FP6 Contractual issues. PRESENTATION OUTLINE. Participation Contract structure Collective Approach signature and entry into force collective Responsibility consortium Agreement Provisions of general conditions, special reference to: financial provisions controls and sanctions. - PowerPoint PPT Presentation
35
RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-20021 Not legally binding FP6 Contractual issues
Transcript
Page 1: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-20021

Not legally binding

FP6

Contractual issues

Page 2: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-20022

Not legally binding

PRESENTATION OUTLINE Participation

Contract structure

Collective Approach

– signature and entry into force– collective Responsibility– consortium Agreement

Provisions of general conditions, special reference to:

– financial provisions– controls and sanctions

Page 3: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-20023

Not legally binding

General Principles

● Reflect requirement of the Legal Framerwork

● Simplification

- No different categories of contractors

- Reduction of the number of contracts

● Collective approach

● Greater flexibility

- the Work Programme may adjust Rules

- flexibility in the composition and changes to consortium

● Greater autonomy for participants

Page 4: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-20024

Not legally binding

Participation New Every legal entity that contributes to the project

General Rule: Participant = contractor

Every legal entity contributing to a project must have a contractual link with the Community

Exceptional cases: subject to very restrictive rules– Third parties identified in Annex I– Subcontractors

Page 5: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-20025

Not legally binding

ParticipationThird parties identified in Annex I

● In most of the cases they do not participate, they simply make their resources available to a

contractor, this is not a case of participation but only a question of eligibility of the cost of these resources

● In exceptional cases: “participation” of members of entities (such as EEIG, SMEs Associations) :

- their members can do some of the work on the project even though they are third parties- contractor and third parties must have a previous agreement, normally the constitution- the third parties, the agreement and the tasks must be identified in Annex I

Page 6: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-20026

Not legally binding

Participation

Subcontracting (1)

● Contractors shall ensure that the work to be performed can be carried out by them.

● Exception: where it is necessary to subcontract certain elements of the work, this should be clearly identified in Annex I.

● Management activities should not be subcontracted

● Minor services may be subcontracted: - which do not represent core elements of the project- which cannot be directly assumed by contractors- where necessary for the performance of the project

Page 7: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-20027

Not legally binding

Participation

Subcontracting (2)

● Consequences :

● Costs must be awarded to the bid offering best value for money (best price-quality ratio) (no more

competitive tender)

● Responsibility of the contractor who enters in subcontract

● The IPR belong to the contractor

Page 8: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-20028

Not legally binding

Contract Structure

●Core contract (standard with specifics of project and special clauses) new version 23 Octobre 2003

●Annex I (technical tasks - the “project”)

●Annex II General Conditions(applicable to every

instrument)

●Annex III Instrument specific provisions (specific to instrument - 5)

Page 9: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-20029

Not legally binding

Contract Structure

● Annex IV - Form AConsent of contractors identified in the core-contract (article 1.2) to accede to the contract. To be signed by the contractor concerned and by the coordinator.

● Annex V - Form BAccession of new legal entities to the contract. To be signed by the new contractor concerned and by the coordinator

● Annex VI - Form CFinancial statement per activity. Specific to each Instrument and/or type of action. To be filled periodically by each contractor

Page 10: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200210

Not legally binding

Signature and entry into force(1)

●Contractual link of all contractors with the Commission (Form A signed by authorised legal representative of the contractor identified in contract, if change form A accompanied by new CPF identifying the new legal representative or letter indicating that other person is also legal representative)

● New Contract enters into force upon signature of coordinator and the Commission. Coordinator must ensure other contractors sign within delays (30/45/60 days)

Page 11: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200211

Not legally binding

Signature and entry into force (2)

●Distribution of pre-financing to coordinator : within 45 days of : date of entry into force of contract/date of signature of minimum number of participants/date of signature of last contractor

●Distribution of pre-financing to contractors : not before minimum number of contractors have acceded to the contract

●Project begins in the date established in the contract (this can be before the contract enters into force but usually later)

Page 12: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200212

Not legally binding

LIABILITY (1)

● New : Collective responsibility of contractors

● Mechanism by which a contractor may be held liable, technically and/or financially, fully or partially, for the action of another contractor

● Consequence of FP6 principle of « autonomy of the consortium » : if the money is granted to the consortium, which decides on its allocation, then consortium as a whole is held liable.

Page 13: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200213

Not legally binding

LIABILITY (2) ● Implementation: applied as a last resort- Breach of contract- Depending on the nature of the breach, the

consortium will be invited to find the appropriate solution (technical responsibility)

- If no solution is found, the defaulting contractor is excluded and the consortium is requested to continue the project (technical responsibility with financial consequences)

- If the consortium refuses to perform:- 1 - the contract is terminated- 2 - the consortium is requested to reimburse money

owed by the defaulting contractor (collective financial responsibility)

Page 14: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200214

Not legally binding

LIABILITY (3)● Implementation: limitations- Limited in proportion to the participant’s share of

costs in the project, up to the total payment they are entitled to receive

- IOs, public bodies or entities guaranteed by MS/AS solely responsible for their own debts

- Exceptions for specific actions for SME’s, fellowships, duly justified cases of specific support actions

- Without prejudice to civil and criminal actions to be launched against the defaulting contractor

Page 15: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200215

Not legally binding

Consortium agreement General principles

●Regulates internal organisation and management of consortium (Mandatory for IP and NoE)

●New Compulsory unless otherwise mentioned in the call for proposal

●Between contractors - NOT signed nor approved by the Commission

●Non binding guidelines provided by the Commission

Page 16: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200216

Not legally binding

Consortium agreementManagement of the

consortium● Distribution of funds paid to the consortium (via the

coordinator) ● No automatic pre-allocation of the funds among contractors :

allocation of funds among contractors to be decided by the consortium (via the consortium agreement )

● Evolution of the project● Organisation of work to be carried out (sub-projects)● Reports presented and submitted by the consortium (via the

coordinator)● Decision-making process● Evolution of the consortium’ composition (modification)

Page 17: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200217

Not legally binding

Amendments● Art.10 of Core Contract & Art.8 of Annex II● Request in writing● New at the request of the coordinator, deemed to act on behalf

of the consortium● New Tacit amendments with implicit agreement of the

Commission within 6 weeks only for modification and evolution of the consortium and for technical reports

● New in IP/NoE, enlargement of the consortium to new contractors and new activities may be foreseen. This enlargement follows a competitive call launched by the consortium with evaluation of proposals by external experts

Page 18: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200218

Not legally binding

Financing

Grant for integration

Grant to the budget

Flat-rate

Networks of excellence

Integrated Projects

Specific targeted research projects

Specific research projects for SMEs

Integrated initiatives relating to infrastructure

Actions to promote human resources & mobility

Coordination actions

Specific support actions

Page 19: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200219

Not legally binding

Financial ProvisionsGrant for integration (NoE)

● New mechanism● Calculation basis: number of

researchers to be integrated

not as a %age of the budget for the JPA● Payment basis: completion of the JPA

+ costs certificates mentioning that the costs incurred are greater than the grant itself

Page 20: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200220

Not legally binding

Financial Provisions

Grant to the budget ● Calculation basis: %age of the preliminary

budget of the execution plan ● Payment basis: covers a share of the

expenditure incurred, necessary for the execution of the indirect action

● %age depends on: type of activity participant involved (cost models)

Page 21: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200221

Not legally binding

Financing: cost reporting models

● FC: actual direct and indirect costs

● New FCF (variant of FC): actual direct costs + flat rate for indirect costs (20% of total actual direct costs, except costs of subcontracts - all instruments)

● AC: actual additional direct costs + flat rate for indirect costs (20% of total actual additional direct costs, except costs of subcontracts)

Page 22: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200222

Not legally binding

Financing: cost reporting models

General Rule: a legal entity applies the same cost model in ALL contracts established under FP6 except may move from AC to FCF/FC or from FCF to FC (“one way ticket”)

Costmodel

Who can use it ?

FC - All legal entitiesFCF - Non-commercial or non-profit organisations

- International organisations- Small or Medium-Sized Enterprises (SMEs)

AC - Obligatory for physical persons- Non-commercial or non-profit organisationsor international organisations not having anaccounting system allowing them to distinguishthe share of their direct and indirect costs tothe project

Page 23: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200223

Not legally binding

FinancingType of activity

Research and technological development (including innovation related activity)

Demonstration

Training

Other specific support activities

New Consortium Management : costs reimbursed up to 100% within the limit of 7% of Community

contribution (AC contractors apply FCF)

Page 24: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200224

Not legally binding

Financial Provisions Identification of costs

● New No cost categories but list of ineligible costs ● To be eligible costs must be :

actual, economic and necessary for the project incurred during the duration of the project

(exception : costs of final reports)recorded in the accounts of the contractor (or third

parties) and must exclude indirect taxes, duties, interests, costs reimbursed in respect of another Community project

follow contractors own accounting rulesNot give rise to profit

● Audit certificates by external auditor (For public bodies - competent public auditor)

Page 25: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200225

Not legally binding

FinancingReceipts

● Three kinds of receipts must be taken into consideration in order to avoid any possibility of profit:

Financial transfers or their equivalent to the contractor from third parties ;

Contributions in kind from third parties;

Income generated by the project.

● In the first two cases (financial transfers or contributions in kind), these endowments are considered as receipts of the project if the third party has provided them specifically to be used in the project.

If, on the other hand, these endowments are at the discretion of the contractor they are not to be considered as receipts.

Page 26: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200226

Not legally binding

FinancingReceipts

● In the first two cases, where contributions from third parties are used for the project by the contractor, the latter is required to inform the third party of this use and in accordance with the national legislation or practice in force.

● In the case of income generated by the project itself:

- General rule: any income generated by the project itself, including the sale of assets bought for the project, are considered as income to the project (receipts)

- Derogation: income generated by the use of the knowledge resulting from the project is not considered as a receipt

Page 27: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200227

Not legally binding

Financing Reporting periods

(12 months for IP and NoE) The consortium will submit the following reports to the

Commission( within 45 days after the end of each reporting period) :

a periodic activity report● a periodic management report (justification of resources/Form

C/summary financial report)● a report on the distribution between contractors● supplementary reports required by Annex to this contract● an audit certificate when (certification of costs incurred in

corresponding period)

Page 28: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200228

Not legally binding

FinancingAudit certificates

Article II.26 each contractor shall provide an audit certificate

prepared and certified by an external auditor for public bodies - competent public officer for each period for which an audit certificate is required:

Article 7an audit certificate must be provided by each contractor

requesting a Community financial contribution exceeding 750.000€.

every 12 months for IP/NoE: Annex III (based on the reporting period)

Page 29: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200229

Not legally binding

Financing Payment Modalities

● Initial pre-financing (Pre-financing for each period and 6 month of next period)

● Periodic payment (base on consumption of pre-financing)● Periodic pre-financing (based on the applicable

periodicity) ● The Community financial contribution is paid to the

coordinator on behalf of the contractors: the consortium decides on the allocation of each tranche of its between the contractors (consortium agreement)

Page 30: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200230

Not legally binding

Payments and reporting schedule for a STREP, CA or SSA

(example of a 3 year contract)Final activity report

Reported costs + audit certificate (mandatory)

Final payment

Periodic activity report (mid-term review : optional)

Reported costs+ (audit certificate if required)

Intermediate pre-financing and/or

paymentNB: impact on the total pre-financing

Detailed work plan

Initial advance

0 6 12 14 18 20 24 26 30 36 38

Months

Page 31: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200231

Not legally binding

Payments and reporting schedule for an IP

(example of a 4 year contract)

Activity report

Reported costs

Activity report Detailed work plan

Reported costs Adjusted advance

Activity report Detailed work plan

Reported costs Adjusted advance

Activity report

Reported costs

Detailed work plan

Adjusted advance

Detailed work plan

Initial advance

0 6 12 18 24 30 36 42 48

Months

Page 32: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200232

Not legally binding

Controls and Audits

Objective to reinforce ex-post controls

● To simplify and streamline ex-ante controls

● As a counterbalance to increased autonomy for participants

Page 33: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200233

Not legally binding

Controls and Audits● Reports - Periodic activity and financial reports

- Supplementary reports if foreseen (in Annex I or III)

● Audit certificates

● Monitoring by Commission with external experts

● Scientific, technological, and financial audits

● Ethical audits

Page 34: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200234

Not legally binding

Sanctions

● Financial irregularity: exclusion criterion

● Recovery decisions (art. 256 EC Treaty)

● Other sanctions in contracts (overclaims)

Page 35: FP6 Contractual issues

RTD-A.3 Legal Unit - Participation rules and contracts 2002-2006 ROME 01-12-200235

Not legally binding

For more information Legal framework within FP6

– Model contract : http://europa.eu.int/comm/research/fp6/working-groups/model-contract/index_en.html

Approved core contract and annex II Approved annex III Consortium checklist, financial guidelines, Form A- accession to

the contract

Helpdesk– http://www.ipr-helpdesk.org– [email protected]

General information on FP6– http://europa.eu.int/comm/research/fp6/index_en.html


Recommended