+ All Categories
Home > Documents > Former Adirondack Steel OU-2 and OU-3 Remedial Action ...

Former Adirondack Steel OU-2 and OU-3 Remedial Action ...

Date post: 02-Oct-2021
Category:
Upload: others
View: 3 times
Download: 0 times
Share this document with a friend
14
FORMER ADIRONDACK STEEL OU-2 AND OU-3 REMEDIAL ACTION Colonie, Albany County, New York Inactive Hazardous Waste Site Number 401039 July 2021 ADDENDUM NUMBER 3 TO CONTRACT D010731 Prepared by: EA Engineering, P.C. and its affiliate EA Science and Technology and New York State Department of Environmental Conservation Division of Environmental Remediation
Transcript
Former Adirondack Steel OU-2 and OU-3 Remedial Action; Addendum No. 3 to contract D010731FORMER ADIRONDACK STEEL OU-2 AND OU-3 REMEDIAL ACTION Colonie, Albany County, New York Inactive Hazardous Waste Site Number 401039
July 2021 ADDENDUM NUMBER 3
TO CONTRACT D010731
Prepared by:
EA Engineering, P.C. and its affiliate EA Science and Technology and
New York State Department of Environmental Conservation Division of Environmental Remediation
Addendum No. 3 Contract D010731 Page 1 of 5
ADDENDUM NUMBER 3 CONTRACTOR BID QUESTIONS
FORMER ADIRONDACK STEEL SITE OU-2 AND OU-3 REMEDIAL ACTION
COLONIE, ALBANY COUNTY, NEW YORK CONTRACT NO. D010731
JULY 14, 2021 TO ALL HOLDERS OF THE CONTRACT DOCUMENTS: Section III, Article 3 of the Contract Documents requires bidders to acknowledge receipt of all addenda on Form V-5. Table of Contents Section A Changes and Additions Section B Questions, Answers, Clarifications Attachments Attachment A Replacement Contract Drawing Sheets
Donald F. Conan, P.E., P.G. Program Manager, EA Engineering, P.C
Addendum No. 3 Contract D010731 Page 2 of 5
Former Adirondack Steel OU-2 and OU-3 Remedial Action Contract No. D010731 Section A: Changes and Additions
• Item 1 REPLACE Sheets 18 through 26 of the Contract Drawings with corrected sheets provided in Attachment A.
Section B: Questions, Answers, Clarifications The following provides answers to the substantive questions received by the New York State Department of Environmental Conservation (Department). Where appropriate, similar questions or questions related to the same subject were combined to streamline the Questions and Answers and reduce redundancy. The Bidders must thoroughly review the bidding documents and not rely solely upon answers provided to questions during bid preparation and during implementation of construction activities. Q1. The color identifying the type 1 and type 2 materials changes throughout the design drawings.
I’m starting to question which color on which sheet to the correct one. For example, please compare sheet 9 of 28 to sheet 18 of 28. Please advise if this can be corrected prior to the bid date.
A1. Identification of Type 1 (Non-TSCA) and Type 2 (TSCA) excavation areas on Sheet 9 of 28 is correct. The discrepancy noted in the question is due to an error with the legend identification on profile views in Sheets 18 through 26 of the Contract Drawings. Color coding of excavation areas between the plan view and profile views is correct, identification in the legend as to which type represents Non-TSCA and TSCA areas was corrected. Please see Item 1 in Section A of this Addendum No. 3
Q2. The project bid form includes the item UP-4 – Excavation Support, 5,610 Square Feet. This
quantity appears to be derived from the John P. Stopen Engineering design, detailed by the “Sheet Pile Enclosure Example”, Sheet No. #7, dated February 10, 2020, provided by the EA “Request for Provisional Approval of Conceptual Excavation and Shoring Plan Letter Report”, which appears to be the quantity for the full height of the suggested steel sheets, per the provided details. Yet, the project provided Section XII – Measurement for Payment, page XII-15, subsection 3.11.B.2 states: “… measured as the area of exposed face in the plan of the shoring system from the ground line in front of the shoring to a maximum of one foot above the retained grade.” This measurement would create an exceptionally lower quantity of excavation support to be measured and paid, versus the provided bid quantity, which would have varying implications as to how the bidding Contractor prices this work. Could the Department please verify the bid quantity versus the measurement for payment for item UP-4, Excavation Support?
A2. Please bid as specified using the quantity provided on the Bid Form.
This ADDENDUM No. 3 becomes part of the June 2021 Former Adirondack Steel Contract Documents D010731.
ATTACHMENT TO ADDENDUM NO. 3
FORMER ADIRONDACK STEEL SITE OU-2 AND OU-3 REMEDIAL ACTION
CONTRACT NO. D010731
ATTACHMENT A ADDENDUM No. 3 FORMER ADIRONDACK STEEL SITE
CONTRACT No. D010731
Replacement Contract Drawing Sheets
GRID T65 GRID T66 GRID S66 GRID R66 GRID Q66 GRID Q67 GRID P67 GRID O67 GRID N68 GRID M68 GRID L68 GRID K68 GRID J69 GRID I69 GRID H70 GRID G70 GRID F70
GRID N67
GRID K69
GRID H69
RESTORE GRASS COVER
SEE DETAIL 8 ON SHEET 28
GRID F70 GRID E70 GRID E71 GRID D71 GRID C71 GRID C72 GRID C73 GRID C74 GRID C75 GRID C76 GRID C77 GRID C78 GRID C79 GRID C80 GRID C81 GRID C82 GRID C83 GRID C84
RESTORE OU3 CREEK SEE DETAIL 11 ON SHEET 28
RESTORE OU2 CREEK SEE DETAIL 12 ON SHEET 28
RESTORE OU2 CREEK WITH CLAY CAP
SEE DETAIL 13 ON SHEET 28
RESTORE OU2 CREEK WITH CLAY CAP
SEE DETAIL 13 ON SHEET 28
RESTORE OU2 CREEK SEE DETAIL 12 ON SHEET 28
RESTORE OU2 CREEK SEE DETAIL 12 ON SHEET 28
RESTORE OU2 CREEK WITH CLAY CAP
SEE DETAIL 13 ON SHEET 28
RESTORE OU2 CREEK SEE DETAIL 12 ON SHEET 28
RESTORE OU2 CREEK WITH CLAY CAP
SEE DETAIL 13 ON SHEET 28
RESTORE OU2 CREEK SEE DETAIL 12 ON SHEET 28
EXISTING GRADE
GENERAL NOTES
1. CONTRACTOR IS RESPONSIBLE FOR STABILITY OF EXCAVATIONS. EXCAVATIONS WITHIN RAIL ROW (50 FT FROM RAIL CENTERLINE) MUST BE APPROVED BY CP.
2. SHORING MAY BE REQUIRED. A PRELIMINARY ANALYSIS OF THE REQUIRED EXCAVATIONS WITHIN OU2 INDICATED THAT SHORING MAY BE NECESSARY IN GRIDS C68 AND C73. THE CONTRACTOR SHALL EVALUATE AND DESIGN SHORING FOR ALL EXCAVATIONS. EXCAVATION AND SHORING DESIGN (INCLUDING SIDE SLOPES) MUST BE DESIGNED AND SEALED BY A NEW YORK PROFESSIONAL ENGINEER HIRED BY THE CONTRACTOR.
3. EXCAVATION SUPPORT (E.G. SHORING) SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE.
DPA
16025.12
631.5
GRID C84 GRID C85 GRID C86 GRID C87 GRID C88 GRID C89 GRID C90 GRID C91 GRID C92 GRID C93 GRID C94 GRID C95 GRID C96 GRID C97 GRID C98 GRID C99 GRID C100
RESTORE OU2 CREEK SEE DETAIL 12 ON SHEET 28
RESTORE OU2 CREEK SEE DETAIL 12 ON SHEET 28
RESTORE OU2 CREEK SEE DETAIL 12 ON SHEET 28
RESTORE OU2 CREEK WITH CLAY CAP
SEE DETAIL 13 ON SHEET 28
GRID C100 GRID C101 GRID C102 GRID C103 GRID C104 GRID C105 GRID C106 GRID D106 GRID D107 GRID D108 GRID D109 GRID D110 GRID D111
GRID D112
GRID C112 GRID B112 GRID A112
RESTORE OU2 CREEK SEE DETAIL 12 ON SHEET 28
RESTORE OU2 CREEK SEE DETAIL 12 ON SHEET 28
EXISTING GRADE
16025.12
1. CONTRACTOR IS RESPONSIBLE FOR STABILITY OF EXCAVATIONS. EXCAVATIONS WITHIN RAIL ROW (50 FT FROM RAIL CENTERLINE) MUST BE APPROVED BY CP.
2. SHORING MAY BE REQUIRED. THE CONTRACTOR SHALL EVALUATE AND DESIGN SHORING FOR ALL EXCAVATIONS. EXCAVATION AND SHORING DESIGN (INCLUDING SIDE SLOPES) MUST BE DESIGNED AND SEALED BY A NEW YORK PROFESSIONAL ENGINEER HIRED BY THE CONTRACTOR.
3. EXCAVATION SUPPORT (E.G. SHORING) SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE.
GRID B5 GRID B6 GRID B7 GRID B8 GRID B9 GRID B10 GRID B11 GRID B12 GRID B13 GRID B14 GRID B15 GRID B16 GRID B17 GRID B18
RESTORE WETLAND COVER SEE DETAIL 10 ON SHEET 28
RESTORE WETLAND COVER SEE DETAIL 10 ON SHEET 28
GRID B22 GRID B23 GRID B24 GRID B25 GRID B26 GRID B27 GRID B28 GRID B29 GRID B30 GRID B31 GRID B32 GRID B33 GRID B34 GRID B35 GRID B36 GRID B37 GRID C37 GRID C38 GRID C39
RESTORE WETLAND COVER SEE DETAIL 10 ON SHEET 28
RESTORE WETLAND COVER SEE DETAIL 10 ON SHEET 28
GRID C39 GRID C40 GRID C41 GRID C42 GRID C43 GRID C44 GRID C45 GRID C46 GRID C47 GRID C48 GRID C49 GRID C50 GRID C51 GRID C52 GRID C53 GRID C54 GRID C55 GRID C56
RESTORE WETLAND COVER SEE DETAIL 10 ON SHEET 28
RESTORE WETLAND COVER SEE DETAIL 10 ON SHEET 28
RESTORE WETLAND COVER SEE DETAIL 10 ON SHEET 28
GRID C56 GRID C57 GRID C58 GRID C59 GRID C60 GRID C61 GRID C62 GRID C63 GRID C64 GRID C65 GRID C66 GRID C67 GRID C68 GRID C69 GRID C70 GRID C71
RESTORE WETLAND COVER SEE DETAIL 10 ON SHEET 28
RESTORE WETLAND COVER SEE DETAIL 10 ON SHEET 28
RESTORE OU2 CREEK WITH CLAY CAP
SEE DETAIL 13 ON SHEET 28
RESTORE OU2 CREEK SEE DETAIL 12 ON SHEET 28
RESTORE OU2 CREEK SEE DETAIL 12 ON SHEET 28
EXISTING GRADE
GRID T65 GRID BOUNDARY
1. CONTRACTOR IS RESPONSIBLE FOR STABILITY OF EXCAVATIONS. EXCAVATIONS WITHIN RAIL ROW (50 FT FROM RAIL CENTERLINE) MUST BE APPROVED BY CP.
2. SHORING MAY BE REQUIRED. A PRELIMINARY ANALYSIS OF THE REQUIRED EXCAVATIONS WITHIN OU2 INDICATED THAT SHORING MAY BE NECESSARY IN GRIDS C68 AND C73. THE CONTRACTOR SHALL EVALUATE AND DESIGN SHORING FOR ALL EXCAVATIONS. EXCAVATION AND SHORING DESIGN (INCLUDING SIDE SLOPES) MUST BE DESIGNED AND SEALED BY A NEW YORK PROFESSIONAL ENGINEER HIRED BY THE CONTRACTOR.
3. EXCAVATION SUPPORT (E.G. SHORING) SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE.
ROW AROW BROW C
X X
EXISTING GRADE
X X
X
ROW AROW BROW C
ZONE OF POTENTIAL TRAIN LOADING
X X
X X
X X
ROW A
2 METERS
3 METERS
10 METERS
50 FEET
X X
X X
X X
ROW BROW CROW D ROW A
2 METERS
3 METERS
10 METERS
50 FEET
ZONE OF POTENTIAL TRAIN LOADING
X X
X X
X X
X X
2 METERS
3 METERS
10 METERS
50 FEET
ZONE OF POTENTIAL TRAIN LOADING
ROW BROW CROW D ROW A
X X
X X
X X
ZONE OF POTENTIAL TRAIN LOADING
X X
X X
X X
X X
2 METERS
3 METERS
10 METERS
50 FEET
ZONE OF POTENTIAL TRAIN LOADING
ROW BROW CROW DROW E
X X
X X
X X
X X
2 METERS
3 METERS
ROW BROW CROW D
X X
X X
X X
X X
DPA
X X
X X
X X
X X
X X
2 METERS
3 METERS
EXISTING GRADE
TYPE 2 (TSCA) WASTE EXCAVATION
TYPE 1 (NON-TSCA) WASTE EXCAVATION
ZONE OF POTENTIAL TRAIN LOADING
SOIL SAMPLE WITH NON-DETECT PCB CONC. SOIL SAMPLE WITH PCB CONC. ≤1 PPM SOIL SAMPLE WITH PCB CONC. >1 AND ≤25 PPM SOIL SAMPLE WITH PCB CONC. >25 AND ≤50 PPM SOIL SAMPLE WITH PCB CONC. >50 AND ≤100 PPM SOIL SAMPLE WITH PCB CONC. >100 PPM
16025.12
1. CONTRACTOR IS RESPONSIBLE FOR STABILITY OF EXCAVATIONS. EXCAVATIONS WITHIN RAIL ROW (50 FT FROM RAIL CENTERLINE) MUST BE APPROVED BY CP.
2. SHORING MAY BE REQUIRED. THE CONTRACTOR SHALL EVALUATE AND DESIGN SHORING FOR ALL EXCAVATIONS. EXCAVATION AND SHORING DESIGN (INCLUDING SIDE SLOPES) MUST BE DESIGNED AND SEALED BY A NEW YORK PROFESSIONAL ENGINEER HIRED BY THE CONTRACTOR.
3. EXCAVATION SUPPORT (E.G. SHORING) SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE.
ZONE OF POTENTIAL TRAIN LOADING
X X
X X
X X
X X
X X
2 METERS
3 METERS
EXISTING GRADE
TYPE 2 (TSCA) WASTE EXCAVATION
TYPE 1 (NON-TSCA) WASTE EXCAVATION
ZONE OF POTENTIAL TRAIN LOADING
ROW BROW CROW DROW EROW FROW GROW HROW IROW JROW KROW L
X X
X X
X X
X X
X X
2 METERS
3 METERS
ZONE OF POTENTIAL TRAIN LOADING
ROW BROW CROW DROW EROW FROW GROW HROW I
2 METERS
3 METERS
RESTORE OU3 CREEK SEE DETAIL 11 ON SHEET 28
RESTORE GRASS COVER SEE DETAIL 8 ON SHEET 28
RESTORE WETLAND COVER SEE DETAIL 10 ON SHEET 28
RESTORE OU2 CREEK WITH CLAY CAP SEE DETAIL 13 ON SHEET 28
ROW BROW CROW DROW EROW FROW GROW H
ZONE OF POTENTIAL TRAIN LOADING
2 METERS
3 METERS
RESTORE OU2 CREEK WITH CLAY CAP
SEE DETAIL 13 ON SHEET 28
ZONE OF POTENTIAL TRAIN LOADING
ROW BROW CROW DROW EROW F
2 METERS
3 METERS
10 METERS
50 FEET
RESTORE GRASS COVER SEE DETAIL 8 ON SHEET 28
ROW BROW CROW D
2 METERS
3 METERS
ROW BROW CROW D
2 METERS
3 METERS
ZONE OF POTENTIAL TRAIN LOADING
ROW BROW CROW D
RESTORE GRASS COVER WITH CLAY CAP
SEE DETAIL 9 ON SHEET 28
RESTORE OU2 CREEK WITH CLAY CAP
SEE DETAIL 13 ON SHEET 28
SOIL SAMPLE WITH NON-DETECT PCB CONC. SOIL SAMPLE WITH PCB CONC. ≤1 PPM SOIL SAMPLE WITH PCB CONC. >1 AND ≤25 PPM SOIL SAMPLE WITH PCB CONC. >25 AND ≤50 PPM SOIL SAMPLE WITH PCB CONC. >50 AND ≤100 PPM SOIL SAMPLE WITH PCB CONC. >100 PPM
DPA
16025.12
1. CONTRACTOR IS RESPONSIBLE FOR STABILITY OF EXCAVATIONS. EXCAVATIONS WITHIN RAIL ROW (50 FT FROM RAIL CENTERLINE) MUST BE APPROVED BY CP.
2. SHORING MAY BE REQUIRED. A PRELIMINARY ANALYSIS OF THE REQUIRED EXCAVATIONS WITHIN OU2 INDICATED THAT SHORING MAY BE NECESSARY IN GRIDS C68 AND C73. THE CONTRACTOR SHALL EVALUATE AND DESIGN SHORING FOR ALL EXCAVATIONS. EXCAVATION AND SHORING DESIGN (INCLUDING SIDE SLOPES) MUST BE DESIGNED AND SEALED BY A NEW YORK PROFESSIONAL ENGINEER HIRED BY THE CONTRACTOR.
3. EXCAVATION SUPPORT (E.G. SHORING) SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE.
ROW BROW CROW D
2 METERS
3 METERS
ROW BROW CROW D
2 METERS
3 METERS
ZONE OF POTENTIAL TRAIN LOADING
ROW BROW D ROW C
2 METERS
3 METERS
ZONE OF POTENTIAL TRAIN LOADING
ROW BROW CROW D
ROW BROW CROW D
2 METERS
3 METERS
ROW BROW CROW D
2 METERS
3 METERS
ZONE OF POTENTIAL TRAIN LOADING
ROW BROW CROW D
ZONE OF POTENTIAL TRAIN LOADING
ROW BROW CROW D ROW A
2 METERS
3 METERS
10 METERS
2 METERS
3 METERS
RESTORE OU2 CREEK SEE DETAIL 12 ON SHEET 28
RESTORE OU2 CREEK
COL 66COL 67COL 68COL 69COL 70COL 71COL 72COL 73
RESTORE GRASS COVER SEE DETAIL 8 ON SHEET 28
RESTORE OU3 CREEK SEE DETAIL 11 ON SHEET 28
COL 68COL 69COL 70COL 71COL 72COL 73
RESTORE GRASS COVER SEE DETAIL 8 ON SHEET 28
RESTORE OU3 CREEK SEE DETAIL 11 ON SHEET 28
RESTORE GRASS COVER SEE DETAIL 8 ON SHEET 28
EXISTING GRADE
TYPE 2 (TSCA) WASTE EXCAVATION
TYPE 1 (NON-TSCA) WASTE EXCAVATION
ZONE OF POTENTIAL TRAIN LOADING
SOIL SAMPLE WITH NON-DETECT PCB CONC. SOIL SAMPLE WITH PCB CONC. ≤1 PPM SOIL SAMPLE WITH PCB CONC. >1 AND ≤25 PPM SOIL SAMPLE WITH PCB CONC. >25 AND ≤50 PPM SOIL SAMPLE WITH PCB CONC. >50 AND ≤100 PPM SOIL SAMPLE WITH PCB CONC. >100 PPM
30
6
16025.12
1. CONTRACTOR IS RESPONSIBLE FOR STABILITY OF EXCAVATIONS. EXCAVATIONS WITHIN RAIL ROW (50 FT FROM RAIL CENTERLINE) MUST BE APPROVED BY CP.
2. SHORING MAY BE REQUIRED. THE CONTRACTOR SHALL EVALUATE AND DESIGN SHORING FOR ALL EXCAVATIONS. EXCAVATION AND SHORING DESIGN (INCLUDING SIDE SLOPES) MUST BE DESIGNED AND SEALED BY A NEW YORK PROFESSIONAL ENGINEER HIRED BY THE CONTRACTOR.
3. EXCAVATION SUPPORT (E.G. SHORING) SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE.
COL 68COL 69COL 70COL 71COL 72
RESTORE GRASS COVER SEE DETAIL 8 ON SHEET 28
RESTORE GRASS COVER SEE DETAIL 8 ON SHEET 28
RESTORE OU3 CREEK SEE DETAIL 11 ON SHEET 28
COL 67COL 68COL 69COL 70COL 71
RESTORE OU3 CREEK SEE DETAIL 11 ON SHEET 28
RESTORE GRASS COVER SEE DETAIL 8 ON SHEET 28
COL 61COL 62COL 63COL 64COL 65COL 66COL 67COL 68COL 69COL 70COL 71
RESTORE OU3 CREEK SEE DETAIL 11 ON SHEET 28
RESTORE GRASS COVER SEE DETAIL 8 ON SHEET 28
RESTORE GRASS COVER SEE DETAIL 8 ON SHEET 28
COL 61COL 62COL 63COL 64COL 65COL 66COL 67COL 68COL 69COL 70 COL 60
RESTORE OU3 CREEK SEE DETAIL 11 ON SHEET 28
RESTORE GRASS COVER SEE DETAIL 8 ON SHEET 28
RESTORE GRASS COVER SEE DETAIL 8 ON SHEET 28
EXISTING GRADE
16025.12
1. CONTRACTOR IS RESPONSIBLE FOR STABILITY OF EXCAVATIONS. EXCAVATIONS WITHIN RAIL ROW (50 FT FROM RAIL CENTERLINE) MUST BE APPROVED BY CP.
2. SHORING MAY BE REQUIRED. THE CONTRACTOR SHALL EVALUATE AND DESIGN SHORING FOR ALL EXCAVATIONS. EXCAVATION AND SHORING DESIGN (INCLUDING SIDE SLOPES) MUST BE DESIGNED AND SEALED BY A NEW YORK PROFESSIONAL ENGINEER HIRED BY THE CONTRACTOR.
3. EXCAVATION SUPPORT (E.G. SHORING) SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE.
COL 61COL 62COL 63COL 64COL 65COL 66COL 67COL 68COL 69COL 70 COL 60
RESTORE OU3 CREEK SEE DETAIL 11 ON SHEET 28
RESTORE GRASS COVER SEE DETAIL 8 ON SHEET 28
COL 62COL 63COL 64COL 65COL 66COL 67COL 68COL 69
RESTORE OU3 CREEK SEE DETAIL 11 ON SHEET 28
RESTORE GRASS COVER SEE DETAIL 8 ON SHEET 28
COL 64COL 65COL 66COL 67COL 68COL 69
RESTORE OU3 CREEK SEE DETAIL 11 ON SHEET 28
RESTORE GRASS COVER SEE DETAIL 8 ON SHEET 28
COL 65COL 66COL 67COL 68COL 69
RESTORE OU3 CREEK SEE DETAIL 11 ON SHEET 28
RESTORE GRASS COVER SEE DETAIL 8 ON SHEET 28
COL 61COL 62COL 63COL 64COL 65COL 66COL 67COL 68COL 69 COL 62COL 63COL 64COL 65COL 66COL 67COL 68COL 69
RESTORE OU3 CREEK SEE DETAIL 11 ON SHEET 28
RESTORE GRASS COVER SEE DETAIL 8 ON SHEET 28
RESTORE OU3 CREEK SEE DETAIL 11 ON SHEET 28
RESTORE GRASS COVER SEE DETAIL 8 ON SHEET 28
EXISTING GRADE
16025.12
1. CONTRACTOR IS RESPONSIBLE FOR STABILITY OF EXCAVATIONS. EXCAVATIONS WITHIN RAIL ROW (50 FT FROM RAIL CENTERLINE) MUST BE APPROVED BY CP.
2. SHORING MAY BE REQUIRED. THE CONTRACTOR SHALL EVALUATE AND DESIGN SHORING FOR ALL EXCAVATIONS. EXCAVATION AND SHORING DESIGN (INCLUDING SIDE SLOPES) MUST BE DESIGNED AND SEALED BY A NEW YORK PROFESSIONAL ENGINEER HIRED BY THE CONTRACTOR.
3. EXCAVATION SUPPORT (E.G. SHORING) SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE.
COL 63COL 64COL 65COL 66COL 67COL 68COL 69 COL 62COL 63COL 64COL 65COL 66COL 67COL 68
RESTORE OU3 CREEK SEE DETAIL 11 ON SHEET 28
RESTORE GRASS COVER SEE DETAIL 8 ON SHEET 28
RESTORE OU3 CREEK SEE DETAIL 11 ON SHEET 28
RESTORE GRASS COVER SEE DETAIL 8 ON SHEET 28
COL 62COL 63COL 64COL 65COL 66COL 67COL 68 COL 62COL 63COL 64COL 65COL 66COL 67
RESTORE GRASS COVER SEE DETAIL 8 ON SHEET 28
RESTORE OU3 CREEK SEE DETAIL 11 ON SHEET 28
RESTORE GRASS COVER SEE DETAIL 8 ON SHEET 28
COL 65COL 66COL 67
EXISTING GRADE
DPA
ESIGN
RK
16025.12
1. CONTRACTOR IS RESPONSIBLE FOR STABILITY OF EXCAVATIONS. EXCAVATIONS WITHIN RAIL ROW (50 FT FROM RAIL CENTERLINE) MUST BE APPROVED BY CP.
2. SHORING MAY BE REQUIRED. THE CONTRACTOR SHALL EVALUATE AND D SHORING FOR ALL EXCAVATIONS. EXCAVATION AND SHORING DESIGN (INCLUDING SIDE SLOPES) MUST BE DESIGNED AND SEALED BY A NEW YO PROFESSIONAL ENGINEER HIRED BY THE CONTRACTOR.
3. EXCAVATION SUPPORT (E.G. SHORING) SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE.
Former Adirondack Steel; OU-2 and OU-3 Remedial Action; Addendum No. 3 Contract D010731
Table of Contents
Section B: Questions, Answers, and Clarifications
Attachments

Recommended