GF Piping Systems
Water PhilippinesVisit GF Piping Systems at the largest
water exhibition in the country, from
March 22 - 24 in Manila. page 4
NDT & moreWe offer the world‘s first NDT service with a pass or fail statement. Read all
about the new GF Services. pages 2-3
New LeadershipAdi Wirawan has joined
George Fischer Pte Ltd Singapore
as Managing Director. page 8
Issue 11 | March 2017
Frontier
NDT with “pass or fail“ statementQuality management for your butt and electro fusion welds in PP and PE
ScanningWorking with our international partner, we are able to scan butt fusion welds with our customized ultrasonic sensors. We can test typically between 20-30 welds per day, saving money during the NDT test day.
AnalysisUsing the data obtained, we are able with our unique algorithm, coupled with our extensive testing and highest quality standards to provide a pass or fail statement on the butt fusion weld.
CertificationTo provide peace of mind to our customers, we will issue a “Fit for Service” statement for each weld. Ensuring the quality and expected life of the piping system, with a 10 year warranty.
Peace of mind with 10 year weld warranty
Increase qualityPass / Fail “Fit for Service” weld report
Save moneyBetween 20-30 weld tests per day, increasing efficiency and reducing site costs
Save timeIncrease of life expectancy of ecoFIT / PROGEF piping system
ecoFIT, PROGEF and ELGEF system
The corrosion-resistant solution for your
applications SpecificationOur extensive know-how
in planning and installation
Fusion weld trainingTo allow participants to gain confidence in
working with our products
NDT testPeace of mind – integrity
of fused joints with full traceability
Fit for serviceStatement (pass / fail)
regarding the long term behavior of the jointsWeld warranty
Tested & certified quality with
10 year warranty
2 Frontier March 2017 Cover story: GF Services
Increase safetyExpert assurance from 60+ years of thermoplastics experience
Using ultrasonic technology, we are able to offer the highest quality control NDT for our butt fusion welds in ecoFIT (PE) and PROGEF (PP) and electrofusion for ELGEF. Key projects around the world rely on NDT technology to ensure highest safety and quality of the weld area in metal piping. Today, our approach to total quality management has resulted in the world’s first NDT Service with a pass or fail statement. Once passed, we offer a 10 year weld warranty.
Fit for service GF Piping Sytems understands the challenges faced along the project cycle, from owners and engineering companies involved in specifications and design to logistical solutions for on time installation of goods and to the safe commissioning operation of the plant. Our NDT solution fulfill the same quality control standard but with the added value GF provides a pass / fail fusion weld statement.
The right way to successOur NDT solution with “Fit for Service” for thermoplastics offers a first approach to quality management in thermoplastics. Using our systems, we can integrate into your design and specifications, offer your team GF recognized fusion weld training, to meeting international standards.
Starting at the front end
of a project, GF supports
engineering and designing
to ensure a sustainable
and efficient solution is
available. Our competence in
all applications and proven
references throughout the
entire product range ensures
the highest management
during project planning and
execution. Our global footprint
is the perfect support platform
for professionals all around
the world.
GF Piping Systems offers full mechanical design capabilities
and services from our highly-skilled plastic design
engineering group. Our
engineering staff can
assist with everything
from part modification of
an existing product, new
product development, spool
drawing, and manufacturing
drawings from customer
provided sketches all the
way to full-system design
from your piping and
instrumentation diagrams
(P&ID). In addition, we
manufacture systems in
a variety of dimensions,
wall thicknesses, inch or metric standards, DIN or ASTM
standards as well as drainage or pressure applications.
3 Frontier March 2017 Cover story: GF Services
Engineering Services and Project SupportFrom an idea to a complete solution - all from one global source
Features at a glance:•License
•Cloud storage
•Project management
•XL 100 users
•S 30 users
•QR scanner
•Synchronized to cloud
•Collection of all job data
•Photos / Notes
•Jobsite data synchronization
•Jobsite monitoring
•Secure platform
•Full access
•Geo mapping
•QR code
•Unitary QR code
•Full traceabilty
•Online live access
•MSA compatibility
•Welding certificates
•Geo position +/- 10cm
•Server synchronization
•Document synchronization
•Quality assurance
•Example: GF NDT Certificate
•Cloud storage
•Peace of mind
Detailed engineering calculations of plastics
CAD the custom product
3D modelling of the custom solution Realizing the final bespoke solution
Track & Trace: Manage your assets Track & Trace offers a complete job-site quality management
package covering preparation, data collection and data
archiving. Using state of the art Apps, Web Platforms, Online
Cloud, Mobile Devices and GPS Hardware. The smart way to
plan, manage and implement installations in a quality driven
and smooth process.
4 Frontier March 2017 Events
Are you interested in hosting a product seminar at your company yourself? Let us know how we can support you best: [email protected]
Only a few days left until Water Philippines: From Wednesday, March 22,
professionals from the Philippines Water Industry will get together at
the leading Water and Wastewater Conference designed to stimulate a
forward thinking approach towards the 2017 theme “Water and Sanitation
Solutions for a Better Future”.
Our local team from GF Piping Systems is very excited to join this event
for the first time and will showcase our latest solutions for Utilities,
Building Technologies and Industrial applications. If you are interested
in Secondary Containment Piping Systems, you shouldn’t miss GF’s
Technical Symposium (see right) to gain more insight on this fascinating
and reliable technology. See you March 22 -24, from 10 am, at booth J100
in the Singapore Pavilion!
Showtime in Manila
On the road in Vietnam
GF Philippines is looking forward to meeting you at Water Philippines
Expert know-how at Technical Symposium
Topic: “Secondary Containment Piping Systems -
Easy and Reliable”
Speaker: Leon Valdes, Regional Sales Manager SEA,
George Fischer Pte Ltd
When:Thursday, March 23, 4 pm - 4.30 pm
Ho Chi Minh, Dongthap, Bac Lieu
and Soc Trang - it has been quite
a journey for GF in Vietnam. With
support from our local Partner
VUCICO, the team has been visiting
several customers in South Vietnam
to introduce the latest products and
solutions for Water Utilities.
5 Frontier March 2017 Product updates
*** MSA 2.1 without Welding BookMSA 2.1 machines without Welding
Book (code 790 156 002 and 790 156
005) will be phased out. Combined with
the welding book, the machines will
still be available.
*** MULTI/JOINT® XL DN450-DN600The non restraint MULTI/JOINT® XL
DN450-DN600 in all material variations
will be phased out. As a replacemnet,
MULTI/JOINT® 3000 Plus is available.
***PE reinforcing saddleEffected by the Phase out of PE
reinforcing saddle are ELGEF 24 Volt
and Welding mat ELGEF 24 Volt.
*** Installation Set TL 315 The Installation Set TL 315 d500-
2000mm for Utility market is no longer
produced. The Installation Set TL500
d500-d2000 will continue to be offered
exclusively for the installation of the
connection saddle with outlet d315 and
d500mm.
Please contact your local sales company (addresses on back page) for more information.
Type EA 15 completes Electric Actuators familyNew model replaces Type EA11With Type EA 15, the new series of Electric
Actuators has been completed. The series
provides the highest reliability and ease of use.
With smart additional functions, these actuators
are ahead of their time. Type EA 15 replaces
actuator type EA11.
Similar to the EA25-250 series, the EA15 has following key features:
• Great visibility even under harsh conditions with
LED enforced actuator feedback
• Easy actuator adjustment via buttons thanks to
digital position detection
• Easy troubleshooting with error code inside
• Fully packed standard actuator with electric
feedback and heater on board
• Plug and Play accessory – no fuss installation
Product Short Spec EA11 (old) EA15 (new)
Nominal Torque [Nm] 10 10
Peak Torque [Nm] 20 20
Cycles (@ 20°C and nominal torque) 150,000 150,000
Control time [s/90°] 5 5
L/W/H [mm] 150/122/167 150/122/167
Flanges F05 F05
Voltage Offering:
Interfaces:
Dimensions:
*** Phase outs and production stops ***
6 Frontier March 2017 Product updates
Prefabrication for fittings up to d1200The new WM 1200 Plus, a hydraulic butt fusion machine for prefabrication of PE and
PP fittings, is ready for sale. The capability of making T, X, Y segmented fittings up to
d1200 goes beyond the limit of d900 of the currently available WM 1200.
At a glance• Maximum jointing angle 45°
• Dimensional range d800 - 1200 mm; d630, d710 mm available on demand
• To produce T, X and Y fittings in the dimensional range d630 - 1200 mm, special
accessories are required
• Welding Recorder integrated in the control panel for operator guidance and
fusion process supervision
• Hydraulically opening and closing of the clamping units
• Hydraulic locking mechanism of the clamping units
Hydraulic WM 1200 Plus machine is available
ecoFIT and PROGEF: Design changesA design change took place within our
ecoFIT (PE) and PROGEF (PP) welded
systems, The modifications affect the
installation length of several T90°
equal/ reduced, reducers and endcaps
in dimensions d50-d315 SDR11/ SDR17.
Additionally released are butt fusion
reducers in d110-d63 for PROGEF
Standard, PROGEF Plus, PROGEF Natural
and ecoFIT.
Improved versions of MSA 2, MSA 4 and WeldinOne Improved versions
of MSA 2, MSA 4
and WeldinOne have
been released. The
improvements relate
to hardware features
(Y Cables kit for PE
COOLFIT), material changes (e.g. gold
coated plugs and 90° adapters) and
software (e.g. guided photo shooting
in the MSA App; shortcut for importing
protocols and photos from PDA).
Prefabricated ceiling cooling systemThe CeilKlima line, a prefabricated
ceiling heating and cooling system
offered in the Italian market, is now
internationally available. It provides high
comfort, high efficiency and low thermal
inertia. It consists of a plasterboard
panel (15 mm thick) with EPS insulation
layer (30 mm thick) in the top which can
be easily and quickly connected to the
distribution system via push fittings.
Modification of JRGUMAT 3400A modification project for
JRGUMAT 3400 has been
conducted. The
dimensions DN20
up to DN50 will
be adapted to the
same principle like
JRGUMAT 3410 (DN 65
and 80). It means that the red sleeve
from the circulation inlet is removed and
consequently the cold water seat will not
be drilled anymore.
New GF publications
For catalogue enquiries, contact us at [email protected]
The new brochure “iFIT. Installations made simple” for Building Technology has been published.
8 pages, available as PDF
The “Small & Light” brochure of GF’s Electric Actuator series has been updated and is now available.
8 pages, available
as PDF
7 Frontier March 2017 Corporation
A further increase in performanceAnnual Report 2016 published GF has developed itself in 2016 fully in line with its strategic objectives
2016–2020. Sales and profits increased again and all three divisions (GF
Piping Systems, GF Automotive and GF Machining Solutions) generated
value.
• Sales increased 3% to CHF 3’744 million
• Operating result up 5% to CHF 311 million
• Earnings per share reached CHF 53, up 15%
• Dividend increase proposed to CHF 20, up from CHF 18
• High free cash flow before acquisitions, up 22%
The Corporation has increased its sales by 3% to CHF 3’744 million. In
local currencies and adjusted for acquisitions and divestments, turnover
growth amounted to 2%. The operating result (EBIT) rose to CHF 311
million, up 5% compared to previous year. This resulted in an EBIT margin
(ROS) of 8.3% against 8.1% in 2015. The return on invested capital (ROIC)
increased to 19.3%, up from 18.9% in 2015. All three divisions generated
ROICs well above their cost of capital, thus creating a high amount of value
for the company.
Net profit amounted to CHF 225 million, 14% above previous year,
resulting in earnings per share of CHF 53 against CHF 46 in 2015. Free
cash flow before acquisitions and divestments reached CHF 231 million,
clearly above the already high level of the previous year (CHF 190 million).
Based on the above, the Board of Directors proposes to the Annual
Shareholders’ Meeting a dividend of CHF 20 per share (CHF 18 in 2016).
Read the Annual Report 2016Scan the QR code to explore videos,
interactive graphics, and much more.
For a printed version, please contact us at
The Annual Report 2016 was presented at the Annual Media Conference 2017 end of February at the Stock Exchange in Zurich.
8 Frontier March 2017 News
“Looking forward to serving you”We are delighted to have Adi
Wirawan on board at George
Fischer Pte Ltd, as Managing
Director for Singapore and South
East Asia. Adi started on 23
January 2017.
Before joining GF, Adi has been
in multiple management roles
within NYSE-listed multi-national
corporations. His last appointment
was with Videojet Technologies,
Inc – Danaher Corporation as
General Manager for South East
Asia, Australia and New Zealand.
Adding value to our customers processes“GF Piping Systems is a great
global brand with the most
extensive product portfolio”, Adi
says. “I am excited to be part of the
team and be able to promote our
solutions to the South East Asia
region.” His focus is clear: It’s the
customer that has to be the centre
of attention. “Our team will focus
on adding value to our customer’s
processes, addressing their
challenges with GF’s innovations
and providing quality products to
meet their commitments. We are
looking forward to serving you”,
said Adi.
With the new leadership, GF
Piping Systems will strengthen
its customer focus and drive
concerted efforts to deliver its
quality solutions to the region.
Get in touch with Adi: Phone: +65 6747 0611 E-Mail: [email protected]
Chemical ResistanceOur specialist teams are highly knowledgeable about the chemical resistance of
materials. The online tool ChemRes PLUS provides you with key basic data.
CO2 CalculatorCalculate the possible carbon dioxide savings of plastics compared to metal
systems.
Cooling Calculation ToolThis tool allows you to calculate all the pipe system parameters important for
cooling, such as pressure loss, heat emission, contraction and temperature loss.
Flow CalculatorWith our Flow Calculator you determine the flow velocity, the flow rate and the
pressure loss in relation to the internal pipe diameter and nominal diameter.
K Factor CalculatorWith the K Factor Calculator you determine the number of impulses generated by the
Signet sensor for each volume unit conducted past the sensor.
Lengths of Bolts & Tightening TorquesWith this, searching for the suitable bolts for your flange connection is no longer necessary.
Valve CalculatorWith our Valve Calculator you determine the dimensions of ball valves, diaphragm
valves, butterfly valves and angle-seat valves for the desired flow volume.
Pressure/Temperature DiagramThese diagrams are intended to serve as a general guide and are valid for water as
flow medium.
Valve Sizing ToolThis tool helps you to select the right size pressure regulator for your application.
Find GF support unter www.gfps.com/tools
Online tools for easy choices
Adi Wirawan, Managing Director
9 Frontier March 2017 Project reference
Waga: Allrounder for difficult connections
Repairing a broken cast iron pipe During construction works in Perk, a village
in Belgium, an excavator broke a cast iron pipe DN450, flooding a village with
60.000 m³ water and causing severe damage to nearby buildings. Water Utility
‘De Watergroep’ contracted Visser & Smit Hanab for the installation of the
MULTI/JOINT® 3000 Plus DN450 couplings.
The challenge the installation company faced was a restraint repair between
the existing ductile iron pipe and the newly installed ductile iron pipe. To make
this repair possible our DN450 MULTI/JOINT® 3000 Plus coupling was used.
Thanks to the one size fits and grips
all principle of our fittings,
making the connection was
very easy. An added advan-
tage of our fitting is that it is
end load restraint. Making
the use of thrust blocks and
other anchoring material no
longer necessary and ensur-
ing a quick, safe and simple
installation.
Repairing a broken cast iron pipe with MULTI/JOINT 3000 Plus DN450
The city of Roosendaal
(Netherlands) decided
to replace the existing
Asbestos Cement pipe which
reached its life expectancy.
Leakages were found in the
past year which led to the
decision to renovate and replace the
Asbestos Cement pipe with PE pipe.
The challenge the installation company Rombouts Kunststof Techniek
B.V. faced was a restraint connection between the Asbestos Cement pipe
and the newly installed PE SDR 17 pipe. As trees were growing above the
old Asbestos Cement pipe, the new PE pipe was installed three metres
besides the Asbestos Cement pipe. To connect the two pipes, an angular
deflection had to be overcome. To make this connection possible our
DN500 x DN450 MULTI/JOINT® 3107 Plus reduced coupling was supplied by
Conval Nederland B.V. Thanks to the one size fits and grips all principle, the
connection was made very easily.
Asbestos Cement to PE with DN500 x DN450 MULTI/JOINT® 3107 Plus reduced coupling
10 Frontier March 2017 Miscelleanous
Gong Xi Fa Cai - Happy new year
Greetings from DubaiGF Malaysia on the roadSome stunning pictures and a big hello to all
Frontier readers from our colleagues at GF
Malaysia:
“Our Malaysian team with all 40 employees
have been visiting Dubai for our annual team
building event. The country in the Middle East
has a lot to offer. We experienced a jeep ride
during a desert safari, visited the largest
mosque in the world, and had a great team
building session in Jumeirah beach to increase
our strong team spirit even more.”
Belated Gong Xi Fa Cai from GF Piping Systems Singapore! The office has been celebrating the arrival of the Chinese New Year with a company dinner in Mid February. Of course the famous Yusheng, a traditional activity
of tossing and throwing food to usher wealth and prosperity, was not allowed to be missed. The year of the rooster began on January 28, 2017 and will last until February 15, 2018.
“After this trip, we are motivated to work even harder to achieve bigger milestones in 2017!”
David Wong (Sales Engineer)
“An eye opening country where impossible was made possible”
“It was so much fun” Vivien Chia (Customer Service Representative)
Sean Soo (Sales Manager)
11 Frontier March 2017 Your chance to win
Your chance to win a Power BankMail the correct answer until 21 April 2017 to [email protected]
Do you know which number should be in the pink
circle? Send us the answer, either by e-mail to
[email protected] or by post to
our Singapore office (see address on back page)
marked “Frontier Competition”. Two winners
will be determined, each will receive one Philips
Backup power on the Go 10000 mAh. Entries close
5pm on 21 Arpil 2017. All correct entries will be
entered into the draw and the winners will be
selected on Monday, 24 April 2017, 3 pm at George
Fischer Pte. Ltd. Singapore. The two winners will
be notified by telephone or email. After three
months, if the prize has not been claimed, we
will redraw the prize and notify the new winners.
The winners will be announced in the next issue
of Frontier.
Employees of
GF and their
immediate
families are
not eligible for
entry.
Double luck for the PhilippinesThe contributions of Virgilio Madalipay from Manila Water
Company, Inc. (picture left, with Emerlinda Pimentel) and
Mickey Lagundino from Meinhardt Philippines, Inc. (picture
right, with Cyndee Lim)) have been picked at our last draw
of Frontier riddle No. 10. Both winners have solved the
holiday sudoku and found the correct answer “GF logo”.
Our colleagues from GF Philippines have met the lucky
winners to give them their prize: a Philips Backup power
on the Go 10000 mAh. for each of them. Congratulations
and well done!
Do you know the missing number?
GF Piping Systems
SingaporeGeorge Fischer Pte. Ltd.11 Tampines Street 92#04-01/07 Tampines BizhubSingapore 528872Phone +65 6747 0611Fax +65 6747 [email protected]
PhilippinesPhilippines Representative Office (Manila)Phone +63 2571 2365Fax +63 2571 2368
VietnamPhilippines Representative Office (Ho Chi Minh City)Phone +84 8 3948 5784Fax +84 8 3948 5786
IndonesiaPT Georg Fischer IndonesiaKarawang - FactoryJl. Desa Anggadita KlariKarawang Timur41371 Jawa BaratPhone +62 267 432 044Fax +62 267 431 [email protected]
Jakarta - OfficePhone +62 21 2900 8564
MalaysiaGeorge Fischer (M) Sdn. Bhd.No. 14, Jalan Anggerik Mokara 31/50Section 31, Kota Kemuning, 40460Shah Alam, Selangor Darul EhsanPhone +60 3 5122 5585Fax +60 3 5122 5575
Branch Office PenangPhone +60 4658 9682Fax +60 4656 0867
Your contact in South East Asia
Subscription / UnsubscriptionIf you want to subscribe or unsubscribe “Frontier”, please email your details and requestto: [email protected] with “Subscribe” / “Unsubscribe” in the subject line.Frontier is published four times a year. The next issue will be published in June 2017.
Published by:George Fischer Pte. Ltd., 528872 Singapore