Page 1: FORGING - Carver Welding · Forging hammer which is broken in two halves Electrode consumption :- 3500 Kg Time Elapsed :- 32 Days TOTAL WELDING SOLUTIONS PROVIDER. MANDREL FOR RING
Page 2: FORGING - Carver Welding · Forging hammer which is broken in two halves Electrode consumption :- 3500 Kg Time Elapsed :- 32 Days TOTAL WELDING SOLUTIONS PROVIDER. MANDREL FOR RING

TOTAL WELDING SOLUTIONS PROVIDER

FORGING INDUSTRY

Page 3: FORGING - Carver Welding · Forging hammer which is broken in two halves Electrode consumption :- 3500 Kg Time Elapsed :- 32 Days TOTAL WELDING SOLUTIONS PROVIDER. MANDREL FOR RING

FORGING INDUSTRY APPLICATIONS

Welding is divided into the three basic phases

1. Repair Repair of Column , Tup , Sow Block and die etc.

2. RebuildRebuild of Tup , Anvil and die etc.

3. Flood WeldingFlood welding of Tup , sow block and die etc.

TOTAL WELDING SOLUTIONS PROVIDER

Page 4: FORGING - Carver Welding · Forging hammer which is broken in two halves Electrode consumption :- 3500 Kg Time Elapsed :- 32 Days TOTAL WELDING SOLUTIONS PROVIDER. MANDREL FOR RING

TOTAL WELDING SOLUTIONS PROVIDER

Mechanically Induced State of Tension

Relative movementDie / Forging

Thermally induced State of Tension Loss of Cohesion

Mec

han

ical

stre

ssT

her

mal

stre

ssMechanically Die Load

Thermal Die Load

Deformation – Cracking - Fracture

Wear – Deformation – Temperature fatigue CrackingForging Die

Page 5: FORGING - Carver Welding · Forging hammer which is broken in two halves Electrode consumption :- 3500 Kg Time Elapsed :- 32 Days TOTAL WELDING SOLUTIONS PROVIDER. MANDREL FOR RING

General Information for Repair and Flood Welding of Forging Die

Before Starting of welding we have to ensure the Die Preparation for the welding. It is necessary activities to get the proper and good result of Die Welding. Procedure for the Die Welding is as follows.

1. Die PreparationA. Scarfing :- It is a process to remove the wear and crack surface of the Die cavity which helps to make the proper welding surface. Minimum surface removal is approx about 5-6 mm per side. For Scarfing process we can use the CARVER product as follows.

Carver 9102 :- available is size of 9.0 mm and 12.0 mmIt is a fast process compared to gouging and machining & very economical.

After Scarfing die should be visually inspected and should be free of crack or any other defect in the die. If any crack or sharp corner observed than remove the same by means of scarfing and grinding. Cracks should be scarfed out and the area checked for defects using a surface crack Test procedure if required. (e.g. dye penetration of magnetic particle inspection)

Page 6: FORGING - Carver Welding · Forging hammer which is broken in two halves Electrode consumption :- 3500 Kg Time Elapsed :- 32 Days TOTAL WELDING SOLUTIONS PROVIDER. MANDREL FOR RING

Dies After forging

Dies afterScarfing

Forging Die and Scarfing Process

Page 7: FORGING - Carver Welding · Forging hammer which is broken in two halves Electrode consumption :- 3500 Kg Time Elapsed :- 32 Days TOTAL WELDING SOLUTIONS PROVIDER. MANDREL FOR RING

General Information for Repair and Flood Welding of Forging Die

2. Preheating

Uniform Pre-Heating is an essential preliminary step for welding to avoid Stress cracking and substantial differences in brightness. In order to reduce stress and Colour differences between the welding zones, this should be followed, At least in the case of alloyed tool steel , Minimum Temperature for Preheating is about 300 to 350 degree Centrigrade. Before starting welding , the die must be covered with insulation mats ( e.g glass wool lined ) to extend the possible welding time. It is also advisable to apply bonding thermometer.

1.Information on preparing and carrying our contract welding.2.Recommendations on temperature control.3.Suggestions for material – specific selection of welding filler.

Page 8: FORGING - Carver Welding · Forging hammer which is broken in two halves Electrode consumption :- 3500 Kg Time Elapsed :- 32 Days TOTAL WELDING SOLUTIONS PROVIDER. MANDREL FOR RING

During WeldingIntermediate Temperature :- It is essential to ensure the workpiece

temperature does not fall below Ms( in the case of the above materials , 300 degree ) . before the welding repair is completed . Otherwise significant transformation stresses occurs that can lead to crack formation. Therefore homogeneous reheating is necessary. In order to avoid frequent delays because of reheating , work times can be extended by continuous heating. E.g using a circular gas burner under the mould during welding.

Welding will be carried out with the help of CARVER products. During Welding Each and every layer should be hammered to ensure the proper joint of welding. Scales should be removed with the help of needle scaler and wire brush to make the surface clean for second layer. This process must be followed to avoid the welding defects like blow holes , scales , lack of fusion , crack and improper joint of welding. In order to avoid coarse structures and unnecessarily high susceptibility to hardening in the welding zone, the lowest possible current should be used and electrodes that are as thin and homogeneous as possible.

Page 9: FORGING - Carver Welding · Forging hammer which is broken in two halves Electrode consumption :- 3500 Kg Time Elapsed :- 32 Days TOTAL WELDING SOLUTIONS PROVIDER. MANDREL FOR RING

Welded DieCARVER make welding Consumables for forging Dies are :-CARVER 9535 :- For Hammer Forging DiesCARVER 9580 :- For Press Forging DiesCARVER 9880 :- For Crack Repair and Joining layers.

Page 10: FORGING - Carver Welding · Forging hammer which is broken in two halves Electrode consumption :- 3500 Kg Time Elapsed :- 32 Days TOTAL WELDING SOLUTIONS PROVIDER. MANDREL FOR RING

4. Post HeatingTemperature Reduction :- When welding has been completed , the die

should be covered and slowly cooled to around 150 degrees. Enabling the austenitic welding material to be converted into martensite. When 150 degree temperature reached , the die must be heated up directly to stress relieving temperature. A stress relieving temperature is 50 degree less than previous tempering temperature is to be performed , with soak time 1 hr/25mm wall thickness.

5. Forging LubricantImportance of Forging Lubricants on DieLubricate :Lubricate :-- Reduce the friction metal to metal thus allowing metal flow to Reduce the friction metal to metal thus allowing metal flow to occur occur in a smooth and controlled way.in a smooth and controlled way.Reduce :Reduce :-- make possible the removal of the forged part from the die.make possible the removal of the forged part from the die.Cooling :Cooling :-- remove undesirable heat from dies.remove undesirable heat from dies.Protect :Protect :-- protect and as a consequence extend the die life.protect and as a consequence extend the die life.

Lubricants used in Forging Lubricants used in Forging Graphite in water dispersions.Graphite in water dispersions.Graphite in oil dispersions.Graphite in oil dispersions.Synthetic compounds based on organic salts.Synthetic compounds based on organic salts.Solid lubricants dispersions based on MoS2, Boron Nitride, GlassSolid lubricants dispersions based on MoS2, Boron Nitride, Glass..

Page 11: FORGING - Carver Welding · Forging hammer which is broken in two halves Electrode consumption :- 3500 Kg Time Elapsed :- 32 Days TOTAL WELDING SOLUTIONS PROVIDER. MANDREL FOR RING

Trimming Tool

Hard Facing electrode usedfor Trimming tool

TOTAL WELDING SOLUTIONS PROVIDER

Page 12: FORGING - Carver Welding · Forging hammer which is broken in two halves Electrode consumption :- 3500 Kg Time Elapsed :- 32 Days TOTAL WELDING SOLUTIONS PROVIDER. MANDREL FOR RING

Other Spares like Shearing Machine Blade

Welding

TOTAL WELDING SOLUTIONS PROVIDER

Page 13: FORGING - Carver Welding · Forging hammer which is broken in two halves Electrode consumption :- 3500 Kg Time Elapsed :- 32 Days TOTAL WELDING SOLUTIONS PROVIDER. MANDREL FOR RING

Repair of Column 10 ton Pneumatic hammer

Damaged Part of Column

Scarfing of Damaged Part

TOTAL WELDING SOLUTIONS PROVIDER

Page 14: FORGING - Carver Welding · Forging hammer which is broken in two halves Electrode consumption :- 3500 Kg Time Elapsed :- 32 Days TOTAL WELDING SOLUTIONS PROVIDER. MANDREL FOR RING

Repair of Column 10 ton Pneumatic hammer

Scarfed Part of ColumnAnd kept for Preheatingprocess

Welding of Damaged Part

TOTAL WELDING SOLUTIONS PROVIDER

Page 15: FORGING - Carver Welding · Forging hammer which is broken in two halves Electrode consumption :- 3500 Kg Time Elapsed :- 32 Days TOTAL WELDING SOLUTIONS PROVIDER. MANDREL FOR RING

Repair of Column 10 ton Pneumatic hammer

Welded Part of Column And kept for Stress Relievingprocess

After Stress RelieveMachining will be done

TOTAL WELDING SOLUTIONS PROVIDER

Page 16: FORGING - Carver Welding · Forging hammer which is broken in two halves Electrode consumption :- 3500 Kg Time Elapsed :- 32 Days TOTAL WELDING SOLUTIONS PROVIDER. MANDREL FOR RING

WELDED AND MACHINED TUP OF MPM 6300B HAMMER

Welding and Machining

TOTAL WELDING SOLUTIONS PROVIDER

Page 17: FORGING - Carver Welding · Forging hammer which is broken in two halves Electrode consumption :- 3500 Kg Time Elapsed :- 32 Days TOTAL WELDING SOLUTIONS PROVIDER. MANDREL FOR RING

RAM OF AERY HAMMER

Welding in shank Area

TOTAL WELDING SOLUTIONS PROVIDER

Page 18: FORGING - Carver Welding · Forging hammer which is broken in two halves Electrode consumption :- 3500 Kg Time Elapsed :- 32 Days TOTAL WELDING SOLUTIONS PROVIDER. MANDREL FOR RING

WELDED AND GRINDED CYLINDER HEAD OF MPM 16000B HAMMER

Welded Area

TOTAL WELDING SOLUTIONS PROVIDER

Page 19: FORGING - Carver Welding · Forging hammer which is broken in two halves Electrode consumption :- 3500 Kg Time Elapsed :- 32 Days TOTAL WELDING SOLUTIONS PROVIDER. MANDREL FOR RING

WELDED AND GRINDED COLUMN OF MPM 16000B ( 5 TON ) HAMMER

Welded Area

TOTAL WELDING SOLUTIONS PROVIDER

Page 20: FORGING - Carver Welding · Forging hammer which is broken in two halves Electrode consumption :- 3500 Kg Time Elapsed :- 32 Days TOTAL WELDING SOLUTIONS PROVIDER. MANDREL FOR RING

Joining of Anvil by Welding

Joining of Anvil ( base ) of 25000 lbs Pneumatic Forging hammer which is broken in two halves

Electrode consumption :- 3500 Kg Time Elapsed :- 32 Days

TOTAL WELDING SOLUTIONS PROVIDER

Page 21: FORGING - Carver Welding · Forging hammer which is broken in two halves Electrode consumption :- 3500 Kg Time Elapsed :- 32 Days TOTAL WELDING SOLUTIONS PROVIDER. MANDREL FOR RING

MANDREL FOR RING ROLLING FORGING

Welding

Machining

TOTAL WELDING SOLUTIONS PROVIDER

Page 22: FORGING - Carver Welding · Forging hammer which is broken in two halves Electrode consumption :- 3500 Kg Time Elapsed :- 32 Days TOTAL WELDING SOLUTIONS PROVIDER. MANDREL FOR RING

BOLSTER FOR PRESS