FRACMOO 2 Working Group August 2, 2017
Transcript
Page 1: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

FRACMOO 2 Working Group

August 2, 2017

Page 2: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

Agenda

Time Item Presenter10:00-10:10 Introduction Greg Cook10:10-11:00 Operational Needs Assessment Clyde Loutan and ISO

Operations11:00-11:30 Proposed Framework for CAISO

Flexible Capacity Procurement Hannes Pfeifenberger, The Brattle Group

11:30-11:55 Flexibility Metrics and Future Considerations

Karl Meeusen

11:55-12:00 Next Steps Kim Perez

Page 2

Page 3: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

IntroductionGreg Cook – Director, Markets and Infrastructure Policy

Page 4: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

Based on stakeholder feedback, the ISO is reframing the flexible capacity initiative.

Page 4

• Broad opposition to previous ISO flexible capacity proposal, including

– Concern about conflating three separate drivers• Renewable curtailments• Risk of retirements• Operational needs

– Expressed need to take additional time to vet durable solution

– Expressed need to include intertie resources

• CAISO is resetting the effort

Page 5: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

Path forward

Page 5

• Re-focus CAISO efforts on developing flexible capacity requirements aligned with operational needs – Develop an analytical approach to supporting proposed solutions

• Draft Final Proposal planned by end of the year– Provide proposal for CPUC consideration – Target implementation for 2020 RA compliance year

• Bring resulting policy to ISO Board summer 2018

Page 6: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

Today’s focus

• What are the operational challenges facing the ISO?

• Where is the current 3-hour max net load ramp based requirement falling short?

• What changes are needed to the current flexible capacity product?

• What is the right framework for informing and assessing flexible capacity procurement needs?

Page 6

Page 7: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

Operational Needs AssessmentClyde Loutan – Principal, Renewable Energy Integration

Page 8: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

Solar production varies from one day to the next ---One week in March 2017

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00

Mar 22 Mar 23 Mar 24 Mar 25 Mar 26 Mar 27 Mar 28 Average

AverageMW

Page 8

Page 9: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

Wind production varies from one day to the next ---One week in March 2017

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

Mar 22 Mar 23 Mar 24 Mar 25 Mar 26 Mar 27 Mar 28 Average

Average

Page 9

Page 10: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

Net Load varies from one day to the next ---One week in March 2017

10,000

12,000

14,000

16,000

18,000

20,000

22,000

24,000

26,000

Mar 22 Mar 23 Mar 24 Mar 25 Mar 26 Mar 27 Mar 28 Average

Page 10

Page 11: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

The assessment of a Balancing Authority control performance is based on the following components• Balancing Authority Ace Limit (BAAL) - is a real-time measure of area

control error and system frequency which cannot exceed predefined limits for more than 30-minutes

• Control Performance Standard (CPS1) - measures how well a BA’s ACE performs in conjunction with the frequency error of the Interconnection

• Disturbance Control Standard (DCS) - is the responsibility of a BA to recover its ACE to zero if its ACE just prior to the disturbance was greater than zero or to its pre-disturbance level if ACE was less than zero within 15 minutes

• Frequency Response

– All BAs to support the interconnection frequency within 52 seconds following a disturbance greater than 500 MW anywhere within the interconnection

CPS1 Pass ≥ 100% over rolling 12 months

BAALLimit ≤ 30 minutes

DCS = 100%

Page 11

Page 12: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

3-hour ramps increase over time with build out of renewables and addition of behind-the-meter resources

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec2016 (Actual) 9,687 10,891 9,828 8,397 9,263 7,669 7,214 7,463 10,030 10,228 11,375 12,9602017 11,342 12,465 11,253 9,973 10,878 8,996 8,379 8,768 11,575 11,900 12,391 14,0042018 12,282 13,313 12,352 11,111 11,803 10,039 9,326 9,617 12,660 12,954 13,376 14,5672019 13,595 14,543 13,574 12,672 12,631 11,350 10,616 10,982 13,981 14,199 14,553 15,4952020 15,439 15,984 15,089 14,572 13,859 13,181 12,391 12,821 16,061 16,169 16,293 16,817

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

18,000

MW

Monthly 3-Hour Upward Ramps

Page 12

Page 13: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

3-hour flex capacity is important but is insufficient to meet all flexible ramping needs going forward, additional speed is needed

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov DecAct. 1Hr_Up_Ramp 4,144 4,929 4,260 3,870 3,585 3,265 2,688 3,118 4,453 4,889 5,512 5,676Act. 3Hr_Up_Ramp 9,687 10,891 9,828 8,397 8,411 7,669 7,214 7,463 10,030 10,228 11,375 12,960

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

MW

Actual 1-Hour & 3-Hour Upward Monthly Ramps --- 2016

Monthly 1-hour upward ramp could be about 50% of the 3-hour upward ramps

Page 13

Page 14: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

Intra-hour upward ramping needs for 2016

1 2 3 4 5 6 7 8 9 10 11 12Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938 3,101Act. 10min_Up_Ramp 1,158 1,286 1,257 1,342 1,287 1,159 809 1,089 1,253 1,310 1,357 1,181Act. 5min_Up_Ramp 695 786 775 947 781 868 608 941 964 852 834 670

0

500

1,000

1,500

2,000

2,500

3,000

3,500

MW

Actual Intra-Hour Upward Monthly Ramps --- 2016

Page 14

Page 15: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

Actual monthly 1-hour and 3-hour downward ramps for 2016 were greater during the summer months

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov DecAct. 3Hr_Dn_Ramp -6,899 -7,681 -7,365 -7,677 -8,382 -10,63 -10,83 -10,95 -10,31 -7,327 -7,705 -8,028Act 1Hr_Dn_Ramp -3,355 -3,917 -3,537 -3,774 -3,387 -4,070 -4,265 -4,089 -3,915 -4,035 -5,274 -4,560

-12,000

-10,000

-8,000

-6,000

-4,000

-2,000

0

MW

Actual 1-Hour & 3-Hour Downward Monthly Ramps --- 2016

Page 15

Page 16: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

Intra-hour downward ramping needs for 2016

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov DecAct 30min_Dn_Ramp -1,724 -2,204 -2,087 -1,990 -1,927 -2,247 -2,189 -2,111 -2,113 -2,142 -2,177 -2,155Act 10min_Dn_Ramp -869 -1,023 -1,128 -1,097 -1,013 -924 -922 -822 -823 -954 -1,181 -1,202Act 5min_Dn_Ramp -843 -671 -895 -945 -798 -753 -598 -697 -560 -836 -890 -1,111

-2,500

-2,000

-1,500

-1,000

-500

0

MW

Actual Intra-Hour Downward Monthly Ramps --- 2016

Page 16

Page 17: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

Controlling CPS1 scores has been a recurring operational challenge – data from Jan to April 2017

10,000

12,000

14,000

16,000

18,000

20,000

22,000

24,000

26,000

28,000

30,000

0%

20%

40%

60%

80%

100%

120%

140%

160%

180%

200%

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Ne

t L

oa

d (

MW

)

CP

S1

(%

)

January, 2017 --- CPS1 (116.9%) Hourly Average vs. Net Load & Solar Production

CPS1>=100% CPS1<100% CPS1=100% Net Load

10,000

12,000

14,000

16,000

18,000

20,000

22,000

24,000

26,000

28,000

0%

20%

40%

60%

80%

100%

120%

140%

160%

180%

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Ne

t L

oa

d (

MW

)

CP

S1

(%

)

February, 2017 --- CPS1 (107.8%) Hourly Average vs. Net Load & Solar Production

CPS1>=100% CPS1<100% CPS1=100% Net Load

10,000

12,000

14,000

16,000

18,000

20,000

22,000

24,000

26,000

28,000

0%

20%

40%

60%

80%

100%

120%

140%

160%

180%

200%

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Ne

t L

oa

d (

MW

)

CP

S1

(%

)

March, 2017 --- CPS1 (112.3%) Hourly Average vs. Net Load & Solar Production

CPS1>=100% CPS1<100% CPS1=100% Net Load

10,000

12,000

14,000

16,000

18,000

20,000

22,000

24,000

26,000

-50%

0%

50%

100%

150%

200%

250%

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Net L

oad

(MW

)

CPS

1 (%

)

April, 2017 --- CPS1 (115.4%) Hourly Average vs. Net Load & Solar Production

CPS1>=100% CPS1<100% CPS1=100% Net Load

Page 17

Page 18: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

16,000

18,000

20,000

22,000

24,000

26,000

-1000%

-800%

-600%

-400%

-200%

0%

200%

400%

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Net

Loa

d (M

W)

Hou

rly

CP

S1

(%)

Hourly CPS1 vs. Net Load --- 01/31/2016

CPS1>=100% CPS1<100% CPS_pass Net Load

At certain times, ISO has persistent challenge balancing real-time supply and demand

ISO supports the Western Grid whenthe blue bars are above 100% (green line)

ISO leans on other BAs when thered bars are less than 100%

PerformanceTarget

Page 18

Page 19: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

Intra-hour variability and uncertainty can result in inability to control the interconnection frequency in real-time

CPS1 is evaluated on a rolling 12-month average. Over the past few years, the rolling average has been declining as a result of some poor daily performances. Thus, the CAISO needs to take measures to improve daily performance on days with higher variability.

-1000%

-800%

-600%

-400%

-200%

0%

200%

400%

0

500

1,000

1,500

2,000

2,500

3,000

3,500

Hou

rly C

PS

1 (%

)

Win

d/S

olar

(M

W)

Wind/Solar vs. CPS1 --- 01/31/2016

CPS1<100% CPS1>=100% Wind Solar CPS1 (Pass)

Page 19

Page 20: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

59.92

59.94

59.96

59.98

60

60.02

60.04

60.06

-400

-300

-200

-100

0

100

200

300

400

500

600

Freq

uenc

y (H

z)

AC

E (M

W)

ACE vs. Frequency --- March 6, 2017

ACE ACE_zero Actual Frequency Scheduled_Frequency

Interplay between supply and demand impacts ability of the fleet to meet ramps - March 6, 2017 (Weekday)

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

10,000

12,000

14,000

16,000

18,000

20,000

22,000

24,000

26,000

28,000

30,000

Win

d &

Sol

ar (M

W)

Load

& N

et L

oad

(MW

)

Load, Wind,Solar & Net-Load ---March 6, 2017

Load Net_Load Wind Solar

Load Solar Net LoadSunrise Ramp

Rate (MW/Min)

7:00 – 10:00

-6 31 -37

MW Change -1,023 5,529 -6,724Sunset Ramp

Rate (MW/Min)

16:00 – 19:00

27 -37 61

MW Change 4,801 -6,703 11,049

10,00012,00014,00016,00018,00020,00022,00024,00026,00028,000

-200%

-100%

0%

100%

200%

300%

400%

500%

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Ne

t L

oa

d (

MW

)

Ho

url

y C

PS

1

(%)

Hourly CPS1 vs. Net Load --- 03/06/2017

CPS1>=100% CPS1<100% CPS_pass Net Load

Page 20

Page 21: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

Interplay between supply and demand impacts ability of the fleet to meet ramps - March 26, 2017 (Weekend)

Load Solar Net LoadSunrise Ramp

Rate (MW/Min)

7:00 – 10:00

9 44 -30

MW Change 1,612 7,947 -5,489Sunset Ramp

Rate (MW/Min)

16:00 – 19:00

16 -37 54

MW Change 2,908 -6,575 9,663

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

10,000

12,000

14,000

16,000

18,000

20,000

22,000

24,000

26,000

28,000

Win

d &

Sol

ar (M

W)

Load

& N

et L

oad

(MW

)

Load, Wind,Solar & Net-Load --- March 26, 2017

Load Net_Load Wind Solar

10,000

12,000

14,000

16,000

18,000

20,000

22,000

24,000

-500%

-400%

-300%

-200%

-100%

0%

100%

200%

300%

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Ne

t L

oa

d (

MW

)

Ho

url

y C

PS

1

(%)

Hourly CPS1 vs. Net Load --- 03/26/2017

CPS1>=100% CPS1<100% CPS_pass Net Load

59.88

59.9

59.92

59.94

59.96

59.98

60

60.02

60.04

60.06

-1000

-800

-600

-400

-200

0

200

400

600

800

1000

Freq

uenc

y (H

z)

AC

E (M

W)

ACE vs. Frequency --- March 26, 2017

ACE ACE_zero Actual Frequency Scheduled_Frequency

Page 21

Page 22: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

Proposed Framework for CAISO Flexible Capacity Procurement

Johannes Pfeifenberger - Principal The Brattle Group

Page 23: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

Future Direction of FRACMOO 2Karl Meeusen, Ph.D. – Senior Advisor, Infrastructure and Regulatory Policy

Page 24: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

Recap of our data analysis

1. The origin of several operational challenges

2. The three hour ramp is still important but it is not capable of serving our full operational needs

3. Implications of not having sufficient flexibility is leading to operational challenges

Page 24

Page 25: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

Flexible capacity needs are a function of both predictable and unpredictable factors

Uncertainty and Variability• Day-Ahead to Real-Time

markets

• Hourly to Fifteen Minute Market

• FMM to five minute dispatch

• Regulation

Ramping Needs• Three hour

• One hour

• Intra-hour

• Fifteen minute

Page 25

Page 26: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

Example of day-ahead versus real-time uncertainty

-500

0

500

1000

1500

2000

2500

3000

3500

4000

4500

7/18

/201

5 1:

057/

18/2

015

2:05

7/18

/201

5 3:

057/

18/2

015

4:05

7/18

/201

5 5:

057/

18/2

015

6:05

7/18

/201

5 7:

057/

18/2

015

8:05

7/18

/201

5 9:

057/

18/2

015

10:0

57/

18/2

015

11:0

57/

18/2

015

12:0

57/

18/2

015

13:0

57/

18/2

015

14:0

57/

18/2

015

15:0

57/

18/2

015

16:0

57/

18/2

015

17:0

57/

18/2

015

18:0

57/

18/2

015

19:0

57/

18/2

015

20:0

57/

18/2

015

21:0

57/

18/2

015

22:0

57/

18/2

015

23:0

57/

19/2

015

0:05

Sola

r Pr

oduc

tion

(MW

)

Day-ahead forecast

30-minutes ahead forecast

10-minutes ahead Forecast

Actual

Page 26

Page 27: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

Suggestions we’ve heard from stakeholders

• Total bids and self-schedules by hour– Categorized by resource type– Categorized by RA and non-RA resources– Categorized by flexible RA and system RA resources

• Total bids and self-schedules of renewable resources by hour, categorized by resource online date

• In actual operations, is the CAISO exhausting resources capable of addressing intra-hour variability?

• To what extent does the CAISO rely on regulation to address intra-hour variability?

• Are resources that provide regulation typically procured and shown as generic or flexible RA?

Page 27

Page 28: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

Need to rethink flexible vs. inflexible capacity while focusing on the core principles of operational needs, economic bidding, and environmental objectives.

Capa

city

(MW

)

Time

• Inflexible - resources that elect to not provide economic bids

• Flexible – resources that submit economic bids

• Redefine net load as load minus inflexible capacity

• Develop forecasted load and net load curves

• Flexible capacity covers the difference between gross load and inflexible capacity

Forecasted Minimum Net Load

Forecasted Maximum Gross Load

Page 28

Page 29: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

CAISO is looking to develop shorter duration products to address operational needs created by uncertainty

• In addition to the existing three hour product, Flexible RA products should address one-hour and intra-hour net load ramps

• Products to address uncertainty and variability:– Day-ahead to real-time– One-hour uncertainty– 15-minute– 5-minute

• Resource counting rules and must offer-obligations must fit operational needs, e.g. provide the needed ramp capability.

• Provide opportunities for both internal and external resources to support flexible needs of the grid

Page 29

Page 30: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

A new RA assessment methodology is needed to evaluate the interaction of the fleet to meet the needs of the transforming grid

• Ensure there is sufficient capacity & energy 8760 hrs/yr

• Satisfy all operational needs all hours of the year

• Consider the interactions of the RA fleet and its attributes across the year

• Properly account for resource use-limitations in the context of the transforming grid

Page 30

Page 31: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

The ISO is taking a holistic, operationally-focused approach to address its flexibility needs, including what ISO market enhancements are needed

• RA enhancements and market design/process enhancements are needed to help the CAISO manage ramping needs, variability, and uncertainty

– IFM-RUC integration

– 15-minute IFM schedules

– Expanding STUC outlook horizon

Page 31

Page 32: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

ISO is targeting the end of 2017 to complete its policy development, but additional coordination is needed.

• Stakeholder comments on proposed metrics by mid-August

• Stakeholder meeting on findings of proposed metrics in September

• Revised FRACMOO2 proposal targeted for mid-October

• Draft final proposal targeted for December

• Collaborate with LRA’s for target implementation for 2020 RA year

• CAISO Board approval summer 2018

Page 32

Page 33: FRACMOO 2 Working Group · Intra-hour upward ramping needs for 2016. 1 2 3 4 5 6 7 8 9 10 11 12 Act. 30min_Up_Ramp 2,496 2,894 2,513 2,244 2,083 1,879 1,630 1,752 2,388 2,830 2,938

Next steps

• Stakeholder comments due:

• August 16, 2017

• Stakeholder meeting:

• September

• Complete stakeholder process by end of 2018

Page 33