N
FILL SITE
TURNING BASIN
NAVIGATION CHANNEL
CONTAINMENT BERM
COLUMBIA CSD (AT ANCHOR)
DIFFUSER PIPE
COLUMBIA CSD (DREDGING)
COLUMBIA CSD FLOATING PIPELINE (AT ANCHOR)
COLUMBIA CSD FLOATING PIPELINE (DREDGING)
FRPD 309 THSD (DREDGING)
FRPD 309 THSD (DISCHARGING)
PIPELINE REMOVAL
PHASE 3
PHASE 1
PHASE 4
BERM CONSTRUCTION
FILL SITE
EXISTING BERM
EXISTING PIPELINE
PHASE 2
FRPD CLAMSHELL DREDGINGCRANE AND SCOW
ROCK SCOW (AT ANCHOR)
B
A
ROCK SCOW (AT ANCHOR)
S:\Dredging\Survey\00 Dredge Progress\2015-2016\07 Major Projects\01 PCT\01 PCT Methodology Plan\2015 PCT Methodology-Columbia_Non-Working.dwg, Methodology Plan Columbia Working, 29/06/2015 11:30:44 AM