Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For...

Date post: 12-Jan-2016
Category:
Upload: kathryn-robertson
View: 213 times
Download: 0 times
Share this document with a friend
Popular Tags:
17
Future Jordan Virtual Power Plant EEEMF Jordan 201 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman May 2015 By Eng. S.Mohamad ALAYA LEBANON
Transcript
Page 1: Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.

Future Jordan Virtual Power Plant

EEEMF Jordan 2015

Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman May 2015

By Eng. S.Mohamad ALAYA LEBANON

Page 2: Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.

Agenda

EEEMF Jordan 2015

1. Introduction2. Jordan electricity market3. Jordan Virtual Power Plant4. Jordan financials

- VPP capacity- Profit and loss analysis- Scenario analysis- Cash flow from VPP- Total investment- Investment schedule - Investment schedule Local partners- Profit to local community

Page 3: Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.

Introduction

Teaming up with is a leading technology owner company in the field of development and deployment Virtual Power Plants (VPP´s) having proven record in the VPP application and implementation

Page 4: Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.

Why Virtual Power Plants ?

- Costly infrastructure with long lead times for new projects

- Public resistance against new projects (transmission and

distribution lines, nuclear, coal, etc.)

- Increasing share of RES

- Higher security of supply

- Increasing consumption

- Environmental issues

- Value chain optimization

- Increasing revenues

EEEMF Jordan 2015

Page 5: Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.

Optimizing energy value chain

EEEMF Jordan 2015

Page 6: Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.

© cyberGRID 2012

Current situation in energy market

Energy shortage:• Demand 2500 MW• Supply 1560 MW

Current cost of providing energy:• $5.5 million a day• $2 Billion yearly

Demand:• Increasing demand average

10% annually• $2,3 mio of peak demand in

February 2012• Power rationing 6-12 hours

Exist-ing62%

Neede

d38%

Current proposed solution: Power boats 270 MW

Cost of 0,33$ per kWh

Page 7: Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.

Jordan VPP solution

Exist-ing 62%

LDRC 12%

Needed

26%Capacity:• 300 MW through 3 years

Demand response:• Emergency situations (tertiary reserve)• Requested response ( maintenance works)

Investors:• SUPERGRID, Local partners• Investment $14.1 million through 3 years

Timeline:• Technical investigation proposal 2nd half of 2015• Demonstrational project 2015/2016

EEEMF Jordan 2015

Page 8: Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.

VPP financials

EEEMF Jordan 2015

- VPP capacity- Profit and loss analysis- Scenario analysis- Cash flow from VPP- Total investment- Investment schedule - Investment schedule Local partners- Profit to local community

Page 9: Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.

FY0 FY1 FY2 FY3 FY4 FY50

50

100

150

200

250

300

350

Total Available Capacity MW offered on the market

VPP capacity

Risk limitation:Client availability 60%

VPP capacity through yearsIn MW

In MW FY0 FY1 FY2 FY3 FY4 FY5Total Available Capacity 0 100 200 300 300 300

MW offered on the market 0 60 120 180 180 180

EEEMF Jordan2015

Page 10: Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.

FY0 FY1 FY2 FY3 FY4 FY50

5000

10000

15000

20000

25000

Total revenues EBITDA EBIT

Profit and Loss analysis

Total sales: $6.7 mio (FY1) to $20.1 mio (FY3)(Revenue per kWh 19 $cents)

Gross margin:Approaching 50%

Depreciation: 10 years linear

EBIT$1,17 mio (FY1) to $9.16 mio (FY3)

Total sales and EBITDA In 000´ $

EEEMF Jordan 2015

In 000´ $ FY0 FY1 FY2 FY3 FY4 FY5Total revenues 0 6732 13465 20197 20197 20197Cost of Goods Sold Total 0 5077 8483 11575 10062 10062EBITDA 0 1656 4981 8622 10135 10135Depreciation 0 482 730 977 977 977EBIT 0 1173 4252 7645 9158 9158

Page 11: Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.

Scenario analysis

Sales revenue in scenario analysisIn 000´ $

Scenario parameters (market risk):

Load size (0,2-0,3)

Client availability ( 50-70%)

EEEMF 2015

FY0 FY1 FY2 FY3 FY4 FY50

5000

10000

15000

20000

25000

Average Low High

In 000´ $ FY0 FY1 FY2 FY3 FY4 FY5

AverageSales Total 0 6732 13465 20197 20197 20197EBITDA 0 1655 4980 8622 10134 10134

LowSales Total 0 5610 11220 16831 16831 16831EBITDA 0 1248 4009 7033 8283 8283

HighSales Total 0 7854 15709 23563 23563 23563EBITDA 0 2062 5953 10210 11986 11986

Page 12: Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.

CF and profit distribution

EEEMF Jordan 2015

Operating CF and profit distributionIn 000´ $

Income tax assumed:25%

Payout ratio:0.8

Assuming investments from partners

FY0 FY1 FY2 FY3 FY4 FY50

5000

10000

15000

20000

25000

30000

Operating Cashflow Cumulative Operating CashflowOwner draw - dividends

In 000´ $ FY0 FY1 FY2 FY3 FY4 FY5Operating Cashflow 0 1373 3949 6762 7906 7906Cumulative Operating Cashflow 0 1372 5321 12083 19989 27895Owner draw - dividends 0 1098 4257 9667 15991 22316

Page 13: Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.

Total Investment with expansion: $14.1 million

Total investment

EEEMF Jordan 2015

Total investment and DividendsIn 000´ $

Project profitability:

NPV: $ 39 million

IRR: 78%

Payback: 2.8 years FY0 FY1 FY2 FY3 FY4 FY5

-10000

-5000

0

5000

10000

15000

20000

25000

30000

35000

Owner draw - dividends Total investment Cumulative CF

P.B.P.

In 000´ $ FY0 FY1 FY2 FY3 FY4 FY5Owner draw - dividends 0 1098 4257 10467 20447 34596Total Investment 2361 3766 6444 9702 7341 8166Cumulative CF -2361 -5029 -7216 -6451 6655 33084

Page 14: Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.

© cyberGRID 2012

Investment schedule

FY0 FY1 FY2 FY3 FY4 FY5

-5000

0

5000

10000

15000

20000

Total investment Dividends Cumulative CF

In 000´ $ FY0 FY1 FY2 FY3 FY4 FY5Total investment -1180 -1666 -1984 -1984 0 0Dividends 0 523 2029 4608 7623 10639Cumulative CF -1180 -2323 -2278 347 7970 18609

Total investment and Dividends (In 000´ $)

P.B.P.Project profitability:

NPV: $ 18.6 million

IRR: 78%

Payback: 2.8 years

Page 15: Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.

Local partners investment schedule

In 000´ $ FY0 FY1 FY2 FY3 FY4 FY5Total investment -1180 -2100 -2100 -2100 0 0Dividends 0 574 2227 5058 8368 11677Net CF -1180 -1525 128 2959 8368 11677Cumulative CF -1180 -2706 -2578 381 8749 20426

FY0 FY1 FY2 FY3 FY4 FY5

-5000

0

5000

10000

15000

20000

25000

Total investment Dividends Cumulative CF

Total investment and Dividends Local partners (In 000´ $)

P.B.P.

Project profitability:

NPV: $ 20.4 million

IRR: 78%

Payback: 2.8 years

EEEMF Jordan 2015

Page 16: Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.

Profit distribution to community

Share of revenues to the industries:30% (COGS)

Excess capacity payment:50%

Payments to industries in LebanonIn 000´ $

EEEMF Jordan 2015

Profit distribution to local community (In 000' $) FY0 FY1 FY2 FY3 FY4 FY5Average 0 3030 6059 9089 9089 9089High 0 3534 7069 10603 10603 10603Low 0 2525 5049 7574 7574 7574

FY0 FY1 FY2 FY3 FY4 FY50

2000

4000

6000

8000

10000

12000

Average High Low

Page 17: Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.