+ All Categories
Home > Documents > Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW...

Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW...

Date post: 14-Oct-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
42
Transcript
Page 1: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95
Page 2: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

C O N T E N T

1 FOREWORD ……………………….

2 HEAVY HAULAGE ……………………

3 HEAVY LIFT …………………………

4 EQUIPMENT RENTAL ……………….

5 CONTACT ADDRESS …………………

page

01

02

10

29

36

Page 3: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

Harbour-Link Logistics Sdn. Bhd. (HLLSB) has formed and strengthened strategic

alliances with joint ventures significantly in both domestic and international.

The HLLSB established mission early on to motivate and guide the many

subsidiaries that now comprise the group. This mission includes an emphasis on

creativity, leadership, drive and diligence, all of which serve as daily reminder of

the deeper objectives of the Group. The mission statement leads HLLSB to seek

new means to accomplish goals and provides motivation during times of hardship.

With the gained experience within a span of more than 25 years, we sturdily

manifest the success is:

(a) To satisfy our customers with our reliable and economical service;

(b) To arrange advanced equipment and facilities as well as create a service

system to meet the diversified needs of our customers.

The new millennium has bought us visions and futuristic prospective to penetrate

into all aspect of industrialization and further enhance our better serve to our

customers in Malaysia.

Towards the new era, HLLSB aims for the ACCURATE, SAFE AND EFFICIENCY.

Through the thriving development force in the total-logistics services,

1

F O R E W O R D

HARBOUR-LINK LOGISTICS SDN. BHD. (206893-W)

Wholly owned subsidiary of Harbour-Link Group Berhad (HLGB)

Page 4: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

With our skill work force and

strong technical back up, we can

bring your cargo climbing the hill,

over the sea and across the stream

all in a package.

Work plan, project management,

JSA, method statement are all in

one.

Supply of cross beam & saddle

1 Technical information for Hydraulic Goldhofer trailer during Transportation

2 Offloading by hydraulic jacking system using trailer jack

2

O ur services cover :

Receiving cargo ex-hook vessel, Ro-Ro, barging, transportation, lifting, erection, mechanical installation,

jacking / skidding / positioning for all kind of cargoes, big / small oversize and over weight.

H E A V Y H A U L A G E

The oversize / overweight load topples.With conventional equipment,this is unavoidable.

5 degrees

BACK VIEW

With our proposed multi-axletrailer c/w Hydraulic jacking system, toppling is avoided.

2

1

Page 5: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

Prime Mover (Scania) X 3 units

Goldhofer Drop Deck Platform (240 Ton Capacity) X 1 unit

Self propelled multi - axle trailer (Goldhofer) X 6 liners

3

E quipment List for Transport:

Multi - axle trailer (Goldhofer) X 20 liners Multi - axle trailer (Commetto) X 6 liners

Prime Mover (Man) X 1unit

H E A V Y H A U L A G E

Page 6: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

1 Transport 450 Ton vessel by 1½ module self-propelled system with turntable

2 Transport 260 Ton vessel by 12 axle-lines with 1½ module self-propelled

3 RO-RO operation at Port Wharf

4 Transport Shell MDS Air Separation Unit (112 Ton)

4

H E A V Y H A U L A G E

1

2

4 3

Page 7: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

H E A V Y H A U L A G E

5 Transport 97 Ton Sulfinol Regenerator (27m length X 5.6m Ø) by 2 units Goldhofer multi-axle trailer

(1½ module x 4 axle-line joined with drop deck)

6 Transport 158 Ton Propane Condenser by 12 axle-lines Goldhofer trailer 7 Transport 97 Ton Sulfinol Regenerator from MLNG laydown to plant site

8 Transport / installation of 76 Ton transformer at Miri Tudan Power Station site

5

5

6

7

8

Page 8: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

1 Loading of 76 Ton transformer ex-mother vessel to barge / landing craft

2 Transport of transformer including jacking / skidding work

3 Receiving 760 Ton Feed Gas Absorber for MLNG Tiga project at Bintulu Port

6

H E A V Y H A U L A G E

3

1

2

Page 9: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

H E A V Y H A U L A G E

4 Transport 760 Ton Absorber from Bintulu Port to MLNG Tiga site (distance - 7km)

5 Transport 120 Ton incinerator by 8 axle-lines x 1½ module Goldhofer trailer

7

4

5

Page 10: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

H E A V Y H A U L A G E

1 Transport 148 Ton genset from Bintulu Port to Kidurong Power Station (distance – 7km)

2 Receiving 140 Ton transformer at Kuching Port

3 Transport 120 Ton genset engine including Ro-Ro, jacking/skidding/positioning at Tanjung Aru

Power Station, Kota Kinabalu

4 Transport 50 Ton Detergent Feedstock Splitter (28m length) from Bintulu Port to SMDS site

8

1

2

3

4

Page 11: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

H E A V Y H A U L A G E

5 Transport crane main body (P&H5300) by Goldhofer multi-axle trailer

6 Transport Runner by Goldhofer multi-axle trailer to Bakun site

9

5

6

Page 12: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

Harbour was a Major Heavy Lift contractor for MLNG

Rejuvenation & MLNG / MLNG Dua Revamp (MRR) Project year 2002 – 2005. With our experience Rigging Team, we provide Malaysia LNG the following services:

1) Site survey & consult of suitable lifting gear / equipment

2) Job Safety Analysis (JSA)

3) Work Method Statement (WMS) review

4) Lifting plan / Rigging study & supervision

5) Manpower – Rigging crews

VENT STACK & STRUCTURE DISPOSAL WORK – MLNG1 BINTULU Foundation Height: 87m

Cargo Weight: 30 Ton (heaviest)

Attachment: 60m main boom + 39m luffing jib

Working Radius: 22m

Equipment: 300 Ton (Kobelco P&H5300) crawler crane

Year: 2002

10

H E A V Y L I F T

Page 13: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

REMOVAL / REINSTALL OF AIR INTAKE STACK – MRR PROJECT Cargo Weight: 12 Ton

Working Radius: 48m

Equipment: 300 Ton (Kobelco P&H5300) crawler crane c/w luffing jib

360 Ton (Liebherr LT1300) mobile crane c/w luffing jib

Year: 2002, 2003, 2004, 2005

11

H E A V Y L I F T

General Requirement of Heavy Lift Activities

in Oil & Gas Industry

Lift Plan Rigging study

AutoCAD drawing

Job Safety Analysis (JSA)

To identify hazard and unsafe acts in workplace.

To analyze the individual activities and its

potential hazards

To determine appropriate control and solution to

eliminate or reduce the hazards/risk.

Work Method Statement (WMS)

Pre-lifting Activities

Lift Day Activities

Post Lifting Activities

Manpower

Equipment List

Safety Issues

Permit To Work (PTW)

Hazard management tool

Means of hazards control and mitigation

Specification and formal agreement of requirements

Identified responsibilities

Know the correct completion and how to use

Identified relevant certificates and documents

Criteria for re-authorization

Audit / feedback loops for improvement

Page 14: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

ERECTION & MECHANICAL INSTALLATION OF THERMAL INCINERATOR – MRR PROJECT Cargo Weight: 120 Ton

Cargo Dimension: 6m (W) x 18m (L) x 6m (H)

Foundation Height: 4m

Equipment: 300 Ton (Kobelco P&H5300) &

150 Ton (Sumitomo LS248RH-2) crawler crane

Year: 2002

12

H E A V Y L I F T

Page 15: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

INSTALLATION OF FIN FAN COOLER – MLNG MODULE 5 Cargo Weight: 29 Ton

Cargo Dimension: 6.0m (W) x 15.8m (L) x 2.0m (H)

Foundation Height: 17m

Working Radius: 16m

Equipment: 150 Ton (Sumitomo LS248RH-2) crawler crane

Year: 2002

13

H E A V Y L I F T

Page 16: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

REMOVAL / REINSTALL OF THERMAL REBOILER – MLNG MODULE 5 Cargo Weight: 50 Ton

Cargo Dimension: 3.2m (W) x 12.4m (L) x 4.0m (H)

Foundation Height: 21m

Working Radius: 18m

Equipment: 300 Ton (Kobelco P&H5300) crawler crane

Year: 2003

14

H E A V Y L I F T

Page 17: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

REMOVAL / INSTALLATION OF DEAERATOR – MLNG REVAMP MODULE 1, 2, 3 Cargo Weight: 80 Ton

Cargo Dimension: 19m (L) x 2.26mØ Attachment: 48m main boom + 100 Ton auxiliary counterweight

Foundation Height: 21m

Working Radius: 24m

Equipment: 400 Ton (Demag CC2000 Superlift) crawler crane

Year: 2003

15

H E A V Y L I F T

Page 18: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

REMOVAL / INSTALLATION OF PROPANE CONDENSER – MLNG SHUTDOWN WORK DOSH INSPECTION MODULE 4 Cargo Weight: 178 Ton

Cargo Dimension: 12.5m (L)

Working Radius: 18m

Equipment: 400 Ton (Demag CC2000 Superlift) crawler crane

Year: 2003 (Module 4)

16

H E A V Y L I F T

Page 19: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

REMOVAL / INSTALLATION OF SULFINOL REGENERATOR C1103 – MRR PROJECT MODULE 1 Cargo Weight: 97 Ton

Cargo Dimension: 27.6m (L) X 5.7mØ Attachment: 80m main boom + 24m luffing jib

Working Radius: 38m

Equipment: 600 Ton (Manitowoc M4600) Ringer Crane

Year: 2003

17

H E A V Y L I F T

Page 20: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

PROVISION OF BARGE CRANE SERVICES FOR LNG LOADING ARMS MAJOR OVERHAUL – MLNG JETTY BERTH 1 Barge Dimension: 230ft (L) X 60ft (W) X 12ft (H)

Cargo Weight: 38 Ton (without main riser)

Cargo Dimension: 3.0m (W) X 31m (L) X 15.5m (H)

Working Radius: 19m

Equipment: 300 Ton (Demag CC2000) & 50 Ton (Kobelco P&H550S) crawler crane

Year: 2004

18

H E A V Y L I F T

Page 21: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

LIFTING & SHIFTING OF OUTFEED SECTION & PRESS SECTION – DAIKEN SARAWAK SDN. BHD. BINTULU Outlet Section: 125 Ton, 6.24m (W) X 5.24m (L) X 5.83m (H)

Press Section: 225 Ton, 5.32m (W) X 8.87m (L) X 5.83m (H)

Equipment: Two (2) sets of Hydraulic Gantries (400 Ton ~ 800 Ton Cap.)

Year: September, 2004

19

H E A V Y L I F T

Page 22: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

LIFTING OF PULLER MACHINE TO REMOVE TUBE BUNDLE – MLNG3 Cargo Weight: Tube Bundle (24.5 Ton) + Puller Machine (9.5 Ton)

Cargo Dimension: 9.1m (L) X 3.0mØ

Working Radius: 10m

Equipment: 360 Ton Truck Crane (Liebherr LT1300)

Year: July, 2005

20

H E A V Y L I F T

Page 23: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

REMOVE & REINSTALL OF PROPANE CONDENSER – MLNG DUA MODULE 4 Cargo Weight: 175 Ton

Cargo Dimension: 12.5m

Working Radius: 28m

Equipment: 600 Ton (Manitowoc M4600) Ringer Crane

Year: August, 2005

21

H E A V Y L I F T

Page 24: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95 Ton)

Cargo Dimension: 4.5m (L) X 2.5m (H), 7m (L) X 1.4m (H)

Equipment: 360 Ton Truck Crane (Liebherr LT1300)

Year: June, 2006

22

H E A V Y L I F T

Page 25: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT

Equipment: 150 Ton Crawler Crane (Sumitomo LS248RH-2)

Year: June, 2006

23

H E A V Y L I F T

Page 26: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

REPLACEMENT & UPGRADING OF GANGWAY AT MLNG JETTY BERTH #1 Cargo Weight: 4.0 Ton Equipment: 300 Ton Crawler Crane (M4600 S4) Working Radius: 22m Year: August 2006

24

H E A V Y L I F T

Page 27: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

▲ Lifting of bridge span

▲ Erection of building structure

AD – HOC WORKS

25

H E A V Y L I F T

Page 28: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

◄▲ Miri Airport Upgrading Project

AD – HOC WORKS

26

◄ Installation of vessel

▲ River diversion at Bakun

H E A V Y L I F T

Page 29: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

▲ Bintulu Port New Building

H E A V Y L I F T

AD – HOC WORKS

27

Page 30: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

◄▲ Tatau Zedtee Plywood Project

AD – HOC WORKS

28

H E A V Y L I F T

Page 31: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

▲ Erection of vessel ◄ Lifting & dredging on barge at Sebangun Wharf

AD – HOC WORKS

29

▲ Construction of Cement Silo

▲ Discharging of drum

H E A V Y L I F T

Page 32: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

Removal of Tower Crane at Parkcity Mall

AD – HOC WORKS

30

H E A V Y L I F T

Page 33: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

Forklift ►

▲ Sky Master

Zoom Boom Forklift ▼

31

The large Harbour fleet covers a wide range of capacities with both hydraulic and mechanical cranes

available. We also provide any others construction equipment to support our fleet in order to handle on package work for our value customers.

Mobile Crane (20 Ton ~ 360 Ton) X 41 units

Crawler Crane (35 Ton ~ 600 Ton) X 11 units

Lorry Crane (3 Ton ~ 15 Ton) X 7 units

Zoom Boom Forklift (3 Ton ~ 6 Ton) X 2 units

Forklift (3 Ton ~ 10 Ton) X 8 units

Sky Master (24m Boom) X 3 units

E Q U I P M E N T R E N T A L

Page 34: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

Manitowoc M4600 S4 Standard Crane ►

32

600 Ton Manitowoc M4600 S3 Ringer Crane ▼

E Q U I P M E N T R E N T A L

Page 35: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

◄ ▲ 400 Ton Demag CC2000 Superlift Crawler Crane

500 Ton Demag CC2400 Superlift Crawler Crane ▲▼

33

E Q U I P M E N T R E N T A L

Page 36: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

–––

50 Ton Kobelco P&H 550S Crawler Crane ►

150 Ton Hitachi KH700▲ 150 Ton Sumitomo LS248RH2▲ Crawler Crane Tower Crane

34

E Q U I P M E N T R E N T A L

Page 37: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

360 Ton Liebherr LT1300 Truck Crane ▲▼ ►

35

E Q U I P M E N T R E N T A L

Page 38: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

120 Ton Tadano TG1200M Mobile Crane ►

◄▲ 160 Ton Tadano TG1600M Mobile Crane

◄ 100 Ton Tadano TG1000M Mobile Crane

36

E Q U I P M E N T R E N T A L

Page 39: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

HERE WE ARE! ◄ Heavy Lift Dept.

37

C O N T A C T A D D R E S S

Page 40: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95
Page 41: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

C O N T A C T A D D R E S S

Head Office:

1st Floor, No. 38-41, BDA-Shahida Commercial Centre, P.O.Box 309, 97008 Bintulu, Sarawak, Malaysia.

Tel: 60-86-332815 Fax: 60-86-332429

E-mail: [email protected]

Kidurong Operation Office:

Lot 3064, Kidurong Industrial Estate, 97000 Bintulu, Sarawak, Malaysia.

Tel: 60-86-253811 / 12

Fax: 60-86-251676

E-mail: [email protected]

[email protected]

Page 42: Full page fax print · LIFTING OF GENERATOR & GAS TURBINE – TELUK SALUT POWER STATION, 190MW COMBINED CYCLE CONVERSION PROJECT Cargo Weight: Generator (85 Ton), Gas Turbine (95

Recommended