FORMOSAT FORMOSAT - - 3/COSMIC Program Status 3/COSMIC Program Status National Space Organization National Space Organization Taiwan Taiwan August 24, 2005 August 24, 2005
Transcript
Page 1: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

FORMOSATFORMOSAT--3/COSMIC Program Status3/COSMIC Program Status

National Space OrganizationNational Space OrganizationTaiwanTaiwan

August 24, 2005August 24, 2005

Page 2: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

2

CDAAC: COSMIC Data Analysis and Archive CenterTACC: Taiwan Analysis Center for COSMIC

CWB/NSPOAt Central Weather Bureau, Taiwan

UCARAt UCAR

NSPOWeather/Climate Group Ionospheric Research GroupGeodesy/Engineer Science Group

NSPOExpand NSPO Ground System

UCARExpand NASA Ground System

UCARFairbanks/ AlaskaKiruna/ Sweden

Orbital/NSPOConstellation MicroSat

Orbital /JPL/NRLGPS/METReceiver (GOX)

Tri-Band Beacon (TBB)

Tiny-Ionospheric Photometer (TIP)

FORMOSAT-3/COSMICFORMOSAT-3/COSMIC

USAF/OSC-LSGMinotaur Launcher Spacecraft

BusSpacecraft

BusPayloadPayload

Ground SegmentGround

Segment

NSPO Ground System

NSPO Ground System

Oversea Ground Station

Oversea Ground Station

Fiducial NetworkFiducial Network

Taiwan Teams

Taiwan Teams

Space SegmentSpace

SegmentScience

Data Center

Science Data

Center

Foreign Teams

Foreign Teams

Launch Vehicle

Services

Launch Vehicle

Services

TACCTACC CDAACCDAAC

Science Teams

Science Teams

UCAR &

Others

Program MatrixProgram Matrix

Page 3: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

3

System ArchitectureSystem Architecture

TT&C

RGS MMC

Domestic & Foreign Users

CDAACCOSMIC Data Analysis and Archive Center

(UCAR)

U.S. Universities & Mission Teams

UCARScienceCenter

RT FiducialNetwork

U.S.Users

S ba

nd

S ba

nd

S/S

ban

d

L ba

nd

RT SOH

NSPO/RGS NSPO/RGS

Universities & Science Teams

24 GPS S/C

TACC (CWB)Taiwan Analysis Center for COSMIC

6-Satellite COSMIC Constellation

Operations

Backup Command

Arc

hive

dD

ata

NSPO Science

Research Program

RTSFairbanks

UH

F/VH

F

RTSKiruna

TBBStations

Science data

NMCUSN

Page 4: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

4

2003 2004 2005 2006J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N DTaskItem

Management & System Eng.1

Spacecraft AIT2

Ground Operations 3

TT&C upgrade3A

Remote Terminal Stations3B

MMC upgrade3C

Data Processing4

CDAAC Development4A

TACC Development4B

Launch Operations5

Mission Operations6

2/26

PMR#4ICWG#3

8/4

PMR#5ICWG#4

10/23

PMR#6 #5

12/15

PMR#7ICWG#6

4/29

PMR#8 ICWG#7

5/26

PARQAR

7/15

PMR#9MOWG#1

12/16

MOWG#2

4/18

PMR#10MOWG#3

8/25

PMR#11MOWG#4

12/19

MOWG#5FDR (TBD)

4/15

MOWG#6

8/16

MOWG#7

11/17

FR#4MOWG#8

6/1

FM1

7/11

StackDyna.Test

12/1

Complete EV Test

12/14

PSR

12/14

FDR(TBD)

Launch(TBD)

5/16 5/27

MMCSIT

6/14

Fairbank Install

6/14 8/14

KirunaInstall

10/11

TT&CSIT

3/16

MMCORR

6/6

GORR

9/15

RTSReady FDR (TBD)

6/16

TDR

1/14

ED

10/11

SIT

12/13

SAR

2/28

RFCTTest

3/14

FR

5/16 3/15 6/14

Fairbank Install

8/14

KirunaInstall

9/16

SAT

1/15

MMC/MNCETE DFT

3/31

ETEDFT

9/15

RTSReady

8/11

CDR

5/27

SIT

12/15

ETE#2

2/20

ETE#3

3/16

ORR

6/6

GORRFDR(TBD)

FR(TBD)

9/30

Develop. S/WSetup

12/31

S/W Ready

10/18

SW v1 to NSPOH/W Setup

11/28

Network Test

5/18

Network Test

9/12

O-Sim#2

10/15

SW v2 to NSPO FDR (TBD)

12/31

S/W Ready

10/18

SW v1 to NSPO

11/28

Network Test.

5/18

Network Test

9/12

O-Sim#2

10/15

SW v2 to NSPO FDR (TBD)

3/31

Sys. Assessment

9/30

Develop. S/W Setup

1/7

InstrumentProcur.

11/18

H/W Setup

2/28

Workshop

9/12

O-Sim#2

10/25

SMRR FDR (TBD)

7/15

MDR1

4/20

MDR2

12/14

PSR

12/21

MRR

2/28

FRR

FDR(TBD) Launch Period

TBD

12/15

SIT Start

12/15

ETESIM

5/5

O-Sim#1

6/13

M-Sim#1

8/22

M-Sim#2

9/12

O-Sim#2

10/17

M-Sim#3

11/28

M-Sim#4

MRR

1/30

M-Sim#5TBD

FDR(TBD)

FORMOSAT-3 Master ScheduleFORMOSAT-3 Master Schedule

Page 5: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

5

Mission Life:2 years minimum.

Design Life : 5 years.

Constellation:consist of 6 satellites.

Weight:70 Kg/each (including propellant).

Dimension:diameter 103 cm, height 16 cm; with two circular solar panel deployed at 121 degrees and 59 degrees.

Payload Instrument:

GPS Occultation Receiver (GOX) By JPL

Tiny Ionospheric Photometer (TIP) by NRL

Tri-Band Beacon (TBB) by NRL

Orbit Period:~100 minutes.

Mission Orbit:circular orbit, altitude 700-800 Km, inclination 72 degree.

FORMOSAT-3 SatelliteFORMOSAT-3 Satellite

Page 6: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

6

FORMOSAT-3 Satellite DevelopmentFORMOSAT-3 Satellite Development

FM1 was assembled and tested, with participation of NSPO engineers, at Orbital and delivered to NSPO in July 2004.

FM1 went through additional tests at NSPO.

Kits for the remaining five satellites were shipped to Taiwan in summer 2004 for integration and test by NSPO team.

NSPO started I&T work on June 1, 2004.

Page 7: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

7

Activities FM 1 FM 2 FM 3 FM 4 FM 5 FM 6 Stacked

Assembly Completed Completed Completed Completed Completed Completed N/R

Initial CPT Completed Completed Completed Completed Completed Completed N/R

EMC Completed N/R N/R N/R N/R N/R N/RPre-Dynamic Test

Alignment Completed Completed Completed Completed Completed Completed N/R

TV Test Completed Completed Completed Completed Completed N/R

Solar Array Assy Completed Completed Completed Completed Completed Completed N/R

Mag. Calibration Completed Completed Completed Completed Completed Completed N/R

Mass Property Completed N/R Completed Completed N/R N/R N/R

Vibration Test Completed Completed Completed N/R N/R N/R Completed

Acoustic Test Completed N/R N/R N/R N/R N/R Completed

Propulsion Leak Test Completed Completed Completed Completed N/RAntenna Boom Auto

Deployment Test Completed Completed Completed Completed Completed Completed N/R

Solar Array ManualDeployment Test Completed Completed Completed Completed Completed Completed N/R

Post-Dynamic TestAlignment Completed Completed Completed N/R

Final CPT Completed Completed N/R

Characterization Test N/R

Final Prep. At NSPO N/R N/R N/R N/R N/R N/R 12/20/2005

Satellite I&T Status at NSPOSatellite I&T Status at NSPO

Page 8: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

8

TV TestTV Test

Page 9: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

9

Alignment TestAlignment Test

Page 10: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

10

Magnetic CalibrationMagnetic Calibration

Page 11: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

11

Solar Array Deployed ConfigurationSolar Array Deployed Configuration

FM4 (Left)FM4 (Left) FM6 (Right)FM6 (Right)

Page 12: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

12

Stacked Configuration for Dynamic TestStacked Configuration for Dynamic Test

Page 13: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

13

Stacked Configuration for Acoustic TestStacked Configuration for Acoustic Test

Page 14: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

14

NSF/UCAR at NSPO I&T FacilityNSF/UCAR at NSPO I&T Facility

Page 15: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

15

Launch OperationLaunch Operation

USAF Minotaur LVNSPO Funded $15 M and DoD STP Funded $4.5 MThree successful launches in 1/00, 7/00, and 4/05Launch vehicle development in progress

Launch CampaignLaunch site survey and range working group meeting hold in August 2005Launch window is being coordinated with USAF Complete S/C readiness for shipment by yearendThe launch site operations will take approximately 75 days

Page 16: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

16

Launch Vehicle (1/2)Launch Vehicle (1/2)

USAF Minotaur LVThe LV consists of 4-stages solid fuel motor

Total height : 19.21 meter

Total weight : 36.2 tons

Three successful launch since 2000.

Page 17: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

17

Mission ParametersPayload Mass: NTE 416 kg

not including the SRSS

Orbit Altitude: 500 km X 537.5 km at 72+0.2,-1.0漂-1.0漂

Launch Site

Vandenberg Air Force Base , CA

Event

1 SI Ignition

2 Pitch Down

3 Max Dynp

4 SI Separation/S2 Ignition

5 S2 Skirt Separation

6 SE Separation

7 S3 Ignition

8 Fairing Separation

9 S3 Burnout

10 S3 Separation

11 S4 Ignition

12 S4 Burnout

13 Payload Separation

14 CCAM

Orbit Altitude: 500 km X

Mission ParametersPayload Mass: NTE 416 kg

not including the SRSSOrbit Altitude : 500 km x

537.5 km at 72+0.2,-1.0 deg

Launch Vehicle (2/2)Launch Vehicle (2/2)

Page 18: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

18

FORMOSAT-3 Ground SystemFORMOSAT-3 Ground System

North TT&CChung-Li

South TT&CTainan

Hsin-ChuMMC/NSPO

Backup RTS

RTS/Kiruna RTS/FairbanksHawaii Australia

NMC/USN PANMC/USN CA

VPNR/T TLMR/T Cortex StatusR/T Antenna Status

R/T CMD

North TT&CChung-Li

South TT&CTainan

Hsin-ChuMMC/NSPO

Backup RTS

RTS/Kiruna RTS/FairbanksHawaii Australia

NMC/USN PANMC/USN CA

VPNR/T TLMR/T Cortex StatusR/T Antenna Status

R/T CMD

Page 19: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

19

Ground System (1/2) Ground System (1/2)

Multi-Mission Center Upgrade NSPO system to accommodate the mission operations of FORMOSAT-3 constellation.

» System integration and test completed in October 2004.» Operation readiness review successfully conducted in March 2005.

TT&C Stations Upgrade Upgrade Taiwan TT&C stations with CORTEX, Up/Down Converters, and Monitor and Control Unit.

» System integration and test completed in October 2004.» The systems have been in operation since May 2005.

Page 20: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

20

Ground System (2/2) Ground System (2/2)

Remote Tracking StationsConstruct RTS sites in Fairbanks, Alaska and Kiruna, Sweden.

» Complete system acceptance test in September 2004.

» Establish communication line (VPN/ADSL) between Mission Control Center and RTS.

» End-to-end test is on-going.

Page 21: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

21

Multi-Mission Center at NSPOMulti-Mission Center at NSPO

Page 22: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

22

TT&C Stations at Northern/SouthernTaiwan

TT&C Stations at Northern/SouthernTaiwan

S/S-Band TT&C Station(NCKU, Tainan)

S/S-Band TT&C Station(NCU, Chung-Li)

Page 23: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

23

Remote Tracking StationsRemote Tracking Stations

RTS at Alaska RTS at Kiruna

Page 24: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

24

512

k VP

N

Command:Normal: MMC → TT&C → SCBackup: MMC → NMC → RTS →SC

Telemetry:Real-time:

• SC → TT&C → MMC• SC → RTS → NMC →

MMCBack Orbit

• Normal: SC → TT&C →MMC

• Backup/L&EO: SC→ RTS → NMC →MMC

Payload science data (GOX & TIP)SC → RTS → NMC → CDAAC

Other science raw data (GPS FID, TBB)FIDNET → CDAAC

Science data Re-transmissionCDAAC → TACC

TACC

MMCNSPO

CDAAC

TANet I2

FIDNET

Internet

1024

k V

PN

NMCUSN

RTS

128 k VPN

T1TT&CTT&C

•The system is expected to receive ~200 occultation events for every orbit. The system will then process, archive, and transmit within 3-hours to weather forecasting models.

Ground Communication Network and Science Data Flow

Ground Communication Network and Science Data Flow

Page 25: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

25

FORMOSAT-3 Deployment TimelineFORMOSAT-3 Deployment Timeline

450

500

550

600

650

700

750

800

850

0 30 60 90 120 150 180 210 240 270 300 330 360 390 420

SC#1

SC#2 SC#3

SC#4 SC#5

SC#6

Alti

tude

(km

)

Days after launch

Page 26: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

26

Payload Checkout PlanPayload Checkout Plan

Launch

Set up S/C configuration

L+0.5 day

Start SC Checkout

L+7 day

Start GOXcheckout

L+9 day

Start TIPcheckout

Start TBBcheckout

L+10 day

Mission Simulation

PL Beep mode: GOX at Beep modeTIP and TBB at Off mode

L+20 day

Start Test Burn(PL are beep mode*

during burns)

CompleteSC

checkout

L+52 day

Page 27: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

27

Data Policy (1/2)Data Policy (1/2)

The Data Distribution Policy is effective for the first two years

FORMOSAT-3/COSMIC data will be provided at no cost or at the cost of reproduction and distribution.

A “data use agreement” is required for the use of data and products.

Users will register through Taiwan (TACC) site.

The review and approval are to be made jointly by both NSPO and UCAR.

Page 28: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

28

Data Policy (2/2)Data Policy (2/2)

The neutral atmosphere data products will be distributed near real-time after processing to NESDIS which will distribute via the GTS to weather centers. All Data and Product are available each day for Science Research.The raw FORMOSAT-3/COSMIC data (e.g., GPS phase and amplitude data) will not be distributed in real time. Requests for the real-time raw data will be reviewed jointly by the NSPO Director General and the UCAR President. Some additional limitations may be placed on data products at the request of the specific Principal Investigator’s requiring data check-out times.

Page 29: FORMOSAT-3/COSMIC Program Status · 2005-08-22 · 3 System Architecture TT&C RGS MMC Domestic & Foreign Users CDAAC COSMIC Data Analysis and Archive Center (UCAR) U.S. Universities

29

ConclusionsConclusions

Satellite I&T are progressing well. Ground system upgrade is completed.Mission operation simulation and training are on-going.Launch vehicle development is on track.Range operation activities are being coordinated.Launch target date is March 2006

Launch slot finalization still needs coordination among all parties.


Recommended