figure 4 – Midwinter has applied for areas of prospective magnetite mineralization in BIF covering 270 km of the trend of the Limpopo Iron Province (applications shown in yellow).

For

per

sona

l use

onl

y

Page 9: For personal use only · 3/21/2012  · Knysna Newcastle Madadeni Paarl Saldanha Vredenburg Welkom Pietermaritzburg Germiston Witbank Barberton Piet Retief ... AREA OF NEW APPLICATIONS

1414 15

MIDWINTER’S NORTHERN LIGHTS PROJECT, SOUTH AFRICAlImpopo Iron provInCe vIeweD on a gloBal sCaleThe Limpopo Iron Province, which is bounded by the Limpopo River to the north and north-west, extends from about 60 km south-west of Northern Lights along a north-easterly trend to Musina, adistanceofmorethan270km.ZandrivierspoortandDeLoskopareclosetothesouthernextremities.

Midwinter believes the Limpopo Iron Province offers some of the best potential in Africa, due to:• itssize(thetargetareaismorethan270kminlength);• thesuperiorqualityoftheconcentrate(allowsforcustomerflexibility);• availableinfrastructure(well-developedroad,railandpower);• theproximityofmarkets(itisclosetotheheartlandofadevelopingsteelindustry);• exportopportunities(thereareraillinkstodeep-waterports),and• theavailabilityofrawmaterials(localcoal,gas,limestoneandwater).

These factors are conducive to the production of a value-added product (pellets, pig iron or steel) or to marketing a concentrate comparable in quality to any currently commercially available.

The potential for the area to become a major supplier to the expanding steel markets is put in perspective when it is compared with the principal producing areas of Australia’s Hamersley Basin (Figure 6), the world’s largest source of globally traded iron ore.

With iron deposits within Limpopo Province already recognized by the South African government, Midwinter’s reconnaissance surveys have identified them as iron ore with characteristics similar to that found at Northern Lights. Midwinter will thus emerge as the dominant participant in the region.

Figure 6 – Limpopo Iron Province, bounded to the north by the Limpopo River and extending south to De Loskop and Zandrivierspoort. This area compares favourably with Australia’s Hamersley Basin (insert on same scale).

MIDWINTER’S NORTHERN LIGHTS PROJECT, SOUTH AFRICA

For

per

sona

l use

onl

y

Page 10: For personal use only · 3/21/2012  · Knysna Newcastle Madadeni Paarl Saldanha Vredenburg Welkom Pietermaritzburg Germiston Witbank Barberton Piet Retief ... AREA OF NEW APPLICATIONS

1616 17

MIDWINTER’S MPAKA METALLURGICAL COAL PROJECT, SWAZILANDovervIewMidwinter has identified an opportunity to expand its interests in the ferrous metals industry via the potential acquisition of a high-quality metallurgical coal project in Swaziland (Figure 7), close to its current iron exploration assets.

Midwinter has an agreement to acquire 100%oftheissuedcapital of Teeman Investments (Pty) Ltd (‘Teeman’), a company incorporated in Swaziland. Teeman’sprincipal asset is a prospecting right application over an area of approximately 20 km2 of ground, with thepresently dormant MpakaCoal Mine (also knownas the Emaswati Colliery)located in its north-west corner(Figure8).

Mpaka Coal Mine was operational from 1964 to 1992. During that time, it produced approximately 5 Mt of good-quality coal (see Table 1), which was used in the production of ferrochrome, ferromanganese and cement.

Figure 8 – geology of Mpaka application area and location of boreholes.

geologyWithin the application area – comprising 20.5 km2 – 19.3 km2 lies over the sedimentary Middle Ecca Series of the Karro Group. This contains the high-quality anthracite seams of the Lower Coal Zone.WithinthatcoalzonetheMainCoalSeamisofprimeinterest,inthatitboastsanaveragethickness of 3.7 m in the Mpaka area (of one set of 25 bore-holes, 23 intersected thicknesses of the Main Coal Seam between 3.2 and 4.5 m; the other two intersection thicknesses were 2.2 m and 1.6 m). Within the project area, the seam dips at a shallow angle of the order of 3 degrees to the east and its depths below surface vary from around 50 m in the west of the project area to 300 m in the east.

Control of raw materIalsTheSwazilandcoaldeposits,whichhaveanexplorationtargetof55-85Mt,canberapidlyupgradedtoJORC-compliantresources.Moreover,Midwintercanutilizetheexistingmineopenings and established infrastructure.

In the event that the Swaziland coal acquisition proceeds as planned, the Company can expand its strategy of controlling input cost to value-added materials by diversifying its potential product rangetoincludethecoalfromMpaka.Also,limestone(usedasafluxforthemanufactureofironand steel) can be derived from the iron-ore pits in Limpopo.

The advantages to the Company of such control of raw materials is that it can utilize reductants and fuel acquired at cost from its own sources, thereby reducing the cost inputs of value-added iron products and increasing profit margins accordingly.

These potential advantages will be incorporated into the Company’s scoping study, planned for 2012.

specification unit mpaka areaYield % 75.00Moisture % 1.30Ash % 14.00Fixedcarbon % 72.00Sulphur % 0.35Phosphorous % 0.01Volatiles % 12.50Ash fusion temperature °C 1250Calorific value 30.00

Table 1 – coal quality at Mpaka.

Figure 7 – Swaziland is close to Midwinter’s iron exploration assets.

Mpaka Prospecting Licence Application 229/2011, lodged on 26/04/2011 by Teeman,is situated just to the south of the main highway that links Mbabne, the capital, and the large town of Manzini, to the west, and the provincial capital of Siteki and the Mozambique port of Muputo, to the east. To date, the area has been testedbywayofatleast48boreholes,thelocationsofwhichareshowninFigure8below.

•••

••

••

••

• •

•••

••

••

••

•••

Mhlume

Lavumisa

32°E

26°

27°

31°E

MnjoliDam

JoziniDam

•Manzini•

Big Bend

Siteki

MBAMANE

Bulembu•Emlembe1862m

••

•LE

BO

MB

O M

OU

NT

AIN

S

SWAZILAND

MO

ZA

MB

I QU

E

SO

UT

H

AF

R I C A

S W A Z I L A N D

Mb uluzi

Mbuluzi

Komati

Lusutfu

Lusutfu

Nggwayuma

Mkh

ondvoNgwempisi

Nhlangano

Mpaka COaL

pROJECT

For

per

sona

l use

onl

y

Page 11: For personal use only · 3/21/2012  · Knysna Newcastle Madadeni Paarl Saldanha Vredenburg Welkom Pietermaritzburg Germiston Witbank Barberton Piet Retief ... AREA OF NEW APPLICATIONS

1818 19

MIDWINTER – CONCLUSIONregIonal strategyWithin southern Africa especially, Midwinter aims to identify areas of potential ferrous metal industry feed stocks that may be enhanced in value via reassessment of the commercial attributes of those areas.

In Limpopo in South Africa, systematic exploration of iron occurrences that were identified long ago is the strategy most likely to confirm the area’s potential. Existing well-developed infrastructure, plus the availability of abundant raw materials, will add value to successful exploration results.

If Midwinter’s Swaziland project proceeds, meanwhile, the Company will have the opportunity to export through nearby ports and/or supply reductants and fuel into its own integrated production chain.

Elsewhere in Africa, opportunities will arise as infrastructure develops. With that in mind, Midwinter is targeting, in particular, opportunities for the commercialisation of other land-locked iron-ore deposits.

value proposItIon Midwinter is well-placed for success in that it:• hasestablishedasignificantpositioninamajorironprovince,withthepotentialtoadd

value through:– control of its own coal deposits– access its own limestone deposits;

• hasalowmarketcapitalization;• maintainsatightcapitalstructure;• hascashinbank,and• hasalowenterprisevalue.

tHe year aHeaD It is expected that the Midwinter program for 2012 will include:•receiptofSouthAfricangovernmentapprovalforequitycontrol;•grantofafurther2,600km2 of tenure over the Limpopo Iron Province;•regionalreconnaissanceandgroundtruthinLimpopo;•drillingofselectediron-oretargetsovera270-kmtrendinLimpopo;•announcementofmaideniron-oreResource;•grantoftheMpakacoalprospectingrightandtakeoverofTeemanInvestments,and•commencementofscopingstudiesforthedevelopmentofbothitscoalandironassets.

For

per

sona

l use

onl

y

Page 12: For personal use only · 3/21/2012  · Knysna Newcastle Madadeni Paarl Saldanha Vredenburg Welkom Pietermaritzburg Germiston Witbank Barberton Piet Retief ... AREA OF NEW APPLICATIONS

20

Midwinter Resources Nllevel 2, 38 Richardson Street

West perth WA 6006Australia

T: +61 8 9322 6451F: +61 8 9322 6398

[email protected]

www.midwinterresources.com.au

For

per

sona

l use

onl

y


Recommended