DOE EM-5 DQO Training Workshop - Day 1 Appendix A. Evolution of the Data Quality Objectives Concept. From qualitative concept to practical implementation. Evolution of the DQO Concept. Objectives: - PowerPoint PPT Presentation
21
1 of 21 From qualitative concept to From qualitative concept to practical implementation. practical implementation. Evolution of the Evolution of the Data Quality Data Quality Objectives Concept Objectives Concept DOE EM-5 DQO Training Workshop DOE EM-5 DQO Training Workshop - Day 1 - Day 1 Appendix A Appendix A
Transcript
Page 1: From qualitative concept to practical implementation.

1 of 21

From qualitative concept to From qualitative concept to practical implementation.practical implementation.

Evolution of the Evolution of the Data Quality Objectives Data Quality Objectives

ConceptConcept

DOE EM-5 DQO Training WorkshopDOE EM-5 DQO Training Workshop - Day 1- Day 1Appendix AAppendix A

Page 2: From qualitative concept to practical implementation.

2 of 21

Evolution of the DQO ConceptEvolution of the DQO Concept

Objectives:Objectives:– To illustrate how the DQO Process has matured To illustrate how the DQO Process has matured

over time from a qualitative concept to practical over time from a qualitative concept to practical implementation.implementation.

– To reinforce DOE’s requirement for integrating the To reinforce DOE’s requirement for integrating the DQO Process into all environmental sampling DQO Process into all environmental sampling programs.programs.

– To dispel the misconception that DQOs are the To dispel the misconception that DQOs are the PARCC parameters.PARCC parameters.

Page 3: From qualitative concept to practical implementation.

3 of 21

EPA QAMS-005/80EPA QAMS-005/80

DQO concept first defined in terms of DQO concept first defined in terms of the the PARCCPARCC parameters: parameters:– PPrecision recision – AAccuracyccuracy– RRepresentativenessepresentativeness– CCompletenessompleteness– CComparabilityomparability

EPA, 1983, Interim Guidelines and Specifications for Preparing Quality Assurance Project Plans, QAMS-005/80, February

Page 4: From qualitative concept to practical implementation.

4 of 21

EPA/540/G-87/003EPA/540/G-87/003EPA/540/G-87/004EPA/540/G-87/004

19871987

Defined DQOs as:Defined DQOs as:– “…“…qualitative and quantitative statements qualitative and quantitative statements

which specify the quality of the data which specify the quality of the data required to support the Agency decisions required to support the Agency decisions during remedial response activities”during remedial response activities”

EPA, 1987, Data Quality Objectives for Remedial Response Activities, EPA/540/G-87/003, March

EPA, 1987, Data Quality Objectives for Remedial Response Activities: Example Scenario, EPA/540/G-87/004, March

Page 5: From qualitative concept to practical implementation.

5 of 21

Major Elements:Major Elements:– Analytical Levels I - IVAnalytical Levels I - IV– PARCC ParametersPARCC Parameters– Three stage DQO Process:Three stage DQO Process:

Stage 1: Identify decision types Stage 2: Identify data uses and needs Stage 3: Design data collection program

EPA, 1987, Data Quality Objectives for Remedial Response Activities, EPA/540/G-87/003, March

EPA, 1987, Data Quality Objectives for Remedial Response Activities: Example Scenario, EPA/540/G-87/004, March

EPA/540/G-87/003EPA/540/G-87/003EPA/540/G-87/004EPA/540/G-87/004

19871987

Stage 3: Design data collection program

Page 6: From qualitative concept to practical implementation.

6 of 21

EPA QA/G-4EPA QA/G-419941994

Supercedes previous DQO guidance.Supercedes previous DQO guidance. Defined DQOs as:Defined DQOs as:

“…“…a a systematic planningsystematic planning tool based on the tool based on the Scientific Method for establishing criteria Scientific Method for establishing criteria for data quality and for developing data for data quality and for developing data collection designs”collection designs”

EPA, 1994, Guidance for the Data Quality Objectives Process, EPA QA/G-4, September

Page 7: From qualitative concept to practical implementation.

7 of 21

EPA QA/G-4EPA QA/G-419941994

Step 4: Specify Boundaries

Step 2: Identify Decisions

Step 3: Identify Inputs

Step 1: State the Problem

Step 5: Define Decision Rules

Step 6: Specify Error Tolerances

Step 7: Optimize Sample Design

Presents a new Presents a new 7-Step DQO 7-Step DQO Process.Process.

EPA, 1994, Guidance for the Data Quality Objectives Process, EPA QA/G-4, September

Page 8: From qualitative concept to practical implementation.

8 of 21

MisconceptionMisconception The term Data Quality The term Data Quality

Objectives is misleading since Objectives is misleading since “data quality” is only one “data quality” is only one component of the DQO component of the DQO process.process.

This underplays the role of This underplays the role of DQOs as a DQOs as a Planning ProcessPlanning Process

More appropriate terms would More appropriate terms would be:be:– Planning Quality Objectives Planning Quality Objectives

(PQOs)(PQOs)– Systematic PlanningSystematic Planning

Objectives (SPOs)Objectives (SPOs)– Decision Making ObjectivesDecision Making Objectives

(DMOs)(DMOs)

DQOs

PQOs SPOsDMOs

Page 9: From qualitative concept to practical implementation.

9 of 21

OpinionOpinion

DQO guidance should be housed in a DQO guidance should be housed in a non-datanon-data section of EPA. This would section of EPA. This would help eliminate the misconception that help eliminate the misconception that the DQO Process is simply the PARCC the DQO Process is simply the PARCC parameters.parameters.

Page 10: From qualitative concept to practical implementation.

10 of 21

DOE-HQDOE-HQSeptember 7, 1994September 7, 1994

DOE Letter, DOE EM-263 to all Field Offices, 1994, Institutionalizing the Data Quality Objectives Process, September

Thomas Grumbly memo:Thomas Grumbly memo:“…“…it is the policy of…(EM) to it is the policy of…(EM) to apply up-front planning…to apply up-front planning…to ensure safer, better, faster, and ensure safer, better, faster, and cheaper environmental cheaper environmental sampling…It is EM policy that sampling…It is EM policy that the…(DQO) process be used in the…(DQO) process be used in all environmental projects...”all environmental projects...”

}

Page 11: From qualitative concept to practical implementation.

11 of 21

Implement DQOs . . .Implement DQOs . . . Easier said than doneEasier said than done Grumbly memo directs sites to do Grumbly memo directs sites to do

DQOs, but...DQOs, but...– No guidance for an implementation No guidance for an implementation

mechanism.mechanism. Lack of a uniform approach results in an

unwieldy process.– No guidance on documentation/format.No guidance on documentation/format.

Lack of documentation format guidance yields variable products (defensibility?).

Page 12: From qualitative concept to practical implementation.

12 of 21

ImpactImpact DOE Cleanup decisions are vulnerable to DOE Cleanup decisions are vulnerable to

criticism - if not rejection.criticism - if not rejection.– Non-standard approach/documentation often lack Non-standard approach/documentation often lack

clearly stated:clearly stated: Decision Statements (Principal Study Questions) Decision Rules Error Tolerances Sample Design

– These shortcomings are revealed in the Data Quality These shortcomings are revealed in the Data Quality Assessment Process.Assessment Process.

Page 13: From qualitative concept to practical implementation.

13 of 21

Challenges at HanfordChallenges at Hanford

Unstructured approach to DQOsUnstructured approach to DQOs– proves to be quite unmanageable.proves to be quite unmanageable.– aggravates acceptance.aggravates acceptance.– Perception that DQOs are waste of time and Perception that DQOs are waste of time and

money.money. Cultural barrierCultural barrier

– SAPs are well understood.SAPs are well understood.– DQOs are not.DQOs are not.

Page 14: From qualitative concept to practical implementation.

14 of 21

EPAQA-G4

Certification of

DQO Training

?*!!

DQO

SOP

Page 15: From qualitative concept to practical implementation.

15 of 21

Page 16: From qualitative concept to practical implementation.

16 of 21

Challenges at HanfordChallenges at Hanford(continued)(continued)

Reality:Reality:– DQOs are not the problem.DQOs are not the problem.– Flawed approach is the problem.Flawed approach is the problem.– More was needed.More was needed.

Merely giving Projects QA/G-4 - not enough.

Page 17: From qualitative concept to practical implementation.

17 of 21

Highly structured, Highly structured, tactical approach to tactical approach to implementing the implementing the overall DQO Process.overall DQO Process.- Identify Projects requiring Identify Projects requiring DQOs.DQOs.- Begins with Scoping - a key Begins with Scoping - a key element. element. - Gets early input from Gets early input from regulatory agencies and key regulatory agencies and key decision makers. decision makers. - Utilizes a facilitator to Utilizes a facilitator to coordinate everythingcoordinate everything- Global Issues identified and Global Issues identified and resolved prior to DQOs.resolved prior to DQOs.

Page 18: From qualitative concept to practical implementation.

18 of 21

- Workbook captures the Workbook captures the inputs/outputs of the 7-Step inputs/outputs of the 7-Step Process.Process.11stst Draft provides Strawman Draft provides Strawman- Visual Sample Plan used in Visual Sample Plan used in DQO meeting to what-if DQO meeting to what-if sample designs.sample designs.

Tools further Tools further streamline the streamline the implementation . . .implementation . . .

1st Draft DQOWorkbook

2nd Draft DQOWorkbook Final DQO

Workbook

- Scoping Checklist to Scoping Checklist to ensure a good start.ensure a good start.

More details to come . . . More details to come . . . (Module 9)(Module 9)

Page 19: From qualitative concept to practical implementation.

19 of 21

History SummaryHistory Summary

ERC DQO Tools

PARCC

3 Stage Process

7 Step Process

ERC DQO Implementation Process

Page 20: From qualitative concept to practical implementation.

20 of 21

Contacts:Contacts:

Sebastian C. Tindall Sebastian C. Tindall Bechtel Hanford Inc.Bechtel Hanford Inc.509-372-9195 509-372-9195 3350 George Washington Way, HO-3350 George Washington Way, HO-

[email protected] [email protected] Richland, WA 99352Richland, WA 99352

Elizabeth M. (Liz) BowersElizabeth M. (Liz) Bowers Department of Energy Department of Energy 509-373-9276 509-373-9276 825 Jadwin Avenue, A2-15825 Jadwin Avenue, [email protected] [email protected] Richland, WA 99352Richland, WA 99352

James R. Davidson, Jr. James R. Davidson, Jr. Davidson & Davidson, Inc.Davidson & Davidson, Inc.509-374-4498 509-374-4498 8390 Gage Blvd., Suite 2058390 Gage Blvd., Suite [email protected] [email protected] Kennewick, WA 99336Kennewick, WA 99336

Page 21: From qualitative concept to practical implementation.

21 of 21

End of ModuleEnd of Module


Recommended