FRP Composite Bridges 2m to 30m Clear Span FRP Composite Bridges 2m to 30m Clear Span Version 2.2
Transcript
Page 1: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

FRP CompositeBridges

2m to 30m Clear Span

FRP CompositeBridges

2m to 30m Clear Span

Version 2.2

Page 2: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Sustainable Infrastructure Systems.................................................High Tech Manufacturing & Quality Materials..................................Our Mission......................................................................................About FiberCore Europe..................................................................

........................What is Sustainable Infrastructure...................................................InfraCore® Technology..................................................................... Delamination & Cracking........................................................ Modular Construction............................................................. Maintenance Free..................................................................FRP Material.................................................................................... InfraCore® Technology....................................................................Typical Values.................................................................................Codes & Standards.........................................................................Fabrication......................................................................................Resistance to Fatigue.....................................................................Resistance to Impact......................................................................Built in Safety..................................................................................Thermal Behaviour..........................................................................Fire..................................................................................................Climate............................................................................................Sustainability...................................................................................Weights..........................................................................................Transport, Shipping & Lifting..........................................................Case Studies Staines Moore Bridge............................................................ Ordnance Bridge...................................................................Project Gallery................................................................................ Cycleway Bridges................................................................. Golf Bridges.......................................................................... Port Bridges.......................................................................... Road Bridges........................................................................

7810111314151617182021232425262728293031323334

44628081107111114

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 3

Page 3: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 4

1300 26 10 74 [email protected]

sisau.com.au26 The Parade West Kent Town SA 5067

When you are ready to talk,contact our structures teamto set a meeting, for samples

or to discuss your project.

Page 4: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Available in Australia & New ZealandFrom Sustainable Infrastructure Systems (Aust.) Pty Ltd

NetherlandsBelgiumNorwaySwedenPoland

AustraliaUK, USA

China

Over 800 StructuresDelivered Worldwide

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 5

Page 5: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Until now, lightweight large single span composite bridges have not been available to designers,

architects, engineers and stakeholders in Australia & New Zealand.

Sustainable Infrastructure Systems (SIS) is proud to introduce FiberCore Europe’s

InfraCore® Inside technology

Welcome to the future of bridge building.

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 6

Page 6: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

SIS is a unique organisation focused on manufacturing and distributing sustainable and recycled products and projects for

From recycled plastic, recycled wood plastic composites (WPC),

through to our CoreSpan® co-extruded multi-composites and aluminum WPC hybrid composite and OEM manufacturing, SIS are market leaders in delivering sustainable products to customers in many markets.

SIS specialise in delivering our product range to markets including Civil Infrastructure, Building & Construction, Oil & Gas, Mining, Aviation, Aquaculture, Marine & Ports, Transport & Logistics and Agriculture.

About Sustainable Infrastructure Systems(Aust.) Pty Ltd

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 7

Page 7: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

High Tech Manufacturing & Quality Materials

Products designed, manufactured and supplied by SIS embody state of the art technology and are engineered by our teams to deliver enhanced performance and

All our products are manufactured to the highest industry standards, following strict quality assurance guidelines. With many employees dedicated to production, quality product and technical expertise is ensured at all times.

Excellent long term relationships with our key suppliers of raw materials and

manufacturing and supply chain processes. The close relationship with our research and development division ensures that SIS manufacturing teams can react quickly and professionally to customer needs.

SIS has built a reputation based on excellent customer service, high quality manufacturing and on providing the right solution in sustainable product design and manufacturing.

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 8

Page 8: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Continuous improvement of equipment design, materials and manufacturing

most commercially viable sustainable products and projects available. SIS also

We manufacture and supply products from materials that include:

• Recycled Plastic • Fiberglass Reinforced Polymers • Recycled Wood Plastic Composite • Recycled Rubber • Co-Extruded Aluminium / Wood Plastic Composite

With a global network of manufacturing facilities, along with projects delivered in

syseamless supply to almost any place on earth.

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 9

Page 9: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

OurMission

SIS aims to set a responsible standard of sustainable product design and manufacture and project delivery for our diverse client base in both the short and the long term.

a part in protecting future generations. Designers, engineers and stake holders have a big responsibility to set standards of product and project deenvironment and the people who live in it.

because it will be the expected.

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 10

Page 10: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

In 1995, Jan Peeters developed Europe’s

Team worked together on the project with the Dutch Department of Waterways.

Although composite is in many respects superior to concrete, wood and steel, the application of this great material in heavily loaded constructions requires extra attention.

Jan Peeters resigned from the Plastic and Rubber Institute at TNO and focused all his attention on developing a revolutionary construction technology with composite.

Despite the long history of composites, these high-tech materials had not been paid much attention. It took almost 10 years before the inventions of Jan Peeters could be applied in infrastructure.

Together with Simon de Jong, Jan Peeters founded FiberCore Europe in 2008.

AboutFiberCore Europe

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 11

Page 11: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

With their patented technology InfraCore® Inside, FiberCore Europe is now a worldwide success.

More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France, Italy, Sweden, Norway, China and the USA.

An important moment in the development of the company was the real scale research, which proved that the InfraCore® technology does not show any fatigue or any other structural failure for 100 years.

FiberCore Europe has grown steadily in recent years. Over the years, numerous patent positions were developed worldwide on the technology and the production method. 2015 showed company growth of over 140% and proved to be the real

nd eight lock gates for the Wilhelmina Canal in Tilburg. After years of investment, the acceptance of the InfraCore® technology in civil infrastructure has become a reality.

Today, Jan Kroon is general manager of FiberCore Europe. Focus will be on further professionalisation and the ambitious (international) growth of the infrastructure company.

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 12

Page 12: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

The InfraCore® Inside technology was invented, developed and promoted

in the world of infrastructure.

system.

It includes everything from the supply of raw materials to veristages in the fabrication process.

Quality

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 13

Page 13: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Sustainable infrastructure is not just about new infrastructure, it is about rehabilitation, reuse or the optimisation of existing infrastructure, which is consistent with the principles of sustainability and sustainable product development, whether it be from civil infrastructure to mining sectors.

This encompasses infrastructure renewal, long-term economic analysis of infrastructure, energy use and reduced infrastructure costs, the protection of existing infrastructure from environmental degradation, material selection for sustainability, quality, durability and energy conservation, minimising waste and materials, the redesign of infrastructure in light of climate change and the remediation of environmentally damaged areas of our world. Clearly, sustainable infrastructure will lead to improvements to society through better socio-economics. Responsible design needs to balance social, economic and environmental issues.

What is Sustainable Infrastructure

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 14

Page 14: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 15

FiberCore Europe structures are made with our patented technology, InfraCore® Inside.

InfraCore® technology was specially developed for the construction of extremely

polymer composite.

In order to guarantee this safety, all InfraCore® structures are provided with the InfraCore® Inside quality mark.

InfraCore Technology

Page 15: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

In the past the weakness of regular composite constructions (sandwiches) was their delamination, a problem caused by the skin coming loose from the core.

Delamination mainly occurs after impact load, followed by fatigue load. In bridges this could be the case after cracking damage followed by passages with a wheel print.

solution for

polymers in Infrastructure.

No Delamination or Cracking

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 16

Page 16: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Modular Construction

comes to maximising speed and safety and minimising disruption. The low weight of

The disruption to surrounding road or rail infrastructure can be heavily reduced

Safety risks for the construction of bridge elements are redirected towards the manufacturing plants - being controlled environments there is much less that can go wrong, when it comes to safety.

the complications that can arise on a construction worksite.

redictable when it comes to costs.

Fewer labour elements necessary for constructing projects on site. This is a ote areas.

Foundations required are approximately only one third of that required for concrete and steel constructions.

The construction speed will minimise building time and road closures. For construction work that is well prepared, a bridge with InfraCore® Inside can be installed within one hour.

As demand on scarce raw materials is reduced and emissions are very low, the technology is sustainable with regard to the environment.

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 17

Page 17: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Modular

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 17

Maintenance Free &Guaranteed for 50 years

Structures with InfraCore® Inside require no maintenance after installation.

moisture, rot, fungi, temperature, etc.

For this reason, InfraCore® elements are covered by a 50-year guarantee.

in a high-quality gel coat or topcoat. As this

bridge, they form one consistent unit.

InfraCore® is resistant to almost all forms

Maintenance is limited to the cleaning and repair of the wearing surface. Repair will be required after the normal decrease of the

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 18

Page 18: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 19

Page 19: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Fiber reinforced polymers are a composite material of

of thermoset resin. The resin

buckling and enables transfer of

Thermoset resin does not get soft at elevated temperatures, unlike thermoplastic material in

plastics.

superior, generally more costly,

of 2800N/mm2 (or MPa) thus are stronger than steel (~355N/mm2).

roving or as mat, either with

the reinforcement in reinforced concrete structures, yet at a much

dispersed over the structure.

FRP Material

Overview of the Properties of InfraCore® Inside,with those applicable to civil engineering structures highlighted.

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 20

Page 20: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

InfraCore® - TechnologyInfraCore® Inside is FiberCore Europe’s proprietary technology to construct strong, lightweight and durable structures in FRP. The technology comprises of the design,

While some freedom exists to tune the technology for each specifabrication follows a modular construction. The dimensional constraints are due to handling and transportation, but not the technology itself.

Structures manufactured using InfraCore® Inside technology are fully prefabricated and integral, with no internal bonding or bolting. The strength therefore relies on the

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 21

Page 21: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

The Principle of InfraCore® Inside : no skin-core debonding

Mechanically behaves like

structure.

In such structures, two skins are spaced in order to create a layer arm.

with lightweight material that only transfers shear stresses.

Inside is that it incorporates a continuous structural connection between the two skins.

This eliminates the brittle failure as a result of debonding between skin and core.

means that a resin-dominated fracture path should be avoided, and it is demonstrated below:

direction, cracks eliminate the load distribution, and then propagate until failure. Fibers in cross-direction are essential to avoid this

In conventional sandwich structures, initial damage is propagated by rolling wheels, leading to skin-core

debonding and total failure.

In InfraCore® Inside, local damage can not lead to catastrophic failure modes. Moreover, the core-material (foam) is not part of the load-bearing structure, but only

acts as a placeholder during construction.

InfraCore® Inside

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 22

Page 22: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

InfraCore® - Technology

The properties of composite materials depend on the

Typical values are as follows:

• Strength, span direction: 55N/mm2 (or MPa)• Strength, transverse: 150N/mm2 (or MPa)

2 (or 11GPa)

the debonding between the core and the skins that is normally critical and fatal in sandwich construction. For

consider InfraCore® Inside as a sandwich typology, and ignore the contribution of the interior foam and webs.

InfraCore® Inside has so far been used to support vehicles of up to 60 tonnes.

The density of infused rigid solid FRP varies with the

1600 and 1800kg/m3. The bare core material, which has no structural role and only serves as a lost mould during construction, weighs 35kg/m3.

Typical Values

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 23

Page 23: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

While the design of FRP structures is not covered by the Eurocodes, the material independent parts of these codes can be used. The use of FRP is well established in naval and aerospace construction and abundant design experience is available.

available, the most advanced being the Dutch design guideline CUR 96-2017

Following the limit state design methodology of Eurocodes, it proposes reduction factors on theoretical material properties, depending on the application, the method of construction and the environment where it is applied. For the design of its InfraCore® Inside structure, FiberCore Europe follows the loadings set out in Eurocodes, and the checking as per the CUR 96-2017 guideline.

SIS engaged FMG Engineering to conduct a full review of the codes and compliance to Australian Standards and Codes.

Codes & Standards

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 24

Page 24: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Schematic view of the vacuum infusion technique

Since InfraCore® Inside is a technology with the same principles at its core, , with the

element that can be produced are dictated by logistics, not by the technology itself. Currently the maximum element length that can be manufactured

is 56m and the maximum width 8m

InfraCore® Inside is constructed with the vacuum infusion technique. This method allows fabricating

bespoke geometries.

The process involves transporting resin through

process takes place inside an airtight bag, with no emissions.

Fabrication

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 25

Page 25: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

When FRP is used in bridge construction, the design is most often

the material is

well outside the domain where it would be sensitive to fatigue.

FRP is also used in windmill blades. These endure much higher levels of stress and strain. From this application, a vast amount of information is available on fatigue behavior.

The resistance of InfraCore® Inside against fatigue has been comprehensively tested at Delft University of Technology. In the tests, a sample was subjected to a loading equivalent to a design life of 150 years.

Resistanceto Fatigue

(Fatigue testing at Delft University of Technology, Netherlands)

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 26

Page 26: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

In infrastructure applications, not only is the loading distribution as prescribed by design codes, but also the resistance to impacts as well.

To demonstrate the resilience of InfraCore® Inside against impacts, panels were subjected to a mass in free fall at the laboratories of TNO.

strain-capacity, as the applied mass bounced back.

Resistanceto Impact

Images made with high-speed camera show no panel failure but an elastic response instead.

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 27

Page 27: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

constructed together as a multi-directional laminate through the infusion method, failure

Built in Safety

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 28

Page 28: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

ster resin. materials are subject to thermal movement like most other materials, but the magnitude

-6/K-6/K

be matched with that of -6/K). which enables integrally connected hybrid structure with minimal

Thermal Behaviour

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 29

Page 29: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

are self-extinguished as soon as the external heat source is taken away.

Fire

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 30

Page 30: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

and are fully resistant to both high and low temperatures.

InfraCore® Inside has been exposed to liquid nitrogen (-1960C), and has come out of the test fully functional.

In hot climates, exposure to temperatures over 90C should be avoided. In areas of long term heat exposure a layer of asphalt can be applied to protect

assets long term.

Climate

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 31

Page 31: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Due to the low dead load, almost zero maintenance, long design life and the ability to recycle and regain the embodied energy after use,

FRP structures have very positive sustainability credentials. Comparisons with other materials should be performed on a

case-by-case basis, and include all the project characteristics, including the foundations, maintenance and after-use.

Sustainability is a very broad subject and depending on the location and the client’s ambition,the following positive contributions could be considered:

Sustainability

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 32

Page 32: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 33

Weights

Length[m]

Width[m]

Deck Depth[mm]

Weight[kg]

5.0 1.2 100 508,02

7.5 1.2 100 812.84

10.0 1.2 220 1117.65

12.5 1.2 370 1625.67

15.0 1.2 510 2032.09

5.0 2.2 100 1016.04

7.5 2.2 120 1524.07

10.0 2.2 180 2133.70

12.5 2.2 270 2946.54

15.0 2.2 370 3759.37

Examples of Structure Weights:

Design Criteria for Weights Above:

Page 33: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 34

Transport, Shipping & Lifting

Page 34: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Bridge elements from 2m to 30m can be shipped globally sport partners,

either inside containers or top loaded, via road, sea, rail or if required air.

Containerised Freight

Bridge elements can be stacked to reduce shipping costs

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 35

Page 35: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

than 2.4m can be manufactured in parts, allowing for 2, 3 or 4 elements to become 1. This inventive step is ground breaking in it’s ability to enable wide structures to be delivered

to site using standard transport options and therefore dramatically reducing costs normally associated with moving wide structures.

See drawings following on how this is achieved

Photographs below show a bridge delivered to site in 2 sections, bolted together and then installed

Split Bridges

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 36

Page 36: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Split bridges once bolted together have a rubber compound applied to the join. This can be colour matched and aggregate

matched to provide a seamless appearance

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 37

Page 37: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 38

Page 38: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 39

Page 39: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Lifting

Each FiberCore bridge element is designed and engineered for its own unique application.

All elements ordered come with a lifting / slinging drawing

and instructions on how to best lift and install each element.

See next page for example.

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 40

Page 40: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 62© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 41

Page 41: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 62© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 41

Page 42: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

FiberCore can create a unique handrail design which is as individual and bespoke as your project.

A full range of standard handrail designs are also available.

n

See next page for example.

Handrail Systems

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 42

Page 43: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 43

Page 44: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

#1

Staines Moore Bridge United Kingdom

Engineering Case Study

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 44

Page 45: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 45

Page 46: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 46

Page 47: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 47

Page 48: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 48

Page 49: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 69© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 49

Page 50: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 50

Page 51: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 51

Page 52: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 52

Page 53: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 53

Page 54: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 54

Page 55: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 55

Page 56: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 56

Page 57: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 57

Page 58: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 58

Page 59: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 59

Page 60: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 60

Page 61: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 61

Page 62: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST ) Pty Ltd Page 83

Engineering Case Study

Ordnance BridgeUnited Kingdom

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 62

Page 63: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 63

Page 64: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 64

Page 65: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 65

Page 66: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 66

Page 67: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 88© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 67

Page 68: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 68

Page 69: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 69

Page 70: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 70

Page 71: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 71

Page 72: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 72

Page 73: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Engineering Case StudyEngineering Case Study

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 73

Page 74: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 74

Page 75: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 75

Page 76: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 76

Page 77: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 77

Page 78: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 78

Page 79: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 79

Page 80: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Cycleway Bridges.......................................

Golf Bridges...............................................

Port Bridges...............................................

Road Bridges.............................................

78

104

108

111

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 80

Page 81: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

78

104

108

111

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 81

Page 82: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Project Number: 07-001

Project Number: 11-007

Location: Dronten, NetherlandsLength: 24mWidth: 5mSpan: 21.5mCategory: 5kN + Service VehicleProduction Year: 2007

Location: Nagelervaart NetherlandsLength: Both 20mWidth: Bridge 1: 1.5m Bridge 2: 2.25mSpan: Both 20mCategory: 5kN + Service VehicleProduction Year: 2011

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 82

Page 83: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Location: Aalsmeer, Aletta Jacobs NetherlandsLength: 11.1mWidth: 4.5mSpan: 11.1mCategory: 5kN + Service VehicleProduction Year: 2012

Location: Borne, NetherlandsLength: both 15mWidth: both 4mSpan: both 15mCategory: 5kN + Service VehicleProduction Year: 2011

Project Number: 11-006

Project Number: 12-061

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 83

Page 84: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Location: Amersfoort, NetherlandsLength: Both 17.74mWidth: Both 5mSpan: Both 17.74mCategory: 5kN + Service VehicleProduction Year: 2011

Location: Potgieterstraat Rotterdam, NetherlandsLength: 18mWidth: 2.25mSpan: 18mCategory: 5kN/m2Production Year: 2010

Project Number: 10-026

Project Number: 11-018

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 84

Page 85: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Project number: 11-020

Project Number: 11-019

Location: Kamerinkse Wetering,NetherlandsLength: Bridge 1: 13.8m Bridge 2: 14.9mWidth: Both 1.5mSpan: Bridge 1: 13.8m Bridge 2: 14.9mCategory: 5kN/m2Production Year: 2011

Location: Sommelsdijk, NetherlandsLength: 31m & 29mWidth: 1.2m & 4mSpan: In Three PartsCategory: 5kN + Service VehicleProduction Year: 2012

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 85

Page 86: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Location: Gouwebos, NetherlandsLength: 39.1mWidth: 4x 2.45m 1x 4mSpan: 5 PartsCategory: 5kN/m2Production Year: 2014

Location: Den Oever, NetherlandsLength: 8.5mWidth: 2.1mSpan: 8.5mCategory: 5kN/m2Production Year: 2013

Project Number: 13-067

Project Number: 14-109

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 86

Page 87: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Location: Dongen, NetherlandsLength: 14.5mWidth: 2mSpan: 14.5mCategory: 5kN + Service VehicleProduction Year: 2014

Location: Hillegersberg, NetherlandsLength: 18.3mWidth: 6.6mSpan: 18.3mCategory: VK35Production Year: 2014

Project Number: 14-139

Project Number: 14-147

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 87

Page 88: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Project Number: 15-166

Project Number: 15-167

Location: Exercitiesingel, NetherlandsLength: 20mWidth: 1.9mSpan: 20mCategory: 5kN/m2Production Year: 2015

Location Amersfoort, NetherlandsLength: 20mWidth: 4mSpan: 20mCategory: 5kN + Service VehicleProduction Year: 2015

Exercitiesingel placed a bicycle footbridge with InfraCore® Inside. The bridge has a size of 20 meters by 1.9 meters. Yet the bridge is only 250mm thick by clamping it on its abutments and therefore the bridge has a sleek appearance. In addition, there is special aspect to this bridge that the abstract designed handrail is made entirely

The bicycle pedestrian bridge serves as a transition to the path towards the nearby cemetery, Kralingen-Crooswijk.

A bicycle bridge with InfraCore® Inside was installed on 4 November for the municipality of Amersfoort.

The bridge is 20m long and 4m wide.The bicycle bridge is part of the Laak zone Phase B project and contributes to the expansion of the recreational possibilities and amenities of and along the Laak. FiberCore already provided a bridge for

Bunschoten.

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 88

Page 89: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Project Number: 13-071

Project Number: 11-035

Location, Beverwaard, NetherlandsLength: variety of lengthsWidth: variety of widthsSpan: variety of spansCategory: 33 bridges deliveredProduction Year: 2013

Location: Uitgeest, NetherlandsLength: 5mWidth: 1.3mSpan: 5mCategory: 5 tonProduction Year: 2004

solution for the limited space under the

height.

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 89

Page 90: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Location : Rhenen, NetherlandsLength: 24mWidth: 2mSpan: 24mCategory: EcoductProduction Year: 2014

Location: Malmo, NetherlandsLength: 4.5mWidth: 3.05mSpan: 4.5mCategory: 5kN/m2Production Year: 2014

Project Number: 14-146

Project Number: 13-092

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 90

Page 91: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

This bicycle bridge, consisting of two parts. Both parts were injected simultaneously, in 2010 this was a world record resin injection.

Project Number: 10-005

Project Number: 09-010

Location: Hoveniersberg Roosendaal, NetherlandsLength: 36mWidth: 5mSpan: 3x 12mCategory: 5kN + Service VehicleProduction Year: 2010

Location: Spoorlaan, Den Haag, NetherlandsLength: 26.5mWidth: 10mSpan: 2x 13.25mCategory: 5kN/m2Production Year: 2009

This bicycle footbridge consists of three 12 meter bridge sections.

The contract work of this project was carried out by Haasnoot Bruggen.

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 91

Page 92: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Project Number: 09-014

Project Number: 09-015

Location: Purmerend, NetherlandsLength: Both 16mWidth: Bridge 1: 2.5m Bridge 2: 3.75mSpan: Both 16mCategory: 5kN/m2Production Year: 2009

Location: Shanghai, ChinaLength: 11.5mWidth: 2mSpan: 11.5mCategory: 5kN + Service VehicleProduction Year: 2009

Both bridges are very smart even though they have relatively large spans.

The railings for this project are made by contractor, Haasnoot Bruggen.

In collaboration with DSM, FiberCore Europe delivered a bridge to the Chinese province of Nanjing in 2009.

Before it was placed, it was exhibited at the World Expo in Shanghai.

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 92

Page 93: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Location: Krimpenerwaard, NetherlandsLength: 10mWidth: 2.75mSpan: 10mCategory: 5kN + Service VehicleProduction Year: 2007

Location: Kunstwerk, NetherlandsLength: 21.5mWidth: 3.35mSpan: 21.5mCategory: 5kN + Service VehicleProduction Year: 2013

Project Number: 13-088

Project Number: 07-002

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 93

Page 94: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Location: Gouderak, NetherlandsLength: 8.5mWidth: 3mSpan: 8.5mCategory: 5kN + Service VehicleProduction Year: 2013

Project Number: 13-101

Project Number: 11-022

Location: Deventer, NetherlandsLength: All 3; 22mWidth: All 3; 2.5mSpan: All 3; 22mCategory: 5kN/m2Production Year: 2012

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 94

Page 95: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Project Number: 13-072

This beautiful bicycle bridge connects two uneven banks with each other, the south bank is higher than the north bank.

Thanks to the double bar, cycling comfort

also created.

Location: Lely Maassluis, NetherlandsLength: 10.2mWidth: 3.5mSpan: 10.2mCategory: 5kN + Service VehicleProduction Year: 2013

Project Number: 12-049

Location: Rozenburg, NetherlandsLength: 26mWidth: 1.5mSpan: 26mCategory: 5kN/m2Production Year: 2012

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 95

Page 96: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

This project was realised in cooperation with Met Janson Bridging.

Location: De Dors Zaanstad, NetherlandsLength: 9.8mWidth: 2.5mSpan: 9.8mCategory: VK30Production Year: 2012

Project Number: 12-060

Project Number: 08-021

Location: Hoogvliet, NetherlandsLength: 14mWidth: 2.75mSpan: 14mCategory: 5kN + Service VehicleProduction Year: 2008/2009

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 96

Page 97: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Location: Alkmaar, NetherlandsLength: 12.5mWidth: 1.52mSpan: 12.5mCategory: 5kN/m2Production Year: 2015

Location: IJsselmonde, NetherlandsLength: 9.8mWidth: 2.75mSpan: 9.8mCategory: 5kN + Service VehicleProduction Year: 2009

Project Number: 15-184

Project Number: 08-001

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 97

Page 98: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Location: Twickel, NetherlandsLength: Both 11.24mWidth: Both 1.6mSpan: Both 11.24mCategory: 5kN/m2Production Year: 2014

Project Number: 15-177

Location: Grote & Terwoldse Wetering Heerde, NetherlandsLength: Grote Wetering = 32m Terwoldse Wetering 12mWidth: Both 2.6mSpan: Grote Wetering = 32m Terwoldse Wetering 12mCategory: 5kN/m2Production Year: 2015

Project Number: 11-030 & 14-118

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 98

Page 99: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Project Number: 10-035

Project Number: 13-099

In Belgium, a new InfraCore® Inside bridge was commissioned on 8 November 2010, perhaps at one of the most special places in Flanders; the Fish Market in the historic city of Ghent.

The synthetic bridge forms an important part of the walking route through the old center of Ghent.

This bridge is unique in several respects; on

bridge in Belgium, on the other it is also the

in a completely 17th-century environment. The modern, subdued design of the bridge forms a harmonious unity with the historical environment.

Location: Vismijn Gent, BelgiumLength: 17.5mWidth: 2.5mSpan: 14.5mCategory: 5kN/m2Production Year: 2010

Location: Mosselbrug Hellevoetsluis, NetherlandsLength: 13.1mWidth: 1.9mSpan: 13.1mCategory: 5kN + Service VehicleProduction Year: 2013

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 99

Page 100: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Location: De Zuidert, NetherlandsLength: 3 Bridges10.5m 2 Bridges12.5mWidth: All 3.1mSpan: 3 Bridges 10.5m 2 Bridges 12.5mCategory: 5kN/m2Production Year: 2011

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 100

InfraCore® Inside by FiberCore Europe has landed in Italy, in the Venice-region.The 17.5m long bridge is installed in the Comune S. Stino di Livenza, a country town northeast of Venice.

The bridge will be used by pedestrian and

bridge in Italy.

The project has been a joint operation between FiberCore Europe and Janson Bridging Italia. The client has chosen for InfraCore® Inside because of its short lead time and low-maintenance features.

The bridge being lightweight strongly facilitated transportation and installation.InfraCore® Inside bridges have already been installed in The Netherlands, Belgium, the United Kingdom, China and the United States.

Location: Livenza, ItalyLength: 17.5mWidth: 2.5mSpan: 17.5mCategory: 5kN + Service VehicleProduction Year: 2013

Project number: 11-030

Project Number: 12-062

Page 101: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Project Number: 16-209

Location: Neerwoldeiland Eelderwolde, NetherlandsLength: 15mWidth: 2.5mSpan: 15mCategory: 5kN/m2Production Year: 2016

Location: Zwanenkade, NetherlandsLength: 11.21mWidth: 3.81mSpan: 11.21mCategory: 5kN + Service VehicleProduction Year: 2014

Project Number: 14-111

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 101

Page 102: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Location: Grote & Terwoldse Wetering Heerde, NetherlandsLength: Grote Wetering = 32m Terwoldse Wetering 12mWidth: Both 2,6mSpan: Grote Wetering = 32m Terwoldse Wetering 12mCategory: 5kN/m2Production Year: 2015

Project Number: 15-177

Project Number: 11-026

Location: Schalwijkerstraat Haarlem, NetherlandsLength: 13.2m & 15mWidth: 9.5m & 7.4mSpan: 13.2m & 15mCategory: 5kN + Occasional Vehicle Production Year: 2012

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 102

Page 103: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Project number: 15-149

The two bridges have been placed near the N216 for the province of Zuid-Holland, between Schoonhoven and Groot-Ammer.

Both bridges have the same dimensions, and are made with the InfraCore® Inside technology.

Location: Schoonhoven, NetherlandsLength: Both 9mWidth: Both 3.5mSpan: 9mCategory: 5kN + Service VehicleProduction Year: 2014

Project Number: 13-074

Location: Zaanstad, NetherlandsLength: 35.16mWidth: 4.16mSpan: In 3 Parts, 1x 15.2m 1x 5m & 1x 14.96mCategory: 5kN + Service VehicleProduction Year: 2013

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 103

Page 104: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

After realising this bridge, it was proven that with the InfraCore® technique in fact a robust bridge could be built.

The shape and section has changed over the years, the technique inside stayed the same. (see page 10. )

Project Number: 1997

Location: Harlingen, NetherlandsLength: 15mWidth: 2.5mSpan: 15mCategory: 5kN/m2Production Year: 1997

First FiberCore bridge in history

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 104

Page 105: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Location: Aalsmeer, NetherlandsLength: 14.9mWidth: 4.5mSpan: 14.9mCategory: 5kN + Service VehicleProduction Year: 2012

Location, Hoogstraten, BelgiumLength: 10mWidth: 2.25mSpan: 10mCategory: 5kN/m2Production Year: 2012

Project Number: 12-061

Project Number: 12-056

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 105

Page 106: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Project Number: 12-040

Project Number: 11-024

Location: Krampenloop, NetherlandsLength: 14mWidth: 3.2mSpan: 14mCategory: 5kN + Service VehicleProduction Year: 2011

Location: Bordeaux, FranceLength: 36.05mWidth: 2mSpan: In 2 Parts; 1x 21.1m 1x14.95mCategory: 5kN/m2Production Year: 2012

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 106

Page 107: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 107

Page 108: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Project Number: 15-148

Two bridges have been placed near the N216 for the province of Zuid-Holland, between Schoonhoven & Groot-Ammer.

Both bridges have the same dimensions, and are made with the InfraCore®Inside technology.

Location: Dubai Desert Golf ClubLength: 10mWidth: 2.5mSpan: 10mCategory: 5kN + Service VehicleProduction Year: 2015

Project Number: 11-008

Location: Flanders Nippon Golf, BelgiumLength: 6mWidth: 3mSpan: 6mCategory: 5kN/m2Production Year: 2011

Flanders Nippon Golf & Business Club in Hasselt / BE An impressive golf course in Belgian Limburg. The course created by Baron Rolin winds its fairways through a plain next to the Demer and between challenging ponds. Obstacles go up beautifully in this protected landscape and make the players a technically very correct game. In the design of the plantations special attention was paid to a harmonious color choice during all seasons. Native trees, shrubs and plants form a home for the local fauna.

The course has also been developed in such a way that it is an interesting challenge for both the experienced and the less experienced golfer.

The Flanders Nippon Golf & Business Club was

installed.

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 108

Page 109: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Project Number: 11-032

Length: 7.5mWidth: 1.5mSpan: 7.5mCategory: 5kN + Service VehicleProduction Year: 2011

Project Number: 12-062

Location: Wood Ranch Golf Club,USA Length: -Width: -Span: -Category: -Production Year: -

Pay & Play golf course in South Holland! Not for nothing the slogan is: Golf is fun & for everyone! Play inexpensively when and how often you want on our 36 holes course!

Delft and Schipluiden and is easily accessible on the A4 from both The Hague and Rotterdam in 10 to 15 minutes. In the more than 17 years of existence, the job has grown into one of the most popular and pleasant jobs in South Holland.

For young and old; beginners and advanced players and always accessible to players from

InfraCore® wave bridges. Meanwhile, there are already three beautiful bridges in the orbit.

Wood Range Golf Club at Simi Valley / USAWood Ranch Golf Club is an original design by Ted Robinson. The beautiful course is located in the rolling hills of Venture County, less than an hour northwest of Los Angeles.

After examining the many options available, it became clear that the InfraCore® Wave

fronts; In addition to the sleek design and

a very edge-oriented approach throughout the process, “said David Coote, Wood Estate Golf Club inspector. “In view of the trend of the golf industry with regard to choosing environmentally friendly products, InfraCore®

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 109

Page 110: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Location: Lingewaal, NetherlandsLength: 9.6mWidth: 1.9mSpan: 9.6mCategory: 5kN + Service VehicleProduction Year: 2011

Location: Orlando, USALength: 8.9mWidth: 2mSpan: 8.9mCategory: 5kN + Service VehicleProduction Year: 2015

Project Number: 11-032

Project Number: 15-163

The Dutch in Lingewaal / NL.This special Inland Links Golf course at International Championship level and designed by the famous Scottish golfer and top designer Colin Montgomerie.

The course has been constructed according to the highest European standards and is therefore the leader in terms of quality, durability and playability in the Netherlands.

Challenging for golf professionals, but also playable for the average golfer.

This 18-hole golf course is integrated in the rural area of Spijk (municipality Lingewaal). The Dutch decided to start with three ultra-slim InfraCore® Wave Bridges. The Dutch annually organizes the prestigious KLM Open, which was won in 2016 by Joost Luiten.

Albert Palmer’s Bay Hill Club and Lodge in Orlando / USA

This is one of the best places in the world to stay. It was only in 1960 that the barren soil was turned into a landscape that would become known 50 years later as one of the most beautiful golf courses in the world.

Bay Hill organizes every year the Arnold Palmer Invitational presented by MasterCard. The most important golfers in the world play at this prestigious PGA tournament. “It gave me peace of mind when I heard that these bridges do not need maintenance for decades. This allows me to focus on more important issues such as course management and presentation” said Matt Beaver, superintendent at Bay Hill.

“We chose InfraCore® Golf Bridges because of the long life and sustainability of these bridges,” said Roy Saunders, Bay Hill Vice President.

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 110

Page 111: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 111

Page 112: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Location, Pistool & Madroelhaven, NetherlandsLength: 31.4mWidth: 1.5mSpan: 31.4mCategory: 5kN/m2Production Year: 2015

Project Number: 14-134

Location: Hartelkanaal, NetherlandsLength: 19.4mWidth: 1.5mSpan: 19.4mCategory: 5kN/m2Production Year: 2015

Project Number: 15-183

The bridges are built according to a totally new bridge concept: The lattice bridge made

The bridges are in the Rotterdam port area. Matthijs Tromp tells in the interview about the many advantages of a FiberCore port bridge such as larger spans, the long, low maintenance life, the strength with respect

client.

Watch the video here explaining why we opted for the lightweight port bridges of FiberCore Europe.

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 112

Page 113: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Project Number: 16-220

Location SpyderbridgesLength: 31.4m & 29mWidth: 1.5mSpan: 31.4m & 29mCategory: 5kN/m2Production Year: 2016

Location: Calandkanaal Oost, NetherlandsLength: 31.4mWidth: 1.5mSpan: 31.4mCategory: 5kN/m2Production Year: 2016

Project Number: 16-210

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 113

Page 114: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 114

Page 115: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Project Number: 14-142

Location: Friesebrug, NetherlandsLength: 16.4mWidth: 7mSpan: 16.4mCategory: EurocodesProduction Year: 2014

Project Number: 12-052

Location: Paramaribo, Suriname,NetherlandsLength: 9.5mWidth: 3.5mSpan: 9.5mCategory: VK30 Bicycle, Pedestrian &

Production Year: 2012

The wooden bridge deck was replaced Monday

deck, in which the InfraCore® Inside technology was applied.

The Friese Bridge, gateway to the city center of

deck, the bridge is ready for the coming decades.

In the end of 2012, FiberCore Europe placed, in close cooperation with construction company Haukes, a small

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 115

Page 116: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Project Number: 11-001

Project Number: 15-159

Location: Brunschoten, NetherlandsLength: 6.8mWidth: 5.8mSpan: 6.8mCategory: EurocodesProduction Year: 2015

This sustainable road bridge with InfraCore® Inside for the heaviest

road. The bridge even made it to the NOS journal. Here you can view the broadcast.

Location: Maarssenseweg, NetherlandsLength: 6.8mWidth: 9mSpan: 6.8mCategory: VK60Production Year: 2011

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 116

Page 117: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Project Number: 15-152Length: 13mWidth: 4.4mSpan: 13mCategory: EurocodesProduction Year: 2015

Project number: 15-152

Project Number: 09-016

Location: Albrandswaard, NetherlandsLength: 10.5mWidth: 4.5mSpan: 10.5mCategory: VK30 Bicycle,

Production Year: 2009/2010

bridges that each connect the public roads to a company surrounded by water.

This project is realized in close cooperation with Haasnoot Bruggen, who also delivered the railings

Location: Mapledurham, EnglandLength: 13mWidth: 4,4mSpan: 13mCategory: EurocodesProduction year: 2015

A road bridge with InfraCore®Inside was placed near London Wednesday 22 April.

The 13 meter long bridge (4 meters wide) has been transported to England via Vlaardingen over the water. The main contractor for the project is ECS Engineering Services.

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 117

Page 118: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Location: Kruisvaartbrug, NetherlandsLength: 13.4mWidth: 11.8mSpan: 13.4mCategory: EurocodesProduction Year: 2014

On Friday afternoon, July 10 the bridge deck for the Crusade Bridge was transported to Utrecht.

The 15m long bridge section, fully produced with InfraCore® Inside, was transported from Rotterdam by boat, and then transported through the city center

Project Number: 11-012

Project Number: 14-119

all with specially designed railings (by Ooms Construction).

Location: Wognum, NetherlandsLength: 10 a 11 meterWidth: Between 1.5 & 5.4mSpan: Between 10 & 11mCategory: van 5kN/m2 up to 45 Tons of

Production Year: 2011

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 118

Page 119: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

Project Number: 11-014

Location: Lunetten, NetherlandsLength: 140mWidth: 6.2mSpan: 6.2

Production Year: 2011/2012

A27 is equipped with an InfraCore® Inside

The deck is constructed out of seven parts and has already been linked to the steel structure at the construction site. The assembled construction was then placed in its entirety over the A27 motorway.

The enormous weight savings were guiding in the choice for a composite deck, in hybrid with the steel construction. The much longer lifespan and maintenance free character of the deck also played a role. The viaduct was built on behalf of ProRail, Heijmans was the main contractor.

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 119

Page 120: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

© Sustainable Infrastructure Systems ( AUST. ) Pty Ltd Page 120

1300 26 10 74 [email protected]

sisau.com.au

How can we help?

Page 121: FRP Composite Bridges - SISAU · worldwide success. More than 700 InfraCore® bridges, bridge decks and lock gates have been delivered in the Netherlands, Belgium, England, France,

1300 26 10 74 [email protected] sisau.com.au