FAILURE MODE AND EFFECT ANALYSIS
PART I HENRY JOHN NUEVA
Introduction to
Presented by:
Minimize the Risk of Failures And Improve Reliability
How to prevent a problem from occurring again in the future ?
How to minimize the risk of potential failure ?
How to produce an error free product or service ?
How to reduce the warranty cost ?
How to improve safety condition in the workplace ?
PROCESS DATA
DOCUMENTATIONOF PROCEDURES
COST SAVING
IMPROVEDESIGN
IMPROVEMENT
• Higher reliability • Better quality • Increase Safety
• Decrease development time and redesign cost• Decrease warranty cost • Decrease waste
• Develop• Research • Progress
PROCESS FMEA SYSTEM FMEA CONSTRUCTIONFMEA
HARDWAREFMEA
SOFTWAREFMEA
Analyzes procedures of the considered system Determines possible weaknesses in the production process. Examines the process related to error causes Process suitability, reliability and quality at an early stage. Design drawing like flowcharts are the basis
Explore the interaction of subsystems or components of the entire system. Aims to identify potential weaknesses, that could arise at the interaction of single components. Considers random and systematic failures during operations.
Makes early assessment of the manufacturing suitability of a product. Considers systematic failures during the construction phase. Possible breakdowns and errors that can occur on separate parts of the system are regarded and proactively avoided. Construction Plan are the basis.
Aims to analyze, evaluate and eliminate risks from the hardware and electronic fields.
Same purpose as Hardware FMEA, but for generated program codes.
FAILURE MODES
Any event which causes a Functional Failure.
Ways in which product, services or processes
can fail.
FAIL
URE
EFF
ECTS
DES
CRIP
TIO
NLOCAL EFFECT
NEXT HIGHER EFFECT
END EFFECT
(Failure effect as it applies to the item under analysis)
(Failure effect as it applies at the next higher indenture level)
(Failure effect at the highest indenture level or total system)
FMEA
The recommended Team Size should be between 4 to 6 person. However, the number of people varies by the number of areas affected by the FMEA.
SAM
PLE
FM
EA F
ORM
1Review the process. Check people involve with various responsibilities and level of experience
2Breakdown the system into components or sub-components
3Brainstorm potential failure modes and list potential effects
4Assign severity ranking for each effect and assign an occurrence and detection ranking for each failure mode
5Calculate the risk priority number (RPN) for each effect and prioritize the failure modes and take action to eliminate or reduce high-risk failure modes
Steps in conducting FMEA
STEP 1If the team is considering a
PRODUCT, then review the engineering drawing of the product.
See the actual product and operate it
If the team is considering a PROCESS/SERVICE, review the operation flowchart.
Physically walk through the process exactly as the process flows
STEP 2To prevent complexity and get
data clearly, use the following techniques in breaking down the system
Filtering Separating Grouping Isolating Other methods
STEP 3During brainstorming, the team
should focus on the different elements below and afterwards organize according to its classification.
People Material Equipment Resources Methods Etc.
STEP 3Information must be thorough
as it will feed into the of risk ranking
Take note of the following: One failure mode can have several
effects. Several failure modes could have one
The Team must determine the END-EFFECTeach failure mode has on the system. This means examining how each failure affects the entire system or facility.
STEP 4Use a 10-point scale with 1
being the lowest ranking and 10 as the highest is recommended but other related ways to assigning and ranking is also applicable.
The best method for determining the occurrence raking is to use Actual Data from the process in the form of failure logs.
STEP 5RPN methodology is a technique
for analyzing the risk associated with potential problems identified during FMEA.
RPN Calculation Benefits
1. Contribute in Risk Assessment 2. Compare components to determine
priority for corrective action
STEP 5Use the formula below in
calculating the Risk Priority Number (RPN)
RPN = Severity x Occurrence x Detection
(RPN = S x O s D)
SAMPLE RISK MATRIX