+ All Categories
Home > Documents > Formaldehyde System

Formaldehyde System

Date post: 05-Jul-2018
Category:
Upload: mvsantiagob
View: 231 times
Download: 0 times
Share this document with a friend

of 22

Transcript
  • 8/16/2019 Formaldehyde System

    1/22

    Formaldehyde System

  • 8/16/2019 Formaldehyde System

    2/22

    Parts Needed

  • 8/16/2019 Formaldehyde System

    3/22

    Syringe BlocThis will need to be made at a machine shop

  • 8/16/2019 Formaldehyde System

    4/22

    Air CylinderMcMaster CarrPart #: 6498K635

  • 8/16/2019 Formaldehyde System

    5/22

    Foot Bracket Cylinder MountMcMaster CarrPart #: 6498K33

  • 8/16/2019 Formaldehyde System

    6/22

    Percentage TimerMcMaster CarrPart #: 2827T1

  • 8/16/2019 Formaldehyde System

    7/22

    Polyurethane TubingMcMaster CarrPart #: 5648K252

    Tubing ordered in

    red to differentiate

    from air lines or

    humidificationlines

  • 8/16/2019 Formaldehyde System

    8/22

    WickingThe Wick StorePart #: 1613

  • 8/16/2019 Formaldehyde System

    9/22

    20 ml SyringeContact your local Merck representative

  • 8/16/2019 Formaldehyde System

    10/22

    Check ValveContact Merck representative

  • 8/16/2019 Formaldehyde System

    11/22

    Syringe and Check Valve

    Assembly

  • 8/16/2019 Formaldehyde System

    12/22

    Air RegulatorMcMaster CarrPart #: 9892K22

  • 8/16/2019 Formaldehyde System

    13/22

    Tubing AdapterPush to fit to tubingMcMaster Carr

    Part #: 51055K58

  • 8/16/2019 Formaldehyde System

    14/22

    Tubing Adapter to Push To Fit

    Connector

    Wicking

    attaches to

    this spot

  • 8/16/2019 Formaldehyde System

    15/22

    Air Metering ValveMcMaster CarrPart #: 62005K124

  • 8/16/2019 Formaldehyde System

    16/22

    Solenoid ValveOrder from Humphrey onlineHumphrey H180-4E1

    120 Volt

  • 8/16/2019 Formaldehyde System

    17/22

    Wick Assembly in the Hatcher

  • 8/16/2019 Formaldehyde System

    18/22

    Timer/Syringe Block Assembly

    in Front of Hatcher

  • 8/16/2019 Formaldehyde System

    19/22

    Timer/Syringe Block Assembly

    in Front of Hatcher

    Valve added to help when

    adding a new jug of

    formaldehyde

  • 8/16/2019 Formaldehyde System

    20/22

    Procedures

  • 8/16/2019 Formaldehyde System

    21/22

    Start/Stop Procedure***Formaldehyde dropped at transfer one time48 hours before hatch-pull, formaldehyde is dropped every 30 minutes

    Formaldehyde is stopped 2 hours before hatch-pull

    ***This will change depending on size of cabinet

  • 8/16/2019 Formaldehyde System

    22/22

    Timer SettingsDrop 20 ml of formaldehyde every 30 minutes to maintain 40-60 ppmduring the hatching process

    This works for a medium Platinum hatcher cabinet


Recommended