+ All Categories
Home > Documents > Format CAMO Newsletter

Format CAMO Newsletter

Date post: 09-Apr-2018
Category:
Upload: srihari-ys
View: 218 times
Download: 0 times
Share this document with a friend

of 10

Transcript
  • 8/8/2019 Format CAMO Newsletter

    1/10

    [Pick the

    date]NAME OF THE ORGANISATION - SPECIFY MONTH & YEAR

    B L R / C A M O / N E W S L E T T E R J a n u a r y 2 0 1 1 Page 1

    I. Details of Accountable Manager and Post Holders:

    Name Designation Mobile Phone No. e-mail

    II. Details of Personnel & Assigned Function:Name Location

    of Posting

    Assigned Function Type of aircraft to

    Manage

    Number of Aircraft

    to Manage

  • 8/8/2019 Format CAMO Newsletter

    2/10

    [Pick the

    date]NAME OF THE ORGANISATION - SPECIFY MONTH & YEAR

    B L R / C A M O / N E W S L E T T E R J a n u a r y 2 0 1 1 Page 2

    III. Details of Aircraft whose Continuing Airworthiness Being Managed bythe Organisation

    Sl.No Name of the Operator

    Aircraft Type

    / Series. /

    Group

    Registration

    Numbers

    Location of

    Operation

    Validity

    C of A ARC

  • 8/8/2019 Format CAMO Newsletter

    3/10

    [Pick the

    date]NAME OF THE ORGANISATION - SPECIFY MONTH & YEAR

    B L R / C A M O / N E W S L E T T E R J a n u a r y 2 0 1 1 Page 3

    IV. Document Management: (CAR, Maintenance Programme, MEL, ADs andSBs)

    Aircraft Type Details of DocumentsReceived

    Applicable /N/A

    Cutoff Date Action Taken

  • 8/8/2019 Format CAMO Newsletter

    4/10

    [Pick the

    date]NAME OF THE ORGANISATION - SPECIFY MONTH & YEAR

    B L R / C A M O / N E W S L E T T E R J a n u a r y 2 0 1 1 Page 4

    V. Maintenance Work Carried Out During the Month:

    Aircraft Registration Aircraft Type WorkCarried Out

    Location MaintenanceOrganisation

    VI.Planned Maintenance Work During the Current Month: Aircraft Registration Aircraft Type Work to be

    Carried Out

    Location Maintenance

    Organisation

  • 8/8/2019 Format CAMO Newsletter

    5/10

    [Pick the

    date]NAME OF THE ORGANISATION - SPECIFY MONTH & YEAR

    B L R / C A M O / N E W S L E T T E R J a n u a r y 2 0 1 1 Page 5

    VII. Significant Aircraft Accident, Incidents & Defects Encountered

    Sl.NoAircraft

    Type

    Reg.

    Number

    Details of Accident / Incident/

    Defect

    Action Taken / Outcome

    of investigation if any

  • 8/8/2019 Format CAMO Newsletter

    6/10

    [Pick the

    date]NAME OF THE ORGANISATION - SPECIFY MONTH & YEAR

    B L R / C A M O / N E W S L E T T E R J a n u a r y 2 0 1 1 Page 6

    VIII.Planned Audit, Execution and Findings

    Planned Audit Area LocationDate of

    AuditDetails of Findings Action Taken

  • 8/8/2019 Format CAMO Newsletter

    7/10

    [Pick the

    date]NAME OF THE ORGANISATION - SPECIFY MONTH & YEAR

    B L R / C A M O / N E W S L E T T E R J a n u a r y 2 0 1 1 Page 7

    IX. Findings Pending for more than 30 days

    Planned Audit

    AreaLocation

    Date of

    AuditDetails of Findings

    Proposed

    Action with

    target date

    Person

    Responsible

  • 8/8/2019 Format CAMO Newsletter

    8/10

    [Pick the

    date]NAME OF THE ORGANISATION - SPECIFY MONTH & YEAR

    B L R / C A M O / N E W S L E T T E R J a n u a r y 2 0 1 1 Page 8

    X. Physical Inspection Carried Out During Aircraft MaintenanceAircraft Type

    with Reg. No.Location

    Date of

    InspectionAreas Inspected

    Observations

    / Findings

    Target date

    for Action

  • 8/8/2019 Format CAMO Newsletter

    9/10

    [Pick the

    date]NAME OF THE ORGANISATION - SPECIFY MONTH & YEAR

    B L R / C A M O / N E W S L E T T E R J a n u a r y 2 0 1 1 Page 9

    XI. Activities Planned for the Current Month:

    Activity Target DatePerson Responsible to

    performRemarks

    XII. Pending Issues with the Regional Office, Bangalore:Date of

    SubmissionIssue Dealing Officer

    Organisations Suggestion

    to close the issue

    XIII. Space for other significant issues not covered by the Newsletter

  • 8/8/2019 Format CAMO Newsletter

    10/10

    [Pick the

    date]NAME OF THE ORGANISATION - SPECIFY MONTH & YEAR

    B L R / C A M O / N E W S L E T T E R J a n u a r y 2 0 1 1 Page 10

    Instructions:

    Pick the date of newsletter in the Header.

    Type the name of the Organisation and the Month and Year to which the

    newsletter is pertinent.

    Additional Rows may be inserted if required.

    This newsletter should be compiled and forwarded by the Continuing

    Airworthiness Manager and sent on or before 7th of every month by email to

    [email protected] in PDF format.

    Care should be taken while compiling the news letter to avoid typographical error.

    Changes to the accepted post holders should be high lighted yellow in colour

    Indicate additional personnel in blue colour font and those resigned / terminated

    with strike through line

    Indicate additions to the aircraft in red colour font and deletions with strike

    through line

    All pending actions with cutoff date should be carry forwarded in the newslettertill compliance

    If any table is split in two pages, first two rows of the table should be reflected in

    the succeeding page also.

    Operators may use this instrument to suggest constructive improvements to the

    regulations and style / system of functioning of the Regional Office, Bangalore.


Recommended