ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 1
FORM1&1A
For
PROPOSEDRESIDENTIALANDCOMMERCIALPROJECTAt
Plotbearingsurveyno.86/1,86/2,86/3(pt),86/4(pt),86/5(pt),115/1(pt),115/2(pt),115/3(pt),115/4(pt),115/5(pt),115/6(pt),115/7(pt), 115/9(pt),116/1,116/2,116/3,116/4,116/5,116/6,117/1,117/2,117/3,117/4,117/5,117/6,117/7,117/8,117/9,117/10,&117/11atVillagePanchpakhadi,PokhranRoadNo.1,Thane(W)400606
ProposedBy
J.K.INVESTOTRADE(INDIA)LTD.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 2
APPENDIX‐I(Seeparagraph–6)
FORM1(I) BasicInformation
Sr.No. Item Details
1 Nameoftheproject/s ProposedResidentialandCommercialProject atThane
2 S.No.intheSchedule 8(b)
3
Proposed capacity / area/length/tonnage to be handled/commandarea/leasearea/numberofwellstobedrilled.
TotalPlotarea 78,310 m2
Builtuparea
Proposed FSI 1,35,526.16 m2
NonFSI 1,82,236.10 m2
Total Constructionarea
3,17,762.26 m2
4 New/Expansion/Modernization New Project
5 ExistingCapacity/Areaetc. ‐
6 Categoryofprojecti.e.AorB BCategory
7 Doesitattractthegeneralcondition?ifyes,pleasespecify
No
8 Doesitattractthespecificcondition?Ifyes,pleasespecify
No
9 Location Thane
Plot/Survey/KhasraNo. Surveyno.86/1,86/2,86/3(pt),86/4(pt),86/5(pt),115/1(pt),115/2(pt),115/3(pt),115/4(pt),115/5 (pt),115/6,115/7 (pt), 115/9 (pt),116/1,116/2,116/3,116/4,116/5,116/6,117/1,117/2,117/3,117/4,117/5,117/6,117/7,117/8,117/9,117/10, & 117/11 at Village Panchpakhadi,PokhranRoadNo.1,Thane(W)
Village Panchpakhadi
Tehsil Thane
District Thane
State Maharashtra
10 Nearest railway station/port alongwithdistanceinkms.
Thanerailwaystation2.2km‐Arieldistance
11 Nearest Town, city, DistrictHeadquarters along with distance inkms.
Thane
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 3
12 Village Panchayat, Zilla Parishad,Municipal Corporation, Local body(complete postal addresses withtelephonenos.tobegiven)
ThaneMunicipalCorporation
13 Nameoftheapplicant J.K.InvestoTrade(India)Ltd.
14 Registeredaddress NewHindHouse,3N.M.Marg,BallardEstate,Mumbai400001
15 Addressforcorrespondence: “Realty Division” JKFT Building, Ground floor,Jekegram,PokhranRoadNo.1,Thane(w)400606
Name Mr.AbhishekKapoor
Designation(Owner/Partner/CEO) CEO‐ RealtyBusinessDivision
Address “RealtyDivision”JKFTBuilding,Groundfloor,Jekegram,PokhranRoadNo.1,Thane(w)400606
Pincode 400606
E‐mail [email protected]
TelephoneNo. 022‐61528259
FaxNo.
16 Detailsofalternativesitesexamined,ifany. Location of these sites should beshownonatoposheet.
NotApplicable
17 Interlinkedprojects NotApplicable
18 Whether separate application ofinterlinked project has beensubmitted?
No
19 Ifyes,dateofsubmission NotApplicable
20 IfNo,Reason Standaloneconstructionproject
21 Whethertheproposalinvolvesapproval/clearanceunder:if,yesdetailsofthesameandtheirstatustobegiven
a) The Forest (Conservation) Act,1980?
b) The wildlife (protection) Act,1972?
c) TheCRZNotification,1991?
WeshallobtaintheNBWLclearanceifapplicableasoursiteisoutoftheproposedESZdraftnotificationpublished by the MoEF & CC published on22.01.2016.Our site is located at a distanceof 2.5km from the National Park, and the extent of theproposed ESZ is 100m from the boundary of theNationalPark.Ifneededweshallcomplytothis.
22 WhetherthereisanyGovernmentOrder/policyrelevant/relatingtothesite?
‐
23 Forestlandinvolved(hectares) Noforestlandinvolvedinproposedprojectsite
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 4
24 Whetherthereisanylitigationpendingagainst the project and/or land inwhich theproject ispropose tobesetup?
a) Nameofthecourtb) CaseNo.c) Orders/Directionsofthecourt
ifanyanditsrelevancewiththeproposedproject.
Nosuchlitigationpendingagainsttheproject
Capacity corresponding to sectoral activity (such as production capacity formanufacturing,mininglease area and production capacity formineral production, area formineral exploration, length forlineartransportinfrastructure,generationcapacityforpowergenerationetc.,)
(II)Activity
1. Construction,operationordecommissioningoftheProjectinvolvingactions,whichwillcausephysical changes in the locality (topography, landuse, changes inwaterbodies,etc.)
Sr.No.
Information/Checklistconfirmation
Yes/NoDetails thereof (with approximate quantities/rates, wherever possible) with source ofinformationdata
1.1 Permanentortemporarychangeinlanduse,landcoverortopographyincludingincreaseinintensityoflanduse(withrespecttolocallanduseplan)
Yes There was an industry on site which has beenpartiallydemolished;ThesiteisinindustrialzoneaspertheDPremarks;NOC for change of land use (from I to R) will beobtainedfromT.M.C.Now site will be developed as Residential andCommercialproject
1.2 Clearanceof existing land,vegetationandbuildings?
Yes Anindustryonsitehasbeenpartiallydemolished
1.3 Creationofnewlanduses?
Yes There was an industry on site which has beenpartiallydemolished;Now site will be developed as mixed usedevelopment
1.4 Pre‐constructioninvestigations e.g. borehouses,soiltesting?
Yes GeotechnicalInvestigationshallbecarriedout
1.5 Constructionworks?
Yes Proposed Residential andCommercialProject.
1.6 Demolitionworks?
Yes Existing industry on site has been partiallydemolished.
1.7 TemporarysitesusedforconstructionworksorHousingofconstructionworkers?
Yes Temporaryshedswillbeprovidedforworkers
1.8 Abovegroundbuildings,structuresorearthworksincludinglinearstructures,cutandfillorexcavations
Yes Debrisgeneratedhasbeenpartlysoldtoauthorizedrecyclers&scrapdealers.Debrisgeneratedshallbepartlyreusedonsiteandpartlydisposaltoauthorizedsites.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 5
1.9 Underground worksincluding mining ortunnelling?
No
1.10 Reclamationworks? No
1.11 Dredging?
No
1.12 Offshorestructures? No
1.13 Productionandmanufacturingprocesses?
No Thisisaconstructionproject
1.14 Facilities for storage ofgoodsormaterials?
Yes Only construction material will be stored intemporarystoragesite
1.15 Facilitiesfortreatmentordisposalofsolidwasteorliquideffluents?
Yes Solid waste will be treated by MechanicalCompostingmethod.Sewagegenerated fromcomplexwillbe treated insewage treatment plant. The excess treatedwaterwill be directly disposed off in municipal sewerlines.Treatedwaterwillbeused for flushing, gardeningandHVACmakeup.The dried sludge and compost will be used asmanureforlandscaping.
1.16 Facilitiesforlongtermhousingofoperationalworkers?
Yes Cabinsforwatchmen/gardeneretc.
1.17 Newroad,railorseatrafficduringconstructionoroperation?
Yes Movements of trucks formaterial transportwhileconstruction
1.18 New road, rail, airwaterborne or othertransport infrastructureincluding new or alteredroutes and stations, ports,airportsetc?
No Existingroadwillbe usedforthetransportpurpose
1.19 Closure or diversion ofexisting transport routesor infrastructure leadingto changes in trafficmovements?
No
1.20 New or divertedtransmission lines orpipelines?
No
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 6
1.21 Impoundment, damming,culverting, realignment orother changes to thehydrologyofwatercoursesoraquifers?
No
1.22 Streamcrossings? No
1.23 Abstractionortransfersofwater form ground orsurfacewaters?
No
1.24 Changes in water bodiesor the land surfaceaffecting drainage or run‐off?
No Therewill not be any changes inwater bodies orthelandsurface
1.25 Transport of personnel ormaterialsforconstruction,operation ordecommissioning?
Yes Construction workers and construction materialduringconstructionphase
1.26 Long‐term dismantling ordecommissioning orrestorationworks?
No
1.27 Ongoing activity duringdecommissioning whichcould have an impact ontheenvironment?
Yes Dustgenerationandincreaseinnoiselevelsduringdemolition
1.28 Influxofpeopletoanareain either temporarily orpermanently?
Yes Constructionworkersduringconstructionphase.
1.29 Introduction of alienspecies?
No Nointroductionofalienspecieswilloccurasthisispurelyresidentialproject
1.30 Loss of native species orgeneticdiversity?
No Nothreatofspecieslosswilloccur
1.31 Anyotheractions?
No No
2. Use of Natural resources for construction or operation of the Project (such as land,water,materials or energy, especially any resourceswhich are non‐renewable or in shortsupply):Sr.No. Information/checklist
confirmationYes/No Details thereof (with approximate quantities
/rates, wherever possible) with source ofinformationdata
2.1 Landespeciallyundevelopedoragriculturalland(ha)
No Noagricultureland
2.2 Water(expectedsource&competingusers)unit:KLD
YesParticulars
WaterRequirement Unit
TotalWaterRequirement 1,255 KLD
2.3 Minerals(MT) No ‐2.4 constructionmaterial–
stone,aggregates,sand/soil
Yes Stone,aggregates,sanddemandwillbemetfromlocalopenmarket
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 7
(expectedsource–MT)
2.5 Forestsandtimber(source–MT)
Yes Onlydoorframes(ifsoplanned)
2.6 Energyincludingelectricityandfuels(source,competingusers)Unit:fuel(MT),energy(MW)
Yes
Totalpowerrequirement:7.3MW
2.7 Anyothernaturalresources(useappropriatestandardunits)
No
3. Use,storage,transport,handlingorproductionofsubstancesormaterials,whichcouldbe
harmfultohumanhealthortheenvironmentorraiseconcernsaboutactualorperceivedrisks
tohumanhealth.
Sr.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximatequantities/rates, wherever possible) withsourceofinformationdata
3.1 Useofsubstancesormaterials,whicharehazardous(asperMSIHCrules)tohumanhealthortheenvironment(flora,fauna,andwatersupplies)
Yes Used oil from DG set will be stored separatelyandwillbegiventoauthorisedrecyclers
3.2 Changes in occurrence ofdisease or affect diseasevectors (e.g. insect or waterbornediseases)
No
3.3 Affectthewelfareofpeoplee.g.bychanginglivingconditions?
No
3.4 Vulnerable groups of peoplewho could be affected by theproject e.g. hospital patients,children,theelderlyetc.,
Yes There will be minor negative impact ofproposed development on School buildings,hospitalpatients,childrenetc.
3.5 Anyothercauses No4. Production of solid wastes during construction or operation or decommissioning(MT/month)
Sr.No. Information/Checklist
confirmationYes/No Detailsthereof(withapproximate
quantities/rates,whereverpossible)withsourceofinformationdata
4.1 Spoil, overburden or minewastes
No
4.2 Municipalwaste(domesticandorcommercialwastes)
Yes Use Quantity UnitTotal SolidWaste 4,664 kg/day
4.3 Hazardouswastes(asperHazardousWasteManagementRules)
Yes UsedoilfromDGsetwillbegiventoauthorisedrecyclers.
4.4 Other industrial process No No,ThisisaResidentialProject
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 8
wastes4.5 Surplusproduct No NotApplicable4.6 Sewagesludgeorother
sludgefromeffluenttreatment
Yes Usedasmanureafterdrying.
4.7 Construction or demolitionwastes
Yes Construction debris during construction phasewillbeutilizedinplotonlyforlandlevelling.The waste will be disposed at designateddisposalsiteasapprovedbythecollector
4.8 Redundantmachineryorequipment
No NotApplicable
4.9 Contaminatedsoilsorothermaterials
No NotApplicable
4.10 Agriculturalwastes No NotApplicable4.11 Othersolidwastes No NotApplicable
5. Releaseofpollutantsoranyhazardous,toxicornoxioussubstancestoair(Kg/hr)
Sr.No.Information/Checklistconfirmation
Yes/NoDetailsthereof(withapproximatequantities/rates,whereverpossible)withsourceofinformationdata
5.1 Emissions from combustionoffossilfuelsfromstationaryormobilesources
Yes EmissionfromDGsetsduringpowerfailureandmovementofvehicleduringoperationphaseoftheproject
5.2 Emissions from productionprocesses
No NotApplicable
5.3 Emissions from materialshandlingincludingstorageortransport
Yes Fugitiveemissionfromhandlingsand andotherconstructionmaterial
5.4 Emissions from constructionactivities including plant andequipment
Yes Transportationofconstructionmaterial,DGsetsetc.
5.5 Dustorodoursfromhandlingofmaterialsincludingconstructionmaterials,sewageandwaste
Yes Transportation, loading and unloading ofmaterialwillgeneratedust
5.6 Emissionsfromincinerationofwaste
No NotApplicable
5.7 Emissions from burning ofwaste in open air (e.g. slashmaterials, constructiondebris)
No NotApplicable
5.8 Emissions from any othersources
No NotApplicable
6. GenerationofNoiseandVibration,andEmissionsofLightandHeat:
Sr.No.Information/Checklistconfirmation
Yes/NoDetails thereof (with approximatequantities/rates, wherever possible) withsource of information data with source ofinformationdata
6.1 Fromoperationofequipment Yes Increase in noise levels due to operations of
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 9
e.g.engines,ventilationplant,crushers
constructionequipments&vehicularmovement
6.2 From industrial or similarprocesses
No NotApplicable
6.3 Fromconstructionordemolition
Yes Increaseinnoiselevelsduringconstruction
6.4 Fromblastingorpiling Yes DuringPiling6.5 Fromconstructionor
operationaltrafficYes Duringconstructionandoperationphaseof the
project.Intheoperationphasetherewillbe increaseinthe vehicular movement because of theresidentsandvisitors
6.6 From lighting or coolingsystems
No NotApplicable
6.7 Fromanyothersources No NotApplicable7. Risksofcontaminationof landorwater fromreleasesofpollutants intothegroundorintosewers,
surfacewaters,groundwater,coastalwatersorthesea:
Sr.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximatequantities/rates, wherever possible) withsourceofinformationdata
7.1 Fromhandling,storage,useorspillageofhazardousmaterials
No The used oil from DG sets will be given toauthorisedrecyclers
7.2 Fromdischargeof sewageorother effluents to water orthe land(expectedmodeandplaceofdischarge)
No STP will be used to treat the sewage. Treatedwater will be used for flushing, gardening andHVACmakeup.
7.3 By deposition of pollutantsemittedtoairintothelandorintowater
No NotApplicable
7.4 Fromanyothersources No NotApplicable
7.5 Is there a risk of long termbuild up of pollutants in theenvironment from thesesources?
No NotApplicable
8. RiskofaccidentsduringconstructionoroperationoftheProject,whichcouldaffecthumanhealthortheenvironment
Sr.No. Information/Checklistconfirmation
Yes/No Details thereof (with approximatequantities/rates, wherever possible) withsourceofinformationdata
8.1 Fromexplosions,spillages,firesetcfromstorage,handling,useorproductionofhazardoussubstances
Yes Spillageofusedoil fromDG sets andexplosioninDiesel storagearea.Adequate fireprotectionmeasureswillbetakenupasperthefireNOC
8.2 Fromanyothercauses
Yes Accidents during construction phase (Slips,fallfromheight,fallingofobjects/materialonworkers, fire, cut and burns, electric shock
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 10
andcollapseofshuttering Fireduetoshortcircuiting Terrorism
8.3 Couldtheprojectbeaffectedbynaturaldisasterscausingenvironmentaldamage(e.g.floods,earthquakes,landslides,cloudburstetc)?
No The proposed structure is designed as perSeismicZoneIIIstandards.
9. Factorswhichshouldbeconsidered(suchasconsequentialdevelopment)whichcould
lead to environmental effects or the potential for cumulative impacts with otherexistingorplannedactivitiesinthelocality
Sr.No. Information/Checklist
confirmationYes/No Details thereof (with approximate
quantities/rates, wherever possible) withsourceofinformationdata
9.1
Leadtodevelopmentofsupporting. facilities,ancillarydevelopmentordevelopmentstimulatedbytheprojectwhichcouldhaveimpactontheenvironmente.g.:
•Supportinginfrastructure(roads,powersupply,wasteorwastewatertreatment,etc.)•housingdevelopment•extractiveindustries•supplyindustries•other
No
The proposed project is a residentialconstruction project. The proposed site islocated in an urbanised area and hence theinfrastructuralfacilitiesalreadyexist.
9.2 Lead to after‐useof the site,which could have an impactontheenvironment
No NotApplicable
9.3 Set a precedent for laterdevelopments
No NotApplicable
9.4 Havecumulativeeffectsduetoproximitytootherexistingorplannedprojectswithsimilareffects
No Atpresentthereisnomajorongoingconstructionprojectofsimilarintensity.
(III)EnvironmentalSensitivity
Sr.No.
Areas Name/Identity
Aerialdistance(within15km.)Proposedprojectlocationboundary
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 11
1 Areasprotectedunderinternationalconventions,nationalorlocallegislationfortheirecological,landscape,culturalorotherrelatedvalue
Yes SanjayGandhi NationalPark:2.5km
2 Areaswhichareimportantorsensitive for ecologicalreasons ‐ Wetlands,watercourses or otherwaterbodies, coastal zone,biospheres, mountains,forests
Yes ViharLake: 7 kmTulsiLake:5kmUlhasRiver:4km
3 Areas used by protected,important or sensitivespecies of flora or fauna forbreeding, nesting, foraging,resting, over wintering,migration
Yes SanjayGandhi NationalPark:2.5km
4 Inland, coastal, marine orundergroundwaters
Yes ViharLake:7 kmTulsiLake:5kmUlhasRiver:4km
5 State,Nationalboundaries No6 Routesorfacilitiesusedby
thepublicforaccesstorecreationorothertourist,pilgrimareas
Yes AbuttingEasternExpressHighway
7 Defenceinstallations No
8 Densely populated or built‐uparea
Yes Fullyurbanisedarea
9 Areasoccupiedbysensitiveman‐madelanduses(hospitals,schools,placesofworship,communityfacilities)
Yes Hospitals,schools,colleges,communityfacilities& places of worship are present around theProjectsite.TheseplacesfallunderTMC
10 Areascontainingimportant,highqualityorscarceresources(groundwaterresources,surfaceresources,forestry,agriculture,fisheries,tourism,minerals)
No
11 Areasalreadysubjectedtopollutionorenvironmentaldamage.(thosewhereexistinglegalenvironmentalstandardsareexceeded)
No
12 Areas susceptible to naturalhazard which could causethe project to present
No
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 12
environmentalproblems(earthquakes, subsidence,landslides, erosion, floodingor extreme or adverseclimaticconditions)
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 13
(IV). ProposedTermsofReferenceforEIAstudies
AttachedwiththeapplicationFormIherebygivenundertakingthatthedata&informationgivenintheapplication&enclosuresaretrueto the best of my knowledge & belief & I am aware that if any part of the data and informationsubmitted is found tobe falseormisleadingatanystage, theprojectwillbe rejectedandclearancegive,ifanytotheprojectwillberevokedatourriskandcost.Date:04.11.2016Place:Thane
J.K.INVESTOTRADE(INDIA)LTD. NewHindHouse,3N.M.Marg,BallardEstate,
Mumbai400001
Signatureoftheapplicant Withname&fulladdress (Projectproponent/Authorisedsignatory) NOTE:
The projects involving clearance under Coastal Regulation Zone Notification, 1991 shallsubmitwiththeapplicationaC.R.Zmapdulydemarcatedbyoneoftheauthorizedagencies,showing theproject activities,w.r.tC.R.Z(at the stageofTOR)and the recommendationsoftheStateCoastalZonemanagementAuthority(atthestageofEC).SimultaneousactionshallalsobetakentoobtaintherequisiteclearanceundertheprovisionsoftheC.R.ZNotification,1991fortheactivitiestobelocatedintheCRZ.
The projects to be located within 10 km of the national Parks, Sanctuaries, Biosphere
Reserves,MigratoryCorridorsofWildAnimals, theprojectproponentshallsubmit themapduly authenticated by Chief Wildlife Warden showing these features vis‐avis the projectlocationandtherecommendationsorcommentsofthechiefWildlifethereon.(atthestageofEC)
All correspondence with the ministry of Environment & Forests including submission ofapplicationforTOR/EnvironmentalClearance,subsequentclarificationsasmayberequiredfromtimetotime,participationintheEACmeetingonbehalfoftheprojectproponentshallbemade by the authorised signatory only. The authorised signatory should also submit adocumentinsupportofhisclaimofbeinganauthorisedsignatoryforthespecificproject.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 14
APPENDIX‐II(Seeparagraph6)
FORM‐1A(onlyforconstructionprojectslistedunderitem8oftheSchedule)
CHECKLISTOFENVIRONMENTALIMPACTS
(ProjectproponentsarerequiredtoprovidefullinformationandwherevernecessaryattachexplanatorynoteswiththeFormand
submitalongwithproposedenvironmentalmanagementplan&monitoringprogramme)
1. LANDENVIRONMENT
(Attachpanoramicviewoftheprojectsiteandthevicinity)
1.1 Willtheexistinglandusegetsignificantlyalteredfromtheprojectthatisnotconsistentwiththesurroundings?(ProposedlandusemustconformtotheapprovedMasterPlan/DevelopmentPlanofthearea.Changeoflanduseifanyandthestatutoryapprovalfromthecompetentauthoritybesubmitted).AttachMapsof(i)sitelocation,(ii)surroundingfeaturesoftheproposedsite(within500meters)and(iii)thesite(indicatinglevels&contours)toappropriatescales.Ifnotavailableattachonlyconceptualplans.
Theexistinglandusewillnotgetalteredfromtheproject.Asperthezoningstructuretheareacomesunderresidentialarea.
ProposeddevelopmentisinlinewithD.PofTMCFollowingdocumentsareattachedassupportingdocuments.
LocationplanisattachedasANNEXUREI
1. ConceptualPlanandDetailedTenementstatementareattachedasANNEXUREII
1.2 Listoutallthemajorprojectrequirementsintermsofthelandarea,builtuparea,waterconsumption,powerrequirement,connectivity,communityfacilities,parkingneeds,etc.
TotalPlotarea 78,310 m2
Builtuparea
ProposedFSI 1,35,526.16 m2
NonFSI 1,82,236.10 m2
Total Constructionarea
3,17,762.26 m2
Waterconsumption
Particulars WaterRequirement
Unit
TotalWaterConsumption
1,255 m3/day
EnergyConsumption
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 15
Particulars EnergyConsumption
Unit
TotalEnergyConsumption
7.3 MW
ParkingProvided
Particulars Parking Provided
Total ParkingProvided
4Wheeler 2398
2Wheeler 1830
Connectivity Proposed site is accessible by40mwidePokhranRoadNo.1,Service Road and EasternHighwayonEast and9m roadonNorthside
1.3 Whatarethelikelyimpactsoftheproposedactivityontheexistingfacilitiesadjacenttotheproposedsite?(Suchasopenspaces,communityfacilities,detailsoftheexistinglanduse,disturbancetothelocalecology).
Theprojectbeingawellplannedactivitywillresultinorganized open spaces and green areas. Thebiodiversityintheareawillincreaseduetoproposedgreenareas.Communitycumrecreationalfacilitieswillbedevelopedhencenostressontheexistingfacilityisanticipated.
1.4. Willtherebeanysignificantlanddisturbanceresultinginerosion,subsidence&instability?(Detailsofsoiltype,slopeanalysis,vulnerabilitytosubsidence,seismicityetcmaybegiven).
Themainreasons forerosionareoverexploitationofgroundwater, instable slopes, landslides etc. Theproposedconstructionwill involvecuttingand fillingoperations. The project will involve construction ofroads and development of green areas,whichwouldreducethechancesoferosionandsubsidence.Subsidence isnotanticipatedasgroundwaterwouldnotbeusedasasourceofwatersupply.Asperseismic‐zoningmapofIndia,theprojectsitefallsunderzoneIII.StructuraldesignrequirementswillbeasperzoneIII.
1.5 Willtheproposalinvolvealterationofnaturaldrainagesystems?(Givedetailsonacontourmapshowingthenaturaldrainageneartheproposedprojectsite)
Theproposeddevelopmentisplannedinsuchamannerthatitwillnotaltertheexistingdrainagepatternofthearea.
1.6 Whatarethequantitiesofearthworkinvolvedintheconstructionactivity‐cutting,filling,reclamationetc.(Givedetailsofthequantitiesofearthworkinvolved,transportoffillmaterialsfromoutsidethesite,etc.)
Excavatedsoilwillbeused forback fillingatproject.Therewillnotbeanytransportof fillmaterials fromoutside.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 16
1.7 Givedetailsregardingwatersupply,wastehandlingetcduringtheconstructionperiod.
SupplySource:TMC
1.8 Willthelowlyingareas&wetlandsgetaltered?(Providedetailsofhowlowlyingandwetlandsaregettingmodifiedfromtheproposedactivity)
Nowetlandsandlow‐lyingareasonthesite.
1.9 Whetherconstructiondebris&wasteduringconstructioncausehealthhazard?(Givequantitiesofvarioustypesofwastesgeneratedduringconstructionincludingtheconstructionlabourandthemeansofdisposal)
Nohealthhazard isanticipated.
2. WATERENVIRONMENT
2.1 Givethetotalquantityofwaterrequirementfortheproposedprojectwiththebreakupofrequirementsforvarioususes.Howwillthewaterrequirementmet?Statethesources&quantitiesandfurnishawaterbalancestatement.
Particulars WaterRequirement
Unit
TotalWaterConsumption
1255 m3/day
Source:‐ TMCDetailedwaterbalancechart&diagramisattachedasANNEXUREIII
2.2 Whatisthecapacity(dependablefloworyield)oftheproposedsourceofwater?
TheproposedwaterdemandwillbemetfromTMC
2.3 Whatisthequalityofwaterrequired,incase,thesupplyisnotfromamunicipalsource?(Providephysical,chemical,biologicalcharacteristicswithclassofwaterquality)
TheproposedwaterdemandwillbemetfromTMC
2.4 Howmuchofthewaterrequirementcanbemetfromtherecyclingoftreatedwastewater?(Givethedetailsofquantities,sourcesandusage)
TreatedwaterfromSTPwillbeusedforflushingintoilet,gardeningandHVACmakeup
Totalsewagegenerated 1172 m3/day
TotalSTPcapacity 1200 m3
Treatedwaterrecycledforflushing
425 m3/day
Treatedwaterforgardening
64 m3/day
HVACmakeup 42 m3/day
Sludgegenerated 12 m3/day
Excesstreatedwater 629 m3/day
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 17
2.5 Willtherebediversionofwaterfromotherusers?(Pleaseassesstheimpactsoftheprojectonotherexistingusesandquantitiesofconsumption)
Nodiversionisanticipated
2.6 Whatistheincrementalpollutionloadfromwastewatergeneratedfromtheproposedactivity?(Givedetailsofthequantitiesandcompositionofwastewatergeneratedfromtheproposedactivity)
The total sewage of about 1172 m3/day will begenerated from the complex. The composition ofwastewaterisgiveninthetableindicatingthequalityofrawwastewaterbeforetreatment
Parameters Values Units
pH 7‐8 mg/l
BOD 250‐300 mg/l
COD 450‐600 mg/l
O&G/ABS 10‐20 mg/l
TSS 100‐200 mg/l
Mitigation measures: Domestic Effluent will betreatedinSTPoftotalcapacityof1,200m3
2.7 Givedetailsofthewaterrequirementsmetfromwaterharvesting?Furnishdetailsofthefacilitiescreated.
The project activity shall have rainwater harvestingonlyofrainfallonterraces.
2.8. Whatwouldbetheimpactofthelandusechangesoccurringduetotheproposedprojectontherunoffcharacteristics(quantitativeaswellasqualitative)oftheareainthepostconstructionphaseonalongtermbasis?Woulditaggravatetheproblemsoffloodingorwaterlogginginanyway?
ProposeddevelopmentisintunewithD.PofTMC
The project will have proper storm water drainagefacility as per Strom Water Drain Remarks byconcernedauthority. So therewill be noproblemofwaterloggingduetothisproject.
2.9 Whataretheimpactsoftheproposalonthegroundwater?(Willtherebetappingofgroundwater;givethedetailsofgroundwatertable,rechargingcapacity,andapprovalsobtainedfromcompetentauthority,ifany)
Intheproposeddevelopmenttherewillbenotappingof groundwater.Water demand for the constructionaswellasoperationalphasewillbemetfromsourcessuchasTMC.Rainwater harvesting scheme will be practiced forgroundwater recharge, which will have a positiveimpactonthegroundwatertable.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 18
2.10 Whatprecautions/measuresaretakentopreventtherun‐offfromconstructionactivitiespollutingland&aquifers?(Givedetailsofquantitiesandthemeasurestakentoavoidtheadverseimpacts)
To prevent degradation andmaintain the quality ofwater source, adequate controlmeasures have beenproposed to check the surface run‐off, as well asuncontrolledflowofwaterintoanywaterbody.
Avoidexcavationduringmonsoonseason.
Rainwater harvesting can serve as a solution towaterprobleminworstcasescenario.
Following methods can increase efficiency ofrainwaterharvestingandrecharginggroundwater.
Catch drainage all along the periphery of plot topreventsurfacerunoff.
Reduceandfiltersurfacerunoff.
Use vegetated swales and depressions to reducerunoff.
2.11 Howisthestormwaterfromwithinthesitemanaged?(Statetheprovisionsmadetoavoidfloodingofthearea,detailsofthedrainagefacilitiesprovidedalongwithasitelayoutindicationcontourlevels)
The project will have proper storm water drainagefacility as per Strom Water Drain Remarks byconcernedauthority. So therewill no beproblemofwaterloggingduetothisproject.
2.12 Willthedeploymentofconstructionlabourersparticularlyinthepeakperiodleadtounsanitaryconditionsaroundtheprojectsite(Justifywithproperexplanation)
No,thedeploymentofconstructionlabourerswillnotlead to any unsanitary condition. The constructionlabourers will be provided with temporary sheltershades within the project premises. The unsanitarycondition will be removed by means of providingreadymadeseptic tanks&soakpits.Solidwastewillbedisposedoffinmunicipalwastedisposalsystem.
2.13 Whaton‐sitefacilitiesareprovidedforthecollection,treatment&safedisposalofsewage?(Givedetailsofthequantitiesofwastewatergeneration,treatmentcapacitieswithtechnology&facilitiesforrecyclinganddisposal)
The Sewage Treatment Plant (STP) is designed totreattherawwastewatergeneratedfromResidentialbuildings.Wastewatergenerated–1,172m3/daySTPcapacityproposed–1,200m3
STPdetailsareattachedasANNEXURE‐IV
3. VEGETATION
3.1 Isthereanythreatoftheprojecttothebiodiversity?(Giveadescriptionofthelocalecosystemwithit’suniquefeatures,ifany)
There is no sensitive ecosystem present that will bedisturbed by the project, as existing land use isResidential
3.2 Willtheconstructioninvolveextensiveclearingormodificationofvegetation?(Provideadetailedaccountofthetrees&vegetationaffectedbytheproject)
Yestreesarepresentonsite.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 19
3.3 Whatarethemeasuresproposedtobetakentominimizethelikelyimpactsonimportantsitefeatures(Givedetailsofproposalfortreeplantation,landscaping,creationofwaterbodiesetcalongwithalayoutplantoanappropriatescale)
About 12,391.30 m2 area is provided for thedevelopmentofGreenbelt in thepremises.Thegreenbelt will be developed for control of pollution andaestheticviewofthecomplex
4. FAUNA
4.1 Istherelikelytobeanydisplacementoffauna‐bothterrestrialandaquaticorcreationofbarriersfortheirmovement?Providethedetails.
No.Theproposedsiteanditssurroundingsdonotsupportanyhabitatforanygroupofwildanimals.SanjayGandhiNationalParkisat2km
4.2 Anydirectorindirectimpactsontheavifaunaofthearea?Providedetails.
No.Therewillbenodirectorindirectimpactontheavifaunaofthearea.
4.3 Prescribemeasuressuchascorridors,fishladdersetctomitigateadverseimpactsonfauna
SincetheProposedProjectwouldnothaveanyadverseimpactonfaunahencemitigationmeasurenotrelevant
5. AIRENVIRONMENT
5.1 Willtheprojectincreaseatmosphericconcentrationofgases&resultinheatislands?(Givedetailsofbackgroundairqualitylevelswithpredictedvaluesbasedondispersionmodelstakingintoaccounttheincreasedtrafficgenerationasaresultoftheproposedconstructions)
The Project will result in negligible increase in theatmospheric concentrations of gases due to D.G.operations (back up power only) and the increasedtraffic. The proposed activity will not result in theformationofanyheatislands,asitdoesnotinvolveanysignificant change in the land use pattern or theconcretingofareas.
5.2 Whataretheimpactsongenerationofdust,smoke,odorousfumesorotherhazardousgases?Givedetailsinrelationtoallthemeteorologicalparameters.
Diesel generator sets operated for back‐up powersupply are identified as the only major sources ofgaseousandparticulateemission.Impactofvehicularisnot significant. SO2, SPM, NOX and CO emissions areexpectedduetofuelcombustioningeneratorsets.
5.3 Willtheproposalcreateshortageofparkingspaceforvehicles?Furnishdetailsofthepresentleveloftransportinfrastructureandmeasuresproposedforimprovementincludingthetrafficmanagementattheentry&exittotheprojectsite.
Adequateparkings areproposed.
Particulars Parking Provided
Total ParkingProvided
4Wheeler
2Wheeler
2398 Nos.
1830Nos.
5.4 Providedetailsofthemovementpatternswithinternalroads,bicycletracks,pedestrianpathways,footpathsetc.,withareasundereachcategory.
Internalroads,footpaths/pedestrianpathwayshavebeenplannedwithintheproposedcomplex
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 20
5.5 Willtherebesignificantincreaseintrafficnoise&vibrations?Givedetailsofthesourcesandthemeasuresproposedformitigationoftheabove.
Considering the addition of vehicles due to theproposed projectwith the existing roads and vehiclesplyingon them, therewill bemarginal increase in thenoiselevelsbutwillnotresultinanimpact.
5.6 WhatwillbetheimpactofDGsets&otherequipmentonnoiselevels&vibrationin&ambientairqualityaroundtheprojectsite?Providedetails.
DGsetwillbeusedinconstructionandoperationphaseonlyincaseofpowerfailure.TheDGSetsshallbeaspertheguidelineslaiddownbyEPR for specific noise emission standards. Measuresshallbe taken forreductionofnoisebyusingacousticenclosures.Noise emissions are expected from variousconstruction equipment and machinery but will notresultinanimpact.
6. AESTHETICS
6.1 Willtheproposedconstructionsinanywayresultintheobstructionofaview,scenicamenityorlandscapes?Aretheseconsiderationstakenintoaccountbytheproponents?
The proposed land use of the site would be mainlyresidential and will not result in obstruction of view,scenic amenity or landscape. However, the buildingswillbeplanned insuchawaythat theorganisedopenareasandlandscapedareasareatthecentresothatallcanenjoythegreenareas.
6.2 Willtherebeanyadverseimpactsfromnewconstructionsontheexistingstructures?Whataretheconsiderationstakenintoaccount?
Internal roads, footpaths/ pedestrian pathways havebeenplannedwithintheproposedcomplex
6.3 Whetherthereareanylocalconsiderationsofurbanform&urbandesigninfluencingthedesigncriteria?Theymaybeexplicitlyspeltout.
TheProjecthasbeendesignedasperthedepartmentoftownplanning,GovernmentofMaharashtra.
6.4 Arethereanyanthropologicalorarchaeologicalsitesorartefactsnearby?Stateifanyothersignificantfeaturesinthevicinityoftheproposedsitehavebeenconsidered.
No anthropological or archaeological sites or artefactsarefoundnearthesitearea.
7. SOCIO‐ECONOMICASPECTS
7.1 Willtheproposalresultinanychangestothedemographicstructureoflocalpopulation?Providethedetails.
No.Majorityofthelabourwillberecruitedlocallyandonly minimal skilled workers would be from outside,whichisanticipatedtobeverysmallandwillnotaltertheexistingdemographicprofileofthearea.
7.2 Givedetailsoftheexistingsocialinfrastructurearoundtheproposedproject.
TheProjectcomesinResidentialareaandhasallbasicinfrastructural facilities as schools, medicalestablishments,shops,etc.
7.3 Willtheprojectcauseadverseeffectsonlocalcommunities,disturbancetosacredsitesorotherculturalvalues?Whatarethesafeguardsproposed?
No. The Project will have positive impact on localcommunities.
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 21
8. BUILDINGMATERIALS
8.1 Mayinvolvetheuseofbuildingmaterialswithhigh‐embodiedenergy.Aretheconstructionmaterialsproducedwithenergyefficientprocesses?(Givedetailsofenergyconservationmeasuresintheselectionofbuildingmaterialsandtheirenergyefficiency)
Yes thebuildingmaterialswithhighembodiedenergywillbeused
8.2 Transportandhandlingofmaterialsduringconstructionmayresultinpollution,noise&publicnuisance.Whatmeasuresaretakentominimizetheimpacts?
Adequate mitigative measures will be adopted.Construction equipment with idling controltechnologieswill beused.Regularmaintenance of theequipments will be carried out. The constructionactivitieswill be carried out during the daytime only.The workers exposed to high noise generating wouldbeprovidedwithearplugsearmuffs.AsperEnvironmentalManagementPlan.
8.3 Arerecycledmaterialsusedinroadsandstructures?Statetheextentofsavingsachieved?
Fly ash in cement concrete. Typically 20‐ 25% of flyashissubstitutedincement.
8.4 Givedetailsofthemethodsofcollection,segregation&disposalofthegarbagegeneratedduringtheoperationphasesoftheproject.
Thebio‐degradableandnon‐biodegradablewastewillbesegregatedatsourceofwastegeneration.Solidwastegenerated:4,664kg/day
9. ENERGYCONSERVATION
9.1 Givedetailsofthepowerrequirements,sourceofsupply,backupsourceetc.Whatistheenergyconsumptionassumedpersquarefootofbuilt‐uparea?Howhaveyoutriedtominimizeenergyconsumption?
Sourceofpowersupply:MSEDCLDGSetwillbeprovidedasemergencybackup.
Particulars EnergyConsumption
Unit
TotalEnergyConsumption
7.3 MW
9.2 Whattypeof,andcapacityof,powerback‐uptoyouplantoprovide?
DGSetwillbeprovidedasemergencybackupforlightingincommonareas,oneliftperbuildingandfirepumpineachbuilding.
TotalDGsetcapacity 1600 kVAHFG
9.3 Whatarethecharacteristicsoftheglassyouplantouse?Providespecificationsofitscharacteristicsrelatedtobothshortwaveandlongwaveradiation?
DoubleglazedglassforResidentialbuilding
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 22
9.4 Whatpassivesolararchitecturalfeaturesarebeingusedinthebuilding?Illustratetheapplicationsmadeintheproposedproject.
The building structure will be designed in such a waythatsolarlightcanbeutilisedmaximumfordaytime.
9.5 Doesthelayoutofstreets&buildingsmaximisethepotentialforsolarenergydevices?Haveyouconsideredtheuseofstreetlighting,emergencylightingandsolarhotwatersystemsforuseinthebuildingcomplex?Substantiatewithdetails.
Solar street lights are proposed in areas such as openspaces,pathways,RGetc.
9.6 Isshadingeffectivelyusedtoreducecooling/heatingloads?WhatprincipleshavebeenusedtomaximizetheshadingofWallsontheEastandtheWestandtheRoof?Howmuchenergysavinghasbeeneffected?
Yes.Shadinghasbeeneffectivelyusedtoreducethecoolingloads.
9.7 Dothestructuresuseenergy‐efficientspaceconditioning,lightingandmechanicalsystems?Providetechnicaldetails.Providedetailsofthetransformersandmotorefficiencies,lightingintensityandair‐conditioningloadassumptions?AreyouusingCFCandHCFCfreechillers?Providespecifications.
Yes.Theroomswillbesodimensionedthateffectiveairconditioning can be carried out. Public areas will becooledbynaturalventilation.Thedesignofthebuildingwillbesuchthatmaximumuseofnaturalventilationcanbe achieved. The walls, roofs and openings will be sodesignedthatinfluxofheatisminimum.
9.8. Whatarethelikelyeffectsofthebuildingactivityinalteringthemicro‐climates?Provideaselfassessmentonthelikelyimpactsoftheproposedconstructiononcreationofheatisland&inversioneffects?
Heat emission from the proposed construction can befromthefollowingsources:Heat absorbed from the concrete structures, heatgenerated from equipments/ appliances, and due toincreased population in the proposed development.However theheatgeneratedwillnotbesignificantandwill be dissipated in the lush greens and open areasprovidedwithin.Henceitcanbeconcludedthattheheatisland effect shall not be a concern for the proposedproject.
9.9. Whatarethethermalcharacteristicsofthebuildingenvelope?(a)roof;(b)externalwalls;and(c)fenestration?GivedetailsofthematerialusedandtheU‐valuesortheRvaluesoftheindividualcomponents.
UvalueinWatts/hr/m2/C
Roof 0.409 Watts/hr/m2/C
Wall 0.352Watts/hr/m2/C
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 23
9.10 Whatprecautions&safetymeasuresareproposedagainstfirehazards?Furnishdetailsofemergencyplans.
The fire fighting system shall compromise of hydrantsystemandportableextinguishers.Smokedetectorswillbeprovidedalongwithmanualcallpoints.Externalyardhydrants shall be installed around all buildings in thecomplex in galvanized steel fire hose cabinet (weatherproof).Allexternalyardhydrantsshallbeatonemeterheight from finished ground level as per NationalBuilding Code. External fire hydrants shall be locatedsuchthatnoportionofanybuildingismorethan45mfrom a hydrant, and the external hydrants are notvulnerabletomechanicalorvehiculardamage.
9.11 Ifyouareusingglassaswallmaterialprovidesdetailsandspecificationsincludingemissivityandthermalcharacteristics.
NotApplicable
9.12 Whatistherateofairinfiltrationintothebuilding?Providedetailsofhowyouaremitigatingtheeffectsofinfiltration.
Thefollowingmeasureswillbeadoptedtomitigatetheeffectsofinfiltration: Aluminiumwindowswithrubbergasket,sothatthe
windowsaresealed,willbeprovided. Summercrosssectionventilationwillbemaximum.
9.13 Towhatextentthenon‐conventionalenergytechnologiesareutilisedintheoverallenergyconsumption?Providedetailsoftherenewableenergytechnologiesused.
NotApplicable
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 24
10. EnvironmentManagementPlan
TheEnvironmentManagementPlanwouldconsistofallmitigationmeasuresforeachitemwiseactivitytobeundertakenduringtheconstruction,operationandtheentirelifecycletominimizeadverseenvironmentalimpactsasaresultoftheactivitiesoftheproject.Itwouldalsodelineatetheenvironmentalmonitoringplanforcomplianceofvariousenvironmentalregulations.Itwillstatethestepstobetakenincaseofemergencysuchasaccidentsatthesiteincludingfire.
EnclosedasAnnexureV
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 25
ANNEXUREILocationPlan
ProjectSite
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 26
ANEXUREIIConceptualPlan
Entry/Exit
A1
A2A3 B1
B2
B3
C1
C2C3D
N
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 27
ANNEXUREIIIWaterBalanceStatement
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 28
ANNEXUREIV
SEWAGETREATMENTPLANT
CalculationforSTPCapacity:Totalestimatedpopulation =9,595personsTotalWaterdemand =1,255m3/dayTotalsewagegeneration =1,172m3/dayThecapacityofSTPprovided:1,200m3TheexpectedcharacteristicsofrawsewageandTreatedsewagearegivenbelow‐
Sr.No. Parameters RawSewage TreatedSewage
1 pH 6.5‐7.5 7.0‐8.5
2 SuspendedSolids 100–200mg/l <1mg/l
3 BOD(3days28°C) 280–350mg/l 5mg/l
4 COD 500–600mg/l ‐
5 Oil&Grease 30–60mg/l ‐
6 TotalColiform <2
ExpectedTreatment: TheSewagefromthebuildingalongwithwastewouldbetreated inseweragetreatment
plant. The sewerage treatmentplant shall bedesigned to treat combined sewage (i.e. soil and
wastewater).Thetreatmentplantshallbecompacttypewithminimum2.4mheadroom
abovemaximumwater level(platformlevel)formaintenance.Theprocessoftreatmentshellbedividedintothreeparts
(a) PrimaryTreatment
(b) SecondaryTreatment(c) TertiaryTreatment
ThetreatmentshallbeextendedaerationwithActivatedSludgeProcess.Theairshallbe
distributedthroughdiffusedaerationsystemsingcoarsebubbleandfineporediffusers.
Afterthetertiarytreatmenttreatedeffluentisusedforlandscapeirrigation&toiletflushingpurpose.
ApplicationformforEnvironmentalClearance ProjectName:,ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 29
UNITSANDITSFUNCTION
NameoftheUnit Purpose
BarScreenChamber Forremovingunwantedfloatingmaterials
EqualizationTank To even out the flow variations, and continuous
uniformmixingoperationswithcoursebubble.
AerationTank Activated Sludge Process For developing the
bacterial culture, which stabilizes the waste
aerators.
Secondary
clarifier/Platesettler
Toseparateoutthesolids fromthetreatedsewage,
And to separate clear supernatant water,Clarifloculator has been proposedwith flashmixer
to add coagulant to allow more settlement of fine
particles.
IntermediateTank To collect the supernatant clear water from the
settlingtankforfurthertreatment.
FilterPress ASludgeholdingtankhasbeenprovidedwith filterpress for dewatering sludge. Sludge cakes shall be
usedasmanure.
PressureSandFilter To filter outminute suspended solids if any in the
treatedwater.
Activated CarbonFilter
To remove color and Odor if any in the filteredwater.
Finalholdingtank Tocollect the final treatedwater fromtheoutletof
Activatedcarbonfilterforreuse
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 30
STPFLOWSHEET
ApplicationformforEnvironmentalClearance ProjectName:ResidentialandCommercialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 31
ANNEXUREV
EnvironmentalManagementPlanduringConstructionPhase
Sr.No.
EnvironmentalComponents
PredictedImpacts
ProbablesourceofImpact
MitigationMeasures
Remarks
CONSTRUCTIONPHASE1. AmbientAir
QualityNegativeimpactinsideconstructionsitepremises.Nonegativeimpactoutsidesite.
Dustemissionsfromexcavation,airemissionsfrommachineryandotherconstructionactivitiesatsite.
Dustreductionmeasuressuchasroadwatering.Periodicmaintenanceofconstructionequipment.Useofgoodqualityfuels.UseofPersonalProtectiveEquipments
Impactsaretemporaryduringconstructionphase.Impactswillbeconfinedtoshortdistances,ascoarseparticleswillsettlewithintheshortdistancefromactivities.
2. Noise Negativeimpactnearnoisegenerationsourcesinsidepremises.Nosignificantimpactonambientnoiselevelsinthesurroundingarea.
NoisegeneratedfromconstructionactivitiesandoperationofconstructionequipmentandDGsets
UseofwellmaintainedequipmentHeavyconstructionactivitylimitedtoday‐timehoursonly.Useofnoisemufflersinandconstructionvehicle.Useofearplugs/muffsbyconstructionstaff.
Temporaryimpactsduringconstructionphase.Noblastingorotherhighnoiseactivitiesenvisaged.
3. Water Nosignificantnegativeimpact.
Surfacerunofffromprojectsite.Oil/fuelandwastespills.Improperdebrisdisposal.Dischargeofsewagefromlabourcamp.
Siltfencestoreducerun‐offSecondarycontainmentanddykesinmaterialstorageareas.Sewagetreatmentinseptictanks.
Labourwillbeemployedtoreducesizeoflabourcamps.Noperennialsurfacewaterresourceadjacenttosite.Noexcavationworkwillbe
4. Land Minornegativeimpact
Excavation,Constructiondebris,waste
Reutilizationandrecyclingofconstructiondebris
ApplicationformforEnvironmentalClearance ProjectName:,ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 32
fromlabourcamp.
Wastefromlabourcampswillbecollectedandcompostedonsite.Noncompostablewastewillbetransportedtolandfillsite.Topsoilwillbeconservedandusedforlandscapinginfunctionalphase.
‐
5. Aesthetics Minornegativeimpacts
ConstructionactivitiesandExcavation
Theimpactswillbecompensatedbyextensivetreeplantationandgardeningintheusephase.
Shorttermimpactrestrictedonlyintheinitialstagesofconstruction.
ApplicationformforEnvironmentalClearance ProjectName:,ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 33
EnvironmentalManagementPlanduringFunctionalPhase
Sr.No.
Environmental
Components
PredictedImpacts
ProbableSourceOfImpact
MitigationMeasures Remarks
FUNCTIONALPHASE
1. AmbientAirQuality
MinorNegativeimpact
ParticulateandgaseousemissionsfromDGsetsandvehiclemovement
UseoflowsulphurgoodfuelPeriodicmaintenanceofDGsetsUseofCNG/LPGasafuelshouldbeencouraged.
DGsetswillbeused.
2. Noise Minornegativeimpactinsidepremises.
Noisefromvehiclemovementandoperationofdieselgeneratorsetsduringpowerfailure.
HousingofDGsetsinbuildingswithappropriateacoustics.TrafficmanagementmeasurestoreducenoiseAppropriatetreeswhichwillactasnoisesbarrierswillbeplantedinthepremisesandalongroadside.
‐‐
3. Water Nosignificantadverseimpact
Oil/fuelandwastespillsinvehicleparkingarea.Dischargeofsewage.Dischargeofcontaminatedstormwater
Sewagewaterwillbetreatedandrecycled.Rainwaterharvestingandrechargeofgroundwateraquiferisproposed.Goodhousekeepingandstormwatermanagementwillbefollowed.
Recycledwaterwillbeusedforgardeningandflushingpurpose.
4. Land Nonegativeimpact
Storageanddisposalofsolid
Treatmentand Segregationofdryandwet
ApplicationformforEnvironmentalClearance ProjectName:,ResidentialProjectatThane
MinistryofEnvironment&Forests,NewDelhi.PriorEnvironmentalClearanceNotification14.09.2006 34
Sr.No.
Environmental
Components
PredictedImpacts
ProbableSourceOfImpact
MitigationMeasures Remarks
wastes.Dischargeofsewage.Fuelandmaterialspills.
reuseofsewagewater.IntegratedwastemanagementandspillcontrolplanDrygarbagewillbesentforrecyclingandwetgarbagewillbecomposted.
garbagebeforewillbedonebeforedisposal.
5. Biological OverallPositiveimpact
Habitatdisturbance
Greenspacesinsidethepremiseswillhelptocompensatetheearliereffectfromvegetation.Landscapingandextensiveplantationinthepremises.
Landscapingwillhelpinreducinganyadverseimpactsonairandnoisequality.
6. Socio‐economic
Overallpositiveimpact
Increasedjobopportunityinhouseholdmaintenanceandancillaryservices.
‐‐ Positiveandlongtermimpact‐
FUNCTIONALPHASE
7. TrafficPattern
NosignificantImpact
Thecomplexislikelytoaddmoderatelytothetrafficflowconsideredduringpeakhour.
TrafficManagementpractiseswillbeemployed.Adequateparkingspacewillbeprovidedinthepremises.