FUJI YA SITE REDEVELOPMENT JULY 23, 2010 1880’s 1911 Posted by http://MillCityTimes.com
Transcript
Page 1: Fuji Ya - Waterworks Redevelopment

FUJI YA SITE REDEVELOPMENT JULY 23, 2010

1880’s

1911

Posted by http://MillCityTimes.com

Page 2: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 1

Mill District : History: North West : 1930’s

Northwestern Consolidated Milling Company and sur-rounding buildings. Top 1920. Bottom 1933.

Posted by http://MillCityTimes.com

Page 3: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 2

Mill District: Recent History : Aerial Photos : 1940’sPosted by http://MillCityTimes.com

Page 4: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 3

Mill District: Recent History : Aerial Photos : 1980’sPosted by http://MillCityTimes.com

Page 5: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 4

Mill District: Existing ConditionsPosted by http://MillCityTimes.com

Page 6: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 5

Mill District: Historic Mills District Master PlanMinneapolis Community Development Group Agency : Urban Design Associates and SRF Consulting Group : September 2001

Posted by http://MillCityTimes.com

Page 7: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 6

Mill District Study : Power of the Falls: Renewing the Vision for St. Anthony Falls Heritage Zone St. Anthony Falls Heritage Board : Cincinnatus, Jim Roe, Hoisington Koegler Group : December 19, 2009

Posted by http://MillCityTimes.com

Page 8: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 7

Mill District: West River Parkway: Mill Ruins Park :Minneapolis Park & Recreation Board : Great River Road Design Group : March 7, 1990

Posted by http://MillCityTimes.com

Page 9: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 8

Mill District: One Fourth Avenue ProjectPosted by http://MillCityTimes.com

Page 10: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 9

Mill District : Fuji Ya Site Characteristics : Bookend

View of Guthrie Theater from river.

Birds-eye photo of Fuji Ya building

Posted by http://MillCityTimes.com

Page 11: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 10

Mill District : Fuji Ya Site Characteristics : Existing Condition & RuinsPosted by http://MillCityTimes.com

Page 12: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 11

Mill District : Fuji Ya Site Characteristics : Gathering, Observing, & View Corridors

View Corridors

Observation

Public Gathering

Posted by http://MillCityTimes.com

Page 13: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 12

Park

Ave

Portl

and

Ave

Chi

cago

Ave

5th

Ave

Mill District: Fuji Ya Site Characteristics : Vistas

5th Ave Portland Ave Park Ave Chicago Ave

Posted by http://MillCityTimes.com

Page 14: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 13

Mill District :Fuji Ya Site Characteristics : Ruins/Public-Private

A

A

B

B

C

C

Public Public/Private

Posted by http://MillCityTimes.com

Page 15: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 14

Mill District : Fuji Ya Site Characteristics : ZonesPosted by http://MillCityTimes.com

Page 16: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 15

1975 Site Plan + Current Streets Appendix : Fuji Ya Documentation

Crown Roller Mill

West River Parkway

S 1st St

5th Ave S

River West

West River Parkway

Posted by http://MillCityTimes.com

Page 17: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 16

Appendix : Fuji Ya Documentation1975 Upper Floor Plans

1975 additionOriginal structureColumbia Mill 1973 addition1975 addition 1968 structure 1973 addition 1973 insertion

Main level Floor Plan Mid and Entry level Floor Plan

Posted by http://MillCityTimes.com

Page 18: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 17

1975 Lower Floor PlanAppendix : Fuji Ya Documentation

1975 additionOriginal structureColumbia Mill 1973 addition

Lower levels Floor Plan

Posted by http://MillCityTimes.com

Page 19: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 18

1975 SectionsAppendix : Fuji Ya Documentation

1975 additionOriginal structure

1968

1973 insertion

Columbia Mill 1973 addition Original structure

Original structure

North East Cross Section South West Cross Section

Posted by http://MillCityTimes.com

Page 20: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 19

South East Elevation North West Elevation

South West Elevation North East Elevation1975 addition

Original structureColumbia Mill 1973 addition1975 additionColumbia MillOriginal structure1973 addition

1968

1973 insertion

Original structure

1968

1973 insertion

Original structure

1975 additionColumbia Mill

Original structure

Posted by http://MillCityTimes.com

Page 21: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 20

Photographs 1980’sAppendix : Fuji Ya Documentation

Posted by http://MillCityTimes.com

Page 22: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 21

Photographs 1980’sAppendix : Fuji Ya Documentation

Posted by http://MillCityTimes.com

Page 23: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 22

June 2010 site visitAppendix : Fuji Ya Documentation

Main Dining Room Upper Kitchen Level River side Tatami Rooms

Tatami Rooms Lower Sub levelMid level Hibachi Grille

Posted by http://MillCityTimes.com

Page 24: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 23

June 2010 site visitAppendix : Fuji Ya Documentation

East Corner of Fuji and Columbia Wall

Roof PenetrationsNorth Side Elevation and Parking LotColumbia Wall

South Side Elevation and Parkway East Side Elevation and Parkway

Posted by http://MillCityTimes.com

Page 25: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 24

View from Roof of Fuji-Ya

St. Anthony Falls Pillsbury Mill3rd Avenue Bridge St. Anthony Falls Laboratory Stone Arch U of M

Lock and Dam No. 1 Canal Gatehouse Location

June 2010 site visitOPPORTUNITY: VIEW

Posted by http://MillCityTimes.com

Page 26: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 25

1975 SectionsAppendix : Fuji Ya Documentation

- Built up roof is in poor condition- Evidence of water damage on wood decking- Exposed timber beams are deter riorated on ends

- Water penetration at removed rooftop units- Surface rust on all metal decking and steel beams- All interior gypboard surfaces are damaged

- Entry 1973 Addition is in poor condition due to water penetration at lower roofs

- Mid level is in most stable condition- Third lowest fl oor is damaged with severe water penetration- Lowest level is unaccessible due to collapsed wood fl oor structure

1975 additionOriginal structure

1968

1973 insertion

Columbia Mill 1973 addition Original structure

Original structure

North East Cross Section South West Cross Section

Posted by http://MillCityTimes.com

Page 27: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 26

Appendix : Fuji Ya Documentation1975 Upper Floor Plans

1973 insertion

- Original 1968 structure is 8” precast plank fl oor structure, cmu walls and timber frame post and beam construction with wood decking. Wood decking is damaged from water penetration at joint and at removed roof top unit locations.- 1975 addition extended into Coumbia Mill Foundations.

Tatami Rooms

Dining RoomWalk in’s

Kitchen

Kitchen

Hibachi Grille

Bar

Entry

- 1973 entry addition is in poor condition. CMU walls and timber framed ceiling and wood decking has severe water damage.- 1973 insertion is in fair condition with metal joists and concrete decking with original brick arch ceiling from original structure is intact.- 1975 addition is poured wall structure, steel joists and concrete topping inserted iinto Original Coumbia mill foundations. Water has entered from open root top penetrations

1975 additionOriginal structureColumbia Mill 1973 addition1975 addition 1968 structure 1973 addition

Main level Floor Plan Mid and Entry level Floor Plan

Posted by http://MillCityTimes.com

Page 28: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 27

DESCRIPTION OF STRUCTURE:

The four level building is situated on site that slopes down towards the Mississippi River. The upper fl oor is one level above 1st Steet level and the basement is one level below West River Parkway along the river. The fi rst fl oor walks out to and is level with West River Parkway.

The building is comprised of multiple framing systems. The roof and upper level are primarily framed with dimension and glu-laminated timber, including the roof deck. Intermediate levels are a combination of historic brick tied arch/steel beam construction with stone and brick bearing walls, precast concrete plank and steel beam/column construction, and open-web steel joists, metal deck/concrete top-ping with steel beams/columns. A portion of the fi rst fl oor (lowest supported level) is framed with wood which has decayed and partially collapsed. Original founda-tion walls are limestone and more recent foundation walls are concrete.

OUR FINDINGS ARE AS FOLLOWS:

1. Wood outriggers are present at the roof level and have experienced severe deterioration in many cases. Wood outriggers along the north (facing the river) and south sides may be ornamental rather than structural since bolts were observed at two locations where the outriggers deteriorated and are no longer in place. Outriggers along the east and west sides may be struc tural since their construction could not be determined from observations.2. The majority of wood framing at the roof and upper level generally appears to be in serviceable condition with the exception of a roof area of approxi mately 25 s.f. This area has deteriorated and collapsed due to water intru sion, exposing the building to the elements.3. Other areas of water leakage occur at the roof due to removal of roof top units and insuffi cient/non-existent roofi ng closure. A few window openings are also partially open to the elements.4. The roof leakage has allowed water to affect portions of all levels of the building.5. Surface rust is evident on the majority of structural elements at all levels.6. More signifi cant rust, including moderate section loss, is evident on much of the steel framing deck, joist, beam, and columns framing at the lower levels.7. Minimal deterioration was evident at the bottom sides of the precast plank, the tied-arch areas, upper level open-web joists/deck, and the interior brick bearing walls.

DISCUSSION:

1. In general, the building is judged to be in a structural condition that would allow adaptive reuse after incorporating structural repairs and replace ment at some areas.2. North and south roof outriggers could likely be replaced fairly easily pro vided they are ornamental as they appear. East and west outriggers will require further evaluation.3. The majority of the roof and upper two levels of the building are currently judged to be in a modest/serviceable structural condition. Areas with wa ter damage will require replacement and other areas require removal of surface rust and modest repair at select elements.4. Lower levels will likely require a more signifi cant degree of structural repair and the collapsed area will require complete replacement.5. Further areas of concern may become evident after review of the exist ing documents and a more comprehensive evaluation of the structure is performed.

RECOMMENDATIONS:

1. Open roof and window openings should be covered up/waterproofed as soon as practical to prevent continued water intrusion into the building and associated deterioration.2. If a more detailed evaluation is desired relative to the building’s present condition and potential for adaptive re-use, we recommend that a com prehensive study be performed. The structural aspects would likely need to include some destructive (such as core samples) and non-destructive (such as member section measurements) materials testing.

Posted by http://MillCityTimes.com

Page 29: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 28

STRUCTURE

Sound except minor elements and collapsed base-ment fl oor.

June 2010 site visitCONDITION OVERVIEW:

WALLS, ROOF, WINDOWS AND DOORS

Requires replacement of components

INTERIORS

Requires replacement

MECHANICAL, ELECTRICAL AND PLUMBING

Requires replacement

ACCESS

6 potential levels, complicated elevator condition

UPPER RIVER SITE

Undeveloped and ruin needs repair

DOWN RIVER SITE

Does not take advantage of site opportunity

Posted by http://MillCityTimes.com

Page 30: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 29

View from Roof of Fuji-Ya

St. Anthony Falls Pillsbury Mill3rd Avenue Bridge St. Anthony Falls Laboratory Stone Arch U of M

Lock and Dam No. 1 Canal Gatehouse Location

June 2010 site visitOPPORTUNITY: VIEW

Posted by http://MillCityTimes.com

Page 31: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 30

River Elevation Diagram

ObservationGathering

Stone Arch Bridge Laborar-

River/CityAccess

Connections

OPPORTUNITY:

Bridge

Mill Place

River West

Carlyle

Crown Roller

Fuji-Ya

Columbia Mill Outline Occidental Mill

Options

Posted by http://MillCityTimes.com

Page 32: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 31

River Section Diagram

1st Street

City Access

Parkway

OPPORTUNITY:

RiverRiver West

Columbia Mill Outline

Fuji-Ya

Ruin

Observation

How High?

River Access

Public Gathering

Posted by http://MillCityTimes.com

Page 33: Fuji Ya - Waterworks Redevelopment

Fuji Ya Site Redevelopment | JULY 23, 2010 32

June 2010 site visitNEXT STEPS:

• Complete the fi rst iteration: preliminary study (pro bono)

o Make any edits or additions o Share report and other committee information with the Park board - o Clarify the role of our committee relative to the Park Board and the Heritage Board o Agree on a process o Outline possible funding sources o Determine format for the next level of study: State of MN Pre Design? Park Board?

• The second iteration: a pre design study (paid) How is a consultant engaged?

o Determine scope of, and implement a public engagement process, o Determine audience for the study, deliverables o Establish goals, criteria for the redevelopment o Technical and agency review: zoning, parking, HPC, detailed condition report, etc o Develop three alternative use and design concept diagram options: � Restore Fuji Ya and balance of site � Open space: no building or minimal new building: defi ne the “park” for the whole site � Open space plus new building: defi ne the building and the “park” o Develop conceptual construction budgets for each, o Financial: develop possible funding sources, conceptual pro forma, operational costs o Evaluate the alternatives relative to goals, criteria and fi nancials o Recommend an alternative o Develop a schedule o Finalize the document