FTTP Feasibility Study – Task 1 Report for The City of Fort Collins August 2016 Uptown Services, LLC Neil Shaw and Dave Stockton, Principals
Transcript
Page 1: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

FTTP Feasibility Study – Task 1 Report for

The City of Fort Collins

August 2016

Uptown Services, LLC Neil Shaw and Dave Stockton, Principals

Page 2: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

2

Reference architecture

Asset inventory and analysis

Innovative design and construction approaches

Sample designs & capital budget

December 16

Page 3: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

Gigabit Passive Optical Network vs. Active Ethernet

Page 4: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

4

Gigabit Passive Optical Network (GPON) ITU G.984.x standard Pure Ethernet services 2.4G downstream / 1.2G upstream Single fiber delivery to subscriber optical network terminal (ONT) GPON ONT’s support ActiveE connections where needed Comprehensive bandwidth management standards Passive system with up to 128 splits and 35 km reach

Active Ethernet (IEEE 802.x) Point to point GigE Single fiber delivery to subscriber ONT Dedicated symmetrical 1G to serving switch port - up to 60 km reach

Majority of FTTP deployments have been GPON

December 16

Page 5: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

5

Current bandwidth utilization Uptown 1Gig client seeing 1.0Mbps peak utilization per subscriber In GPON 1:32 @ 50%, utilization is 10-15% of 2.4Gbps available Industry data ranges between 1-2Mbps peak per subscriber Consumption tied to subscriber behavior not their provisioned

bandwidth on fiber (high breakage on 1Gig service)

When will GPON 2.4G run out of gas? Calix Networks estimates GPON saturation between 2022 and 2024 Bandwidth headroom impacted by IPTV delivery on FTTP system

Challenges for system design Cater to all levels of the broadband user continuum Build a network that will never be obsolete Time the technology lifecycle correctly Create the right economics for the enterprise to succeed over time

December 16

Page 6: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

6

GPON – Low Cost and Flexible 2.5G of shared downstream bandwidth Flexible splitter placement and less demand for fiber strands High port density – 5,210 subs in one chassis (10 rack units) Consumes less space in rack and 33% as much power required Supports path to 10G GPON

Active Ethernet – “Futureproof” Dedicated GigE from serving switch to each subscriber One strand from subscriber to serving switch location Better suited for high capacity transport services than GPON Longer reach – 60 km Extreme fiber strand counts required without active field cabinets Requires more fiber, space, power, cabinets, electronics and capital

Tradeoffs can be quantified

December 16

Page 7: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

7

Network Electronics GPON cards and ports = $50 per subscriber AE cards and ports = $320 per subscriber AE is $5.4M more than GPON at 20,000 subscribers

Outside Plant Materials GPON splitters = $15 more per passing AE fibers per cable 2x-3x more = $1,600,000 over 600 miles AE is $700,000 more than GPON at 60,000 passings

Technical Services GPON splitters require four splices / eight passings = $20 per passing AE requires four splices / passing = $160 per passing AE is $8.4M more than GPON over 60,000 passings

AE will also require more and larger cabinets around the City

December 16

Page 8: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

Evolving FTTP Standards

Page 9: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

9

ITU GPON Standards Evolution XG-PON1 (G.987) – 10G Down / 2.5G Up XG-PON1 available for four years Operators waiting for symmetrical 10G (NG-PON2) NG-PON2 (G.989) – 10G Down / 10G Up Commercial deployments for NG-PON2 starting in 2016

IEEE Ethernet Standards Evolution Point to Point GigE (802.3ah) – 1G symmetrical 10G EPON (802.3av) – 10G symmetrical Commercially available in 2013

December 16

Page 10: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

10

Full Service Area Network (FSAN) NG-PON2 Four time and wave division multiplexing (TWDM) channels Up to four 10G PONs combine for 40G aggregate capacity Will operate over legacy splitters Higher split ratios and longer reach included in the standard

Will accommodate point to point overlay WDM technology used to deliver line rates of 1, 2.5 and 10G over

separate wavelengths Will occupy 1603nm – 1625nm channels Full coexistence with other services

Full 4x10G capability not expected until 2017 XGS-PON - 10G/10G interim option to be available in 2016 XGS-PON standard expected to be ratified in early 2016

Eventual capability of 8x10G PONs December 16

Page 11: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

11

Deploy GPON as the ruling architecture Design approach for mass market service areas Implement robust design standards in terms of network capacity Centralized versus distributed split? Deployed splitter capacity?

Deploy hybrid architecture as needed for hi-cap services Design for dedicated fiber to equipment sites for active Ethernet Less “cookie cutter” than GPON network One-off designs to reflect specific market conditions

Monitor GPON product lifecycle Determine final GPON platform strategy based on bid results Design system that will easily accommodate upgrades Plan for upgrades based on service mix (linear video?)

December 16

Page 12: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

Reference Architecture – Building Blocks

Page 13: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

13

Provider Owned Premises Equipment Optical Network Terminal – indoor wall mount or desktop versions Optional router capability (wireless or not) Set Top Boxes required for all TV sets receiving digital video services

Customer Owned Premises Equipment Router – may not be GigE capable All end user computing devices Standard telephones for telephone service

Inside Wire Phone services use the existing phone wiring Digital video services use new CAT6 wiring or Wi-Fi Data services delivered over new CAT6 cable or Wi-Fi

December 16

Page 14: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

14

Service Drop and Test Access Point One fiber drop cable installed from drop terminal to premises Fiber drop pushed or pulled in shallow drop conduit Drop fiber terminated in test access point (TAP) mounted on dwelling TAP provides demarcation between outside and inside fiber (bulkhead) Drops installed after subscriber orders service

Network Terminal Network terminals connect drops to the FTTP outside plant network One network terminal serves between four and sixteen passings Drops have traditionally been spliced at the terminal location Connectorized systems allow for “plug and play” installs – no splicing Network terminals are connected to the distribution system

Network terminal strategy is crucial

December 16

Page 15: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

15

Distribution fiber Distribution fiber connects network terminals to the feeder network Feeder network connections can occur at a splice closure or cabinet Distribution cables can range in size from 1 to 144 fibers The size and type of cable is driven by the splitting approach

Centralized split approach 1x32 splitters aggregated in splitter cabinets Dedicated fiber strands from network terminals to cabinets Each cabinet typically fed with 12 feeder fibers One cabinet for every 250 homes on average

Distributed split approach 1x4 and 1x8 splitters deployed in network terminals 1x4 and 1x8 splitters also deployed upstream in closure or cabinet Approach reduces fiber and splicing in distribution network by 87.5% One cabinet can support up to 1,500 homes with distributed split

December 16

Page 16: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

16

Optical Line Terminals (OLTs) An OLT combines all digital content onto PON ports Each 20 card chassis supports up to 5,120 GPON subscribers Requires environmentally controlled space and 10 Rack Units OLTs connect upstream via multiple 10G uplinks

Feeder Network Feeder connects splitter cabinets to serving OLTs Typically one feeder fiber per 32 passings (PON port) 1,875 feeder fibers would be required to service 60,000 passings Multiple equipment sites reduces the number of fibers per site Typical feeder cable is 144 fiber with multiple OLT sites

December 16

Page 17: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

17

Backbone Network – Layer 2 Backbone connects equipment sites to the core network routers OLTs can connect to each other using protected 10G rings (ERPS) Backbone uses much less fiber capacity than feeder – 12 to 24 fibers

Core Network – Layer 3 Core network safely routes traffic to and from the outside world Border Gateway Protocol (BGP) routers connect to the Internet BGP routers deployed in pairs Installed on backbone network in physically diverse locations Each router connects to at least two Internet backbone providers

Outside World – Content Two physically diverse Internet backbone connections desired Video content would come in over one or both Internet connections Phone would also route over one or both Internet connections

December 16

Page 18: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

Asset Inventory and Analysis

Page 19: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

19

Fiber Network Characteristics 144 fiber cable routed throughout the City in conduit 112 fibers in use / 32 fibers “available”

Network Users City Departments – Traffic, IT, Utilities (electric and water) Third party governmental entities – CSU, Larimer County, Schools Private sector dark fiber leases – Level 3, FRII, i-cubed, “Yipes”

Fiber capacity is limited 32 fibers are likely not available throughout the network City should reserve at least one spare buffer tube for maintenance Capacity could be characterized as “scarce”

Applicability to Future Broadband Efforts Backbone – could be used to connect network hub sites Feeder – not sufficient capacity to provide capacity beyond hub sites

December 16

Page 20: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

20

Backbone Capacity Building Blocks 10 Gig using two fibers & 10 Gig using one fiber 40 Gig using two fibers & 100 Gig using two fibers Nx10 Gig using two fibers and wave division multiplexing (WDM)

10 Gig Transport Technology Standard 10 Gig transport is preferred when fiber is abundant One to Two fibers per 10 Gig should suffice for early FTTP demand FTTP would eventually outstrip fiber strand availability on PRPA ring(s)

40 Gig and 100 Gig Optics 40 Gig is available on some platforms, 100 Gig is less prevalent in FTTP Both options are very expensive and introduce risk to network

Wave Division Multiplexing Uses passive couplers to combine different wavelengths on one fiber “Course” and “Dense” options available for passing 2 to 40 waves WDM platforms offer great flexibility at each node – at a cost $$$

Projected bandwidth demands will inform ultimate direction

December 16

Page 21: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

21

Significant fiber conduit network in place GIS layers not made available for this stage of study Paper maps show pervasive deployment of 2 inch conduits Most pathways have two conduits including one spare for future use

Applicability to future broadband effort Additional microducts can be blown in with existing fiber cable Spare conduits would support multiple fibers and/or microducts Reduces the feeder network construction requirements Limits costly hard surface construction and new railroad crossings Not appropriate for distribution network

Implications of joint use with Electric Utility Electric staff desires to route around structures with energized facilities Would require creating of path around manholes (in the street) Would avoid safety issues with non-qualified personnel Would limit fiber damage in the case of fires or explosions in manholes Budget will need to reflect additional cost to create alternate paths

December 16

Page 22: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

22

Substations Substation buildings are not equipped to house telecom systems Most substations have space for a new telecom hut (≈ 8’ x 12’) Fiber conduits would need to be routed into new huts

Existing fiber network and equipment Existing City network does not appear to be useful for FTTP IT department would prefer to be a customer of the new network CSU manages the Ft. Collins network No overlap beyond the use of 12-24 fibers for backbone systems

Tropos Wireless Network System currently used for meter reading only – not Wi-Fi Sized for collection of meter reading data – 10 routers per square mile Consumer broadband would require 5x-7x routers (> $5M) Tropos 7320 routers do not support 802.11ac (limited to 802.11n) Expanding Tropos system for broadband = expensive distraction

December 16

Page 23: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

Innovative Design and Construction Approaches

Page 24: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

24

Maintain long term quality and reliability – Overarching Lower subscriber dissatisfaction and higher retention Lower operating expense

Leverage existing infrastructure wherever possible Lower capital expenditures Minimize new crossings in problem areas – Highways and Railroads Minimize new hard surface construction / disruption

Simplify network and subscriber installation requirements Lower capital expenditures More efficient installation process

Minimize cost for high volume items Significant capital reductions Offsets that would allow for additional capital spending in other areas

Minimize impact to landscape Lower capital expenditures Lower subscriber dissatisfaction

December 16

Page 25: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

25

Backbone Use existing strands in PRPA fiber to create high capacity backbone Interconnect all OLT sites Connect City FTTP to outside world No need to overbuild existing fiber backbone for this purpose

Feeder PRPA fiber not suitable for feeder network Existing conduits are ideal pathways for new feeder network Should work for majority of conduit mileage

Distribution - Hard Surface Areas Existing conduits may provide pathway in hard surface areas Would require over pulling of microducts Would reduce, but not eliminate hard surface construction

December 16

Page 26: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

December 16 26

•Conduit Type •Structure Size

•Boring •Trenching

•Centralized Split •Distributed Split

•Connectorization •Cable type •Terminal type

Fiber Cable, Terminals and Cabinets

Network Architecture

Underground Path Creation

Construction Techniques

What is optimal mix of these elements from cost, operations and quality perspectives?

Page 27: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

27

The promise of microtrenching according to YouTube System based approach to hard surface installation of conduits Equipment cuts, vacuums, installs and restores in one pass Narrow cut 8-10 inches deep

Realities Road resurfacing and gutter repairs typically go deeper than 8 inches Hand holes still need to be placed out of the roadway Cost is much higher than boring ($22.00 - $30.00 per foot) Public works engineers prefer 18 inch minimum depth 18 inch depth is difficult to maintain with a very narrow trench

Recommendations Do not assume microtrenching will play a major role for FTTP Include approach in the construction bid specification Include as an option for hard surface areas depending on availability Continue to monitor improvements (e.g. depth and restoration options)

December 16

Page 28: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

28 December 16

Spliceless Install

Required

Connectorized Splitters

Distributed Split

Drop Terminal &

Preterminated Cable

Small Terminal Structure

Microduct Pathways

Small Drop Flower Pots

Page 29: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

29

Benefits 99% of installs would not require any fusion splicing Significantly reduces the cost of equipment (splicer ≥ $5,000) Simplify installation process Improve testing and troubleshooting Reduced operating expense (in house and contract labor)

Complications Cost to provide connection ports at drop closure location Cost to preterminate and stock different length drop cables Drop terminal size and impact on housing structure Added loss of connector compared to fusion splice

What’s at stake 23,400 + installs with contractor savings of $10 - $30 per splice 15-20 splicers at $5,000 - $7,000 each Additional drop fiber cost of $0.16 per foot

December 16

Page 30: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

30

Standard Approach – Network Access Point (NAP) Standard high count fiber cable is accessed at each NAP location Closure is assembled, cable is prepped and assigned fibers are dressed Installer opens NAP, fusion splices drop and closes NAP Total materials and labor for 8 passings = $350

Terminal Approach #1 Standard high count fiber cable is accessed at each NAP location Closure is assembled, cable is prepped, assigned fibers are spliced to

pigtails and plugged into drop port Installer accesses terminal and plugs drop into assigned port Total materials and labor for 8 passings = $650

Terminal Approach #2 Terminal comes equipped with splitter, input port and output ports Single fiber preterminated microcable is plugged into terminal input Preterminated drops are plugged into the terminal outputs Total materials and labor for 8 passings = $300

Minimum savings of $750K assuming 7,500 terminals

December 16

Page 31: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

31

Standard Fiber Cable Fiber strand counts typically 288 or less for FTTP Deployed on large cable reels using motorized trailers Cable diameter ranges from 0.4 to 0.8 inches

Microcable Fiber strand counts typically 144 or less for FTTP Deployed on large or medium cable reels Certain designs do not require heavy equipment to install Typically installed in microduct

Preconnectorized Cables Microcables with factory terminated end(s) Connectors available for 1 fiber up to 24 fiber terminations Certain preterminated cables can be installed in microduct

Installation Methods Pulling – traditional approach Pushing – requires special cable design Blowing – very fast, requires specialized jetting device

December 16

Page 32: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

32

Fiber cable bend radius Most traditional fiber cable coils will require a 17”x30” handhole Microcable coils will fit inside a 9 inch flower pot

Closure / terminal dimensions Most traditional NAPs will require a 17”x30” handhole Certain terminals will fit inside a 9 inch round flower pot

Conduit type and bend radius Larger HDPE rolled pipe is difficult to sweep up into a small structure Bend radius can sometimes exceed bore depth for 2 inch diameter pipe Microduct is more flexible for sweeping into handholes and flower pots

Structure Material and Labor 17x30x18 Handhole - $84.25 Materials + $245 Labor = $329.25 13x24x15 Handhole - $51.75 Matertials + $150 Labor = $201.75 9 Round x 18 Flower Pot - $17.23 Materials + $95 Labor = $112.23

Minimum savings of $956,250 assuming 7,500 terminals

December 16

Page 33: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

Sample Designs

Page 34: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

July 2016 34

100% GPON standards based system Relying on next generation standards to support future growth Nx10G capabilities over time

Distributed split architecture Deploy 1x8 and 1x4 splitters in drop terminals Secondary terminal serves subscribers Primary terminals serve multiple secondary terminals Maintains 1x32 split ratio Splicing and cable sizes reduced by at least 75%

Design assumes the use of micro-cable technology Microduct bundles for all distribution fiber Smaller footprint for terminal and drop hand hole locations

No above ground structures

Page 35: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

July 2016 35

100% GPON standards based system Relying on next generation standards to support future growth Nx10G capabilities over time

Centralized split architecture One fiber per passing terminates in splitter cabinet Approximately one splitter cabinet per 250 passings Deploy 1x32 splitters as required in splitter cabinets Network Access Points (NAPs) connect subscriber drops to network All drops fusion spliced at serving NAP

Design assumes the use of standard cable technology Single jacket – loose tube fiber cable design throughout 1.5 IN HDPE conduits employed for drops and distribution pathways

No above ground structures

Page 36: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

July 2016 36

Mature approach with proven track record Uptown designed our first centralized split network in 2006 Fusion splicing is much less complicated

Economics appear to be a wash for outside plant Less fiber and splicing for distributed split Lower cost terminals and conduits for centralized

Centralized equipment costs are less Centralized splitters and PON ports added as subscribers are added Distributed splitters and PON ports installed up front for 75-90% of

passings Installation process more complex with centralized

All drops fusion splice at the time of the pre-install Requires closure re-entry for each drop install Test points limited to dwelling and splitter cabinet

Page 37: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

37 July 2016

Page 38: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

38

Design Metric Value Aerial Plant Miles 0.0 Underground Plant Miles 3.2 % Aerial 0% % UG 100% Passings 243 Passings per Mile of Plant 75 Materials Cost per Passing $140 Labor Cost per Passing $980 Total Cost per Passing $1,119 Total Materials (no drops) $33,917 Total Labor (no drops) $238,109 Total Cost $272,025

* - Does not include engineering, fixed equipment, subscriber capital and installation costs.

July 2016

Page 39: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

39

Design Metric Value Aerial Plant Miles 0.0 Underground Plant Miles 2.5 % Aerial 0% % UG 100% Passings 243 Passings per Mile of Plant 96 Materials Cost per Passing $132 Labor Cost per Passing $781 Total Cost per Passing $912 Total Materials (no drops) $31,954 Total Labor (no drops) $189,761 Total Cost $221,715

* - Does not include engineering, fixed equipment, subscriber capital and installation costs.

July 2016

Page 40: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

40

Design Metric Value Aerial Plant Miles 0.0 Underground Plant Miles 2.2 % Aerial 0% % UG 100% Passings 107 Passings per Mile of Plant 107 Materials Cost per Passing $126 Labor Cost per Passing $699 Total Cost per Passing $825 Total Materials (no drops) $29,538 Total Labor (no drops) $164,279 Total Cost $193,817

* - Does not include engineering, fixed equipment, subscriber capital and installation costs.

July 2016

Page 41: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

41

Design Metric Value Aerial Plant Miles 0.0 Underground Plant Miles 0.6 % Aerial 0% % UG 100% Passings 81 Passings per Mile of Plant 143 Materials Cost per Passing $98 Labor Cost per Passing $530 Total Cost per Passing $628 Total Materials (no drops) $7,940 Total Labor (no drops) $42,185 Total Cost $50,905

* - Does not include engineering, fixed equipment, subscriber capital and installation costs.

July 2016

Page 42: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

42

Design Metric Value Aerial Plant Miles 0.0 Underground Plant Miles 0.7 % Aerial 0% % UG 100% Passings 63 Passings per Mile of Plant 95 Materials Cost per Passing $128 Labor Cost per Passing $792 Total Cost per Passing $920 Total Materials (no drops) $8,058 Total Labor (no drops) $49,905 Total Cost $57,963

* - Does not include engineering, fixed equipment, subscriber capital and installation costs.

July 2016

Page 43: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

43

Design Metric Value Aerial Plant Miles 0.0 Underground Plant Miles 2.6 % Aerial 0% % UG 100% Passings 174 Passings per Mile of Plant 66 Materials Cost per Passing $165 Labor Cost per Passing $1,097 Total Cost per Passing $1,262 Total Materials (no drops) $26,663 Total Labor (no drops) $190,926 Total Cost $219,589

* - Does not include engineering, fixed equipment, subscriber capital and installation costs.

July 2016

Page 44: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

44

Design Metric Value Aerial Plant Miles 0.0 Underground Plant Miles 3.8 % Aerial 0% % UG 100% Passings 235 Passings per Mile of Plant 62 Materials Cost per Passing $170 Labor Cost per Passing $1,187 Total Cost per Passing $1,357 Total Materials (no drops) $39,833 Total Labor (no drops) $278,859 Total Cost $318,692

* - Does not include engineering, fixed equipment, subscriber capital and installation costs.

July 2016

Page 45: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

45

Sample Design Area

OH Miles

UG Miles Passings

Passings per Mile Weight

Materials per

Passing

Labor per

Passing

Total per

Passing

Quail Hollow 0.0 3.2 243 75 30.1% $140 $980 $1,120

English Ranch 0.0 2.5 243 96 22.6% $132 $781 $913

Alta Vista 0.0 0.7 63 95 6.4% $128 $792 $920

Old Town 0.0 2.2 235 98 5.7% $126 $699 $825

Hearthfire 0.0 2.6 174 66 2.1% $165 $1,097 $1,262

Taft Canyon 0.0 3.8 235 62 1.8% $170 $1,187 $1,356

Willow Brook 0.0 0.6 81 143 0.0% $98 $530 $628

MDUs* 0.0 0.0 0 0 31.3% $73 $424 $497 Weighted Average / Total 0.0 15.6 1,274 82 100% $116 $739 $855

* - MDU and commercial sample designs not completed. July 2016

Single family weightings based on parcels per zoning district Representative MDU and commercial sample designs not completed Willow Brook design area was not deemed to be representative MDU costs estimated to be 50% of average single family costs

Page 46: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

46

Outside Plant Costs Weighted Average Per

Passing

Total Construction Cost @ 72,435 Passings

(NOTE: Does not include other system costs e.g. electronics and operations)

Materials $116 $8,402,460

Labor $739 $53,529,465

Total $855 $61,931,925

Contingency @ 15%* $128 $9,271,680

Total $984 $71,276,040

Key Construction Costs Directional boring in landscaped areas - $10.00 per foot Vault, hand hole and flower pot adder - $2.00 per foot Pulling fiber in conduit - $0.75 per sheath foot (average for all cables) Splicing - $30 per splice

July 2016

* - Contingency based on unknowns related to serving a large number of multi-tenant buildings

Page 47: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

July 2016 47

$662.55 , 77%

$35.15 , 4%

$35.15 , 4%

$24.89 , 3%

$24.27 , 3%

$22.63 , 3%

$22.54 , 2% $17.44 , 2% $14.80 ,

2%

UG Path Labor

UG Path Materials

Cabinet Labor

Peds and Vaults Materials

Fiber Cable Labor

Cabinet Materials

Enclosures Labor

Fiber Cable Materials

Enclosures Materials

Page 48: FTTP Feasibility Study – Task 1 Report › connexion › files › feasibility... · FTTP Feasibility Study – Task 1 Report . for . The City of Fort Collins . August 2016 . Uptown

July 2016 48

GPON standards based system will best serve the immediate and long term needs of the Fort Collins market

Centralized split architecture is the best fit the technical and reliability requirements of the Fort Collins technical team

Up to eight huts located in sub station yards could house equipment for the entire FTTP network

Abundant conduit along major arterial routes significantly reduces the cost of the feeder network

Total outside plant cost per passing of $984 is based on sample designs from large cross section of the City

100% underground environment drives outside plant costs higher than a typical FTTP deployment


Recommended