+ All Categories
Home > Documents > FP 420 Brainstorm on Mechanics. Hamburg 18/5/06

FP 420 Brainstorm on Mechanics. Hamburg 18/5/06

Date post: 06-Jan-2016
Category:
Upload: roana
View: 32 times
Download: 0 times
Share this document with a friend
Description:
FP 420 Brainstorm on Mechanics. Hamburg 18/5/06. FP 420 Connection Cryostat Design Keith Potter, Shrikant Pattalwar, Benoit Florin, Thierry Renaglia, Thierry Colombet, Domenico Dattola. Connection Cryostat V4. - PowerPoint PPT Presentation
15
FP 420 Hamburg -Brainstorm on mechanics- 18/05/06 1 D. D. INFN To/CERN PH CMM FP 420 Brainstorm on Mechanics. Hamburg 18/5/06 FP 420 Connection Cryostat Design Keith Potter, Shrikant Pattalwar, Benoit Florin, Thierry Renaglia, Thierry Colombet, Domenico Dattola
Transcript
Page 1: FP 420 Brainstorm on Mechanics. Hamburg 18/5/06

FP 420 Hamburg -Brainstorm on mechanics- 18/05/06 1D. D. INFN To/CERN PH CMM

FP 420 Brainstorm on Mechanics. Hamburg 18/5/06

FP 420 Connection Cryostat DesignKeith Potter, Shrikant Pattalwar, Benoit Florin, Thierry Renaglia,

Thierry Colombet, Domenico Dattola

Page 2: FP 420 Brainstorm on Mechanics. Hamburg 18/5/06

FP 420 Hamburg -Brainstorm on mechanics- 18/05/06 2D. D. INFN To/CERN PH CMM

Connection Cryostat V4.

With respect to the previous version presented during the past meeting, the dimension of slots has been increased; only 2 slots of 4 m each one ,connected together by a passage of 500x 250 in the central region.

Page 3: FP 420 Brainstorm on Mechanics. Hamburg 18/5/06

FP 420 Hamburg -Brainstorm on mechanics- 18/05/06 3D. D. INFN To/CERN PH CMM

Collecting all continuity line on top of beam pipe. (option 4)

The liquid helium level necessary to keep the bus bars fully dipped is higher than the

level in the dipole cryostat. The size of the thermal shield (50-80K) surrounding the above cold mass works out to be large and will come in the way of beam pipe.

(dia ~ 420 mm)

Page 4: FP 420 Brainstorm on Mechanics. Hamburg 18/5/06

FP 420 Hamburg -Brainstorm on mechanics- 18/05/06 4D. D. INFN To/CERN PH CMM

Move all on bottom side except line X (option 5)

This option appears to be enough space for detector mounting, is confined within the boundaries of the existing interconnection cryostat and meets all the cryogenic requirement defined by the CERN design criteria.

Page 5: FP 420 Brainstorm on Mechanics. Hamburg 18/5/06

FP 420 Hamburg -Brainstorm on mechanics- 18/05/06 5D. D. INFN To/CERN PH CMM

DFP Arc Termination Module (ATM) in LHC

Page 6: FP 420 Brainstorm on Mechanics. Hamburg 18/5/06

FP 420 Hamburg -Brainstorm on mechanics- 18/05/06 6D. D. INFN To/CERN PH CMM

Distribution Feed Boxes (DFB) with ATM Internal layout

Page 7: FP 420 Brainstorm on Mechanics. Hamburg 18/5/06

FP 420 Hamburg -Brainstorm on mechanics- 18/05/06 7D. D. INFN To/CERN PH CMM

ATM DFB interface I

Page 8: FP 420 Brainstorm on Mechanics. Hamburg 18/5/06

FP 420 Hamburg -Brainstorm on mechanics- 18/05/06 8D. D. INFN To/CERN PH CMM

ATM DFB interface II

Page 9: FP 420 Brainstorm on Mechanics. Hamburg 18/5/06

FP 420 Hamburg -Brainstorm on mechanics- 18/05/06 9D. D. INFN To/CERN PH CMM

ATM DFB interface III

Page 10: FP 420 Brainstorm on Mechanics. Hamburg 18/5/06

FP 420 Hamburg -Brainstorm on mechanics- 18/05/06 10D. D. INFN To/CERN PH CMM

ATM Distribution Feed Boxes interface. IV

Page 11: FP 420 Brainstorm on Mechanics. Hamburg 18/5/06

FP 420 Hamburg -Brainstorm on mechanics- 18/05/06 11D. D. INFN To/CERN PH CMM

Assembly Connection Cryostat ATM, B-Bar lines, line X

Page 12: FP 420 Brainstorm on Mechanics. Hamburg 18/5/06

FP 420 Hamburg -Brainstorm on mechanics- 18/05/06 12D. D. INFN To/CERN PH CMM

Tunnel layout

Page 13: FP 420 Brainstorm on Mechanics. Hamburg 18/5/06

FP 420 Hamburg -Brainstorm on mechanics- 18/05/06 13D. D. INFN To/CERN PH CMM

X line position I

X line does not exist on the current Arc Termination Module.

Adding this line on the existing ATM design seems not problematic.

Keeping this line on the same position as on magnets, detector accessibility is limited from top side.

Page 14: FP 420 Brainstorm on Mechanics. Hamburg 18/5/06

FP 420 Hamburg -Brainstorm on mechanics- 18/05/06 14D. D. INFN To/CERN PH CMM

Xline pos II

This option allow a good detector accessibility.

Page 15: FP 420 Brainstorm on Mechanics. Hamburg 18/5/06

FP 420 Hamburg -Brainstorm on mechanics- 18/05/06 15D. D. INFN To/CERN PH CMM

Next steps (technical)

There are many technical issues to be resolved, some major once are listed below…• Whether the system can be designed in 3-4 different parts (the two ends and the middle section) and assembled in the tunnel during installation or should be assembled as a single 12 m large unit in line with the existing assembly process. • In either of the cases a support structure needs to be worked out.

( A single large module is preferred)•Whether the detectors will be mounted independently of the cryostat or the cryostat will have to provide the necessary support.• How to provide the ‘cold’ to the thermal shields surrounding the line X in the upper region. We will have to design some interconnections in the end sections to achieve this. • Defining the material of various components of the new design…


Recommended