Lewisburg, PA | 800.233.8404 | +1.570.522.9800 | PlayworldSystems.com
Front View
Free Standing Vine Climber 350-1152
Lewisburg, PA | 800.233.8404 | +1.570.522.9800 | PlayworldSystems.com
Natural Color Scheme 2
Natural Color Scheme 1
Primary Color Scheme
Back View
Free Standing Vine Climber 350-1152
0 5' 10'
0 5' 10'
FOO
TIN
G L
EGEN
D
= C
OM
PO
NE
NT
FOO
TIN
G (
DET
AIL
3)
= C
AN
TILE
VE
R, "
T" P
OS
T, A
ND
CO
MP
ON
ENT
POST
FO
OTI
NG
(D
ETAI
L 2)
= S
PIR
AL
SLI
DE
CE
NTE
R P
OS
T FO
OTI
NG
(D
ETAI
L1)
= G
RO
UN
D Z
ER
O P
OS
T FO
OTI
NG
(D
ETAI
L 2)
= S
UP
PO
RT
PO
ST
FOO
TIN
G (
DET
AIL
1 or
4)
(144
" (36
58m
m) I
ND
ICA
TES
POST
LEN
GTH
)
(ZZC
H18
50 IN
DIC
ATES
PAR
T N
UM
BER
)
(112
" (28
45m
m) I
ND
ICA
TES
POST
LEN
GTH
)
8428
8428
224"212"
200"
200"
200"200"
212"
212"212"
FOO
TIN
G L
EGEN
D
= C
OM
PO
NE
NT
FOO
TIN
G (
DET
AIL
3)
(ZZC
H18
50 IN
DIC
ATES
PAR
T N
UM
BER
)
= S
PIR
AL
SLI
DE
CE
NTE
R P
OS
T FO
OTI
NG
(D
ETAI
L1)
= C
AN
TILE
VE
R, "
T" P
OS
T, A
ND
CO
MP
ON
ENT
POST
FO
OTI
NG
(D
ETAI
L 2)
= G
RO
UN
D Z
ER
O P
OS
T FO
OTI
NG
(D
ETAI
L 2)
= S
UP
PO
RT
PO
ST
FOO
TIN
G (
DET
AIL
1 or
4)
(144
" IN
DIC
ATE
S PO
ST L
ENG
TH)
(112
" IN
DIC
ATE
S PO
ST L
ENG
TH)
Posts
ZZCH0077 41 3.5in OD x 200in STEEL POST W/O CAP
ZZCH0257 42 3.5in OD x 212in STEEL POST W/O CAP
ZZCH0259 13 3.5in OD x 224in STEEL POST W/O CAP
Climbers
ZZCH6837 34 10ft DECK-DECK VINE CLIMBER
ZZUN8396 65 12in LOG HOP
ZZUN8428 76 16in LOG HOP
Roofs & Arches
ZZCH9806 37 SMALL TREE TOPPER
ZZCH9807 68 LARGE TREE TOPPER
Additional Tool & Maintenance Kits
ZZCHGUID 19 CHALLENGER GUIDELINES
ZZUN9910 110 SURFACING WARNING LABEL KIT
ZZUN9930 111 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
ZZUN9990 112 TOOL AND ADDITIONAL PARTS KIT W/AEROSOL
Part No. Description
Design Number: 350-1152C - Bill Of Material
Free Standing Vine Climber
Ref.No. Quantity
Tuesday, September 10, 2013 Page of1 1 www.PlayworldSystems.com
CertifiedZZCH00771 3.5in OD x 200in STEEL POST W/O CAP4 244.04 317 0 4.00 0.50 0
CertifiedZZCH02572 3.5in OD x 212in STEEL POST W/O CAP4 244.04 356 0 4.00 0.52 0
CertifiedZZCH02593 3.5in OD x 224in STEEL POST W/O CAP1 64.51 89 0 1.00 0.13 0
CertifiedZZCH68374 10ft DECK-DECK VINE CLIMBER 3 1,162.71 5,716 21 15.00 0.45 3
CertifiedZZUN83965 12in LOG HOP 6 305.82 645 6 6.00 0.18 6
CertifiedZZUN84286 16in LOG HOP 7 377.58 815 7 7.00 0.21 7
CertifiedZZCH98067 SMALL TREE TOPPER 3 42.18 276 0 1.50 0.00 0
CertifiedZZCH98078 LARGE TREE TOPPER 6 180.18 953 0 3.00 0.00 0
N/AZZCHGUID9 CHALLENGER GUIDELINES 1 0.00 1 0 0.25 0.00 0
CertifiedZZUN991010 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0
N/AZZUN993011 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
1 13.07 90 0 0.25 0.00 0
N/AZZUN999012 TOOL AND ADDITIONAL PARTS KIT W/AEROSOL
1 3.46 75 0 0.25 0.00 0
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-1152C - Compliance and Technical Data
Free Standing Vine Climber
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
360 782 9,332 34 42.50 1.992,637.64 16Totals:
9 Metric Tons352 Kg162 Kg1,186.94 Kg 1.51 m3
Tuesday, September 10, 2013 Page of1 2 www.PlayworldSystems.com
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-1152C - Compliance and Technical Data
Free Standing Vine Climber
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
The lay-out for this custom playscape, design number 350-1152C, has been configured to meet the requirements of the ASTM F1487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.
The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.
The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.
Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]
A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.
A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.
ASTM F1487
2010 ADA Standards for Accessible Design
Installation Times
Carbon Footprint
Pre-Consumer Recycle Content
Post-Consumer Recycle Content
Tuesday, September 10, 2013 Page of2 2 www.PlayworldSystems.com
CertifiedZZCH00771 3.5in OD x 200in STEEL POST W/O CAP4 244.04 317 0 4.00 0.50 0
CertifiedZZCH02572 3.5in OD x 212in STEEL POST W/O CAP4 244.04 356 0 4.00 0.52 0
CertifiedZZCH02593 3.5in OD x 224in STEEL POST W/O CAP1 64.51 89 0 1.00 0.13 0
CertifiedZZCH68374 10ft DECK-DECK VINE CLIMBER 3 1,162.71 5,716 21 15.00 0.45 3
CertifiedZZUN83965 12in LOG HOP 6 305.82 645 6 6.00 0.18 6
CertifiedZZUN84286 16in LOG HOP 7 377.58 815 7 7.00 0.21 7
CertifiedZZCH98067 SMALL TREE TOPPER 3 42.18 276 0 1.50 0.00 0
CertifiedZZCH98078 LARGE TREE TOPPER 6 180.18 953 0 3.00 0.00 0
N/AZZCHGUID9 CHALLENGER GUIDELINES 1 0.00 1 0 0.25 0.00 0
CertifiedZZUN991010 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0
N/AZZUN993011 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
1 13.07 90 0 0.25 0.00 0
N/AZZUN999012 TOOL AND ADDITIONAL PARTS KIT W/AEROSOL
1 3.46 75 0 0.25 0.00 0
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-1152C - Compliance and Technical Data
Free Standing Vine Climber
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: CAN/CSA-Z614-07
UnitCSA
Status
ActivePlay
Events
Post-
Part No. Qty.
360 782 9,332 34 42.50 1.992,637.64 16Totals:
9 Metric Tons352 Kg162 Kg1,186.94 Kg 1.51 m3
Tuesday, September 10, 2013 Page of1 2 www.PlayworldSystems.com
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-1152C - Compliance and Technical Data
Free Standing Vine Climber
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: CAN/CSA-Z614-07
UnitCSA
Status
ActivePlay
Events
Post-
Part No. Qty.
The lay-out for this custom playscape, design number 350-1152C, has been configured to meet the requirements of the CAN/CSA-Z614-07 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the CAN/CSA-Z614-07 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.
The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.
Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]
A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.
A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.
CAN/CSA-Z614-07
Installation Times
Carbon Footprint
Pre-Consumer Recycle Content
Post-Consumer Recycle Content
Tuesday, September 10, 2013 Page of2 2 www.PlayworldSystems.com
CertifiedZZCH00771 3.5in OD x 200in STEEL POST W/O CAP4 244.04 317 0 4.00 0.50 0
CertifiedZZCH02572 3.5in OD x 212in STEEL POST W/O CAP4 244.04 356 0 4.00 0.52 0
CertifiedZZCH02593 3.5in OD x 224in STEEL POST W/O CAP1 64.51 89 0 1.00 0.13 0
CertifiedZZCH68374 10ft DECK-DECK VINE CLIMBER 3 1,162.71 5,716 21 15.00 0.45 3
CertifiedZZUN83965 12in LOG HOP 6 305.82 645 6 6.00 0.18 6
CertifiedZZUN84286 16in LOG HOP 7 377.58 815 7 7.00 0.21 7
CertifiedZZCH98067 SMALL TREE TOPPER 3 42.18 276 0 1.50 0.00 0
CertifiedZZCH98078 LARGE TREE TOPPER 6 180.18 953 0 3.00 0.00 0
N/AZZCHGUID9 CHALLENGER GUIDELINES 1 0.00 1 0 0.25 0.00 0
N/AZZUN991010 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0
N/AZZUN993011 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
1 13.07 90 0 0.25 0.00 0
N/AZZUN999012 TOOL AND ADDITIONAL PARTS KIT W/AEROSOL
1 3.46 75 0 0.25 0.00 0
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-1152C - Compliance and Technical Data
Free Standing Vine Climber
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: EN1176:2008
Unit ENStatus
ActivePlay
Events
Post-
Part No. Qty.
360 782 9,332 34 42.50 1.992,637.64 16Totals:
9 Metric Tons352 Kg162 Kg1,186.94 Kg 1.51 m3
Tuesday, September 10, 2013 Page of1 2 www.PlayworldSystems.com
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 350-1152C - Compliance and Technical Data
Free Standing Vine Climber
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: EN1176:2008
Unit ENStatus
ActivePlay
Events
Post-
Part No. Qty.
This custom structure, drawing number 350-1152C, has been designed to meet the general safety requirements of EN1176:2008. These requirements have been established with the consideration of the risk factor on available data. The items listed as certified have been reviewed and approved by a third party certification service. In addition to the product listing the overall layout and design of this structure, as shown in the plan, was completed in accordance with the general safety requirements of EN1176:2008.
The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.
Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]
A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.
A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.
EN1176:2008
Installation Times
Carbon Footprint
Pre-Consumer Recycle Content
Post-Consumer Recycle Content
Tuesday, September 10, 2013 Page of2 2 www.PlayworldSystems.com