STRUCTURE
The pavilion is composed o 50mm by 100mmlengths o sawn timber
which are supported at the base by a number o
steel rods mounted on metposts.
Two areas o seating placed at key areas act as a
base, giving the individual walls stability.
The two walls are tied together at the top to
brace against wind loads and to provide urther
stability.
Using only dry joints and xings the pavilion is
ully demountable.
7/27/2019 Fortify Assembly
4/17
4 Components and Tools
COMPONENTS AND TOOLS
7/27/2019 Fortify Assembly
5/17
5Components and Tools
x 15
x 15
x 650
x 18
x 32
x 32
x 32
2000mm +
1100mm +
750mm
300mm
25mm diameter
Acetal black rod
3 x 3 Connecting
block
3 x 24 Metal spike
Metpost
[47 x 100 x 750mm = 650pcs]
[47 x 100 x 300mm = 18pcs][47 x 100 x 1650mm = 4pcs]
[47 x 100 x 2000mm = 7pcs]
[47 x 100 x 1400mm = 1pc ]
[47 x 100 x 1250mm = 4pcs]
[47 x 100 x 1100mm = 1pc ]
[47 x 100 x 900mm = 1pc ]
[47 x 100 x 800mm = 1pc ][47 x 100 x 700mm = 18pcs ]
[47 x 100 x 1800mm = 1pc ]
[47 x 100 x 1850mm = 1pc ]
[47 x 100 x 1950mm = 1pc ]
[47 x 100 x 2050mm = 1pc ]
[47 x 100 x 2150mm = 1pc ]
[47 x 100 x 2200mm = 1pc ]
[47 x 100 x 2300mm = 1pc ]
[47 x 100 x 2350mm = 2pcs]
[47 x 100 x 2450mm = 1pc ]
[47 x 100 x 2500mm = 1pc ]
DETAILED COMPONENT
LIST
7/27/2019 Fortify Assembly
6/17
6 Assembly Guide
ASSEMBLY GUIDE
OFF-SITE COMPONENTS1- 50mm x 100mm sawn treated timber to be cut into diferent
types o typical blocks
50 x 100 x 750mm
50 x 100 x 300mm
50 x 100 x (700-2500mm)
2- 25mm Dia holes are drilled at some o the blocks
3- All the blocks are carried to the site (approx. 720pcs)
7/27/2019 Fortify Assembly
7/17
7Assembly Guide
ON-SITE CONSTRUCTION1- The position o the metpost are marked
according to the designcurve using the grid system
2- The 3 metposts are tap 24 into the ground
3- 3 x 3 connecting blocks are inserted into
the metposts
4 - 500mm Acetal black rods are mounted
through the connecting blocks
5- Slot the holed timber blocks through the
metal poles in an
arrangement o brick laying method
6- Timber blocks above 500mm height are
xed together by screws
7- Timber strips are xed across the walls
7/27/2019 Fortify Assembly
8/17
8 Assembly Guide
1 2
3
4
Base Detail
7/27/2019 Fortify Assembly
9/17
9Assembly Guide
5 2
4
7/27/2019 Fortify Assembly
10/17
10 Assembly Guide
6
7
7/27/2019 Fortify Assembly
11/17
11Assembly GuideSequence of Assembly
1
7/27/2019 Fortify Assembly
12/17
12 Assembly Guide
2
7/27/2019 Fortify Assembly
13/17
13Assembly Guide
3
7/27/2019 Fortify Assembly
14/17
14 Assembly Guide
4
7/27/2019 Fortify Assembly
15/17
15Assembly Guide
5
7/27/2019 Fortify Assembly
16/17
16
Component Supplier Dimension Quantity Price () Cost ()
Sawn Treated Timber laveronline.co.uk 47mm X 100mm X 4800mm 145 8.71 1263
Acetal black rod http://directplasticsonline.co.uk/ 25mm Dia X 500mm H 32 3.94 126
Metal Spike metpost https://www.shaweldtimber.co.uk/ 3 x 24 32 5.07 163
Connecting blocks http://www.ebay.co.uk/ 3 x 3 2 2.95 5.9
Connecting screws http://www.toolstation.com/ 6mm Dia x 150mm 10 7.27 72.7
Services 100
COSTING
TOTAL COST: approx. 1750
7/27/2019 Fortify Assembly