From: Tabatha LeBlanc <email address removed> Sent: March 28, 2014 12:26 PM To: Spagnuolo,Colette [CEAA] Cc: Clark Gilbert Subject: March Monthly Update Dear Ms. Griffiths, As requested, Stillwater Canada Inc. is providing a monthly update for the Marathon PGM-Cu Project. For the month of March, the evaluation of the Project continues and there are no status updates or schedules for completion available at this time. Stillwater is committed to keeping our communities informed and hosted a public information session on March 5th in the Town of Marathon. The purpose of the session was to provide information about the Marathon PGM-Cu Project and answer questions. Stillwater has extended an offer to our aboriginal communities to host a similar information session for their community. A copy of the March 5th presentation has been enclosed with this email for posting on the CEA Registry. Sincerely, Tabatha ____________________________
Tabatha LeBlanc BSc EP
Environmental Manager
<contact information removed>
Town of Marathon
Public Session
March 5, 2014
Purpose of Today’s Session
1. Correct and Clear Communication
Visible and available to our communities, public, aboriginal groups and other stakeholders interested in the Marathon PGM-Cu Project
Directly from Stillwater and not from second hand sources
2. Project Goals
3. Project Design
4. Request to Suspend Environmental Assessment
5. Recent Updates and Next Steps
6. Questions and Answers
Project Goals
3
• Conduct ourselves and activities in the spirit of
a good corporate citizen
• Sincere and transparent communication
• A safe work environment
• Develop the Project in a responsible manner
• A benchmark for environmental protection in
Ontario, striving for continual improvement
• Potential revenue source for governments
• Provide suitable return for investors
Project History
4
• 1920’s -1940’s , indication of iron and copper mineralization
• 1963, Anaconda first comprehensive drilling program (Discovery of PGM-Cu deposit)
• 1986 – 2014, resource & feasibility studies for the site completed by Anaconda, Fleck
Resources (Polymet Mining), Geomaque, Marathon PGM Corp. and Stillwater
• 2008, Economic down turn, activities reduced at Marathon PGM Corp.
• 2010 February, Project Description submitted to trigger Environmental Assessment (EA)
• 2010 July, EA Suspension to prepare addendum to Project Description
• 2010 November, Stillwater Mining Corp. acquired Marathon PGM Corp. platinum group
metal assets
• 2012 April, Mitsubishi ‘s MC Mining acquires 25% ownership of Stillwater Canada Inc.
• 2012 June, Submission of Environmental Impact Statement Report and Supporting
Information Documents
• 2013 December , Joint Review Panel determines sufficiency
• 2014 January, EA Suspension to complete evaluation of Project
Principles of Environmental Design -
Design into Practice
5
Project development has incorporated
environmental design principles.
Environmental Assessment is a
planning tool.
Examples:
• Evolution of Project Design through
consultation resulted in reduced footprint
• Segregation of potential acid generating
mine rock and process solids
• Selection process used for the mine
components based on alternatives
assessment and regulatory feedback
• Effluent discharge locations selected
based on receiving environmental
suitability and Aboriginal and Public
consultation
Project Components
6
• Average milling rate of 25,000 to 28,000 tpd crushing plant &
concentrator
• Operating life of mine approximately 10 to 12 yrs
• Open pit with satellite pits
• Mine rock stockpile area (MRSA)
• Process solids management facility (PSMF)
• Associated infrastructure:
• Access road to site
• Hydro corridor
• Explosive Plant
• Rail load-out facility
• Concentrate storage facilities
• Warehouse and maintenance facilities
Suspension of Environmental Assessment
• A request to suspend the Environmental Assessment
was made to Joint Review Panel on January 30
• Based on the shareholders’ continuing strategic review,
SCI have determined to suspend the permitting process
until a full evaluation of Project is complete.
• January 31, the Joint Review Panel responded and
suspended the Environmental Assessment for the
Project.
• Link for CEA Registry http://www.ceaa-
acee.gc.ca/050/details-eng.cfm?evaluation=54755
Recent Updates
• Recent updated study work indicates the project will not provide an acceptable level of return to its shareholders.
• The SCI project team has identified opportunities that, if feasible, may improve the level of shareholder return from the project. This may require changes to the currently proposed Plan of Operations.
• SCI is in the process of reorganizing offices to better match with the anticipated scope of work going forward.
Next Steps
• Project fits within strategy of focusing on PGM assets in low geopolitical risk jurisdictions
• High quality JV partner (Mitsubishi – 25% stake)
• Committed to completing feasibility study and project optimization
• As soon as decisions or milestones are determined, Stillwater will be communicating with our communities.
• Contact us by dropping by the office, phone or email if you have any questions.
Questions and Answers
Thank- you for your participation and interest in the Marathon PGM-Cu Project