Forte – Creating the World’s Tallest CLT Apartment Building

Date post: 27-Jan-2015
Category:
Upload: rethink-wood
View: 107 times
Download: 2 times
Share this document with a friend
Description:
This presentation from the first ever US CLT Symposium shares the process and key insights gained when designing the world’s tallest cross laminated timber apartment building. The building was 10 floors, 32.17 meters tall and consisted of 23 apartments. The Forte saved 1,451 tons of carbon, by choosing to design with wood over steel or concrete.
Popular Tags:
39
FORTÉ CREATING THE WORLD’S TALLEST CLT APARTMENT BUILDING © Lend Lease 2013
Transcript
  • 1. FORTCreating the worldstallest CLT apartmentbuilding Lend Lease 2013

2. Lend Lease Established in 1958 reating innovative and sustainableCEUROPE, MIDDLE East andproperty and infrastructure solutions AFRICA (EMEA) AMERICAS Operate in 4 key regions Australia, Asia, America and EMEAASIA Completed over 10,000 projects worldwide ertically integrated real estate solutionsV Australiabusiness operating in any market sector 3. Dick Dusseldorp,Lend Lease Founder 1973The time is not far off when companies will have to justify their worth to society, with greater emphasis being placed on environmental and societal impact than straight economics. 4. The WorldsTallest TimberApartmentBuilding First CLT building in Australia Targeting first 5 star green star residential(as built) First Lend Lease Australia project toincorporate pods High profile location 5. ModularBATHROOMS 6. FortVICTORIA HARBOURMELBOURNE cale: 10 floors, 23 apartmentsS uild Period:BStart on site: February 2012Begin CLT installation: June 2012C LT structure complete: Aug 2012Practical completion: December 2012 rchitect: Lend LeaseA LT supplier: KLHC 7. FORT by the numbers32.17m the worldsHIGH tallest timber apartment building5 expected to be thefirst residentialgreen building tostar achieve this485 759tonnes of CLT PANELStimber 8. FORT by the numbers34,550screws 5,500 angle brackets ON 25 Shipped in CONTAINERS2SHIPSLend lease Saving 1,451apprenticesuPskilled in newconstructiontechnique tonnes of carbon 9. FortSustainabilitystory 10. Fort Approach toSustainabilityObjectives: Step change in multi-story residential LT proof of conceptC Star Green Star As Built5Approach: Passive design Sustainable materials and embodied carbon Metering for long term data 11. Why is embodiedcarbon importantEmbodiedCarbonThe focusCradle to Gateon embodiedcarbon is As reductions in operationalcarbon are achieved,increasingembodied carbon is formingEnd of LifeGate to Site a higher percentage of abuildings overall co2 impactMaintenanceOnsiteOperationalCarbon Operations 12. FORT started Where itVictoria HarbourNorth Wharf 13. Why CrossLaminated Timber? Alternative solution forNorth Wharf. ommercialise sustainability.C Shorter construction times. Reduced tolerances facilitatingoff-site manufacture. 14. CLT FROm A DEVELOPERSperspectiveed prod16m Stable engineered product Highly mechanised production process3m Simplicity - basic assembly concepts Scale - large panel dimensions that suitmajor commercial construction Robust 15. Fortesachievements 0 Injuries Very clean, quiet siteSAFE Positive feedback from sub-contractors 2% less greenhouse gas emissions over 50 year life cycle 2 On track for 5 star Green Star As Built Sustainable Significant reduction in site waste Significantly reduced truck movements to site 30% reduction in pilingsLight Weight Ability to precisely position panels 4 month saving (30%) compared to concrete structureTime Savings & Bathroom PODs worked well with system Efficiencies Significant room for further improvements No spare panels requiredHigh Quality Precise tolerances demonstrated Ability to use as a high quality visual finish 16. Fort,ConceptDesign 17. st The Context Docklands 18. 2 EastThe Victoria Harbour MasterPlan Urban Design Objectives 19. ARCHITECTURALSolution 20. ILS -TYPICAL 21. DETAILS -BALUSTRADE 22. AL MAIN FACADEubond:Alubond:Architectural Aesthetics 3 rchitectural ABuildability Aesthetics 3 BuildabilitySustainability 3 SustainabilityDurability3 DurabilityMaintenance3 Maintenance 3 WarrantyWarranty 3 CostCostpports the business case?? 23. DETAILS ALUMINIUM Windows 24. ARCHITECTURALSolution 25. ARCHITECTURALSolution 26. ARCHITECTURALSolution 27. ARCHITECTURALSolution 28. Design PrOcess& Technical DetailingIt is a different design /construction process All design completed up front File to factory process 3D modelling in auto-CAD Installation sequencing, crane calculations Minimises waste, reduces onsite decisionmaking and errors 29. Fort Panelsequencingand erectionorder 30. Summary Design ExperienceLessons Procurement hat doesW Construction Experience our R&D tellus thus far? Industry Relations Consumer Market Reactions 31. Fort Proven speedsucCess Clean and safe factors Robust, high quality result Potential to be cost competitive Contractors love it Bankers and insurers get it ustomers areC not afraid of it 32. Thefuture 33. Dock Square Library,Melbourne 34. Dock Square Library,Melbourne 35. FREE OPEN AIR CINEMA:URBANIZED FRiday EVening22-23 February 2013 Victoria Harbour 807 Bourke Street, THE OFFICIAL LAUNCH OF FORT APARTMENTS, First public open for inspection.Urban market Open-air cinemaGreen transport displays VI Activities for kids on sustainabilityExpert speakers Join us at the Fort Living Festival for a celebration of a healthy, happy city lifestyle.FESTI VAL DOWNLOAD THE FULL EVENT PROGRAM AT www.forteliving.com.auLOGO LOGO 36. Questions?