M/s. Neogen Chemicals Ltd. 1 Form-1 (For amendment of EC) Submitted by M/s. Neogen Chemicals Ltd. (Formerly: Solaris Chemtech Limited) Survey No. 526A, At & PO: Karakhadi, Padra - Jambusar road, Taluka –Padra, Dist.: Vadodara, Gujarat-391450
Transcript
Page 1: Form-1 (For amendment of EC) - Welcome to …environmentclearance.nic.in/writereaddata/modification/...M/s. Neogen Chemicals Ltd. 1 Form-1 (For amendment of EC) Submitted by M/s. Neogen

M/s. Neogen Chemicals Ltd.

1

Form-1

(For amendment of EC)

Submitted by

M/s. Neogen Chemicals Ltd. (Formerly: Solaris Chemtech Limited)

Survey No. 526A, At & PO: Karakhadi, Padra - Jambusar road, Taluka –Padra, Dist.: Vadodara,

Gujarat-391450

Page 2: Form-1 (For amendment of EC) - Welcome to …environmentclearance.nic.in/writereaddata/modification/...M/s. Neogen Chemicals Ltd. 1 Form-1 (For amendment of EC) Submitted by M/s. Neogen

M/s. Neogen Chemicals Ltd.

2

FORM 1 (I) Basic Information

Sr. No.

Item Details

1. Name of the Project/s: M/s. Neogen Chemicals Ltd. (Formerly: Solaris Chemtech Limited)

2. S. No. in the schedule Project or Activity -5(f)- Synthetic organic chemicals industry (dyes & dye intermediates; bulk drugs and intermediates excluding drug formulations; synthetic rubbers; basic organic chemicals, other synthetic organic chemicals and chemical intermediates).

3. Proposed capacity/area/length /

tonnage to be handled/command

area/lease area/ number of wells to

be drilled

Existing unit, application is for Name Change & validity extension of Environmental Clearance (EC).

We have already Environmental clearance granted by MoEF&CC for the expansion of specialty chemicals from 390.01 to 1702.01 MT/month. Total land area: 89034 m2

Details of production is summarized as per Annexure-I.

4. New/ Expansion/ Modernization Existing unit, application for Name Change & validity extension of Environmental Clearance (EC).

5. Existing Capacity/ Area etc. Total land area: 89034 m2 Production Capacity: 1702.01 MT/month as per the EC

6. Category of Project i.e. 'A' or 'B' 'A'

7. Does it attract the general condition?

If yes, please specify.

No

8. Does it attract the specific condition?

If yes, please specify.

No

9. Location

Plot/ Survey No./Khasra No. 526A

Village Karkhadi

Tehsil Padra

District Vadodara

State Gujarat

10. Nearest railway station/airport along

with distance in kms.

Rly Station (Kural): 7.5 km Air Port: Vadodara: 40 km

Page 3: Form-1 (For amendment of EC) - Welcome to …environmentclearance.nic.in/writereaddata/modification/...M/s. Neogen Chemicals Ltd. 1 Form-1 (For amendment of EC) Submitted by M/s. Neogen

M/s. Neogen Chemicals Ltd.

3

11. Nearest Town, City, District

Headquarters along with distance in

kms.

Nearest Town: Padra- 20 km City: Vadodara- 40 km District headquarters: Vadodara- 30 km

12. Village Panchayats, zilla Parishad,

Municipal Corporation, Local body

(complete postal address with

telephone nos. to be given)

Village Panchayat: Karakhadi Zilla Parisad:-Vadodara District Panchayat office, Vadodara

13. Name of the applicant Dr. Harin Kanani

(Executive Director)

14. Registered Address 115, Vardhaman Industrial Complex,

LBS Road, Thane-400601,

Maharashtra

Address for correspondence As above

Name : Dr. Harin Kanani

Designation (Owner/Partner/ CEO) : Executive Director

Address: 115, Vardhaman Industrial Complex, LBS Road, Thane, Maharashtra.

Pin Code 400601

E-mail : [email protected]

Telephone No. : +91 9833567878 +91 9833561987

Fax No. :

16. Details of Alternative Sites examined,

if any. Location of these sites should

be shown on a topo sheet.

No alternative site, request is for

amendment in EC for change the

name of company and extends the

validity of EC.

17. Interlinked Projects No

18. Whether separate application of

interlinked project has been

submitted?

No

19. If yes, date of submission N.A.

20. If No, reason Not required

21. Whether the proposal involves approval/clearance under: if yes, details of the same & their status to be given. (a) The Forest (Conservation) Act, 1980?

No,

Proposed location is not attracting

any of mentioned related clearance.

Page 4: Form-1 (For amendment of EC) - Welcome to …environmentclearance.nic.in/writereaddata/modification/...M/s. Neogen Chemicals Ltd. 1 Form-1 (For amendment of EC) Submitted by M/s. Neogen

M/s. Neogen Chemicals Ltd.

4

(b) The Wildlife (Protection) Act,

1972?

(c) The CRZ Notification, 1991?

22. Whether there is any Government

Order/Policy relevant/ relating to the

site?

No

23. Forest land involved (hectares) No

24. Whether there is any litigation

pending against the project and/or

land in which the project is propose

to be set up?

(a) Name of the Court

(b) Case No.

(c) Orders/ directions of the

Court, if any & its relevant with the

proposed project.

No

Not applicable

Page 5: Form-1 (For amendment of EC) - Welcome to …environmentclearance.nic.in/writereaddata/modification/...M/s. Neogen Chemicals Ltd. 1 Form-1 (For amendment of EC) Submitted by M/s. Neogen

M/s. Neogen Chemicals Ltd.

5

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Sr. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan)

No No change in Land use pattern, land cover and topography of the area because request is for amendment in EC and Land use pattern of the plant area already been modified for Chemical manufacturing. Hence, there is already a permanent change in the land use pattern of the plot area.

1.2 Clearance of existing land, vegetation and Buildings?

No Presently there is an existing Chemical manufacturing Unit. There will be no clearing of vegetation/buildings.

1.3 Creation of new land uses?

No N.A.

1.4

Pre-construction investigations e.g. bore houses, soil testing?

No Already carried out.

1.5 Construction works? Yes Construction, fabrication and installation of plant machinery as per the plant design of proposed expansion.

1.6 Demolition works? No Not required. 1.7 Temporary sites used for

construction works or housing of construction workers?

No No, Housing will not be required. Workers are coming from nearby villages.

1.8 Above ground buildings, structures or earthworks including linear structures, cut and fill or excavations

No N.A.

1.9 Underground works including mining or Tunnelling?

No N.A.

1.10 Reclamation works? No N.A. 1.11 Dredging? No N.A. 1.12 Offshore structures? No N.A. 1.13 Production and manufacturing

processes? Yes As per the Annexure-I.

1.14 Facilities for storage of goods or materials?

Yes Necessary raw material storage yard will come up within the plant premises.

1.15 Facilities for treatment or disposal of solid waste or liquid effluents?

Yes Existing unit have all facility mentioned below. For the

Page 6: Form-1 (For amendment of EC) - Welcome to …environmentclearance.nic.in/writereaddata/modification/...M/s. Neogen Chemicals Ltd. 1 Form-1 (For amendment of EC) Submitted by M/s. Neogen

M/s. Neogen Chemicals Ltd.

6

Sr. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data proposed project, unit will unit will have facilities for treatment or disposal of solid waste or liquid effluents.

1.16 Facilities for long term housing of Operational workers?

No N.A.

1.17 New road, rail or sea traffic during construction or operation?

No Existing transport routes are adequate for the proposed additional traffic.

1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc?

No No road or rails are envisaged near to plant premises.

1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements?

No N.A.

1.20 New or diverted transmission lines or pipelines?

No N.A.

1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers?

No N.A.

1.22 Stream crossings? No N.A. 1.23 Abstraction or transfers of water

form ground or surface waters? No N.A.

1.24 Changes in water bodies or the land surface affecting drainage or run-off?

No Request is for amendment in EC for change the name of company and extends the validity of EC.

1.25 Transport of personnel or materials for construction, operation or decommissioning?

No Transport of construction materials, raw material for production and finished product will be transported mainly through trucks/tanker.

1.26 Long-term dismantling or decommissioning or restoration works?

No N.A.

1.27

Ongoing activity during decommissioning which could have an impact on the Environment?

No N.A.

1.28 Influx of people to an area in either temporarily or permanently?

No N.A.

1.29 Introduction of alien species? No Local native plants will be planted in and around the plant premises and existing green belt will be enhanced.

1.30 Loss of native species or genetic No If any, shall be compensated

Page 7: Form-1 (For amendment of EC) - Welcome to …environmentclearance.nic.in/writereaddata/modification/...M/s. Neogen Chemicals Ltd. 1 Form-1 (For amendment of EC) Submitted by M/s. Neogen

M/s. Neogen Chemicals Ltd.

7

Sr. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

diversity? through green belt development.

1.31 Any other actions? No N.A.

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-Renewable or in short supply):

Sr. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

2.1 Land especially undeveloped or agricultural land (ha)

No Developed land. Existing Chemical Manufacturing Unit is working there.

2.2 Water (expected source & competing users) unit: KLD

Yes Pl. refer Annexure-II.

2.3 Minerals (MT) No N.A. 2.4 Construction material – stone,

aggregates, sand / soil (expected source – MT)

Yes Construction material like stone, aggregates, sand / soil (expected source – MT) will be used as per the plant design.

2.5 Forests and timber (source – MT) No No Forest timber used except office/lab furniture.

2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW)

Yes The power required would be increase from 475 kVA to 1000 kVA. Fuel: Coal-2 T/hr.

2.7 Any other natural resources (use appropriate standard units)

No N.A.

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Sr. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

3.1

Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies)

Yes

Toluene, Hydrogen peroxide, Sulphuric acid, Phenol, Potassium hydroxide, P- Nitro toluene, Isopropyl alcohol, Sodium hydroxide etc will be used as Hazardous Chemicals.

3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases)

No N.A.

3.3 Affect the welfare of people e.g. by changing living conditions?

Yes Improve the living standard positively through employment by unit.

Page 8: Form-1 (For amendment of EC) - Welcome to …environmentclearance.nic.in/writereaddata/modification/...M/s. Neogen Chemicals Ltd. 1 Form-1 (For amendment of EC) Submitted by M/s. Neogen

M/s. Neogen Chemicals Ltd.

8

Sr. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc.,

No N.A.

3.5 Any other causes No N.A.

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Sr. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

4.1 Spoil, overburden or mine wastes Yes As soon as construction is over the rubbish will be cleared and all un-built surfaces reinstated. Appropriate vegetation will be planned and all such areas shall be landscaped.

4.2 Municipal waste (domestic and or commercial wastes)

Yes Papers, garden trash, plastics, vegetable wastes, floor sweepings etc are the domestic solid wastes to be generated from the industry premises. These wastes are segregated and managed properly.

4.3 Hazardous wastes (as per Hazardous Waste Management Rules)

Yes Pl. refer Annexure-III

4.4 Other industrial process wastes Yes Pl. refer Annexure-III

4.5 Surplus product No N.A.

4.6 Sewage sludge or other sludge from effluent treatment

No Request is for amendment in EC in terms of drop of 1 product and correction in land details.

4.7 Construction or demolition wastes

Yes The generation of waste material is expected during the construction activity. Other wastes include topsoil, clay, sand, and gravel. These are normally re-used as filler material at the plant site after completion of excavation work, for internal road works/ pavements/drains etc.

4.8 Redundant machinery or equipment

No N.A.

4.9 Contaminated soils or other materials

No N.A.

4.10 Agricultural wastes No N.A.

4.11 Other solid wastes No Any other solid waste generation will be suitably collected and will

Page 9: Form-1 (For amendment of EC) - Welcome to …environmentclearance.nic.in/writereaddata/modification/...M/s. Neogen Chemicals Ltd. 1 Form-1 (For amendment of EC) Submitted by M/s. Neogen

M/s. Neogen Chemicals Ltd.

9

Sr. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data be disposed off scientifically as per SPCB norms.

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Sr. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

5.1 Emissions from combustion of fossil fuels from stationary or mobile sources

Yes Air emissions comprising SPM, NOx, and SO2 will be from the operating Boiler and D.G. sets. As per Annexure-IV.

5.2 Emissions from production processes

Yes As per Annexure-IV.

5.3 Emissions from materials handling including storage or transport

Yes Fugitive emission, proper care will be taken to minimize it as per the statutory norms.

5.4 Emissions from construction activities including plant and equipment

Yes Exhaust emissions from vehicles and equipment deployed during the construction phase also result in marginal increase in the levels of SO2, NOx, PM.

5.5 Dust or odours from handling of materials including construction materials, sewage and waste

No N.A.

5.6 Emissions from incineration of waste

No N.A.

5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris)

No N.A.

5.8 Emissions from any other sources

No N.A.

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Sr. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

6.1 From operation of equipment e.g. engines, ventilation plant, crushers

No During the operational phase, noise generation will be from the Boiler, Driving Unit, cooling tower, DG set, vehicles movement and general noise characteristic of an industry. The DG set room will have proper acoustic arrangements. The noise levels in and around the industry are maintained within the stipulated norms both during the day and night time as per CPCB norms.

6.2 From industrial or similar processes

No

6.3 From construction or demolition Yes Heavy construction traffic for

Page 10: Form-1 (For amendment of EC) - Welcome to …environmentclearance.nic.in/writereaddata/modification/...M/s. Neogen Chemicals Ltd. 1 Form-1 (For amendment of EC) Submitted by M/s. Neogen

M/s. Neogen Chemicals Ltd.

10

Sr. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data loading and unloading, fabrication and handling of equipment and construction materials are likely to cause an increase in the ambient noise levels.

6.4 From blasting or piling No N.A.

6.5 From construction or operational traffic

Yes Heavy construction traffic for loading and unloading, fabrication and handling of equipment and construction materials are likely to cause an increase in the ambient noise levels. The areas affected are those close to the site. During the operational phase, noise will be as per the statutory norms after project boundary.

6.6 From lighting or cooling systems No N.A. 6.7 From any other sources No N.A.

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

Sr. No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

7.1 From handling, storage, use or spillage of hazardous materials

No Chances to spill of chemicals during the handling which resulted to contaminate the soil/water. Proper care for handing with collects any spill leakages and disposed after proper treatment.

7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge)

No Water will be used for process and utilities. Unit have ETP and after desire norms of CETP inlet, effluent will be sent for further treatment and disposal Domestic sewage generated will be treated in Septic Tank and Soak Pit.

7.3 By deposition of pollutants emitted to air into the land or into water

No N.A.

7.4 From any other sources No N.A. 7.5 Is there a risk of long term build

up of pollutants in the environment from these sources?

No There is no risk anticipated for long term build up of pollutants in the environment from any of the source.

Page 11: Form-1 (For amendment of EC) - Welcome to …environmentclearance.nic.in/writereaddata/modification/...M/s. Neogen Chemicals Ltd. 1 Form-1 (For amendment of EC) Submitted by M/s. Neogen

M/s. Neogen Chemicals Ltd.

11

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

Sr. No.

Information/Checklist confirmation

Yes/ No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous Substances

Yes We shall follow the Guidelines of factory act to minimize the accident

8.2 From any other causes No N.A. 8.3 Could the project be affected by

natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)?

Yes May effect by earthquakes because industry will be located in earth quake zone-III.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality.

Sr. No.

Information/Checklist confirmation

Yes/No

Details thereof (with approximate quantities /rates, wherever possible) with source of information data

9.1 Lead to development of supporting Facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: • Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) • housing development • extractive industries • supply industries • other

No N.A.

9.2 Lead to after-use of the site, which could have an impact on the environment

No N.A.

9.3 Set a precedent for later developments

No N.A.

9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects

No N.A.

Page 12: Form-1 (For amendment of EC) - Welcome to …environmentclearance.nic.in/writereaddata/modification/...M/s. Neogen Chemicals Ltd. 1 Form-1 (For amendment of EC) Submitted by M/s. Neogen

M/s. Neogen Chemicals Ltd.

12

(III) Environmental Sensitivity

Sr. No.

Areas

Name/ Identity

Aerial distance (within 15km.) Proposed project location boundary

1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value

No There are no such areas within 15 km from proposed expansion project boundary.

2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests

Yes Mahi River – 4.20 km & other village lakes in vicinity.

3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration

No There are no such areas within 15 km from proposed expansion project boundary.

4 Inland, coastal, marine or underground waters

No There are no such areas within 15 km from proposed expansion project boundary.

5 State, National boundaries No There is no interstate or national boundary anywhere in the near vicinity.

6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas

No There are no pilgrim places or places of tourist importance in near vicinity.

7 Defence installations No There are no such areas within 15 km from proposed expansion project boundary.

8 Densely populated or built-up area Yes Many villages falls within 15 km radius of project site, However densely populated town Padra – 16.3 km from project boundary

9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities)

Yes Hospitals Padra -16.3 km from project boundary School-Karakhadi – 2.1 km Places of worship – 2.2 km

10

Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)

No There are no such areas within 15 km from proposed expansion project boundary.

11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded)

No There are no such areas within 15 km from proposed expansion project boundary.

12 Areas susceptible to natural hazard which could cause the project to present environmental problems

No Industry is located in earth quake zone-III.

Page 13: Form-1 (For amendment of EC) - Welcome to …environmentclearance.nic.in/writereaddata/modification/...M/s. Neogen Chemicals Ltd. 1 Form-1 (For amendment of EC) Submitted by M/s. Neogen

M/s. Neogen Chemicals Ltd.

13

(earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

(IV) Proposed Terms of Reference for EIA studies

No need to propose TOR as request is for amendment in EC for change the name of company and extend the validity of EC.

Page 14: Form-1 (For amendment of EC) - Welcome to …environmentclearance.nic.in/writereaddata/modification/...M/s. Neogen Chemicals Ltd. 1 Form-1 (For amendment of EC) Submitted by M/s. Neogen

M/s. Neogen Chemicals Ltd.

14

''I hereby given understanding that the data and information given in the application and enclosure are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.

Date: 27/05/2017 Dr. Harin Kanani

Place: Karakhadi Director

NOTE:

1. The projects involving clearance under costal regulation zone notification, 1991

shall submit with the application a C.R Z may duly demarcated by one of the

authorized agencies, showing the project activity, w.r.t. C.R.Z. (at the stage of

TOR) and the recommendations of the state costal zone Management Authority (at

the stage of EC). Simultaneous action shall also be taken to obtain the requisite

clearance under the provision of the C.R.Z notification, 1991 for the activities to be

located in the CRZ.

2. The project to be located within 10 km of the national parks, sanctuaries, biosphere

reserves, migratory corridors of the wild animals, the project proponent shall

submit the map duly authenticated by chief wildlife warden showing these features

vis-à-vis the project location and the recommendations or comments of the chief

wildlife warden thereon(at the stage of EC)."

3. All correspondence with the ministry of environment and forests including

submission of application for TOR/environment clearance, subsequent

clarifications, as may be required from time to time, participation in the EAC

meeting on behalf of the project proponent shall be made by the authorized

signatory only. The authorized signatory should also submit a document in support

of his claim of being an authorized signatory for the specific project."

Page 15: Form-1 (For amendment of EC) - Welcome to …environmentclearance.nic.in/writereaddata/modification/...M/s. Neogen Chemicals Ltd. 1 Form-1 (For amendment of EC) Submitted by M/s. Neogen

M/s. Neogen Chemicals Ltd.

15

Annexure-I

Size of the Project

Sr. No.

Product Capacity (MT/month) Existing Additional Total

1 N-Propyl Bromide 16.67 00 16.67

2 N-Butyl Bromide 4.17 00 4.17

3 2,4,6-Tribromophenol 36 00 36

4 FF-680 12.5 00 12.5

5 TBBA Diallyl Ether 25.5 00 25.5

6 TBBA BIS, 2-3, DPF 16.67 00 16.67

7 Tri bromo phenol Oligomer 8.33 00 8.33

8 TBBA 41.67 00 41.67

9 Para Nitro Benzyl Bromide 50 00 50

10 Para Bromo Benzyl Bromide 50 00 50

11 1,4-Dibromobutane 25 00 25

12 DECA bromo Diphenyl oxide 20 00 20

13 Para Bromo Phenol 10 00 10

14 Para Bromo Anisol 10 00 10

15 Tertiary Butyl Bromo Acetate 10 00 10

16 Bromo Acetyl Bromide 10 00 10

17 Allyl Bromide 10 00 10

18 Bromo Methyl Tertiary Butyl Benzoate 0.5 00 0.5

19 5-Bromopthalide 5 00 5

20 Cetyl Bromide 5 00 5

21 Sodium Bromide 15 00 15

22 2-Bromo-3'-Chloropropiophenone 5 00 5

23 5-Bromo Acetyl Salicylamide 2 00 2

24 Penta Bromo Benzyl Acrylate 5 00 5

25 Benzyl Bromide 1 00 1

26 Methyl phenyl propionoic acid 00 10 10

27 Acetyl Bromide 00 20 20

28 P-Bromo Fluorobenzene 00 50 50

29 5-Amino pthalide 00 20 20

30 4-Bromo-Methyl - 2-Cyano bi phenyl 00 20 20

31 TBBA Oligomer 00 20 20

32 Hexyl Bromide 00 20 20

Page 16: Form-1 (For amendment of EC) - Welcome to …environmentclearance.nic.in/writereaddata/modification/...M/s. Neogen Chemicals Ltd. 1 Form-1 (For amendment of EC) Submitted by M/s. Neogen

M/s. Neogen Chemicals Ltd.

16

Sr. No.

Product Capacity (MT/month) Existing Additional Total

33 5-[4'-Bromomethyl - 1,1'-biphenyl 2-

yl] - 1- triphenylmethyl - 2H- tetrazole

00 20 20

34 (4-[3,4-Dichlorophenyl] -3,4-dihydro-

1(2H)-napthalenone

00 20 20

35 5-Difluoromethoxy-2-

mercaptobenzimidazole

00 20 20

36 4-Methoxy Phenyl acetonitrile 00 12 12

37 Dibromo dimethyl hydantoin 00 30 30

38 Ethyl-2-bromo Butyrate 00 25 25

39 Dipropyl Diethyl malonate 00 50 50

40 P-Bromo - Ethyl benzene 00 10 10

41 Bromo proponyl bromide 00 10 10

42 Bromo phenyl acetic acid 00 15 15

43 2-Cyano-4'-methyl-biphenyl (OTBN) 00 25 25

44 4- Nitro Benzyl aclohol 00 15 15

45 Ethyl Bromo acetate 00 20 20

46 Methyl bromo acetate 00 20 20

47 1-Bromoctane , octyl bromide 00 10 10

48 2-Ethylhexylbromide 00 10 10

49 1-Bromodecane 00 10 10

50 1-Bromododecane 00 10 10

51 Allyl bromo acetate 00 10 10

52 Ethylene bis( 3,4,5,6-tetrabromo

phthalimide), BT-93

00 50 50

53 Iso amyl bromide 00 10 10

54 Bromo chloro propane 00 100 100

55 Deca Bromo Diphenyl ethane 00 50 50

56 Tetra bromo phthalic anhydride 00 25 25

57 FR-245 00 25 25

58 Bromo acetic acid 00 25 25

59 Tetrabromo bis phenol - A - diglycidyl

ether (TBBA-DGE)

00 50 50

60 N-bromo succinimide 00 50 50

61 5-[2-Bromoethyl]-6-chloro-1(H)indol- 00 10 10

Page 17: Form-1 (For amendment of EC) - Welcome to …environmentclearance.nic.in/writereaddata/modification/...M/s. Neogen Chemicals Ltd. 1 Form-1 (For amendment of EC) Submitted by M/s. Neogen

M/s. Neogen Chemicals Ltd.

17

Sr. No.

Product Capacity (MT/month) Existing Additional Total

2(3H)-one

62 Methyl cis/trans-4-(4-fluorophenyl)-N-

methyl nipecotate

00 10 10

63 4-Fluoronitrobenzene 00 10 10

64 2-amino-3,5-dibromo benzaldehyde 00 15 15

65 Meta Bromo Anisole 00 15 15

66 4-Bromo Phenetole 00 15 15

67 4 - Amino Phthalimide 00 20 20

68 6-Chloro hexanone 00 100 100

69 5-Cyano phthalide 00 50 50

70 4-Bromo Benzyl alcohol 00 10 10

71 p-Bromo toluene 00 20 20

72 2-Bromo benzonitrile 00 20 20

73 Ethylene dibromide 00 50 50

74 Hexa bromo cyclododacane (HBCD) 00 25 25

75 2,6-Diethyl-4-methyl bromobenzene 00 50 50

Total 395.01 1307.00 1702.01

By Products

1. p-Nitro Benzoic acid 16.45 00 16.45

2. p-Bromo Benzoic acid 19.85 00 19.85

3. Hydro bromic acid 57.288 00 57.288

Total 93.588 00 93.588

Page 18: Form-1 (For amendment of EC) - Welcome to …environmentclearance.nic.in/writereaddata/modification/...M/s. Neogen Chemicals Ltd. 1 Form-1 (For amendment of EC) Submitted by M/s. Neogen

M/s. Neogen Chemicals Ltd.

18

Annexure-II

Details of water consumption

Sr. No.

Sources Present In m3/d

Proposed In m3/d

Total In m3/d

I Domestic 8 16 24 II Gardening 5 25 30 III Industrial

A Processing 14 66 80 B Boiler 17 103 120 C Cooling 95 180 275 D Washing - 10 10

Total 139 400 539

Details of waste water generation

Sr. No.

Sources Present In m3/d

Proposed In m3/d

Total In m3/d

I Domestic 7 14 21 II Industrial A Processing 12 57 69 B Boiler 3 10 13 C Cooling 13 20 33 D Washing - 10 10

Industrial 28 97 125 Total 35 111 146

Page 19: Form-1 (For amendment of EC) - Welcome to …environmentclearance.nic.in/writereaddata/modification/...M/s. Neogen Chemicals Ltd. 1 Form-1 (For amendment of EC) Submitted by M/s. Neogen

M/s. Neogen Chemicals Ltd.

19

Water Balance Diagram (Existing)

Total Water Consumption

139 m3/d

Domestic 8 m3/d

Process 14 m3/d

Utilities 112 m3/d

Greenbelt 5 m3/d

Cooling 95 m3/d

7 m3/d 12 m3/d

Bleed off 13m3/d

Blow Down 3 m3/d

Boiler 17 m3/d

ETP 35 m3/d

82 m3/d Evaporation loss

14 m3/d Steam Generation

1 m3/d Loss/ Utilization

Loss

Page 20: Form-1 (For amendment of EC) - Welcome to …environmentclearance.nic.in/writereaddata/modification/...M/s. Neogen Chemicals Ltd. 1 Form-1 (For amendment of EC) Submitted by M/s. Neogen

M/s. Neogen Chemicals Ltd.

20

Water Balance Diagram (Proposed)

After Expansion Total Water Consumption: - 139 + 386.5 = 525.5 m3/d After Expansion Total Wastewater Generation: - 35 + 99 = 134 m3/d

Total Water Consumption 386.5 m3/d

Domestic 2.5 m3/d

Process 66 m3/d

Utilities 283 m3/d

Greenbelt 25 m3/d

Cooling 180 m3/d

2 m3/d 57 m3/d

Bleed off 20 m3/d

Blow Down 10 m3/d

Boiler 103 m3/d

ETP 99 m3/d

160 m3/d Evaporation loss

93 m3/d Steam Generation

Washing 10 m3/d

0.5 m3/d Loss / Utilization

9 m3/d Loss

Page 21: Form-1 (For amendment of EC) - Welcome to …environmentclearance.nic.in/writereaddata/modification/...M/s. Neogen Chemicals Ltd. 1 Form-1 (For amendment of EC) Submitted by M/s. Neogen

M/s. Neogen Chemicals Ltd.

21

Annexure-III

Details of Solid / Hazardous waste

Sr.

No

Name of Waste Quantity MT/month Method of

Disposal Existing Proposed Total

1 ETP waste 30 70 100 Land fill at approved site

2 Process waste 42.4 57.6 100 Incineration

3 Used carbon

residue

0.4 0.6 1.0 Send back to suppliers for regeneration

4 Used oil 0.001 0.1 0.1 Sale to registered recycler

5 Plastic waste 10 KL 20 KL 30 KL Sale to actual users

Page 22: Form-1 (For amendment of EC) - Welcome to …environmentclearance.nic.in/writereaddata/modification/...M/s. Neogen Chemicals Ltd. 1 Form-1 (For amendment of EC) Submitted by M/s. Neogen

M/s. Neogen Chemicals Ltd.

22

Annexure –IV

Details of Air Emission

Sr. No.

Stack attached to Status Fuel

Type

Stack Height,

in m

APC measures

Probable emission

Flue Gas Stacks

1 Boiler Proposed coal 32 Cyclone

separator, bag filter

SPM, SO2 NOx

Process gas stacks

1 Bromine reactor

Existing - 16 Two stage caustic

scrubber

Bromine, HBr

2 Bromine storage tank

Existing - 12 Two stage caustic

scrubber

Bromine, HBr

3 Pulveriser Existing - 10 Cyclone separator, bag filter

PM

4 Fluidized bed Existing - 13.5 Cyclone separator, bag filter

Bromine, HBr

5 Bromine reactor

Proposed - 16 Two stage scrubber

Bromine, HBr

6 Reactor Proposed - 16 Two stage scrubber

Bromine, HBr


Recommended