Frankfurt (Germany), 6-9 June 2011 Underground cable rating Suggest steady-state for planning  The future is hard to predict… Cyclic rating for existing, but note:  Needs thorough knowledge of installed conditions  Must consider:  Moisture migration  External heat sources  Condition of existing cables
14
Frankfurt (Germany), 6-9 June 2011 John MILLAR – Finland – RT.1a/5a Distribution Network Planning and Underground Cables Keeping overview while attending to detail …with much appreciated help from, among others: Prof. Matti Lehtonen and Eero Saarijärvi
Transcript
Page 1: Frankfurt (Germany), 6-9 June 2011 John MILLAR – Finland – RT.1a/5a Distribution Network Planning and Underground Cables Keeping overview while attending.

Frankfurt (Germany), 6-9 June 2011

John MILLAR – Finland – RT.1a/5a

Distribution Network Planning and Underground Cables

Keeping overview while attending to detail

…with much appreciated help from, among others: Prof. Matti Lehtonen and Eero Saarijärvi

Page 2: Frankfurt (Germany), 6-9 June 2011 John MILLAR – Finland – RT.1a/5a Distribution Network Planning and Underground Cables Keeping overview while attending.

Frankfurt (Germany), 6-9 June 2011

My research fields

Ampacity of underground cables Practical investigations of their thermal

environment Development of real-time algorithms

Network planning algorithm MV, LV and MV-LV…

Page 3: Frankfurt (Germany), 6-9 June 2011 John MILLAR – Finland – RT.1a/5a Distribution Network Planning and Underground Cables Keeping overview while attending.

Frankfurt (Germany), 6-9 June 2011

Underground cable rating

Suggest steady-state for planning The future is hard to predict…

Cyclic rating for existing, but note: Needs thorough knowledge of installed conditions Must consider:

Moisture migration External heat sources Condition of existing cables

Page 4: Frankfurt (Germany), 6-9 June 2011 John MILLAR – Finland – RT.1a/5a Distribution Network Planning and Underground Cables Keeping overview while attending.

Frankfurt (Germany), 6-9 June 2011

Cyclic vs. Steady-state rating forexisting MV cables

0

200

400

600

800

1000

1200

1400

20

30

40

50

60

70

80

90

0 24 48 72 96 120 144 168 192 216 240 264 288 312 336

Max

imum

con

duct

or t

empe

ratu

re (°

C) a

nd C

ritica

l rad

ius

for m

oist

ure

mig

ratio

n (m

m)

Time (hours)

Cond. Temp Current

0

200

400

600

800

1000

1200

1400

20

30

40

50

60

70

80

90

0 24 48 72 96 120 144 168 192 216 240 264 288 312 336

Max

imum

con

duct

or t

empe

ratu

re (°

C) a

nd C

ritica

l rad

ius

for m

oist

ure

mig

ratio

n (m

m)

Time (hours)

Cond. Temp

Moisture migration radius

Steady-state temp response

Current

65 °C steady-state current limit

0

200

400

600

800

1000

1200

1400

20

30

40

50

60

70

80

90

0 24 48 72 96 120 144 168 192 216 240 264 288 312 336

Max

imum

con

duct

or t

empe

ratu

re (°

C) a

nd C

ritica

l rad

ius

for m

oist

ure

mig

ratio

n (m

m)

Time (hours)

Cond. Temp

Moisture migration radius

Steady-state temp response

Current

90 °C steady-state current limit

65 °C:• steady-state rating: 340A• cyclic rating: 385 A

90 °C:• steady-state rating: 382 A• cyclic rating: 462 A

Page 5: Frankfurt (Germany), 6-9 June 2011 John MILLAR – Finland – RT.1a/5a Distribution Network Planning and Underground Cables Keeping overview while attending.

Frankfurt (Germany), 6-9 June 2011

Cables: Installation challenges Crowding of underground services

Duct bank and tube installation ratings more challenging

Charging current >> load currents for long rural cable connections

Page 6: Frankfurt (Germany), 6-9 June 2011 John MILLAR – Finland – RT.1a/5a Distribution Network Planning and Underground Cables Keeping overview while attending.

Frankfurt (Germany), 6-9 June 2011

Distribution network planning Automating the laborious task of trial and

error planning An algorithm that deals with real networks

and realistic planning issues in reasonable computation times

Trying to keep up with contemporary developments...

Page 7: Frankfurt (Germany), 6-9 June 2011 John MILLAR – Finland – RT.1a/5a Distribution Network Planning and Underground Cables Keeping overview while attending.

Frankfurt (Germany), 6-9 June 2011

VOH_MV ‘Optimally’ routes lines between fixed

primary and secondary substations, i.e. plans the MV network.• Optimal or full switching – 3 levels• Optimal or full backup connections

between main feeders• Existing network consideration and

upgrade times• User-preferred network

Page 8: Frankfurt (Germany), 6-9 June 2011 John MILLAR – Finland – RT.1a/5a Distribution Network Planning and Underground Cables Keeping overview while attending.

Frankfurt (Germany), 6-9 June 2011

17400

17600

17800

18000

18200

18400

18600

18800

19000

48400 48600 48800 49000 49200 49400 49600 49800 50000

VOH_MV, e.g.:

Page 9: Frankfurt (Germany), 6-9 June 2011 John MILLAR – Finland – RT.1a/5a Distribution Network Planning and Underground Cables Keeping overview while attending.

Frankfurt (Germany), 6-9 June 2011

VOH_MV_LV Starts with LV customers and primary

substation positions ‘Optimises’, according to various planning

philosophies: secondary substations (no. and positions) connection (cable) boxes (no. and positions) And, of course the MV and LV network

routing – switches – backup

Page 10: Frankfurt (Germany), 6-9 June 2011 John MILLAR – Finland – RT.1a/5a Distribution Network Planning and Underground Cables Keeping overview while attending.

Frankfurt (Germany), 6-9 June 2011

VOH_MV_LVOne approach

0

200

400

600

800

0 200 400 600 800

LV customers

PrimarySubstations

0

200

400

600

800

0 200 400 600 8000

200

400

600

800

0 200 400 600 800

Page 11: Frankfurt (Germany), 6-9 June 2011 John MILLAR – Finland – RT.1a/5a Distribution Network Planning and Underground Cables Keeping overview while attending.

Frankfurt (Germany), 6-9 June 2011

0

200

400

600

800

0 200 400 600 800

0

100

200

300

400

500

600

700

800

900

0 100 200 300 400 500 600 700 800 900

VOH_MV_LVAnother approach

Page 12: Frankfurt (Germany), 6-9 June 2011 John MILLAR – Finland – RT.1a/5a Distribution Network Planning and Underground Cables Keeping overview while attending.

Frankfurt (Germany), 6-9 June 2011

0

200

400

600

800

0 200 400 600 8000

200

400

600

800

0 200 400 600 800

VOH_MV_LVand another approach

Page 13: Frankfurt (Germany), 6-9 June 2011 John MILLAR – Finland – RT.1a/5a Distribution Network Planning and Underground Cables Keeping overview while attending.

Frankfurt (Germany), 6-9 June 2011

VOH_MV_LVand finally...

0

200

400

600

800

0 200 400 600 8000

200

400

600

800

0 200 400 600 8000

200

400

600

800

0 200 400 600 800

Page 14: Frankfurt (Germany), 6-9 June 2011 John MILLAR – Finland – RT.1a/5a Distribution Network Planning and Underground Cables Keeping overview while attending.

Frankfurt (Germany), 6-9 June 2011

Contemporary developments mmm... We know that this algorithm

should be able to handle distributed generation – coming ‘soon’! What else?

Many thanks!