+ All Categories
Home > Documents > Free Standing Vine Climber · 4 zzch6837 10ft deck-deck vine climber 3 5 zzun8396 12in log hop 6 6...

Free Standing Vine Climber · 4 zzch6837 10ft deck-deck vine climber 3 5 zzun8396 12in log hop 6 6...

Date post: 21-Jul-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
13
Lewisburg, PA | 800.233.8404 | +1.570.522.9800 | PlayworldSystems.com Front View Free Standing Vine Climber 350-1152
Transcript
Page 1: Free Standing Vine Climber · 4 zzch6837 10ft deck-deck vine climber 3 5 zzun8396 12in log hop 6 6 zzun8428 16in log hop 7 roofs & arches 7 zzch9806 small tree topper 3 8 zzch9807

Lewisburg, PA | 800.233.8404 | +1.570.522.9800 | PlayworldSystems.com

Front View

Free Standing Vine Climber 350-1152

Page 2: Free Standing Vine Climber · 4 zzch6837 10ft deck-deck vine climber 3 5 zzun8396 12in log hop 6 6 zzun8428 16in log hop 7 roofs & arches 7 zzch9806 small tree topper 3 8 zzch9807

Lewisburg, PA | 800.233.8404 | +1.570.522.9800 | PlayworldSystems.com

Natural Color Scheme 2

Natural Color Scheme 1

Primary Color Scheme

Back View

Free Standing Vine Climber 350-1152

Page 3: Free Standing Vine Climber · 4 zzch6837 10ft deck-deck vine climber 3 5 zzun8396 12in log hop 6 6 zzun8428 16in log hop 7 roofs & arches 7 zzch9806 small tree topper 3 8 zzch9807

0 5' 10'

Page 4: Free Standing Vine Climber · 4 zzch6837 10ft deck-deck vine climber 3 5 zzun8396 12in log hop 6 6 zzun8428 16in log hop 7 roofs & arches 7 zzch9806 small tree topper 3 8 zzch9807

0 5' 10'

Page 5: Free Standing Vine Climber · 4 zzch6837 10ft deck-deck vine climber 3 5 zzun8396 12in log hop 6 6 zzun8428 16in log hop 7 roofs & arches 7 zzch9806 small tree topper 3 8 zzch9807

FOO

TIN

G L

EGEN

D

= C

OM

PO

NE

NT

FOO

TIN

G (

DET

AIL

3)

= C

AN

TILE

VE

R, "

T" P

OS

T, A

ND

CO

MP

ON

ENT

POST

FO

OTI

NG

(D

ETAI

L 2)

= S

PIR

AL

SLI

DE

CE

NTE

R P

OS

T FO

OTI

NG

(D

ETAI

L1)

= G

RO

UN

D Z

ER

O P

OS

T FO

OTI

NG

(D

ETAI

L 2)

= S

UP

PO

RT

PO

ST

FOO

TIN

G (

DET

AIL

1 or

4)

(144

" (36

58m

m) I

ND

ICA

TES

POST

LEN

GTH

)

(ZZC

H18

50 IN

DIC

ATES

PAR

T N

UM

BER

)

(112

" (28

45m

m) I

ND

ICA

TES

POST

LEN

GTH

)

Page 6: Free Standing Vine Climber · 4 zzch6837 10ft deck-deck vine climber 3 5 zzun8396 12in log hop 6 6 zzun8428 16in log hop 7 roofs & arches 7 zzch9806 small tree topper 3 8 zzch9807

8428

8428

224"212"

200"

200"

200"200"

212"

212"212"

FOO

TIN

G L

EGEN

D

= C

OM

PO

NE

NT

FOO

TIN

G (

DET

AIL

3)

(ZZC

H18

50 IN

DIC

ATES

PAR

T N

UM

BER

)

= S

PIR

AL

SLI

DE

CE

NTE

R P

OS

T FO

OTI

NG

(D

ETAI

L1)

= C

AN

TILE

VE

R, "

T" P

OS

T, A

ND

CO

MP

ON

ENT

POST

FO

OTI

NG

(D

ETAI

L 2)

= G

RO

UN

D Z

ER

O P

OS

T FO

OTI

NG

(D

ETAI

L 2)

= S

UP

PO

RT

PO

ST

FOO

TIN

G (

DET

AIL

1 or

4)

(144

" IN

DIC

ATE

S PO

ST L

ENG

TH)

(112

" IN

DIC

ATE

S PO

ST L

ENG

TH)

Page 7: Free Standing Vine Climber · 4 zzch6837 10ft deck-deck vine climber 3 5 zzun8396 12in log hop 6 6 zzun8428 16in log hop 7 roofs & arches 7 zzch9806 small tree topper 3 8 zzch9807

Posts

ZZCH0077 41 3.5in OD x 200in STEEL POST W/O CAP

ZZCH0257 42 3.5in OD x 212in STEEL POST W/O CAP

ZZCH0259 13 3.5in OD x 224in STEEL POST W/O CAP

Climbers

ZZCH6837 34 10ft DECK-DECK VINE CLIMBER

ZZUN8396 65 12in LOG HOP

ZZUN8428 76 16in LOG HOP

Roofs & Arches

ZZCH9806 37 SMALL TREE TOPPER

ZZCH9807 68 LARGE TREE TOPPER

Additional Tool & Maintenance Kits

ZZCHGUID 19 CHALLENGER GUIDELINES

ZZUN9910 110 SURFACING WARNING LABEL KIT

ZZUN9930 111 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL

ZZUN9990 112 TOOL AND ADDITIONAL PARTS KIT W/AEROSOL

Part No. Description

Design Number: 350-1152C - Bill Of Material

Free Standing Vine Climber

Ref.No. Quantity

Tuesday, September 10, 2013 Page of1 1 www.PlayworldSystems.com

Page 8: Free Standing Vine Climber · 4 zzch6837 10ft deck-deck vine climber 3 5 zzun8396 12in log hop 6 6 zzun8428 16in log hop 7 roofs & arches 7 zzch9806 small tree topper 3 8 zzch9807

CertifiedZZCH00771 3.5in OD x 200in STEEL POST W/O CAP4 244.04 317 0 4.00 0.50 0

CertifiedZZCH02572 3.5in OD x 212in STEEL POST W/O CAP4 244.04 356 0 4.00 0.52 0

CertifiedZZCH02593 3.5in OD x 224in STEEL POST W/O CAP1 64.51 89 0 1.00 0.13 0

CertifiedZZCH68374 10ft DECK-DECK VINE CLIMBER 3 1,162.71 5,716 21 15.00 0.45 3

CertifiedZZUN83965 12in LOG HOP 6 305.82 645 6 6.00 0.18 6

CertifiedZZUN84286 16in LOG HOP 7 377.58 815 7 7.00 0.21 7

CertifiedZZCH98067 SMALL TREE TOPPER 3 42.18 276 0 1.50 0.00 0

CertifiedZZCH98078 LARGE TREE TOPPER 6 180.18 953 0 3.00 0.00 0

N/AZZCHGUID9 CHALLENGER GUIDELINES 1 0.00 1 0 0.25 0.00 0

CertifiedZZUN991010 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0

N/AZZUN993011 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL

1 13.07 90 0 0.25 0.00 0

N/AZZUN999012 TOOL AND ADDITIONAL PARTS KIT W/AEROSOL

1 3.46 75 0 0.25 0.00 0

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: 350-1152C - Compliance and Technical Data

Free Standing Vine Climber

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: ASTM F1487

UnitASTMStatus

ActivePlay

Events

Post-

Part No. Qty.

360 782 9,332 34 42.50 1.992,637.64 16Totals:

9 Metric Tons352 Kg162 Kg1,186.94 Kg 1.51 m3

Tuesday, September 10, 2013 Page of1 2 www.PlayworldSystems.com

Page 9: Free Standing Vine Climber · 4 zzch6837 10ft deck-deck vine climber 3 5 zzun8396 12in log hop 6 6 zzun8428 16in log hop 7 roofs & arches 7 zzch9806 small tree topper 3 8 zzch9807

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: 350-1152C - Compliance and Technical Data

Free Standing Vine Climber

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: ASTM F1487

UnitASTMStatus

ActivePlay

Events

Post-

Part No. Qty.

The lay-out for this custom playscape, design number 350-1152C, has been configured to meet the requirements of the ASTM F1487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.

The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.

The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.

Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]

A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.

A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.

ASTM F1487

2010 ADA Standards for Accessible Design

Installation Times

Carbon Footprint

Pre-Consumer Recycle Content

Post-Consumer Recycle Content

Tuesday, September 10, 2013 Page of2 2 www.PlayworldSystems.com

Page 10: Free Standing Vine Climber · 4 zzch6837 10ft deck-deck vine climber 3 5 zzun8396 12in log hop 6 6 zzun8428 16in log hop 7 roofs & arches 7 zzch9806 small tree topper 3 8 zzch9807

CertifiedZZCH00771 3.5in OD x 200in STEEL POST W/O CAP4 244.04 317 0 4.00 0.50 0

CertifiedZZCH02572 3.5in OD x 212in STEEL POST W/O CAP4 244.04 356 0 4.00 0.52 0

CertifiedZZCH02593 3.5in OD x 224in STEEL POST W/O CAP1 64.51 89 0 1.00 0.13 0

CertifiedZZCH68374 10ft DECK-DECK VINE CLIMBER 3 1,162.71 5,716 21 15.00 0.45 3

CertifiedZZUN83965 12in LOG HOP 6 305.82 645 6 6.00 0.18 6

CertifiedZZUN84286 16in LOG HOP 7 377.58 815 7 7.00 0.21 7

CertifiedZZCH98067 SMALL TREE TOPPER 3 42.18 276 0 1.50 0.00 0

CertifiedZZCH98078 LARGE TREE TOPPER 6 180.18 953 0 3.00 0.00 0

N/AZZCHGUID9 CHALLENGER GUIDELINES 1 0.00 1 0 0.25 0.00 0

CertifiedZZUN991010 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0

N/AZZUN993011 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL

1 13.07 90 0 0.25 0.00 0

N/AZZUN999012 TOOL AND ADDITIONAL PARTS KIT W/AEROSOL

1 3.46 75 0 0.25 0.00 0

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: 350-1152C - Compliance and Technical Data

Free Standing Vine Climber

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: CAN/CSA-Z614-07

UnitCSA

Status

ActivePlay

Events

Post-

Part No. Qty.

360 782 9,332 34 42.50 1.992,637.64 16Totals:

9 Metric Tons352 Kg162 Kg1,186.94 Kg 1.51 m3

Tuesday, September 10, 2013 Page of1 2 www.PlayworldSystems.com

Page 11: Free Standing Vine Climber · 4 zzch6837 10ft deck-deck vine climber 3 5 zzun8396 12in log hop 6 6 zzun8428 16in log hop 7 roofs & arches 7 zzch9806 small tree topper 3 8 zzch9807

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: 350-1152C - Compliance and Technical Data

Free Standing Vine Climber

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: CAN/CSA-Z614-07

UnitCSA

Status

ActivePlay

Events

Post-

Part No. Qty.

The lay-out for this custom playscape, design number 350-1152C, has been configured to meet the requirements of the CAN/CSA-Z614-07 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the CAN/CSA-Z614-07 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.

The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.

Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]

A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.

A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.

CAN/CSA-Z614-07

Installation Times

Carbon Footprint

Pre-Consumer Recycle Content

Post-Consumer Recycle Content

Tuesday, September 10, 2013 Page of2 2 www.PlayworldSystems.com

Page 12: Free Standing Vine Climber · 4 zzch6837 10ft deck-deck vine climber 3 5 zzun8396 12in log hop 6 6 zzun8428 16in log hop 7 roofs & arches 7 zzch9806 small tree topper 3 8 zzch9807

CertifiedZZCH00771 3.5in OD x 200in STEEL POST W/O CAP4 244.04 317 0 4.00 0.50 0

CertifiedZZCH02572 3.5in OD x 212in STEEL POST W/O CAP4 244.04 356 0 4.00 0.52 0

CertifiedZZCH02593 3.5in OD x 224in STEEL POST W/O CAP1 64.51 89 0 1.00 0.13 0

CertifiedZZCH68374 10ft DECK-DECK VINE CLIMBER 3 1,162.71 5,716 21 15.00 0.45 3

CertifiedZZUN83965 12in LOG HOP 6 305.82 645 6 6.00 0.18 6

CertifiedZZUN84286 16in LOG HOP 7 377.58 815 7 7.00 0.21 7

CertifiedZZCH98067 SMALL TREE TOPPER 3 42.18 276 0 1.50 0.00 0

CertifiedZZCH98078 LARGE TREE TOPPER 6 180.18 953 0 3.00 0.00 0

N/AZZCHGUID9 CHALLENGER GUIDELINES 1 0.00 1 0 0.25 0.00 0

N/AZZUN991010 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0

N/AZZUN993011 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL

1 13.07 90 0 0.25 0.00 0

N/AZZUN999012 TOOL AND ADDITIONAL PARTS KIT W/AEROSOL

1 3.46 75 0 0.25 0.00 0

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: 350-1152C - Compliance and Technical Data

Free Standing Vine Climber

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: EN1176:2008

Unit ENStatus

ActivePlay

Events

Post-

Part No. Qty.

360 782 9,332 34 42.50 1.992,637.64 16Totals:

9 Metric Tons352 Kg162 Kg1,186.94 Kg 1.51 m3

Tuesday, September 10, 2013 Page of1 2 www.PlayworldSystems.com

Page 13: Free Standing Vine Climber · 4 zzch6837 10ft deck-deck vine climber 3 5 zzun8396 12in log hop 6 6 zzun8428 16in log hop 7 roofs & arches 7 zzch9806 small tree topper 3 8 zzch9807

DescriptionConcrete

(Yds3)

TotalWeight

(lbs) Users

Design Number: 350-1152C - Compliance and Technical Data

Free Standing Vine Climber

Pre-Consumer

Recycled Content(lbs)

CO2eFootprint

(kgs)InstallHours

Ref.No.

Reference Document: EN1176:2008

Unit ENStatus

ActivePlay

Events

Post-

Part No. Qty.

This custom structure, drawing number 350-1152C, has been designed to meet the general safety requirements of EN1176:2008. These requirements have been established with the consideration of the risk factor on available data. The items listed as certified have been reviewed and approved by a third party certification service. In addition to the product listing the overall layout and design of this structure, as shown in the plan, was completed in accordance with the general safety requirements of EN1176:2008.

The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.

Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]

A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.

A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.

EN1176:2008

Installation Times

Carbon Footprint

Pre-Consumer Recycle Content

Post-Consumer Recycle Content

Tuesday, September 10, 2013 Page of2 2 www.PlayworldSystems.com


Recommended