FREDERICK COUNTY
Transcript

 

FREDERICK COUNTY

INTERSTATE CONSTRUCTION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1

Principal Arterial

Interstate

Primary

90,000 - 259,000

105,000 - 299,000

CLASSIFICATION:STATE - FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2018) -

PROJECTED (2040) -

As one of Maryland's most heavily traveled roadways, I-270 congestion affects both motorist safety and the economy. These improvements will reduce congestion and improve safety and reliability for all roadway users.

EXPLANATION:

STATE GOALS :

Quality of ServiceXSystem Preservation Community VitalitySafety & SecurityX Environmental Stewardship

Maryland Transportation Plan (MTP) Goals/Selection Criteria:

Economic ProsperityX

I-270, Eisenhower Highway

Implementation of innovative congestion management (ICM) tools to reduce congestion on I-270, including the east and west I-270 spurs (31.5 miles). Improvements will include a series of roadway and technology-based improvements.

MD 85 Phase 1 Highway Reconstruction, Crestwood Boulevard/Shockley Drive to Spectrum Drive (Line 5) MD 85 Corridor Study, South of English Muffin Way to North of Grove Road (Line 15)I-270 Interchange Construction at Watkins Mill Road (Montgomery County Line 1)Traffic Relief Plan (Statewide - Line 4)

Construction underway.

The cost increase of $2.3 million is due to ramp metering design modifications.

This project will reduce congestion and improve safety and reliability.PURPOSE & NEED SUMMARY STATEMENT:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2018 - 23 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFAX GrandfatheredProject Outside PFA

Exception GrantedPFA Status Yet To Be DeterminedException Will Be Required

Not Subject to PFA Law

FEDERALPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

02,061

0112,054114,115

0

02,061

020,36922,430

0

000

27,59427,594

0

000

32,21532,215

0

000

31,87631,876

0

000000

000000

000000

000

91,68591,685

0

000000

BUDGET

SPECIALX GENERAL OTHER

2018 2019 2020 ....2021.... ....2022.... ....2023.... ....2024....

PROJECT CASH FLOW

PAGE ____________SHA-F-1The estimated cost is for the entire project in Montgomery and Frederick counties.STIP REFERENCE #MO0691 12/01/2018

PRIMARY CONSTRUCTION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 2

Principal Arterial

Freeway/Expressway

Primary

50,650

95,970

CLASSIFICATION:STATE - FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2018) -

PROJECTED (2040) -

The new interchange will improve safety and operations for all users by closing an existing at-grade intersection, providing new east-west access, and constructing a park and ride facility. This interchange will support ongoing and planned growth.

EXPLANATION:

STATE GOALS :

Quality of ServiceXSystem PreservationX Community VitalityXSafety & SecurityX Environmental Stewardship

Maryland Transportation Plan (MTP) Goals/Selection Criteria:

Economic ProsperityX

US 15, Catoctin Mountain Highway

Construct a new US 15 grade-separated interchange and park-and-ride lot at Monocacy Boulevard. Bicycle and pedestrian improvements will be included where appropriate.

US 15/US 40 Frederick Freeway Study, I-70/US 40 to MD 26 (Line 14)

Construction underway. Frederick County funded $1.4 million for engineering. City of Frederick funded $1.4 million for engineering.

The cost increase of $12.1 million is due to a right-of-way court settlement.

This project will add a new US 15 interchange at Monocacy Boulevard to safely accommodate future traffic associated with existing and planned development. The project will close an existing at-grade US 15 intersection at Hayward Road.

PURPOSE & NEED SUMMARY STATEMENT:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2018 - 23 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFAX GrandfatheredProject Outside PFA

Exception GrantedPFA Status Yet To Be DeterminedException Will Be Required

Not Subject to PFA Law

FEDERALXPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

6824,344

30,57938,08973,69424,385

6824,344

29,96332,99567,98424,246

00

4085,0945,502

139

00

2080

2080

000000

000000

000000

000000

00

6165,0945,710

139

000000

BUDGET

SPECIALX GENERAL OTHERX

2018 2019 2020 ....2021.... ....2022.... ....2023.... ....2024....

PROJECT CASH FLOW

PAGE ____________SHA-F-2STIP REFERENCE #FR5711 12/01/2018

SECONDARY CONSTRUCTION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 3

Principal Arterial

Freeway/Expressway

Primary

24,975

31,475

CLASSIFICATION:STATE - FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2018) -

PROJECTED (2040) -

The existing structure is rated poor.EXPLANATION:

STATE GOALS :

Quality of ServiceSystem PreservationX Community VitalitySafety & Security Environmental Stewardship

Maryland Transportation Plan (MTP) Goals/Selection Criteria:

Economic Prosperity

US 15, Catoctin Mountain Highway

Replace Bridge 10097 over MD 26.

US 15/US 40 Frederick Freeway Study, I-70/US 40 to MD 26 (Line 14)

Construction underway.

None.

The existing structure, built in 1957, is rated poor.PURPOSE & NEED SUMMARY STATEMENT:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2018 - 23 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFAX GrandfatheredProject Outside PFA

Exception GrantedPFA Status Yet To Be DeterminedException Will Be Required

Not Subject to PFA Law

FEDERALXPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

0642

06,0916,733

465

0642

05,8306,472

465

000

261261

0

000000

000000

000000

000000

000000

000

261261

0

000000

BUDGET

SPECIALX GENERAL OTHER

2018 2019 2020 ....2021.... ....2022.... ....2023.... ....2024....

PROJECT CASH FLOW

PAGE ____________SHA-F-3STIP REFERENCE #FR1301 12/01/2018

SECONDARY CONSTRUCTION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 4

Minor Arterial

Other Principal Arterial

Secondary

13,625

16,700

CLASSIFICATION:STATE - FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2018) -

PROJECTED (2040) -

The project will improve safety and enhance community vitality in the Town of Middletown.EXPLANATION:

STATE GOALS :

Quality of ServiceSystem PreservationX Community VitalityXSafety & SecurityX Environmental Stewardship

Maryland Transportation Plan (MTP) Goals/Selection Criteria:

Economic Prosperity

US 40 Alternate, Old National Pike

Construct roadway improvements, including upgrades to pedestrian/bicyclist facilities, resurfacing, curb and gutter, and stormwater management improvements, from Ivy Hill Drive to Middletown Parkway (2.1 miles).

Construction underway. Town of Middletown is funding $3.8 million for construction.

None.

The project will facilitate the safe and efficient flow of vehicular and pedestrian traffic movements along US 40 Alternate.PURPOSE & NEED SUMMARY STATEMENT:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2018 - 23 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFAX GrandfatheredProject Outside PFA

Exception GrantedPFA Status Yet To Be DeterminedException Will Be Required

Not Subject to PFA Law

FEDERALXPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

03,462

33014,27618,06811,937

03,462

2326,332

10,0268,090

00

547,8717,9253,847

00

4455990

000

18180

000000

000000

000000

00

987,9448,0423,847

000000

BUDGET

SPECIALX GENERAL OTHERX

2018 2019 2020 ....2021.... ....2022.... ....2023.... ....2024....

PROJECT CASH FLOW

PAGE ____________SHA-F-4STIP REFERENCE #FR3501 12/01/2018

SECONDARY CONSTRUCTION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 5

Major Collector

Other Principal Arterial

Secondary

36,050 - 53,875

52,875 - 81,325

CLASSIFICATION:STATE - FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2018) -

PROJECTED (2040) -

This project will improve safety for all roadway users by reconstructing the interchange and bridges. It also supports ongoing and planned growth by increasing roadway and interchange capacity.

EXPLANATION:

STATE GOALS :

Quality of ServiceSystem Preservation Community VitalitySafety & SecurityX Environmental Stewardship

Maryland Transportation Plan (MTP) Goals/Selection Criteria:

Economic ProsperityX

MD 85, Buckeystown Pike

Widen MD 85 to a multilane divided highway from Crestwood Boulevard/Shockley Drive to Spectrum Drive (0.8 miles), including MD 85 interchange reconstruction at I-270 and I-270 dual bridges replacement. This project is Phase one of a three-phase project to widen and reconstruct MD 85 from south of English Muffin Way to north of Grove Road.

MD 85 Corridor Study, South of English Muffin Way to North of Grove Road (Line 15)

Construction underway. County funded $1.5 million for partial engineering.

None.

This project will relieve congestion and provide capacity for planned commercial development in the MD 85 corridor. Additionally, the existing I-270 dual bridges, built in 1950, are rated poor.

PURPOSE & NEED SUMMARY STATEMENT:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2018 - 23 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFAX GrandfatheredProject Outside PFA

Exception GrantedPFA Status Yet To Be DeterminedException Will Be Required

Not Subject to PFA Law

FEDERALXPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

5316,612

14,88064,29486,31757,643

5316,6128,261

10,62526,02910,246

00

3,91713,68017,59713,702

00

2,30712,48414,79111,299

00

39512,89113,28610,502

000

14,61414,61411,894

000000

000000

00

6,61953,66960,28847,397

000000

BUDGET

SPECIALX GENERAL OTHERX

2018 2019 2020 ....2021.... ....2022.... ....2023.... ....2024....

PROJECT CASH FLOW

PAGE ____________SHA-F-5STIP REFERENCE #FR3881 12/01/2018

SECONDARY CONSTRUCTION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 6

Intermediate Arterial

Minor Arterial

Secondary

9,775

15,925

CLASSIFICATION:STATE - FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2018) -

PROJECTED (2040) -

The existing structure is rated poor.EXPLANATION:

STATE GOALS :

Quality of ServiceSystem PreservationX Community VitalitySafety & Security Environmental Stewardship

Maryland Transportation Plan (MTP) Goals/Selection Criteria:

Economic Prosperity

MD 140, Main Street

Replace Bridge 10062 over Flat Run.

Construction underway.

None.

The existing structure, built in 1932, is rated poor.PURPOSE & NEED SUMMARY STATEMENT:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2018 - 23 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFAX GrandfatheredProject Outside PFA

Exception GrantedPFA Status Yet To Be DeterminedException Will Be Required

Not Subject to PFA Law

FEDERALXPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

01,344

3114,3165,9714,542

01,344

2912,5334,1683,017

008

1,7831,7911,525

00

100

100

002020

000000

000000

000000

00

201,7831,8031,525

000000

BUDGET

SPECIALX GENERAL OTHER

2018 2019 2020 ....2021.... ....2022.... ....2023.... ....2024....

PROJECT CASH FLOW

PAGE ____________SHA-F-6STIP REFERENCE #FR5361 12/01/2018

SECONDARY CONSTRUCTION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 7

Major Collector

Major Collector

Secondary

22,575

47,600

CLASSIFICATION:STATE - FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2018) -

PROJECTED (2040) -

The corridor experiences operational failures due to congested roads and high traffic volumes, especially during peak periods.EXPLANATION:

STATE GOALS :

Quality of ServiceXSystem PreservationX Community VitalitySafety & SecurityX Environmental Stewardship

Maryland Transportation Plan (MTP) Goals/Selection Criteria:

Economic ProsperityX

MD 180, Jefferson Pike

Reconstruction of MD 180, from north of I-70 west crossing to I-70 east crossing (0.7 miles), including new, second bridge over US 15/US 340.

Engineering and right-of-way underway. Construction to begin during current fiscal year.

The cost decrease of $5.1 million is due to reduced engineering needs, and a more detailed engineers estimate. Construction delayed from FY 19 to FY 20 due to necessary coordination with the City of Frederick reagrding a road closure affecting the project delivery.

Operational and capacity improvements to support mobility and economic development in Frederick County.PURPOSE & NEED SUMMARY STATEMENT:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2018 - 23 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFAX GrandfatheredProject Outside PFA

Exception GrantedPFA Status Yet To Be DeterminedException Will Be Required

Not Subject to PFA Law

FEDERALXPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

02,295

56613,08615,94710,620

02,239

300

2,2690

056

1860

24238

00

1563,9264,0823,191

00

1555,2345,3894,238

00

393,9263,9653,153

000000

000000

056

53613,08613,67810,620

000000

BUDGET

SPECIALX GENERAL OTHER

2018 2019 2020 ....2021.... ....2022.... ....2023.... ....2024....

PROJECT CASH FLOW

PAGE ____________SHA-F-7STIP REFERENCE #FR6781 12/01/2018

SECONDARY CONSTRUCTION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 8

Major Collector

Major Collector

Secondary

9,625

13,750

CLASSIFICATION:STATE - FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2018) -

PROJECTED (2040) -

The existing structure is rated poor.EXPLANATION:

STATE GOALS :

Quality of ServiceSystem PreservationX Community VitalitySafety & Security Environmental Stewardship

Maryland Transportation Plan (MTP) Goals/Selection Criteria:

Economic Prosperity

MD 355, Urbana Pike

Replace Bridge 10086 over Bennett Creek.

Construction underway.

The cost increase of $6.2 million is due to an unfavorable bid.

The existing structure, built in 1924, is rated poor.PURPOSE & NEED SUMMARY STATEMENT:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2018 - 23 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFAX GrandfatheredProject Outside PFA

Exception GrantedPFA Status Yet To Be DeterminedException Will Be Required

Not Subject to PFA Law

FEDERALXPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

02,5391,095

13,17816,81212,575

02,520

353

2,5581,812

019

9163,5504,4852,920

00

1446,0736,2174,975

000

3,5523,5522,868

000000

000000

000000

019

1,06013,17514,25410,763

000000

BUDGET

SPECIALX GENERAL OTHER

2018 2019 2020 ....2021.... ....2022.... ....2023.... ....2024....

PROJECT CASH FLOW

PAGE ____________SHA-F-8STIP REFERENCE #FR1321 12/01/2018

SECONDARY CONSTRUCTION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 9

Major Collector

Minor Arterial

Secondary

13,250

16,625

CLASSIFICATION:STATE - FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2018) -

PROJECTED (2040) -

The existing structure is rated poor.EXPLANATION:

STATE GOALS :

Quality of ServiceSystem PreservationX Community VitalitySafety & Security Environmental Stewardship

Maryland Transportation Plan (MTP) Goals/Selection Criteria:

Economic Prosperity

MD 355, Urbana Pike

Replace Bridge 10084 over the CSX railroad.

Construction underway.

The cost decrease of $8.7 million is due to a fiscal analysis adjustment.

The existing structure, built in 1931, is rated poor.PURPOSE & NEED SUMMARY STATEMENT:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2018 - 23 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFAX GrandfatheredProject Outside PFA

Exception GrantedPFA Status Yet To Be DeterminedException Will Be Required

Not Subject to PFA Law

FEDERALXPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

01,870

75110,91513,5361,443

01,870

331,8673,7701,349

00

2184,7835,001

94

00

2863,5993,885

0

00

214666880

0

000000

000000

000000

00

7189,0489,766

94

000000

BUDGET

SPECIALX GENERAL OTHER

2018 2019 2020 ....2021.... ....2022.... ....2023.... ....2024....

PROJECT CASH FLOW

PAGE ____________SHA-F-9STIP REFERENCE #FR5591 12/01/2018

SECONDARY CONSTRUCTION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 10

Rural Major Collector

Major Collector

Secondary

4,500

7,100

CLASSIFICATION:STATE - FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2018) -

PROJECTED (2040) -

The existing bridge is rated poor.EXPLANATION:

STATE GOALS :

Quality of ServiceSystem PreservationX Community VitalitySafety & SecurityX Environmental Stewardship

Maryland Transportation Plan (MTP) Goals/Selection Criteria:

Economic Prosperity

MD 464, Point of Rocks Road

Replace Bridge 1009000 over Little Catoctin Creek

Construction to begin during current fiscal year.

Added to construction program.

The exisiting structure, built in 1933, is rated poor.PURPOSE & NEED SUMMARY STATEMENT:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2018 - 23 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFAX GrandfatheredProject Outside PFA

Exception GrantedPFA Status Yet To Be DeterminedException Will Be Required

Not Subject to PFA LawX

FEDERALXPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

01,112

454,0695,2264,031

01,096

150

1,111781

01630

1,3561,4021,086

000

2,5642,5642,045

000

149149119

000000

000000

000000

01630

4,0694,1153,250

000000

BUDGET

SPECIALX GENERAL OTHER

2018 2019 2020 ....2021.... ....2022.... ....2023.... ....2024....

PROJECT CASH FLOW

PAGE ____________SHA-F-10STIP REFERENCE #FR6541 12/01/2018

SECONDARY CONSTRUCTION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 11

Major Collector

Minor Arterial

Secondary

3,600

5,400

CLASSIFICATION:STATE - FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2018) -

PROJECTED (2040) -

The existing structure is rated poor.EXPLANATION:

STATE GOALS :

Quality of ServiceSystem PreservationX Community VitalitySafety & Security Environmental Stewardship

Maryland Transportation Plan (MTP) Goals/Selection Criteria:

Economic Prosperity

MD 478, Knoxville Road

Replace Bridge 10089 over a branch of the Potomac River.

Construction underway.

None.

The existing structure, built in 1925, is rated poor.PURPOSE & NEED SUMMARY STATEMENT:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2018 - 23 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFAX GrandfatheredProject Outside PFA

Exception GrantedPFA Status Yet To Be DeterminedException Will Be Required

Not Subject to PFA Law

FEDERALXPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

0818425

5,0936,3364,315

0818337133

1,288441

00

252,6562,6812,087

00

292,3042,3331,787

00

290

290

005050

000000

000000

00

884,9605,0483,874

000000

BUDGET

SPECIALX GENERAL OTHER

2018 2019 2020 ....2021.... ....2022.... ....2023.... ....2024....

PROJECT CASH FLOW

PAGE ____________SHA-F-11STIP REFERENCE #FR1021 12/01/2018

INTERSTATE DEVELOPMENT AND EVALUATION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 12

Principal Arterial

Interstate

Primary

101,475

150,725

CLASSIFICATION:STATE - FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2018) -

PROJECTED (2040) -

I-70, Eisenhower Memorial Highway

Widen I-70 to six lanes between Mount Phillip Road and I-270 (3.0 miles). This is Phase four of a four-phase project to upgrade I-70 from Mount Phillip Road to east of MD 144FA.

I-270, Innovative Congestion Management (Line 1)MD 180, Jefferson Pike (Line 7)US 15/US 40 Frederick Freeway Study, I-70/US 40 to MD 26 (Line 14)Traffic Relief Plan (Statewide - Line 5)

Engineering on hold.

None.

This project will reduce congestion and provide capacity to accommodate planned development.JUSTIFICATION:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2018 - 23 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFAX GrandfatheredProject Outside PFA

Exception GrantedPFA Status Yet To Be DeterminedException Will Be Required

Not Subject to PFA Law

FEDERALXPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

1,2516,724

21,4930

29,46813,629

1,2516,724

21,4930

29,46813,629

000000

000000

000000

000000

000000

000000

000000

000000

BUDGET

SPECIALX GENERAL OTHER

2018 2019 2020 ....2021.... ....2022.... ....2023.... ....2024....

PROJECT CASH FLOW

PAGE ____________SHA-F-12STIP REFERENCE #101007 12/01/2018

INTERSTATE DEVELOPMENT AND EVALUATION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 13

Principal Arterial

Interstate

Primary

68,175

86,375

CLASSIFICATION:STATE - FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2018) -

PROJECTED (2040) -

I-70, Baltimore National Pike

A project to construct I-70/US 40 interchange improvements at Meadow Road, MD 144FA, and Old National Pike.

Engineering underway by developer. County and developer are funding this project.

None.

This project will provide the missing eastbound I-70 exit and westbound I-70 entry movements. Providing these movements will accommodate development in the surrounding area.JUSTIFICATION:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2018 - 23 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFAX GrandfatheredProject Outside PFA

Exception GrantedPFA Status Yet To Be DeterminedException Will Be Required

Not Subject to PFA Law

FEDERALXPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

252000

2520

252000

2520

000000

000000

000000

000000

000000

000000

000000

000000

BUDGET

SPECIALX GENERAL OTHERX

2018 2019 2020 ....2021.... ....2022.... ....2023.... ....2024....

PROJECT CASH FLOW

PAGE ____________SHA-F-13STIP REFERENCE #FR5801 12/01/2018

PRIMARY DEVELOPMENT AND EVALUATION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 14

Principal Arterial

Freeway/Expressway

Primary

98,800 - 123,675

119,800 - 173,425

CLASSIFICATION:STATE - FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2018) -

PROJECTED (2040) -

US 15, Frederick Freeway, and US 40, Frederick Freeway

Planning and preliminary engineering study to improve safety and mainline operations along US 15 and US 40 from I-270 to north of Biggs Ford Road (7.0 miles).

I-270, Innovative Congestion Management (Line 1)US 15, MD 26 Bridge Replacement (Line 3)I-70, Mount Phillip Rd. and I-270 (Line 12) Traffic Relief Plan (Statewide - Line 4)

Planning and engineering underway.

None.

This section does not meet current highway standards. Existing interchanges have short acceleration and deceleration lanes, sharp curves, and short merging and weaving sections.JUSTIFICATION:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2018 - 23 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFAX GrandfatheredProject Outside PFA

Exception GrantedPFA Status Yet To Be DeterminedException Will Be Required

Not Subject to PFA Law

FEDERALXPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

2,4914,000

00

6,4910

2,431421

00

2,8520

60567

00

6270

01,300

00

1,3000

01,265

00

1,2650

0447

00

4470

000000

000000

603,579

00

3,6390

000000

BUDGET

SPECIALX GENERAL OTHER

2018 2019 2020 ....2021.... ....2022.... ....2023.... ....2024....

PROJECT CASH FLOW

PAGE ____________SHA-F-14STIP REFERENCE #FR1881 12/01/2018

SECONDARY DEVELOPMENT AND EVALUATION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 15

Major Collector

Other Principal Arterial

Secondary

17,300 - 53,800

27,300 - 78,725

CLASSIFICATION:STATE - FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2018) -

PROJECTED (2040) -

MD 85, Buckeystown Pike

Study to widen MD 85 to a multilane divided highway from south of English Muffin Way to north of Grove Road (2.4 miles). Bicycle and pedestrian improvements will be included where appropriate.

MD 85 Phase 1 Highway Reconstruction, Crestwood Boulevard/Shockley Drive to Spectrum Drive (Line 5)

Planning complete. Proceeding with phase one construction (Line 5).

None.

This project will reduce congestion and provide capacity for planned commercial development in the MD 85 corridor.JUSTIFICATION:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2018 - 23 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFAX GrandfatheredProject Outside PFA

Exception GrantedPFA Status Yet To Be DeterminedException Will Be Required

Not Subject to PFA Law

FEDERALXPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

531000

5310

531000

5310

000000

000000

000000

000000

000000

000000

000000

000000

BUDGET

SPECIALX GENERAL OTHERX

2018 2019 2020 ....2021.... ....2022.... ....2023.... ....2024....

PROJECT CASH FLOW

PAGE ____________SHA-F-15STIP REFERENCE #FRNEW3 12/01/2018

SECONDARY DEVELOPMENT AND EVALUATION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 16

Major Collector

Major Collector

Secondary

29,750

72,025

CLASSIFICATION:STATE - FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2018) -

PROJECTED (2040) -

MD 180 and MD 351, Jefferson Pike/Ballenger Creek Pike

Study to improve MD 180 and MD 351 capacity and operations between Greenfield Drive and Corporate Drive (2.7 miles). Bicycle and pedestrian improvements will be included where appropriate.

MD 180 Highway Reconstruction, North of I-70 (west) to I-70 (east) (Line 7)I-70 Phase 4 Highway Reconstruction, I-270 to Mount Phillip Road (Line 12)

Planning on hold. County contributed $0.5 million to planning.

None.

The MD 180 and MD 351 corridor is experiencing rapid development. Businesses and residential developments in the study area contribute to operational failures along the existing roadway network, especially during peak periods.

JUSTIFICATION:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2018 - 23 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFAX GrandfatheredProject Outside PFA

Exception GrantedPFA Status Yet To Be DeterminedException Will Be Required

Not Subject to PFA Law

FEDERALXPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

2,288000

2,2880

2,288000

2,2880

000000

000000

000000

000000

000000

000000

000000

000000

BUDGET

SPECIALX GENERAL OTHERX

2018 2019 2020 ....2021.... ....2022.... ....2023.... ....2024....

PROJECT CASH FLOW

PAGE ____________SHA-F-16STIP REFERENCE #FR5491 12/01/2018

SAFETY, CONGESTION RELIEF, HIGHWAY AND BRIDGE PRESERVATION PROGRAM

ITEM NO. DESCRIPTION AND IMPROVEMENT TYPE

CONSTRUCTIONTOTAL 2019PROJECT

COST($000's)

STATE HIGHWAY ADMINISTRATION -- FREDERICK COUNTY LINE 17

ROUTE NO.

December 1, 2018

STARTStatus as of

Fiscal Year 2018 Completions

Resurface/Rehabilitate

18,4311 CompletedAt various locations in Frederick County; mill and resurface

1,3362 CompletedLiberty Road; West South Street to MD 31; safety and resurfaceMD 26

Environmental Preservation

263 CompletedEisenhower Memorial Highway; Bill Moxley Road to Interstate MM 67.0; landscapeI 70

Sidewalks

1,1404 CompletedPetersville Road; B Street to Center Street; sidewalksMD 17

PAGE _________SHA-F-17

SAFETY, CONGESTION RELIEF, HIGHWAY AND BRIDGE PRESERVATION PROGRAM

ITEM NO. DESCRIPTION AND IMPROVEMENT TYPE

CONSTRUCTION2 Year (19 - 20)PROJECT

COST($000's)

STATE HIGHWAY ADMINISTRATION -- FREDERICK COUNTY LINE 17 (cont'd)

ROUTE NO.

December 1, 2018

STARTStatus as of

Fiscal Year 2019 and 2020

Resurface/Rehabilitate

14,3915 Under constructionAt various locations in Frederick County; mill and resurface

6,3686 FY 2019Eisenhower Memorial Highway; East of MD 75 to structure 10183 over Monocacy River; safety and resurface

I 70 WB

Bridge Replacement/Rehabilitation

2,1617 FY 2019Various bridges on Eisenhower Memorial Highway, Catoctin Mountain Highway, E. Main Street; clean/paint bridges

7,4578 FY 2019Clay Street; Bridge 1002900 over Monocacy River; bridge rehabilitationFunding provided by the Governor’s Investment in Highways and Bridges Initiative

MD 28

Safety/Spot Improvement

4,2949 Under constructionCatoctin Mountain Highway; Hansonville Road to Hessong Bridge Road; geometric improvementsUS 15

5,45210 FY 2019Catoctin Mountain Highway; South of Orndorff Road to north of College Lane; geometric improvements

US 15

2,28811 FY 2019Foxville Road; Pryor Road to Stottlemeyer Road; drainage improvementMD 77

Urban Reconstruction

2,78612 Under constructionMain Street; East North Avenue to Timbermill Run; urban reconstructionMD 140

8,01213 Under constructionMain Street; West of Royal Oak Drive to Bye Alley; urban reconstruction(Transportation Infrastructure Investment Act of 2013)

MD 144 FB

5,87614 Under constructionJefferson Pike; MD 383 (Broad Run Road) to Old Holter Road; urban reconstructionMD 180

PAGE _________SHA-F-18

SAFETY, CONGESTION RELIEF, HIGHWAY AND BRIDGE PRESERVATION PROGRAM

ITEM NO. DESCRIPTION AND IMPROVEMENT TYPE

CONSTRUCTION2 Year (19 - 20)PROJECT

COST($000's)

STATE HIGHWAY ADMINISTRATION -- FREDERICK COUNTY LINE 17 (cont'd)

ROUTE NO.

December 1, 2018

STARTStatus as of

Fiscal Year 2019 and 2020 (cont'd)

Traffic Management

45815 FY 2019Jefferson Pike; Butterfly Lane to MD 180/Swallowtail Drive; signalizationMD 180

TMDL Compliance

1,57116 Under constructionAt various locations in Frederick County - Group 1A; drainage improvement

1,25317 Under constructionTree establishment at various locations in Frederick County; landscape

2,70618 Under constructionLittle Catoctin Creek at US 340; wetlands replacement

2,10619 FY 2019Tree planting at various locations in Frederick County; landscape

Enhancements

Acquisition of Scenic Easements and Scenic/Historic Sites

97920 UnderwaySaving Maryland's Critical Civil War Battlefields; 7 battlefield acquisitions

Pedestrian/Bicycle Facilities

36021 FY 2019Ballenger Creek Trail Phase IV; project consists of construction of a 10 foot wide, 1,600 linear foot asphalt trail

PAGE _________SHA-F-19


Recommended