FREDERICKSBURG AREA METROPOLITAN · DESCRIPTION FROM: 0.466 MILE NORTH OF INT. ROUTE 1 AND 17 TO:...

Date post: 10-Aug-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
10
Transcript
Page 1: FREDERICKSBURG AREA METROPOLITAN · DESCRIPTION FROM: 0.466 MILE NORTH OF INT. ROUTE 1 AND 17 TO: I-95 SBL EXIT RAMP (0.1180 MI) UPC NO 74002 SCOPE MINOR WIDENING PROJECT WIDENING
Page 2: FREDERICKSBURG AREA METROPOLITAN · DESCRIPTION FROM: 0.466 MILE NORTH OF INT. ROUTE 1 AND 17 TO: I-95 SBL EXIT RAMP (0.1180 MI) UPC NO 74002 SCOPE MINOR WIDENING PROJECT WIDENING
Page 3: FREDERICKSBURG AREA METROPOLITAN · DESCRIPTION FROM: 0.466 MILE NORTH OF INT. ROUTE 1 AND 17 TO: I-95 SBL EXIT RAMP (0.1180 MI) UPC NO 74002 SCOPE MINOR WIDENING PROJECT WIDENING

FY13 FY14 FY15

Final FY13-18 SYIP 869,000$ 1,759,000$

Final FY13-18 SYIP 65,000$ 65,000$

1,335,000$ 3,163,000$ 147,000$

Final FY13-18 SYIP 1,089,000$ 181,000$ 10,752,000$

1,325,000$

Final FY13-18 SYIP 8,138,000$

486,000$ 186,000$

Final FY13-18 SYIP 517,000$ 2,995,000$

75,000$

Final FY13-18 SYIP 75,000$

Final FY13-18 SYIP 100,000$

130,000$

Final FY13-18 SYIP 130,000$

232,000$

Final FY13-18 SYIP 232,000$

Final FY13-18 SYIP (10,955,000)$

90077 $ 4,351,000 Final FY13-18 SYIP 600,000$ 1,358,000$

454,000$ 106,000$

Final FY13-18 SYIP 5,000,000$ 12,588,000$

Final FY13-18 SYIP 1,155,000$

Final FY13-18 SYIP -$

3,750,000$ 1,249,197$

Final FY13-18 SYIP 503,000$ 9,422,197$

2,476,000$ 121,000$

Final FY13-18 SYIP 3,054,000$ 6,051,000$

Final FY13-18 SYIP 514,000$

Final FY13-18 SYIP 115,000$ 258,000$

Final FY13-18 SYIP 97,000$ 276,000$

Final FY13-18 SYIP 281,000$ 581,000$

141,000$ 189,000$ 200,000$

Final FY13-18 SYIP 955,000$

Final FY13-18 SYIP -$

675,000$

Final FY13-18 SYIP 675,000$

Total CMAQ 5,567,000$ 3,352,000$ 3,539,197$ $ 12,458,197

Total RSTP 1,089,000$ 1,050,000$ 1,075,000$ $ 3,214,000

Total Revenue Sharing 8,982,000$ $0 $0 $ 8,982,000

Total CPR Bonds 503,000$ $0 $0 $ 503,000

Total Federal STP 3,054,000$ $0 $0 $ 3,054,000

Totals 19,195,000$ 4,402,000$ 4,614,197$ 47,124,197$ $ 28,211,197

100451 US-1 Signal Optimization (City) -$

100450 PR-3 Signal Optimization (City) -$

T12266GWRideConnect Guaranteed Ride

Home425,000$

93975FAMPO Land Use Scenario Planning

Support300,000$

91856 FAMPO CMP Update Support 179,000$

102626 FAMPO Public Involvement $ 308,000 143,000$

90268 FAMPO LRTP Planning Assistance $ 814,000 514,000$

FAMPO TIP AMENDMENT TO ADD FY2013 – 2015 SIX YEAR IMPROVEMENT PROGRAM FUNDING

Allocations

US-1 Widening100456

100448Gordon Rd. Commuter Parking

Expansion $ 11,639,243 400,000$

Notes

4,837,000$

-$

890,000$

6,813,000$ $ 13,558,000

TotalUPC # Project Total Project Cost Previous Funding

51845US-1/Harrison Rd. Intersection

Improvement

$ 76,650,000

$ 1,500,000

$ 10,970,486

100459 Princess Anne St. Improvements

93225SC-610/Onville Rd. Intersection

Improvements

100439Lafayette Blvd Kenmore Ave Rounabout

$ 825,000 -$

93136US-1 & Morris/Mudd Taver Rd.

Intersection Improvement $ 5,298,599 1,806,000$

100449US-1 & Potomac Creek Dr. Turn Lanes

$ 1,339,000 -$

100438US-1 Augustine Ave Intersection

Improvement $ 1,359,000 100,000$

101595 I-95 Access Project - PE Only $ 14,500,000 1,545,000$

Remainder moved to other

projects statewide.

100444

US-1 Bridge over Hazel Run

Replacement $ 3,241,927 -$

US-1 Bridge over Rappahannock Canal

Bridge Replacement

102987 Fredericksburg Parking Structure $ 29,126,255 -$

97552Staffordboro Commuter Parking

Expansion $ 10,355,000 3,920,000$

93065FRED Replacement Buses 1,155,000$

93066 Spotsylvania VRE Station $ 20,422,982 7,028,000$

Page 4: FREDERICKSBURG AREA METROPOLITAN · DESCRIPTION FROM: 0.466 MILE NORTH OF INT. ROUTE 1 AND 17 TO: I-95 SBL EXIT RAMP (0.1180 MI) UPC NO 74002 SCOPE MINOR WIDENING PROJECT WIDENING

$0 $0 $0 $0 $0

MPO Note This UPC has been closed out and remaining funds have been transferred to UPC 90268. Res.12-06

ROUTE/STREET 0095 TOTAL COST $1,245,205

FUND SOURCE MATCH FY12 FY13 FY14 FY15

DESCRIPTION FROM: Rappahannock River TO: Route 3

UPC NO 87768 SCOPE STUDIES ONLY

PROJECT I-95 Access Study ADMIN BY Other

SYSTEM Interstate JURISDICTION Fredericksburg OVERSIGHT NFO

Interstate Projects

F

Primary Projects

27

PE CM 0 $27,500 $37,658 $39,923 $28,150

MPO Note Closed per Reso 12-21 dated 6-18-2012. Balance transferred to UPC T12266

ROUTE/STREET 0000 TOTAL COST $288,000

FUND SOURCE MATCH FY13 FY14 FY15 FY16

DESCRIPTION FROM: region wide TO: region wide

UPC NO 92132 SCOPE SAFETY/TRAFFIC OPERS/TSM

PROJECT Van Start Support ADMIN BY Other

SYSTEM Primary JURISDICTION Multi-jurisdictional: Fredericksbug MPO OVERSIGHT

$0 $0 $0 $0 $0

MPO Note PE Complete

ROUTE/STREET SPOTSYLVANIA PWY TOTAL COST $7,000,000

FUND SOURCE MATCH FY12 FY13 FY14 FY15

DESCRIPTION FROM: ROUTE 3 WEST (SPOTSYLVANIA COUNTY) TO: ROUTE 17 BYPASS (13.8000 MI)

UPC NO 52334 SCOPE STUDIES ONLY

PROJECT SPOTSYLVANIA PARKWAY - (PE ONLY FOR STUDY) ADMIN BY VDOT

SYSTEM Primary JURISDICTION Spotsylvania County OVERSIGHT FO

$0 $0 $0 $0 $0

MPO Note Project complete.

ROUTE/STREET 0001 TOTAL COST $51,723

FUND SOURCE MATCH FY12 FY13 FY14 FY15

DESCRIPTION FROM: 0.466 MILE NORTH OF INT. ROUTE 1 AND 17 TO: I-95 SBL EXIT RAMP (0.1180 MI)

UPC NO 74002 SCOPE MINOR WIDENING

PROJECT WIDENING IMPROVEMENTS ADMIN BY VDOT

SYSTEM Primary JURISDICTION Spotsylvania County OVERSIGHT NFO

$0 $0 $0 $0 $0

MPO Note PE only - complete, Construction under UPC 92990

ROUTE/STREET 0003 TOTAL COST $1,455,085

FUND SOURCE MATCH FY12 FY13 FY14 FY15

DESCRIPTION FROM: ROUTE 1112 (RUTHERFORD DRIVE) TO: ROUTE 627 (GORDON ROAD) (1.2100 MI)

UPC NO 13564 SCOPE RECONSTRUCTION

PROJECT RTE 3 - ADD THROUGH & RIGHT TURN LANES EBL and WBL ADMIN BY Locally

SYSTEM Primary JURISDICTION Spotsylvania County OVERSIGHT FO

1

Fredericksburg MPO Projects to be removed from TIP

Page 5: FREDERICKSBURG AREA METROPOLITAN · DESCRIPTION FROM: 0.466 MILE NORTH OF INT. ROUTE 1 AND 17 TO: I-95 SBL EXIT RAMP (0.1180 MI) UPC NO 74002 SCOPE MINOR WIDENING PROJECT WIDENING

CN Other $0 $4,079,856 $0 $0 $0

EB $178,298 $713,192 $0 $0 $0

RW Other $0 $2,885,530 $0 $0 $0

RW TOTAL $178,298 $3,598,722 $0 $0 $0

MPO Note Phase I - Complete

FUND SOURCE MATCH FY12 FY13 FY14 FY15

SYSTEM Primary JURISDICTION Spotsylvania County OVERSIGHT NFO

UPC NO 52299 SCOPE NEW CONSTRUCTION

ROUTE/STREET 0208 TOTAL COST $24,584,916

DESCRIPTION FROM: 1.2 KILOMETERS EAST PO RIVER TO: 1.6 KILOMETERS WEST NI RIVER (4.8200 KM)

PROJECT RTE 208-SPOTSYLVANIA COURTHOUSE BYPASS- 4 LNS NEW LOCATION ADMIN BY VDOT

Secondary Projects

$0 $0 $0 $0 $0

MPO Note Project Complete

ROUTE/STREET COURTHOUSE ROAD (0630) TOTAL COST $4,767,194

FUND SOURCE MATCH FY12 FY13 FY14 FY15

DESCRIPTION FROM: Route 688 TO: 0.374 Miles East of CSX Railroad (0.6690 MI)

UPC NO 93521 SCOPE BRIDGE REPLACEMENT

PROJECT ARRA Stafford 630 Bridge Over CSX Railroad (Structure #6040) ADMIN BY VDOT

SYSTEM Secondary JURISDICTION Stafford County OVERSIGHT

$0 $0 $0 $0 $0

MPO Note Project Complete

ROUTE/STREET GARRISONVILLE RD (0610) TOTAL COST $8,346,592

FUND SOURCE MATCH FY12 FY13 FY14 FY15

DESCRIPTION FROM: 0.126 MILE WEST ROUTE 643 TO: 0.415 MILE EAST ROUTE 643 (0.5410 MI)

UPC NO 51919 SCOPE RECONSTRUCTION

PROJECT RTE 610 - RECONSTRUCTION ADMIN BY VDOT

SYSTEM Secondary JURISDICTION Stafford County OVERSIGHT NFO

CN STP $82,164 $328,654 $0 $0 $0

MPO Note Project Complete

PROGRAM NOTE TIP AMD to add CN phase obligating $328,654 STP funds to FFY12. (RMF 11-18-11)

ROUTE/STREET COURTHOUSE ROAD (0630) TOTAL COST $410,817

FUND SOURCE MATCH FY12 FY13 FY14 FY15

UPC NO 102502 SCOPE Bridge Replacement w/o Added Capacity

SYSTEM Secondary JURISDICTION Stafford County OVERSIGHT

DESCRIPTION FROM: Route 688 TO: 0.374 Miles East of CSX Railroad (0.6690 MI)

PROJECT ARRA-C Stafford 630 Bridge Over CSX Railroad (Structure #604 ADMIN BY VDOT

2

Fredericksburg MPO Projects to be removed from TIP

Page 6: FREDERICKSBURG AREA METROPOLITAN · DESCRIPTION FROM: 0.466 MILE NORTH OF INT. ROUTE 1 AND 17 TO: I-95 SBL EXIT RAMP (0.1180 MI) UPC NO 74002 SCOPE MINOR WIDENING PROJECT WIDENING

Miscellaneous Projects

$0 $0 $0 $0 $0

MPO Note Study completed for 2035 LRTP

ROUTE/STREET TOTAL COST $250,000

FUND SOURCE MATCH FY12 FY13 FY14 FY15

DESCRIPTION

UPC NO 83521 SCOPE R/W OR ENG

PROJECT LONG RANGE REGIONAL TRANSIT STUDY ADMIN BY Other

SYSTEM Miscellaneous JURISDICTION Fredericksburg District-wide OVERSIGHT NFO

$0 $0 $0 $0 $0

MPO Note See FAMPO Resolution 11-36 balance transfered to UPC 102626.

ROUTE/STREET TOTAL COST $414,983

FUND SOURCE MATCH FY12 FY13 FY14 FY15

DESCRIPTION FROM: Fredericksburg TO: Various

UPC NO 91855 SCOPE STUDIES ONLY

PROJECT Public Involvement Survey ADMIN BY Other

SYSTEM Miscellaneous JURISDICTION Multi-jurisdictional: Fredericksbug MPO OVERSIGHT

$0 $0 $0 $0 $0

MPO Note Project Completed. RSTP funds FY08, Reso. 08-01. Bal. transferred to UPC 102626. Reso 5/10/11

ROUTE/STREET 0000 TOTAL COST $50,000

FUND SOURCE MATCH FY12 FY13 FY14 FY15

DESCRIPTION FROM: Area-wide TO: Various

UPC NO 90269 SCOPE STUDIES ONLY

PROJECT Transit Authority Planning Assistance ADMIN BY MPO

SYSTEM Miscellaneous JURISDICTION Multi-jurisdictional: Fredericksbug MPO OVERSIGHT

$0 $0 $0 $0 $0

MPO Note All Funds Expended. Project completed

ROUTE/STREET 0000 TOTAL COST $100,000

FUND SOURCE MATCH FY12 FY13 FY14 FY15

DESCRIPTION FROM: Area-wide TO: Various

UPC NO 92909 SCOPE STUDIES ONLY -

PROJECT Hot Lanes Parking Study ADMIN BY MPO

SYSTEM Miscellaneous JURISDICTION Multi-jurisdictional: Fredericksbug MPO OVERSIGHT

3

Fredericksburg MPO Projects to be removed from TIP

Page 7: FREDERICKSBURG AREA METROPOLITAN · DESCRIPTION FROM: 0.466 MILE NORTH OF INT. ROUTE 1 AND 17 TO: I-95 SBL EXIT RAMP (0.1180 MI) UPC NO 74002 SCOPE MINOR WIDENING PROJECT WIDENING

Public Transportation Projects

$0 $0 $27,500 $37,658 $39,923

MPO Note Closed per Reso 12-21 dated 6-18-2012. Transferred to UPC T12266

ROUTE/STREET 0000 TOTAL COST 187,225

FUND SOURCE MATCH FY12 FY13 FY14 FY15

DESCRIPTION FROM: Fredericksburg TO: King George

UPC NO 91838 SCOPE SAFETY/TRAFFIC OPERS/TSM

PROJECT Guaranteed Ride Home Program Assistance ADMIN BY Other

SYSTEM Public Transportation

JURISDICTION Fredericksburg OVERSIGHT

$0 $0 $0 $0 $0

MPO Note Project completed. Balance transferred to UPC 88699 February 2011.

ROUTE/STREET NA (0000) TOTAL COST $50,000

FUND SOURCE MATCH FY12 FY13 FY14 FY15

DESCRIPTION FROM: na TO: na

UPC NO 93977 SCOPE STUDIES ONLY

PROJECT Human Services Transportation ADMIN BY Other MPO

SYSTEM Public Transportation

JURISDICTION Fredericksburg District-wide OVERSIGHT

MPO TIP Report

PE CM $170,000 $680,000 $0 $0 $0

MPO Note CMAQ funds flexed to transit. Project completed.

ROUTE/STREET 0000 TOTAL COST $1,307,500

FUND SOURCE MATCH FY12 FY13 FY14 FY15

DESCRIPTION Five Transit Routes

UPC NO 93067 SCOPE

PROJECT New FRED Transit Routes ADMIN BY Locally

SYSTEM Public Transportation

JURISDICTION Multi-jurisdictional: Fredericksbug MPO OVERSIGHT NFO

$0 $0 $0 $0 $0

MPO Note Project completed.

ROUTE/STREET NORTH STAFFORD COUNTY BUS SERVICE (0000) TOTAL COST

FUND SOURCE MATCH FY12 FY13 FY14 FY15

DESCRIPTION

UPC NO T4312 SCOPE

PROJECT NORTH STAFFORD COUNTY BUS SERVICE ADMIN BY DRPT

SYSTEM Public Transportation

JURISDICTION Stafford County OVERSIGHT NFO

4

Fredericksburg MPO Projects to be removed from TIP

Page 8: FREDERICKSBURG AREA METROPOLITAN · DESCRIPTION FROM: 0.466 MILE NORTH OF INT. ROUTE 1 AND 17 TO: I-95 SBL EXIT RAMP (0.1180 MI) UPC NO 74002 SCOPE MINOR WIDENING PROJECT WIDENING

Projects by Grouping

80531 Fredericksburg District-wide 0095 $219,345Interstate

I-95 - REPLACE THREE O/H SIGN STRUCTURES ON SBL

FROM: At Exits 118, 126 & 140 TO: (Thornburg, Spotsylvania & Stafford) Complete

Construction : Safety/ITS/Operational Improvements

System UPC Jurisdiction / Name / Description Street(Route) Estimate

81499 Spotsylvania County 0601 $747,068Secondary

RTE 601 - BRIDGE REPLACEMENT OVER PLENTIFUL CREEK

FROM: 0.86 Mi. North Rte 653 TO: 0.97 Mi. North Rte 653 (0.1050 MI) Complete

15458 Stafford County COURT HOUSE ROAD (0630) $2,732,128Secondary

RTE 630 - BRIDGE OVER CSX RAILROAD (STRUCTURE #6040)

FROM: Route 688 TO: 0.374 Mi. East of CSX Railroad (0.6690 MI) PE & RW phase - complete

Construction : Bridge Rehabilitation/Replacement/Reconstruction

System UPC Jurisdiction / Name / Description Street(Route) Estimate

92440 Stafford County I95 (0095) $10,221,032Interstate

ARRA Spotsylvania/Stafford I95 Resurfacing/Rumble Strips

Various Locations (16.7000 MI) Complete

93976 Fredericksburg District-wide NA (0000) $30,000Miscellaneous

GWRC GIS System Upgrade

FROM: na TO: na Complete. Balance transferred to UPC 74042 Fall Hill Avenue project.

77061 Fredericksburg District-wide 9999 $1,343,043Miscellaneous

Signal Optimization & Timing in Stafford, Spot, KG Counties

FROM: Various Routes TO: Various counties (5.0000 MI) STIP Adj FFY10-01 to move CN phase obligation of $1,1318,044 from FFY09 to FFY10. Complete

92436 Fredericksburg District-wide $2,331,827Primary

ARRA Stafford/Spotsylvania/King George 17/1/3 Resurfacing

Various Locations Complete

90406 Fredericksburg District-wide 0000 $11,000Primary

Rideshare Signs and Bike Rack at Regional Commuter Lots

FROM: Various TO: Commuter Lots Complete

94835 Stafford County JEFFERSON DAVIS HWY (0001) $300,000Primary

Upgrade Existing Signal at Jeff Davis Hwy and Telegraph Rd

FROM: Jefferson Davis Hwy (Rt 1) TO: Telegraph Rd (Rt 637) Complete

94208 Spotsylvania County PLANK ROAD (0003) $214,422Primary

Extend westbound and eastbound left turn lanes Complete

FROM: Intersection of Rte. 626 & Rte. 3 TO: 0.189 MI. E.of the Intersection of Rte. 626 & Rte. 3 (0.1890 MI)

93978 Spotsylvania County PLANK ROAD/SPOTSWOOD FURNACE ROAD (0003) $96,645Primary

Intersection Improvements

FROM: Int. Rte. 620 and Rte. 3 TO: 0.038 mile east of the int. Rte. 620 & Rte. 3 Complete

5

Fredericksburg MPO Projects to be removed from TIP

Page 9: FREDERICKSBURG AREA METROPOLITAN · DESCRIPTION FROM: 0.466 MILE NORTH OF INT. ROUTE 1 AND 17 TO: I-95 SBL EXIT RAMP (0.1180 MI) UPC NO 74002 SCOPE MINOR WIDENING PROJECT WIDENING

16277 Spotsylvania County BRAGG ROAD (0639) $13,293,501Secondary

RTE 639 - RECONSTRUCTION

FROM: ROUTE 3 TO: 0.003 MILE NORTH ROUTE 618 (0.8960 MI) Complete

94837 Spotsylvania County COURTHOUSE ROAD (0208) $300,000Primary

Upgrade Existing Signal at Courthouse Rd and Hood Dr

FROM: Courthouse Road (Rt 208) TO: Hood Drive (Rt 636) Complete

96043 Fredericksburg District-wide NA (PG00) $2,354,365Primary

Upgrade guardrail

FROM: Various locations TO: Various locations (20.0000 MI) Complete

64195 Stafford County 0017 $1,142,747Primary

RTE 17 - VEHICLE OVER HEIGHT DETECTORS

AT ROUTE I-95 Complete

Construction : Safety/ITS/Operational Improvements

System UPC Jurisdiction / Name / Description Street(Route) Estimate

15459 Stafford County COURTHOUSE ROAD (0630) $6,614,819Secondary

RTE 630 - RECONSTRUCTION Complete

FROM: 2.89 KILOMETERS EAST OF ROUTE 1 TO: 0.016 KILIMETERS EAST OF ROUTE 688 (1.4540 KM)

81438 Stafford County DEACON ROAD (0607) $240,931Secondary

RTE 607 - CONSTRUCT SIDEWALK

FROM: Int. Route 218 and Route 607 TO: 0.32 Mi. N Int Route 218 and Route 607 (0.3200 MI) Complete

74042 Fredericksburg $1,624,470Urban

BRAGG ROAD/FALL HILL AVENUE - WIDENING

FROM: 0.003 MILE NORTH ROUTE 618 (RIVER ROAD) TO: 0.093 MILE NORTH ROUTE 618 (RIVER ROAD) (0.0900 MI) Complete

86997 Fredericksburg 0001 $480,000Urban

Install Safety Lighting on Falmouth Bridge

Falmouth Br. over Rappahannock River on Rte 1 Closed -Funds allocated to UPC 88699 Resolution 11-06

87006 Fredericksburg 0002 $1,202,596Urban

Intersection Improvement, Dixon Street and Lansdowne Road Closed - Funds moved to FAMPO RSTP

FROM: Intersection of Route 2 (Dixon Street) and TO: Route 638 (Landsdowne Road) - balance for Reallocation. Reso 09-49

94280 Fredericksburg $175,000Enhancement

Cowan Boulevard Trail Extension

FROM: Cowan Boulevard TO: Existing sidewalk system Completed

85326 Fredericksburg $45,000Enhancement

Fredericksburg Market Square - Alleyway - Phase III

FROM: Market Square TO: Alleyway Improvements -CN cancelled w/no expenditures. PE under UPC 18716

85325 Fredericksburg $30,000Enhancement

Fredericksburg's Market Square - Canopy - Phase II

FROM: Market Square TO: Replacement of Canopy -CN cancelled w/no expenditures. PE under UPC 18716

Construction : Transportation Enhancement/Byway/Non-Traditional

System UPC Jurisdiction / Name / Description Street(Route) Estimate

6

Fredericksburg MPO Projects to be removed from TIP

Page 10: FREDERICKSBURG AREA METROPOLITAN · DESCRIPTION FROM: 0.466 MILE NORTH OF INT. ROUTE 1 AND 17 TO: I-95 SBL EXIT RAMP (0.1180 MI) UPC NO 74002 SCOPE MINOR WIDENING PROJECT WIDENING

Construction : Transportation Enhancement/Byway/Non-Traditional

System UPC Jurisdiction / Name / Description Street(Route) Estimate

13785 Spotsylvania County $227,500Primary

VIRGINIA CENTRAL RAILWAY TRAIL - PHASE I

FROM: BICYCLE/PEDESTRIAN CORRIDOR OF 1.25 MILE SECTION CONNECTING TO: RESIDENTIAL AREAS TO COMMERCIAL & RECREATIONAL FACILITIES Complete.

78242 Fredericksburg $236,250Primary

CITY OF FREDERICKSBURG - "DOS AMIGOS" SLAVERY MUSEUM PE complete

FROM: "DOS AMIGOS" SLAVE SHIP TO BE USED AS A MARITIME DISPLAY TO: AT THE SLAVRY MUSEUM

52017 Stafford County $1,126,520Primary

STAFFORD COUNTY - TRANSP RELATED ACTIVITIES, INCLUDE STUDY

FROM: TO RESTORE & OPERATE HISTORIC FERRY SERVICE, ARCHAEOLOGICAL TO: EVALUATE FERRY LANDINGS & COLONIAL ERA TOLL KEEPER'S HOUSE, Complete

18716 Fredericksburg $550,000Urban

RENOVATION OF FREDERICKSBURG'S MARKET SQUARE

FROM: THE SQUARE WILL BE REGRADED, OVERHEAD POWER LINES TO: WILL BE PLACED UNDERGROUND WITH ADEQUATE DRAINAGE. Complete - balance transferred to T4971

Transit : Amenities

System UPC Jurisdiction / Name / Description Street(Route) Estimate

87013 Fredericksburg 0000 $5,000Public Transportation

Bike Racks at Commuter Lots

Park and Ride Lots Balance $922.00 transferred to UPC #91239. Complete

94027 Fredericksburg N/A (0000) $150,000Miscellaneous

GW Ride Connect Marketing

FROM: N/A TO: N/A Closed per Reso 12-21 dated 6-18-2012. Transferred to UPC T12266

Transit : Ridesharing

System UPC Jurisdiction / Name / Description Street(Route) Estimate

Transit : Vehicles

System UPC Jurisdiction / Name / Description Street(Route) Estimate

93068 Fredericksburg District-wide 0000 $500,000Public Transportation

Five Transit Vehicles for Routes in FAMPO area Complete

7

Fredericksburg MPO Projects to be removed from TIP


Recommended