West African Power Industry Convention 2007, Abuja, NIGERIA Future Power and Energy Security in West Africa Alhaji S. Maigida Coordinator-PHCN, Liaison Unit Abuja – Nigeria 20 th November 2007
Transcript
Page 1: Future Power and Energy Security in West Africa · Future Power and Energy Security in West Africa AlhajiS. Maigida Coordinator-PHCN, Liaison Unit Abuja –Nigeria 20 th November

West African Power Industry Convention 2007, Abuja, NIGERIA

Future Power and Energy Security in West Africa

Alhaji S. Maigida

Coordinator-PHCN, Liaison Unit

Abuja – Nigeria20th November 2007

Page 2: Future Power and Energy Security in West Africa · Future Power and Energy Security in West Africa AlhajiS. Maigida Coordinator-PHCN, Liaison Unit Abuja –Nigeria 20 th November

� West African Power Industry Convention 2007, Abuja, NIGERIA

Electricity Supply in West Africa

� Population of approx. 258 million

� Total installed capacity – about 12,461MW

� All ECOWAS states (except Cote d’Ivoire) are

experiencing acute power shortages which have grown

into major crisis

� About 46% of the electricity demand in the ECOWAS

region is not being met

Page 3: Future Power and Energy Security in West Africa · Future Power and Energy Security in West Africa AlhajiS. Maigida Coordinator-PHCN, Liaison Unit Abuja –Nigeria 20 th November

� West African Power Industry Convention 2007, Abuja, NIGERIA

Electricity Supply in West Africa……. [2]

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

MEGAWATTS

BENIN

BURKINA FASO

COTE D'IVOIRE

THE GAMBIA

GHANA

GUINEA

GUINEA-BISSAU

LIBERIA

MALI

NIGER

NIGERIA

SENEGAL

SIERRA LEONE

TOGO

Installed capacity Average capacity available

Page 4: Future Power and Energy Security in West Africa · Future Power and Energy Security in West Africa AlhajiS. Maigida Coordinator-PHCN, Liaison Unit Abuja –Nigeria 20 th November

� West African Power Industry Convention 2007, Abuja, NIGERIA

Reasons for Insufficient Supply

�Technical Causes- obsolete equipment, inadequate maintenance, operational inefficiencies, insufficient

capacity, non utilization of primary energy sources etc

� Financial Factors:- low user tariffs, low collection rates, poor financial standing of the Utilities etc

� Institutional Issues:- planning & implementation

responsibility, bureaucracy in decision making,

sensitivity of tariffs to low income/wage levels etc

Page 5: Future Power and Energy Security in West Africa · Future Power and Energy Security in West Africa AlhajiS. Maigida Coordinator-PHCN, Liaison Unit Abuja –Nigeria 20 th November

� West African Power Industry Convention 2007, Abuja, NIGERIA

Power Security and Energy Issues

� Inadequate and unreliable generation capacity

25812,463 West Africa

1306,000 Nigeria

301990,000 USA

6182,000 UK

4974,000 South Korea

4446,000 South Africa

23446,000 Indonesia

6544,000 Iran

2839,000 Saudi Arabia

2524,000 Malaysia

44,740 UAE

(Million)(MW)

PopulationPower GenCountry

Page 6: Future Power and Energy Security in West Africa · Future Power and Energy Security in West Africa AlhajiS. Maigida Coordinator-PHCN, Liaison Unit Abuja –Nigeria 20 th November

� West African Power Industry Convention 2007, Abuja, NIGERIA

� Inadequate and unreliable transmission network

for Gas and ElectricityMap 4: Existing NEPA Transmission Line System

ONITSHA

KAINJI

JEBBA/GS

JEBBA/TS

SHIRORO

AJAOKUTA

Abeokuta

Ikeja

Akure

Benin City

Asaba

PortHarcourt

Owerri

Uyo

ALAGBADO

BirninKebbi

Minna

Kaduna

Abuja

Jos

Bauchi

Gombe

Damaturu

MaiduguriKano

IIorin

AdoEkiti

Lokoja

Lafia

Makurdi

MAKURDI

EnuguAkwa

Umuahia

Ibadan

AFAMPOWER ST.

Sokoto

Gusau

Katsina

Hadejia

Jalingo

Yola

Abakaliki

Calabar

JIGAWA

KANO

KATSINA

SOKOTO

ZAMFARA

KEBBI

KWARA

KADUNA

ABUJA

NIGER

NASSARAWA

TARABA

YOBE

PLATEAU

BENUE

EBONYI

CROSS

RIVER

AN AMBRA

OSUN

BAYELSA

KOGI

EDO

ABIA

RIVERS

DELTA

ONDO

OYO

ENUGU

IMO

ADAMAWA

BORNO

GOMBE

BAUCHI

EKITI

LAGOS

AKWA

IBOM

ATLANTIC OCEAN

NIGER

REPUBLICOF BENIN

REPUBLICOF CAMEROON

REPUBLICOFCHAD

TRANSMISSION LINE LEGEND132KVLINES - EXISTING

132KV LINES - AWARDED

132KV LINES - APPROVED

132KV LINES - UNDER CONSTRUCTION

330KV LINES - EXISTING

330KV LINES - AWARDED

330KV LINES - APPROVED

330KV LINES - UNDER CONSTRUCTION

BULK SUPPLY - EXISTING

BULK SUPPLY - UNDER CONSTRUCTION

BULK SUPPLY - APPROVED / AWARDED

HYDROELECTRIC POWER SUPPLY

THERMAL POWER STATIONS

132 KV 330 KV

H

SAPELEP/ST.

DELTAPOWER ST.

2 Circuits

OGUN

Osogbo

2 Circuits

3 Circuits

Notes:1. Multi-circuits are not indicated for the 132KV system.

2 Circuits

2 Circuits

2 Circuits

EGBINP/ST.

NIGERIA

Report Maps 7-24-00

TCN

Dutse Azar

e

Page 7: Future Power and Energy Security in West Africa · Future Power and Energy Security in West Africa AlhajiS. Maigida Coordinator-PHCN, Liaison Unit Abuja –Nigeria 20 th November

� West African Power Industry Convention 2007, Abuja, NIGERIA

LA PA LMA

GOMERA

HIERRO

TENERIF

A R C H I P I É L A G O C A N A R I O

GRAN CANARIA

FUERTEVENTURA

LANZAROTE

FORMENTERA

IBIZA

MALLORCA

MENORCA

R E DE L É C T R I C AD E E S PA Ñ A

RED DE TRANSPORTE DEENERGÍA ELÉCTRICA DE ESPAÑA

SITUACIÓN A 1 DE ENERO DE 2001Y PROGRAMADAS PARA 2001-2008

El vas

Badajoz

P.T. Princesa

Es Figueral

Calvia

Playa Blanca

Formentera

S. Jorge

Corralejo

ErrondeniaIrún

CalaBosch

Cala Mesquida

Adrall

BenosLacD´Oo

Andorra

Lindoso

Las Conchas

Miralbueno

St .Cugat

Isora

Granadi lla

Lomo delCardo

Jinamar

Sant a Agueda

Tabares

Úbeda

Órgiva

El Fargue

Villanueva del Rey

Casillas

Rocio

Pinto

D. Rodrigo

Caparacena

Palencia

Santiago II

S. Pedro

Velle

La Secuit a

Pierola

Begues

M. Figueres

Sant Boi

L´Hospit alet (Hec)

Alcudia II

Juia

Bescanó

Torrellano

Eixample

R. Caldes

L´Hospit alet

Puer to

Parralejo

Olivares

Bco. Tirajana

Pola

Los Vientos

María de Huerva

Facinas

P.E.S. Cando

Alv arado

Repsol

FrieiraAtios

C. NacionesEl Coto

Arganda

V.Cañada

Torrijos

Benilloba

El Palmeral

Boadilla

S.Chinarro

Mesón do VentoGrela

Albarellos

Pazosde Borben

Cartel le

Astil lero

Palau

M.Torrero

Fuencarral

C. Plat a

Canillejas

Son Reus

Campoamor

Puerto de la Cruz

Parla II

Lucero

Zamudio

Arroyo Molinos Albreasa

Aldaya/El Oliveral

Fuenlabrada O.

Aravaca

NavalcarneroParla

Orihuela

Vall d´UxoSegorbe

Aljarafe

Molins

Mangraners (AVE)

Franquesas

Trinitat

Aeropuerto

Zona Franca

GavaSadumi

Juneda

Zaragoza (AVE)Los Leones

El Ventero

A. ZincLaminación

Uninsa

Suido

Chantada

Cayetano

Eiris

E lda

P.E. Testeiros

P.E. CocoP.E. Montecastelo

MazarredoMediodía

Vimianzo

Mazaricos

Lanzas Agudas

Port odemouros

Belesar

Tabiel la

Magallón

Fuendetodos

Jalón

La Roca

Vilanova

Hort aleza

Balboa

Torre Arenil las

Hoya Morena

S. Vicente

RojalesRocamora

Poble Nou

Briviesca

San Rafael

Casares

Paterna

Tharsis

S.Sevi llana

Guadaira

Carburos

LlubiEs BessonsSon Orlandis

Val ldurgent

Foix-Castelle tBellisens

Tarragona (Enher)Foix

GrelaSabón

Meirama

Santiago II

Tibo

Albarellos

Soutelo

Port odemouros

Castrelo

S. Pedro

Sidegasa

Velle

S. Esteban

Ribadelago

QuereñoCorna tel

Remolina

Guardo

Las Ondinas

Peñadrada

St a. Marina

Tabiel laCarrio

TrasonaAboño

Palencia

Villalbilla

Logroño

Vill imar

MondragónT. Nervión

Tubacex

Ayala

Alí

PuenteLarra

Miranda

CacicedoAceriasa

Astil lero

La Jara

Mat aporquera

Nervacero

Babcock

BasauriAlonsotegui

Ortuella

Entrerrios

Tudela

Tafalla

El Sequero

Quel

Forjas AlavesasGamarra

Abadiano

Orbegozo

Pasajes

Ormaiztegui

Aristrain

T. Foradada

Cinca

Mangraners

Eriste

La For tunadaSesue

ConstantiBellisens

El Morell

Castellet

Moralets

Perafort

Tabescán

Llavorsi

Cercs

Centelles

S. Celoni

Juia

Vic S. Celoni

La RocaPalau

S. FostP. Conversión Canyet

Santa Coloma

Badalona

Besos

CollblancL´Hospit alet

Sant Boi

Viladecans

S. Andreu

Urgell

L´Hospit alet (Hec)

Centel les

Pobla

Cas tellbisbal

Sant JustMaragal l

Tarragona

Foix

El Ingenio

Escucha

Bolarque I

J. Cabrera Bolarque IIGabriel y Galán

Guijo de Granadil la

Casa tejadaTala vera

M. del Campo

La OlmaRenedo

Zamora

RicobayoCastro Zara tánVilla lcampo

Vi llamayor

Torrejón

Tal avera

Aceca Aceca

P.S. Fernando

Tres Cantos

Hort alezaProsperidad

NorteMajadahonda

Getafe

La Fortuna

C. Plat a

Vallecas

Retamar

Leganés

Vicál varo

J. Cabrera

Huel ves

Azután

Andujar

C. Real (Ave)

Mérida

Cáceres

Azután

Valdecañas

Hoya Morena

Madridejos

La Paloma

Campoamor

S. VicenteXixonaPetrel

SaguntSidmed

F. San LuisTorrente

Alcira

Bahía de Algeciras

Costa Sol

Alhaurín

Los Ramos

Los Montes

Atarfe

GábiasBenahadux

Los Alcores

Puert o Real

La Car tuja

Onuba

C. ColónTorre Arenil las

Santiponce

Centenar io

Dos HermanasQuintos

Mesón do Vento

Trives

Conso

Soto de Ribera

Montearenas

Compostilla II

Herrera

Agua yo

Penagos

La Eliana

Ca tadau

La Plana

Benejama

Aceca

Olmedilla

Picón

La Lancha

Puertol lano

Guadame

Tajo de laEncant ada

Pinar del Rey

Guillena

Los Barrios

D. Rodrigo

Aldeadávi la

Villarino

C.N. AlmarazJ.M. de Oriol

Almaraz

Aldeadávila

Saucelle

Tordesillas

La Mudarra (Id)

Hernani

Ichaso

Gueñes

Orcoyen

Ga tica

Peñaf lor

Esca trón

Vic

Mequinenza

Ascó

Vandel lós

Vi llanueva

M.Torrero

Poblade Segur

Ribarroja

Pont deSuert

Loeches

Morata

San Sebastián

Villaviciosa

Alcorcón

V illaverde

Fuencarral

Moraleja

Sentmenat

Pierola

Begues

Can Jardi

Rubí

M. Figueres

Meco

Meco

Alarcos

Huel ves

Son Reus

A.C.V.

Repsol

Pazosde Borben

Porland

Candelaria

Granadi llaJinamar

Bco. Tirajana

Puente de S. Miguel

Alcudia II

Puebla deSanabria

Sant Adria

Montblanc

L. Corts

Monca yo

Magallón

A. Vega

Ferroatlántica

Valdemoro II

Tambre II

D. Basaur i

Jalón

Aena

Canillejas

Ence

P. de laSal

LasMazorras

El Cerro

Sidenor

Santurce

Arkale

Coslada

Rojales

Caparacena

Escombreras

El Espart al

Oncala

La Torrecilla

Elgea

Mercedes Benz

Lourizan

El Palmar

Belesar

Requena

Ci llamayor

La Olma

La Mudarra

Muruarte

Lubián

Cartel le

Gurrea

Bajo Cinca

Bolarque II

Noguera

Tri llo

Belesar

Conso

La Lancha MontecilloBajo

Vent a de la Inés

Arroyo del Valle

La Nava

Puertol lano

Mora

El Emperador

Picón

Almaraz

Aceca

Otero de Herreros

Añover

Bemposta

Pocinho

Aldeadávila

Saucelle

ValparaisoPuebla deSanabria

San AgustínGrado

Vi llanueva

Ribarroja

Poblade Segur

Escalona

Mediano

Pont deSuert

Biescas II

Sabiñanigo

Pragneres

Mouguerre

Sangüesa

Cordovi lla

Orcoyen

Puente de S. Miguel

Arkale

Ponte Bibey

Prada

SobradeloSantiago

Villablino

Compostilla II

Pereda

Siero

Otero

Almaraz

Alcorcón

V illaverde

El Horni llo

P. de Suert -Pobla

Abrera

La Mudarra (Id)

Añover

Sentmenat

Rubí

Guadame

La Mudarra

Villarino

Trives

La Lomba

Soto de Ribera

Montearenas

Penagos Hernani

IchasoAgua yo

Esca trónM. Figueres

Tordesillas

Barcina

Mequinenza

Elcogas

Cartel le

Navalcarnero

Lemoniz

Ga tica

Azpeitia

Garoña

Cortes II

Saucelle II

Pinar del Rey

Hinojosa

M. Cortes

Castellón

La Plana

Soto de Ribera

HernaniIchaso

Gueñes

Santurce

Los Barrios

AmorebietaPenagos

Bescanó

La Secuit a

Isona

Bes canó

Fuencarral

Fuencarral

Ichaso

Vitoria

Gueñes

Vel illa

Soto de Ribera

Lada

Pinar del Rey

Rocamora

Aragón

Sentmena t

Sentmenat

Magallón

Boimente

Penedés

Mesón do Vento

Puentes deGarcía Rodríguez

Puerto de la Cruz

Santurce

Muruarte

Castejón

Terrer

Medinaceli

Rueda de Jalón

Tri lloFuentes dela Alcar ria

Anchuelo

Zierbana

Abanto

El Palmar

Nueva Escombreras

Fuendetodos

Valencia (Torrente)

Santa Coloma

Maestrazgo 1(Morel la)

Maestrazgo II

Arcos de laFrontera (Sur)

Cartel le

Valdecaballeros

Romica

OlmedillaLa Eliana

La Plana

Benejama

Guadame

Balboa

Est . Ter. Estrecho

Narcea

Osera

Alqueva

Trives

La Serna

Pinilla

Virtus

Palos

Monzón

Cazaril

Figueras

Arcos de laFrontera(Norte)

Hueneja

Villameca

La Lora

Peñalba

Sagunto

Graus

Vimbod

Escucha

Lucena

Mesón do Vento

Aluminio Español

Puentes deGarcía Rodríguez

Lit oralde Almería

Tajo de laEncant ada

Pinar del Rey

D. Rodrigo

Guadame

Escombreras

La Asomada

Rocamora

Romica

Benejama

OlmedillaLa Eliana

Ca tadau

M. CortesC.N. Cofrentes

Tri llo

La Plana

Valdecaballeros

CedilloC.N. Almaraz

Arañuelo

J.M. de OriolFalagueira

Mora ta

Loeches

S. Sebastián

Galap agar

Villaviciosa

Moraleja

Lastras del Pozo

Tordesillas

La Mudarra

Aldeadávi la

Hinojosa

Villarino

Grijo t a

Almazán

Teruel

Peñaf lor

La Serna

Esca trón

Mequinenza

Ascó

Vandel lós

Vic

CaldersSentmena tCan Barba

Begues Rubí

Pierola

Can Jardi

Sal lente

CantegritHernani

Ichaso

Vel illaVitoria

Herrera

Agua yo

Gueñes

Trives

La Lomba

Anl lares

Compostilla

Soto de Ribera

Narcea

Montearenas Vi lecha

La Robla

La Gaudiere

Baixas

Galapagar

Galapagar

Almaraz

La MudarraGrijota

Loeches

Trillo

C of rentesAlmaraz

OlmedillaArañuelo

Morata

San Sebastián

Moraleja

Villaviciosa

VicSallente

Ascó

Vandellós

Mequinenza

AscóVandel lós

Can Barba

M. Figueres

Pierola

Begues

Can Jardi

Rubí

Hernani

Balboa

Bienvenida

Cartel le

Lindoso

Lada

Mell oussa

Sentmenat

Guillena

Pinilla

Est . Ter. Estrecho

Aragón

Abril-2001

Los Guinchos

Llanos Blancos

El Palmar

Guanarteme

Punta Grande

Las Salinas

Mahón

SonMolines

S. Juan de Dios

Almería

Cádiz

Málaga

Puentenuevo

Cijara

Canelles

Peares

Salime Tanes

Burceña

1 1

2 22 1

1 1

2 22 1

previstos instaladosCircuitosLíneas

En servicio

En construccióny programadas Todas las líneas se han dibujado en e l

color al que func ionan. En las construidasa tens ió n distinta ésta se indica entreparéntes is (F 400 kV)

En servicio

Centrales actuales

En construcción yprogramadas

Subestaciones

Cablesubterráneo/submarino

Prevista transformación a 400 kV

400 kV

220 kV132/110 kV

<110 kV

En servicioEn construccióny programadas

TensionesRed Eléctrica empresas

Nuclear

Lignito Neg ro

Lignito Pardo

Hullas y An tracitas Nac.

Hullas Importación

Fuel

Fuel y Gas

Hidráulicas >100 MW

Ciclo Combinado

Cádiz Oeste

The Spanish Electrical Sector

Page 8: Future Power and Energy Security in West Africa · Future Power and Energy Security in West Africa AlhajiS. Maigida Coordinator-PHCN, Liaison Unit Abuja –Nigeria 20 th November

� West African Power Industry Convention 2007, Abuja, NIGERIA

FRENCH GRID

Page 9: Future Power and Energy Security in West Africa · Future Power and Energy Security in West Africa AlhajiS. Maigida Coordinator-PHCN, Liaison Unit Abuja –Nigeria 20 th November

� West African Power Industry Convention 2007, Abuja, NIGERIA

Power Security & Energy Issues - contd.

� Insufficient oil and gas for domestic market

� Disruption and vandalization of Gas/Transmission

infrastructure

� High demand and high prices of oil and gas

� Fear of security of investments

� Climate change – drought

� Uneconomical Electricity and Gas tariffs

� Huge capital cost – foreign content

� Large Land area

� Poverty – Ability to pay

� Niger Delta Issues – Environmental Degradation

Page 10: Future Power and Energy Security in West Africa · Future Power and Energy Security in West Africa AlhajiS. Maigida Coordinator-PHCN, Liaison Unit Abuja –Nigeria 20 th November

� West African Power Industry Convention 2007, Abuja, NIGERIA

Power Security & Energy Issues - contd.

� There is need to develop a plan that will address

the above issues to ensure

1. The availability of gas and electricity supply

2. The adequacy of generating capacity, gas and electricity infrastructure

Page 11: Future Power and Energy Security in West Africa · Future Power and Energy Security in West Africa AlhajiS. Maigida Coordinator-PHCN, Liaison Unit Abuja –Nigeria 20 th November

� West African Power Industry Convention 2007, Abuja, NIGERIA

Addressing Future Power and Energy Security

� Increase generating capacity

�Completion of NIPP Power Stations

�Independent Power Producers

�Execution of sub-regional generation projects planned by WAPP

�Isolated generation (where appropriate)

�Rehabilitation of existing power plants/stations

� Strengthen Transmission network

�Complete NIPP Transmission projects

�Interconnection of the 5 isolated member states(Liberia, Sierra- Leone, Guinea, Guinea-Bissau, Gambia)

Page 12: Future Power and Energy Security in West Africa · Future Power and Energy Security in West Africa AlhajiS. Maigida Coordinator-PHCN, Liaison Unit Abuja –Nigeria 20 th November

� West African Power Industry Convention 2007, Abuja, NIGERIA

Addressing Future Power and Energy Security

� Improve gas supply�Resolve Niger Delta crisis

�Complete the West African Gas Pipeline

�Extend gas supply network to Northern Nigeria

� Adjustment of Tariff to attract investment in gas and electricity sectors

� Cooperation on major Regional Projects – INGA

� Diversification of Energy Sources – Renewables: the proportion of electricity generated to increase substantially

Page 13: Future Power and Energy Security in West Africa · Future Power and Energy Security in West Africa AlhajiS. Maigida Coordinator-PHCN, Liaison Unit Abuja –Nigeria 20 th November

� West African Power Industry Convention 2007, Abuja, NIGERIA

Addressing Future Power and Energy Security

� More emphasis on demand side management –save energy

� A strong framework of regulation to promote

cross border electricity trade

� Nuclear power??

� Drawing up an Energy policy master plan to be

piloted by WAPP

� Establishment of an Energy Charter to address

the rights and obligations of consumers

Page 14: Future Power and Energy Security in West Africa · Future Power and Energy Security in West Africa AlhajiS. Maigida Coordinator-PHCN, Liaison Unit Abuja –Nigeria 20 th November

� West African Power Industry Convention 2007, Abuja, NIGERIA

Opportunities in the Power Sector- Nigeria

Power Generation

� Privatization of power generation stations

• 6 existing power stations (3 hydro and 3 thermal with a total

capacity of approx. 4000MW)

• 4 new gas fired power stations (total capacity of the four

plants is about 1600MW)

• 7 new gas fired power stations presently being built

under the NIPP. Total capacity of the seven plants is about

2600MW.

� Investment in the development of IPPs (Gas, Coal, Hydro, Nuclear etc)

Page 15: Future Power and Energy Security in West Africa · Future Power and Energy Security in West Africa AlhajiS. Maigida Coordinator-PHCN, Liaison Unit Abuja –Nigeria 20 th November

� West African Power Industry Convention 2007, Abuja, NIGERIA

Opportunities in the Power Sector- Nigeria

Transmission

� Construction of Transmission lines & Substations

Distribution

� Privatization of Distribution

Others

� Establishment of Manufacturing Plants and Repair

Facilities for power equipment & machinery