Fwd. Anchor Windlass / Capstan Location/Operations
Transcript
Page 1: Fwd. Anchor Windlass / Capstan Location/Operations.

Fwd. Anchor Windlass / Capstan

Location/Operations

Page 2: Fwd. Anchor Windlass / Capstan Location/Operations.

In this training module we will look at the following piece of Deck Machinery: • Forward Anchor Windlass/CapstanWe will also take a look at how it operates, the location of it’s HPU (where applicable), and other information important to know about this piece of equipment.

Fwd. Anchor Windlass/Capstan

Page 3: Fwd. Anchor Windlass / Capstan Location/Operations.

Deck MachineryForward Windlass/Capstan

Page 4: Fwd. Anchor Windlass / Capstan Location/Operations.

The forward Anchor Windlass/Capstan is for mooring and line handling operations as well as anchoring operations.Vertically oriented, hydraulically operated: Coastal Marine Equipment 1V07533-124-00

► Line Pull-9,000 lbs. ► ABS Continuous Duty Line Pull- 3,700 lbs. ► Chain Speed-30FPM ► Brake Holding-30,600 lbs. (Maximum)

Deck MachineryForward Windlass/Capstan

Page 5: Fwd. Anchor Windlass / Capstan Location/Operations.

Deck MachineryForward Windlass/Capstan

Riding Pawl:

Costal Marine Equipment

Model: IR-CSO75

Page 6: Fwd. Anchor Windlass / Capstan Location/Operations.

Deck MachineryForward Windlass/Capstan

Forward Windlass/Capstan HPU:• Located in STBD VSP Room, AFT.• Coastal Marine Equipment 30 HPU• 480 VAC, 3 phase, 30 HP motor• 2,600 PSI @ 22 GPM• Local reset and power on/off• Breaker on Main Switchboard

Page 7: Fwd. Anchor Windlass / Capstan Location/Operations.

Deck MachineryForward Windlass/Capstan

HPU Normally turned On/Off from FWD Wheelhouse Console.

This ensures wheelhouse watch is aware Windlass/Capstan are going to be put into operation.

Page 8: Fwd. Anchor Windlass / Capstan Location/Operations.

Forward Windlass/Capstan

Deck Machinery

Directional Controls For Heave/Veer

Page 9: Fwd. Anchor Windlass / Capstan Location/Operations.

Deck MachineryForward Windlass/Capstan

Hawse Pipe leads to anchor pocket

Anchor • Stockless, high holding• 595 pounds

Page 10: Fwd. Anchor Windlass / Capstan Location/Operations.

Deck MachineryForward Windlass/Capstan

Spill pipe into chain locker• 451 feet of ¾ inch grade 2 stud link chain• Marked a different color every 50 feet

We will seal spill pipe with and aerosol style high expansion foam after each use to keep water and debris out of chain locker!

• 50' - Red • 100' - White • 150' - Blue • 200' - Orange • 250' – Green • 300' – Yellow

Page 11: Fwd. Anchor Windlass / Capstan Location/Operations.

Riding Pawl

Pelican Hook/Turnbuckle Chain Stopper

Clutch Engage/Disengage Hand wheel

Windlass Brake Hand wheel

Deck MachineryForward Windlass/Capstan

Capstan

Page 12: Fwd. Anchor Windlass / Capstan Location/Operations.

Deck MachineryForward Windlass/Capstan

When the clutch on the capstan engages the windlass, the motor can now heave (or veer) the anchor.

The part of the windlass that “grabs” the chain links is called the “wildcat.”

Page 13: Fwd. Anchor Windlass / Capstan Location/Operations.

Deck MachineryForward Windlass/Capstan

The Pelican Hook/Turnbuckle Chain Stopper secures the anchor in place at all times when the anchor is not in use. It provides a positive means of securing the anchor system when the windlass is disengaged from the capstan.

Page 14: Fwd. Anchor Windlass / Capstan Location/Operations.

Deck MachineryForward Windlass/Capstan

Riding Pawl:• Guides chain over deck to hawse pipe• Prevents anchor from slipping, accidental

release in “down” position• Allows for anchor paying out in “up” position.

“Up” Positon – for releasing or paying out anchor

“Down” Position – for retrieving/securing anchor

Page 15: Fwd. Anchor Windlass / Capstan Location/Operations.

Deck MachineryForward Windlass/Capstan

Operating the Capstan:(Line handling)

1. Ridding Pawl Down

2. Chain Stopper Secure

Page 16: Fwd. Anchor Windlass / Capstan Location/Operations.

Deck MachineryForward Windlass/Capstan

3. Anchor Brake Tight (Clockwise)

4. Call wheelhouse: Turn on HPU

Operating the Capstan:(Line handling)

Page 17: Fwd. Anchor Windlass / Capstan Location/Operations.

Deck MachineryForward Windlass/Capstan

5. Disengage Clutch (Clockwise)

5(a). May have to “jog” capstan with the controls to free the clutch pawls from the capstan dogs. This will allow capstan to move up from clutch pawls (Picture above shows clutch (wildcat) disengaged)

Capstan dog

Clutch Pawl

Operating the Capstan:(Line handling)

Page 18: Fwd. Anchor Windlass / Capstan Location/Operations.

6. You may now operate controls to capstan to heave lines. Up/Down on controls changes direction capstan turns. Allows you to change lead of line pull, or heave/veer the line you are working. Be safe!

Deck Machinery

Operating the Capstan:(Line handling)

Forward Windlass/Capstan

Page 19: Fwd. Anchor Windlass / Capstan Location/Operations.

Deck MachineryForward Windlass/Capstan

Day to Day Configuration

For our normal, day to day operations we will leave the Windlass/Capstan set up for Capstan operations:• Riding pawl secured

(down)• Chain Stopper on• Anchor Brake tight• Wildcat disengaged

Page 20: Fwd. Anchor Windlass / Capstan Location/Operations.

When informed by the wheelhouse watch to prepare for anchoring, the following needs to be done with the Windlass/Capstan:

Deck MachineryForward Windlass/Capstan

Anchoring Operations(Preparing to Anchor)

1. Wheelhouse watch turns on HPU

Page 21: Fwd. Anchor Windlass / Capstan Location/Operations.

2. Windlass Brake tight (CW)

Deck MachineryForward Windlass/Capstan

Anchoring Operations(Preparing to Anchor)

3. Engage clutch (CCW)

Page 22: Fwd. Anchor Windlass / Capstan Location/Operations.

3(a). As you engage clutch, jog capstan to line up dogs and pawls .

Deck MachineryForward Windlass/Capstan

Anchoring Operations(Preparing to Anchor)

4. Remove chain stopper

Page 23: Fwd. Anchor Windlass / Capstan Location/Operations.

Deck Machinery

Anchoring Operations(Preparing to Anchor)

5. Raise the stopper on Riding Pawl

6. Contact wheelhouse watch, and if they give you the ok, release the windlass brake (CCW), and lower the anchor to the water’s edge using the windlass motor. This is called “walking out the anchor.”

Forward Windlass/Capstan

Page 24: Fwd. Anchor Windlass / Capstan Location/Operations.

7. Once anchor is walked out, tighten the windlass brake (CW).

Deck MachineryAnchoring Operations(Preparing to Anchor)

Forward Windlass/Capstan

8. Now, disengage the clutch. The anchor will now be hanging free of the hawse pipe, held only by the windlass brake.

Page 25: Fwd. Anchor Windlass / Capstan Location/Operations.

Deck MachineryForward Windlass/CapstanAnchoring Operations

(Preparing to Anchor)

9. Stand-by at the windlass brake: The anchor is now ready to “let go.” Inform the wheelhouse the anchor is ready to let go, and have them turn off the HPU. Make sure all personnel on foredeck are out of the way of the anchor chains path.

Page 26: Fwd. Anchor Windlass / Capstan Location/Operations.

Deck MachineryForward Windlass/CapstanAnchoring Operations

(Anchoring)

1. When Pilot gives the order to “let go the anchor,” release the brake (CCW) until the chain starts to pay out. Do not let the chain run uncontrolled. Feather the brake to slow the speed of pay-out so chain does not pile up on bottom. Pay out amount of chain specified by Pilot. It’s marked every 50 feet up to the first 300 feet. Don’t let out all the chain!!! (451 feet). Engage brake when proper amount of chain is out.

Page 27: Fwd. Anchor Windlass / Capstan Location/Operations.

2. With brake set on windlass, Pilot will use astern momentum to set anchor. Foredeck crew will provide feedback to Pilot regarding the strain and lead of the anchor chain. Once vessel has settled and it is determined the anchor is holding, turn the HPU back on and do the following:

Deck MachineryForward Windlass/CapstanAnchoring Operations

(Anchoring)

3. Engage Clutch 4. Lower Stopper on Riding Pawl

5. Release Brake

Page 28: Fwd. Anchor Windlass / Capstan Location/Operations.

Deck Machinery

Anchoring Operations(Anchoring)

Forward Windlass/Capstan

6. Slowly veer chain using windlass motor, allowing a chain link to catch on stopper (May have to push on stopper slightly with hand).

7. As the chain locks on the Riding Pawl stopper, pay out enough chain to put a slight belly in between the Riding Pawl and the windlass.

Page 29: Fwd. Anchor Windlass / Capstan Location/Operations.

Deck MachineryForward Windlass/Capstan

Anchoring Operations(Anchoring)

8. Set the brake 9. Disengage Clutch 10. Turn off HPU

Note: Do not put the Pelican Hook/Turnbuckle chain stopper on when the anchor is deployed!

Page 30: Fwd. Anchor Windlass / Capstan Location/Operations.

Deck MachineryForward Windlass/Capstan

Anchoring Operations(Heaving Anchor)

1. Pilot will inform you they are ready to heave anchor: Turns on HPU

2. Engage Clutch 3. Release Brake

Page 31: Fwd. Anchor Windlass / Capstan Location/Operations.

4. Riding Pawl Down (Should already be down)

5. Charge a hose line to rinse muck from chain as it comes into hawse pipe. You can use on-ship fire pump or White System. Whatever floats your boat…

Deck Machinery

Anchoring Operations(Heaving Anchor)

Forward Windlass/Capstan

6. You are now ready to heave the anchor. Let the Pilot know the windlass is ready, and if they give you the o.k., start heaving.

7. Always have a spotter inform the Pilot the direction the chain is leading (Dead ahead, to port, to starboard, straight up/down), and relative strain (light, moderate, heavy)

Page 32: Fwd. Anchor Windlass / Capstan Location/Operations.

8. Spotter needs to keep Pilot informed of chain lead and strain the entire time. Also needs to look for anchor. When it reaches surface, inform Pilot, and have person on windlass controls slow down the rate of heave. Now, slowly bring anchor all the way into pocket. DO NOT JAMB IT INTO POCKET WITH WINDLASS MOTOR!

9. Once anchor is in the pocket let the Pilot know “anchor home.”

Deck MachineryForward Windlass/Capstan

Anchoring Operations(Heaving Anchor)

Page 33: Fwd. Anchor Windlass / Capstan Location/Operations.

Deck MachineryForward Windlass/Capstan

Anchoring Operations(Heaving Anchor)

12. Secure Chain Stopper13. Set Brake 13. Disengage Clutch

14. Shut off HPU


Recommended