TIP Administrative Modifications
M06-22 INDOT 2000843 Railroad ProtectionPear Rd - Norfolk
Southern RR - DOT #
522571L
St Joseph Section 130 CN $ 306,000 $ 34,000 $ 340,000 Delete Project from TIP
M06-22 INDOT 2000842 Railroad ProtectionQuince Rd - Norfolk
Southern RR Co. - Dot #
522568D
St Joseph Section 130 CN $ 306,000 $ 34,000 $ 340,000 Delete Project from TIP
M06-22 INDOT 2000841 Railroad ProtectionCounty Club Rd - Norfolk
Southern RR Co. - DOT
# 522568D
St Joseph Section 130 CN $ 306,000 $ 34,000 $ 340,000 Delete Project from TIP
M06-22 INDOT 2000840 Railroad ProtectionPine Rd - Norfolk Southern
RR Co. - DOT # 522567WSt Joseph Section 130 CN $ 306,000 $ 34,000 $ 340,000 Delete Project from TIP
M05-22 INDOT 2000781 Railroad ProtectionMiddlebury St - Norfolk
Southern Railway Co. -
DOT 522662S
Elkhart Section 130 CN $ 550,000 $ - $ 550,000
Increase Federal Funding by
$244,000 & Add project to 2020-
2024 TIP
M05-22 INDOT 2000780 Railroad ProtectionMain St - Norfolk
Southern Railway Co. -
DOT #522506F
Elkhart Section 130 CN $ 550,000 $ - $ 550,000
Increase Federal Funding by
$244,000 & Add project to 2020-
2024 TIP
M04-22 Elkhart 2001662 New Bridge Construction
Hively Avenue, East of Main
Street crossing the NS
Railroad
Elkhart Safety CN $ 2,742,600 $ 783,600 $ 3,526,200 Move Project from FY 2023 to FY
2024 (22-26 TIP only)
Modification
NumberSponsor DES LocationWork Type Action2023
Federal
Funding Type Federal Match 2022Phase 2024 2025 2026
FY 2022-2026 TIP Administrative Modifications
County
Printed 3/10/2022
TIP Administrative Modifications
M03-22 Elkhart 1900821 New Bridge Construction
Hively Avenue, East of Main
Street crossing the NS
Railroad
Elkhart Safety CN $ 1,634,650 $ 4,081,537 $ 5,716,187 Move Project from FY 2023 to FY
2024 (22-26 TIP only)
M02-22 Elkhart 1801933 New Bridge Construction
Hively Avenue, East of Main
Street crossing the NS
Railroad
Elkhart Safety CN $ 7,991,301 $ 2,345,568 $ 10,336,869
Increase Federal Funding by
$859,135 (both TIPs) and move
project from FY 2023 to FY 2024 (22-
26 TIP only)
M02-22 Elkhart 1801933 New Bridge Construction
Hively Avenue, East of Main
Street crossing the NS
Railroad
Elkhart Safety RW $ 2,625,000 $ 875,000 $ 3,500,000 Move Project from FY 2022 to FY
2023
M01-22Kosciusko
County1902838 Bridge Replacement
Bridge #30 on Beer Rd over
Turkey Creek Kosciusko STP CN $ 1,249,120 $ 312,280 $ 1,561,400
Data Entry Correction. Change work
type to Bridge Replacement
M01-22Kosciusko
County1902838 Bridge Replacement
Bridge #30 on Beer Rd over
Turkey CreekKosciusko STP RW $ 48,240 $ 12,060 $ 60,300
Data Entry Correction. Change work
type to Bridge Replacement
M48-21 INDOT 2100918Repair or Replace
Joints
US 20 WB Bridge over
CR 13, 1.09 Miles East
of US 33
Elkhart NHPP CN $ 29,671 $ 7,418 $ 37,089 Add Project to TIP
M48-21 INDOT 2100917Repair or Replace
Joints
US 20 Bridge over CR
13, 1.09 Miles East of US
33
Elkhart NHPP CN $ 29,671 $ 7,418 $ 37,089 Add Project to TIP
M48-21 INDOT 2100889Substructure Repair and
Rehabilitation
US 30 WB Bridge over SR
15, 9.12 Miles West of SR
13
Kosciusko NHPP CN $ 117,013 $ 29,253 $ 146,266 Add Project to TIP
Printed 3/10/2022
TIP Administrative Modifications
M48-21 INDOT 2100889Substructure Repair and
Rehabilitation
US 30 WB Bridge over SR
15, 9.12 Miles West of SR
13
Kosciusko NHPP PE $ 202,240 $ 50,560 $ 252,800 Add Project to TIP
M48-21 INDOT 2100888Substructure Repair and
Rehabilitation
US 30 EB Bridge over SR 15,
9.12 Miles West of SR 13Kosciusko NHPP CN $ 117,013 $ 29,253 $ 146,266 Add Project to TIP
M47-21 INDOT 2001535Traffic Signals
Modernization
Various Locations within
the Fort Wayne Distirct
Elkhart &
KosciuskoSTBG CN 1,438,922$ 359,731$ 1,798,653$ Add Project to TIP
M46-21 INDOT 2101279 Railroad Protection
Apple Road in Osceloa
(DOT #522517T) & CR 29 in
New Paris (DOT #533516S)
Various Section 130 CN 990,000$ 110,000$ $ 1,100,000 Add Project to TIP
M45-21Elkhart
County1700309
Br Repl, Comp. Cont.
Conc. Construction
Bridge 152 on
Mishawaka Rd over
Yellow Creek
Elkhart STBG CN $ 2,577,782 $ 644,445 Increase Federal Funding by
$265,782
M44-21 Goshen 1900739Auxiliary Lanes, Two-Way
Left Turn Lanes
College Ave from US 33 to
NS Railroad Line (East
entrance of parking lot)
Elkhart STBG CN $ 2,836,194 $ 709,048 $ 3,545,242 Decrease Federal Funding by
$263,806
M43-21 INDOT 2001662 New Bridge, OtherHively Ave, East of Main,
Crossing the NS RailroadElkhart Local Trax CN $ 2,742,600 $ 783,600 $ 3,526,200 Update Letting Date to 4/12/23
M42-21 INDOT 1900821 New Bridge, OtherHively Ave, East of Main,
Crossing the NS RailroadElkhart Local Trax CN $ 1,634,650 $ 4,081,537 $ 5,716,187 Update Letting Date to 4/12/23
Printed 3/10/2022
TIP Administrative Modifications
M41-21 INDOT 1801933 New Bridge, OtherHively Ave, East of Main,
Crossing the NS RailroadElkhart Local Trax CN $ 7,132,166 $ 2,059,190 $ 9,191,356 Update Letting Date to 4/12/23
M41-21 INDOT 1801933 New Bridge, OtherHively Ave, East of Main,
Crossing the NS RailroadElkhart Local Trax RW $ 2,625,000 $ 875,000 $ 3,500,000 Update Letting Date to 4/12/23
M41-21 INDOT 1801933 New Bridge, OtherHively Ave, East of Main,
Crossing the NS RailroadElkhart Local Trax PE $ 264,510 $ - $ 264,510 Update Letting Date to 4/12/23
M40-21 INDOT 2001537Traffic Signals
Modernization
Various Uninterruptible
Power Supplies (UPS) at
Various Signal Locations
within the Fort Wayne
District
Various STBG PE $ 80,000 $ 20,000 $ 100,000 Add Project to TIP
M39-21 South Bend 1801240Traffic Signals, New or
Modernized
School Zone Flashing
Beacons St. Joesph HSIP CN $ 753,600 $ 188,400 $ 942,000
Increase Federal Funding by
$153,600 and Change Scope of
Work
M38-21 South Bend 1902178 Road ReconstructionOlive Street from Indiana Ct
to Tucker Dr - Phase IISt. Joesph STBG PE $ 96,000 $ 24,000 $ 25,000 Increase Federal Funding by $20,000
M37-21 INDOT 2100182 New Flasher Installation
Speed Control (Including
School Flashers), Various
Locations within the Fort
Wayne District
Various STBG CN $ 224,246 $ 56,061 $ 280,307 Add Project to TIP
M37-21 INDOT 2100182 New Flasher Installation
Speed Control (Including
School Flashers), Various
Locations within the Fort
Wayne District
Various STBG PE $ 28,000 $ 7,000 $ 35,000 Add Project to TIP
M37-21 INDOT 2100180Traffic Signal Visibility
Improvements
Various Stop Control
Visibility at Various
Locations within Fort
Wayne District
Various STBG CN $ 448,490 $ 112,123 $ 560,613 Add Project to TIP
M37-21 INDOT 2100180Traffic Signal Visibility
Improvements
Various Stop Control
Visibility at Various
Locations within Fort
Wayne District
Various STBG PE $ 45,600 $ 11,400 $ 57,000 Add Project to TIP
Printed 3/10/2022
TIP Administrative Modifications
M37-21 INDOT 2100160Traffic Signal
Modernizations
Various Signal Locations
within the Fort Wayne
District
Various STBG CN $ 1,477,600 $ 369,400 $ 1,847,000 Add Project to TIP
M37-21 INDOT 2100160Traffic Signal
Modernizations
Various Signal Locations
within the Fort Wayne
District
Various STBG PE $ 148,000 $ 37,000 $ 185,000 Add Project to TIP
M36-21 INDOT 2100183 Pavement Markings
Grooved Markings, Various
Locations within the Fort
Wayne District
Various STBG CN $ 224,246 $ 56,061 $ 280,307 Add Project to TIP
M36-21 INDOT 2100163Raised Pavement
Markings, Refurbished
Various RPM locations
within the Fort Wayne
District
Various STBG CN $ 558,300 $ 139,575 $ 697,875 Add Project to TIP
M35-21 INDOT 2100794Small Structure
Replacement
SR 19 Culvert over Little
Yellow Creek, 5.23 Miles
North of SR 14
Kosciusko STBG CN $ 479,520 $ 119,880 $ 100,000 $ 499,400 Add Project to TIP
M35-21 INDOT 2100794Small Structure
Replacement
SR 19 Culvert over Little
Yellow Creek, 5.23 Miles
North of SR 14
Kosciusko STBG RW $ 32,000 $ 8,000 $ 40,000 Add Project to TIP
M35-21 INDOT 2100705 Bridge Deck Overlay
SR 19 NB Bridge over I-90
EB/WB, 9.15 Miles North of
US 20
Elkhart STBG CN $ 594,746 $ 148,686 $ 743,432 Add Project to TIP
M35-21 INDOT 2100706 Bridge Deck Overlay
SR 19 SB Bridge over I-90
EB/WB, 9.15 Miles North of
US 20
Elkhart STBG CN $ 1,060,373 $ 265,093 $ 1,325,466 Add Project to TIP
M34-21 INDOT 2002007 Bridge Deck OverlayUS 20 over York Road, 1.38
Miles E US 31St Joesph NHS CN $ 1,664,820 $ 416,205 $ 5,000 $ 2,076,025 Clerical Error
M33-21 INDOT 2100287 Safety Revision
Statewide Highway/Rail
Grade Crossing Safety
Action Plan
Various HSIP PE $ 6,430 $ 700 $ 7,130 Add Project to TIP
M32-21 INDOT 2002345 Bridge Deck OverlayCleveland/Brick Rd over US
31 SB/NB, 0.44 N I-90St Joseph NHS CN $ 1,630,181 $ 407,545 $ 5,000 $ 5,000 $ 2,027,726 Add project to TIP
M32-21 INDOT 2002345 Bridge Deck OverlayCleveland/Brick Rd over US
31 SB/NB, 0.44 N I-90St Joseph NHS PE $ 200,000 $ 50,000 $ 250,000 Add project to TIP
M32-21 INDOT 2002136 Bridge Deck OverlayUS 20 over Miami Highway,
0.87 E US 31St Joseph NHS CN $ 1,664,870 $ 416,217 $ 5,000 $ 5,000 $ 2,071,087 Add project to TIP
M32-21 INDOT 2002136 Bridge Deck OverlayUS 20 over Miami Highway,
0.87 E US 31St Joseph NHS PE $ 240,000 $ 60,000 $ 300,000 Add project to TIP
M32-21 INDOT 2002007 Bridge Deck OverlayUS 20 over York Road, 1.38
E US 31St Joseph NHS PE $ 200,000 $ 50,000 $ 250,000
Decrease Federal Funding by
$440,000
Printed 3/10/2022
TIP Administrative Modifications
M31-21Kosciusko
County2000829 Railroad Protection
First Street DOT #
533535W - Upgrade -
Norfolk Southern RR
KosciuskoLocal Safety
Section 130CN $ 450,000 $ 50,000 $ 500,000 Add project to TIP
M30-21Elkhart
County2100065 New Bridge Construction
Extension and Realignment
of CR 13 from Sunnyside
Ave to CR 45
Elkhart Local Funds CN $ - $ 1,349,800 $ 1,349,000 Increase local funding by $87,100
M29-21Elkhart
County2001724 New Bridge Construction
County Bridge 150 -
Sunnyside Ave over Yellow
Creek - Norfolk Southern
Railroad
Elkhart Local Trax CN $ 983,195 $ 259,304 $ 1,242,499 Decrease Federal Funding by
$97,192
M28-21Elkhart
County2001723 New Bridge Construction
County Bridge 151 -
Concord Mall Dr over
Yellow Creek - Norfolk
Southern Railroad
Elkhart Local Trax CN $ 997,912 $ 263,186 $ 1,261,098 Increase Federal Funding by $21,086
M27-21Elkhart
County1900836 New Bridge Construction
County Bridge 148 -
Sunnyside Ave/ Mall Dr at
US 33 over Norfolk
Southern Railroad
Elkhart Local Trax CN $ 3,694,427 $ 974,354 $ 4,668,781 Increase Federal Funding by $42,513
M26-21Elkhart
County1801913 New Bridge Construction
Sunnyside Ave/ Mall Dr. at
US 33 (Main Street) over
Norfolk Southern Railroad
Elkhart Local Trax CN $ 6,266,804 $ 8,708,133 $ 14,974,937 Update DES #
M25-21Elkhart
County1801913 New Bridge Construction
Sunnyside Ave/ Mall Dr. at
US 33 (Main Street) over
Norfolk Southern Railroad
Elkhart Local Trax RW $ 4,562,446 $ 1,440,772 $ 3,650 $ 5,999,569 Update DES #
M24-21Kosciusko
County1900841 New Bridge Construction
CR 1300 N Extension over
Norfolk Southern Railroad
and Main Street
Kosciusko Local Trax CN $ 1,911,840 $ 481,616 Increase Federal Funding by
$615,312
M23-21Kosciusko
County1801935 New Bridge Construction
CR 1300 N Extension over
Norfolk Southern Railroad
and Main Street
Kosciusko Local Trax CN $ 3,724,684 $ 938,924 $ 4,663,608 Decrease Federal Funding by
$158,839
M22-21 INDOT 2100697 Bridge Deck OverlayUS 30 [email protected]
AVENUEMarshall NHPP CN $ 836,080 $ 209,020 $ 5,000 $ 5,000 $ 1,035,100 Add project to TIP
M22-21 INDOT 2100697 Bridge Deck OverlayUS 30 [email protected]
AVENUEMarshall NHPP RW $ 24,000 $ 6,000 $ 30,000 Add project to TIP
M22-21 INDOT 2100697 Bridge Deck OverlayUS 30 [email protected]
AVENUEMarshall NHPP PE $ 200,000 $ 50,000 $ 250,000 Add project to TIP
M22-21 INDOT 2100696 Bridge Deck OverlayUS 30 [email protected]
AVENUEMarshall NHPP CN $ 836,080 $ 209,020 $ 5,000 $ 5,000 $ 1,035,100 Add project to TIP
M22-21 INDOT 2100696 Bridge Deck OverlayUS 30 [email protected]
AVENUEMarshall NHPP RW $ 24,000 $ 6,000 $ 30,000 Add project to TIP
M22-21 INDOT 2100696 Bridge Deck OverlayUS 30 [email protected]
AVENUEMarshall NHPP PE $ 90,400 $ 22,600 $ 113,000 Add project to TIP
Printed 3/10/2022
TIP Administrative Modifications
M22-21 INDOT 2101092Small Structure Pipe
Lining
over UNT St Joseph River,
00.11 W SR 331St. Joesph NHPP CN $ 258,121 $ 64,530 $ 20,000 $ 302,651 Add project to TIP
M22-21 INDOT 2101092Small Structure Pipe
Lining
over UNT St Joseph River,
00.11 W SR 331St. Joesph NHPP RW $ 32,000 $ 8,000 $ 40,000 Add project to TIP
M22-21 INDOT 2101092Small Structure Pipe
Lining
over UNT St Joseph River,
00.11 W SR 331St. Joesph NHPP PE $ 80,000 $ 20,000 $ 50,000 $ 50,000 Add project to TIP
M22-21 INDOT 2100832Small Structure Pipe
Lining
over UNT St Joseph River,
00.11 W SR 331St. Joesph NHPP CN $ 187,600 $ 46,900 $ 20,000 $ 214,500 Add project to TIP
M22-21 INDOT 2100832Small Structure Pipe
Lining
over UNT St Joseph River,
00.11 W SR 331St. Joesph NHPP RW $ 32,000 $ 8,000 $ 40,000 Add project to TIP
M22-21 INDOT 2100832Small Structure Pipe
Lining
over UNT St Joseph River,
00.11 W SR 331St. Joesph NHPP PE $ 80,000 $ 20,000 $ 50,000 $ 50,000 Add project to TIP
M22-21 INDOT 2100761Small Structure
Replacement
over UNT St Joseph River,
0.12 mi E SR331 (under NE
Quad Ramp)
St. Joesph NHPP CN $ 1,140,208 $ 285,052 $ 5,000 $ 5,000 $ 1,415,260 Add project to TIP
M22-21 INDOT 2100761Small Structure
Replacement
over UNT St Joseph River,
0.12 mi E SR331 (under NE
Quad Ramp)
St. Joesph NHPP PE $ 124,000 $ 31,000 $ 155,000 Add project to TIP
M21-21 INDOT 2100794Small Structure
Replacement
SR 19 Culvert over Little
Yellow Creek, 5.23 Miles
North of SR 14
Kosciusko STBG PE $ 120,000 $ 30,000 $ 150,000 Add project to TIP
M21-21 INDOT 2100735 Bridge Deck Overlay
US 6 Bridge over Solomon
Creek, 0.78 Miles West of
US 33
Elkhart NHPP PE $ 74,400 $ 18,600 $ 93,000 Add project to TIP
M21-21 INDOT 2100706 Bridge Deck Overlay
SR 19 Bridge over I-90
EB/WB, 9.15 Miles North of
US 20
Elkhart STBG PE $ 144,800 $ 36,200 $ 181,000 Add project to TIP
M21-21 INDOT 2100705 Bridge Deck Overlay
SR 19 Bridge over I-90
EB/WB, 9.15 Miles North of
US 20
Elkhart STBG PE $ 81,600 $ 20,400 $ 102,000 Add project to TIP
M21-21 INDOT 2100681 Bridge Thin Deck Overlay
US 6 CR 29 Bridge over US
6, 1.00 Miles West of SR 13
(W Jct)
Elkhart NHPP PE $ 60,000 $ 15,000 $ 75,000 Add project to TIP
M21-21 INDOT 2100648 Bridge Thin Deck Overlay
US 33 Bridge over Elkhart
River, 4.44 Miles North of
SR 13
Elkhart NHPP PE $ 60,000 $ 15,000 $ 75,000 Add project to TIP
M21-21 INDOT 2100918 Repair or Replace JointsUS 20 WB Bridge over CR
13, 1.09 Miles E of US 33Elkhart NHPP CN $ 29,671 $ 7,418 $ 37,089 Add project to TIP
Printed 3/10/2022
TIP Administrative Modifications
M21-21 INDOT 2100918 Repair or Replace JointsUS 20 WB Bridge over CR
13, 1.09 Miles E of US 33Elkhart NHPP PE $ 28,000 $ 7,000 $ 35,000 Add project to TIP
M21-21 INDOT 2100917 Repair or Replace JointsUS 20 Bridge over CR 13,
1.09 Miles East of US 33Elkhart NHPP CN $ 29,671 $ 7,418 $ 37,089 Add project to TIP
M21-21 INDOT 2100917 Repair or Replace JointsUS 20 Bridge over CR 13,
1.09 Miles East of US 33Elkhart NHPP PE $ 28,000 $ 7,000 $ 35,000 Add project to TIP
M21-21 INDOT 2100889Substructure Repair and
Rehabilitation
US 30 WB Bridge over SR
15, 9.12 Miles West of SR
13
Kosciusko NHPP CN $ 117,013 $ 29,253 $ 146,266 Add project to TIP
M21-21 INDOT 2100889Substructure Repair and
Rehabilitation
US 30 WB Bridge over SR
15, 9.12 Miles West of SR
13
Kosciusko NHPP PE $ 40,000 $ 10,000 $ 50,000 Add project to TIP
M21-21 INDOT 2100888Substructure Repair and
Rehabilitation
US 30 EB Bridge over SR 15,
9.12 Miles West of SR 13Kosciusko NHPP CN $ 117,013 $ 29,253 $ 146,266 Add project to TIP
M21-21 INDOT 2100888Substructure Repair and
Rehabilitation
US 30 EB Bridge over SR 15,
9.12 Miles West of SR 13Kosciusko NHPP PE $ 28,000 $ 7,000 $ 35,000 Add project to TIP
M21-21 INDOT 2100934Channel Clearing and
Protection
US 33 Culvert for UNT
Elkhart River, 3.06 Miles
North of SR 15
Elkhart NHPP CN $ 51,660 $ 12,915 $ 64,575 Add project to TIP
M21-21 INDOT 2100934Channel Clearing and
Protection
US 33 Culvert for UNT
Elkhart River, 3.06 Miles
North of SR 15
Elkhart NHPP PE $ 20,000 $ 5,000 $ 25,000 Add project to TIP
M21-21 INDOT 2100882Debris Removal From
Channel
SR 15 Bridge over RING
DITCH, 05.60 Miles North
of SR 14.
Kosciusko ST STBG CN $ 29,734 $ 7,434 $ 37,168 Add project to TIP
M21-21 INDOT 2100882Debris Removal From
Channel
SR 15 Bridge over RING
DITCH, 05.60 Miles North
of SR 14.
Kosciusko ST STBG PE $ 20,000 $ 5,000 $ 25,000 Add project to TIP
M20-21Kosciusko
County2003013 Bridge Replacement
Bridge #9 on Husky Trail
over Deeds CreekKosciusko ST STBG CN $ 2,025,000 $ 506,250 $ 2,531,250
Decrease local match funding by
$75,000
2024 Action
FY 2020-2024 TIP Administrative Modifications
2020 2021 2022 2023CountyFederal
Funding TypePhase Federal Match
Modification
NumberSponsor DES Work Type Location
Printed 3/10/2022
TIP Administrative Modifications
M32-21 INDOT 2002290Small Structure Pipe
Lining
SR 23 over ditch, 1.05 N Jct
US 31/20St Joseph NHS CN $ 236,324 $ 59,081 Add project to TIP
M32-21 INDOT 2002290Small Structure Pipe
Lining
SR 23 over ditch, 1.05 N Jct
US 31/20St Joseph NHS PE $ 56,000 $ 14,000 $ 70,000 Add project to TIP
M32-21 INDOT 2002289Small Structure
ReplacementSR 4, 1.20 W US 31 St Joseph NHS CN $ 512,565 $ 128,141 $ 5,000 Add project to TIP
M32-21 INDOT 2002289Small Structure
ReplacementSR 4, 1.20 W US 31 St Joseph NHS PE $ 84,400 $ 21,100 $ 85,500 Add project to TIP
M32-21 INDOT 2002007 Bridge Deck OverlayUS 20 over York Road, 1.38
E US 31St Joseph NHS CN $ 1,664,820 $ 416,205 $ 5,000 Add project to TIP
M32-21 INDOT 2002007 Bridge Deck OverlayUS 20 over York Road, 1.38
E US 31St Joseph NHS PE $ 200,000 $ 50,000 $ 250,000 Add project to TIP
M32-21 INDOT 2002301Small Structure Pipe
Lining
US 30 over UNT Lemer-
Berger Ditch, 0.47 W SR
331
Marshall NHS CN $ 196,184 $ 49,046 $ 5,000 $ 5,000 Add project to TIP
M32-21 INDOT 2002301Small Structure Pipe
Lining
US 30 over UNT Lemer-
Berger Ditch, 0.47 W SR
331
Marshall NHS PE $ 56,000 $ 14,000 $ 70,000 Add project to TIP
M22-21 INDOT 2002472Bridge Rehabilition or
Repair
US 31 under Kenilworth Rd
2.1 miles E of SR 931 (Dixie
Hwy) MSE repairs NBI#
79840
St. Joesph STP CN $ 800,000 $ 200,000 $ 1,000,000 Add project to TIP
M22-21 INDOT 2002471Bridge Rehabilition or
Repair
US 31 NB over S Main St
0.09 miles W of Old US 31 S
MSE repairs NBI# 79850
St. Joesph STP CN $ 120,000 $ 30,000 $ 150,000 Add project to TIP
M19-21 INDOT 2100938Small Structure
Maintenance and Repair
LaPorte Grouped Project -
Bridge, Culvert, and Small
Structure Preservation
St. Joesph ST STBG VAR $ 66,451,288 $ 16,672,925 $ 31,589,414 $ 26,927,512 $ 8,880,991 $ 7,503,726 $ 8,518,389 Add Grouped Projects to TIP
M18-21St Joseph
County1702832 Road Reconstruction
Pierce Rd from US 31 to
Miami HwySt. Joseph ST STBG RW $ 195,000 $ 48,750 $ 243,750
Decrease Federal funding by
$153,600 (to include in PE) and
move to FY 22
M18-21St Joseph
County1702832 Road Reconstruction
Pierce Rd from US 31 to
Miami HwySt. Joseph ST STBG PE $ 724,800 $ 181,200 $ 238,000 $ 668,000
Increase federal funding in FY 21 by
$153,600 for RW Services
M17-21Elkhart
County1700309 Bridge Replacement
Bridge 152 on Mishawaka
Rd over the Yellow CreekElkhart STBG CN $ 2,312,000 $ 578,000 $ 2,890,000
Move letting from August to
Decemeber
M16-21 Elkhart 1801933 New Bridge, OtherHively Ave., east of Main
St., crossing the NS RailroadElkhart Local Trax PE $ 1,734,741 $ - $ 1,734,741
Increase Funding by $481,819,
Change Work Type, & Change
Letting Date
Printed 3/10/2022
TIP Administrative Modifications
M15-21 Goshen 2100021 Added Travel LanesCollege Ave from S 9th to
US 33Elkhart STBG PE $ 545,600 $ 136,400 $ 250,000 $ 432,000
Move $200,000 in federal funding to
SFY 2022
M14-21St Joseph
County1700659 Transit Operating Preventative Maintenance St. Joseph 5307 NA $ 1,040,000 $ 260,000 $ 1,300,000
Decrease Federal Funding by
$240,000
M13-21St Joseph
County1900448
Intersection
Improvement
Cleveland at Beech -
RoundaboutSt. Joseph CMAQ CN $ 1,738,000 $ 434,500 $ 2,172,500
Change fund type from STBG to
CMAQ
M13-21St Joseph
County1900448
Intersection
Improvement
Cleveland at Beech -
RoundaboutSt. Joseph CMAQ RW $ 328,000 $ 82,000 $ 410,000
Change fund type from STBG to
CMAQ
M12-21Elkhart
County1401749
Intersection
Improvement
CR 18 at CR 13 and CR 115
IntersectionElkhart CMAQ CN $ 1,916,000 $ 479,000 $ 2,395,000
Decrease Federal Funding by
$424,000
M11-21Elkhart
County1700309
Bridge Repl. Comp. Cont.
Conc. Construction
Bridge 152 on Mishawaka
Rd over the Yellow CreekElkhart STBG CN $ 2,312,000 $ 578,000 $ 2,890,000
Increase Federal Funding by
$424,000
M10-21 INDOT 1902037
Fort Wayne Grpd Proj.
Traffic Signal System and
Lighting Improvements
Various Locations
throughout the Fort Wayne
District
Various ST STBG CN $ 10,602,173 $ 2,650,544 $ 3,877,824 $ 3,808,687 $ 1,350,000 $ 4,216,206 $ - Increase Federal Funding by
$800,000
M09-21 INDOT 1902039
Fort Wayne Grp Proj
Median Guardrail/Cable
Projects with no Change
to Access
Various Locations
throughout the Fort Wayne
District
Various ST STBG CN $ 3,301,414 $ 825,354 $ 530,000 $ 670,000 $ 500,000 $ 1,250,000 $ 1,088,384 Increase Federal Funding by
$400,000
M08-21 INDOT 2100032
LaPorte Grpd Proj Traffic
Signal System and
Lighting Improvements
SR 23 at the intersection of
SR 933St. Joseph ST STBG VAR $ 4,162,062 $ 1,070,515 $ 51,200 $ 661,000 $ 710,000 $ 3,711,377 $ 90,000 Increase Federal Funding by $72,000
M07-21 INDOT 2001537
Fort Wayne Grpd Proj.
Traffic Signal System and
Lighting Improvements
Uniteruptible Power
Supplies (UPS) at various
locations in the Fort Wayne
District
Various ST STBG VAR $ 9,802,173 $ 2,450,544 $ 3,877,824 $ 3,808,687 $ 350,000 $ 4,126,206 Increase Federal Funding by
$503,844
M06-21 INDOT VAR
Fort Wayne Grpd Proj.
Bridge, Culvert and Small
Structure Preservation
Fort Wayne Grpd Proj
Bridge, Culvert and Small
Structiure Preservation at
various locations in the
Various Various VAR $ 30,231,215 $ 7,151,810 $ 7,974,749 $ 9,233,486 $ 10,119,875 $ 2,356,130 $ 6,738,070 Increase Federal Funding by
$1,215,824
M05-21 Goshen 1900739 Added Travel Lanes
College Ave from US 33 to
NS Railroad Line (East
Entrance of parking lot)
Elkhart STBG RW $ 685,600 $ 171,400 $ 857,000 Move all funding into FY 2023
M04-21Elkhart
County1401749
Intersection
Improvement
CR 18 at CR 13 and CR 115
IntersectionElkhart CMAQ CN $ 2,340,000 $ 585,000 $ 2,928,000
Move funding year from FY 22 to FY
23
M03-21 Elkhart 1801611 Added Travel LanesBristol St: from Jeanwood
Dr. to CR 15Elkhart STBG RW $ 480,000 $ 120,000 $ 600,000
Move Funding year from FY 21 to FY
22
M02-21 Goshen 2100020 Road ReconstructionBlackport Dr from Monroe
St to Lincoln AveElkhart STBG RW $ 40,000 $ 10,000 $ 50,000 Update Des Number
Printed 3/10/2022
TIP Administrative Modifications
M02-21 Goshen 2100020 Road ReconstructionBlackport Dr from Monroe
St to Lincoln AveElkhart STBG PE $ 304,000 $ 76,000 $ 380,000 Update Des Number
M01-21 Goshen 2100021 Added Travel LanesCollege Avenue between
9th and US 33Elkhart STBG PE $ 545,600 $ 136,400 $ 682,000 Update Des Number
M39-20St Joseph
County1900448
Intersection
Improvement
Cleveland at Beech -
RoundaboutSt. Joseph STBG RW $ 328,000 $ 82,000 $ 410,000 Additional Federal Funding $184,000
M39-20St Joseph
County1900448
Intersection
Improvement
Cleveland at Beech -
RoundaboutSt. Joseph STBG CN $ 1,738,000 $ 434,500 $ 2,172,500 Additional Federal Funding $238,214
M38-20Elkhart
County1900486 New Road Construction
CR 17 Phase I: from CR 142
to CR 38Elkhart STBG RW $ 398,214 $ 99,554 $ 497,768 Additional Federal Funding $298,214
M37-20 INDOT 2001535Traffic Signal
Modernizations
Fort Wayne Grpd Proj
Traffic Signal System and
Lighting Improvmenets
Various ST STBG VAR $ 9,301,329 $ 2,324,583 $ 3,877,824 $ 3,708,687 $ 350,000 $ 1,887,748 Add Grouped Project to TIP, increase
federal Funding by $1,717,922
M36-20 Plymouth 1600926 Road Reconstruction
Hoham Drive starting at
North Michigan St to 400'
west of Western Ave
Marshall ST STBG PE $ 43,600 $ 10,900 $ 39,800 $ 14,700 Additional Federal Funding $11,760
M36-20 INDOT VAR Bridge Thin Deck Overlay
Fort Wayne Grpd Proj,
Culvert, and Small Structure
Preservetion
Kosciusko Various VAR $ 31,833,792 $ 6,975,387 $ 7,974,749 $ 9,127,280 $ 9,969,875 $ 3,056,041 $ 5,637,246
Add Grouped Projects to TIP,
Increase Federal Funding by
$2,818,401
M35-20Norfolk
Southern2000783
LaPorte Grpd Proj Rail
Crossing Protection
NS RR - S Franklin 478509G,
W Main 478510B, Elder
522522P, Vemon 522546D
St. JosephHSIP - Section
130PE $ 1,224,000 $ 136,000 $ 1,360,000 Add Grouped Project to TIP
M34-20Norfolk
Southern2000783
Fort Wayne Grpd Proj
Rail Crossing Protection
NS RR - S Franklin 478509G,
W Main 478510B, Elder
522522P, Vemon 522546D
KosciuskoHSIP - Section
130PE $ 1,224,000 $ 136,000 $ 1,360,000 Add Grouped Project to TIP
M33-20 INDOT 2002529Raised Pavement
Markings, Refurbished
LaPorte Grpd Proj Signing,
Marking, Striping, and
Rumble Strips
Marshall and St.
JosephST NHS VAR $ 1,664,000 $ 196,000 $ 610,000 $ 580,000 $ 670,000 $ - $ -
Increase Federal Funding by
$544,000
M32-20 INDOT 2002531Traffic Signal Visibility
Improvements
LaPorte Grpd Proj Traffic
Signal System and Lighting
Improvements
Marshall ST NHS VAR $ 4,090,062 $ 1,022,515 $ 51,200 $ 650,000 $ 700,000 $ 3,711,377 $ - Increase Federal Funding by
$568,000
M31-20 INDOT 2001733
Fort Wayne Grpd Proj
Traffic Signal System and
Lighting Improvements
Various Signals in the Fort
Wayne District
Elkhart &
KosciuskoST STBG PE $ 7,583,407 $ 1,895,852 $ 3,877,824 $ 3,363,687 $ 350,000 $ 1,887,748 $ -
Increase Federal Funding by
$288,000
M30-20 INDOT VAR
Fort Wayne Grpd Proj
Bridge, Culvert, and Small
Structure Preservation
Various Locations within
the Fort Wayne District
Elkhart &
KosciuskoVarious VAR $ 29,015,391 $ 6,802,854 $ 7,974,749 $ 8,964,530 $ 9,969,875 $ 2,356,130 $ 5,637,246
Increase Federal Funding by
$2,625,073
M29-20 INDOT 1601969 Pipe LiningSR 13, 2.88 miles S of US 6,
UNT of Skinner DitchKosciusko ST STBG CN $ 238,405 $ 59,601 $ 298,006
Correct Clerical Error, Change Phase
from RW to CN
Printed 3/10/2022
TIP Administrative Modifications
M28-20 INDOT VAR
Fort Wayne Grpd Proj
Traffic Signal System and
Lighting Improvements
Various Locations within
the Fort Wayne DistrictVarious ST STBG VAR $ 7,295,407 $ 1,823,852 $ 3,877,824 $ 3,353,687 $ 1,887,748
Increase Federal Funding by
$1,910,998
M27-20 Transpo 2001740 Transit Operating
Purchase Misc.
Communications
Equipment
St. Joseph 5307 NA $ 10,711 $ 2,678 $ 13,389 Add Des Number
M26-20 Transpo 2001739 Transit Operating Purchase < 35ft Vehicle St. Joseph 5339 NA $ 70,000 $ 17,500 $ 87,500 Add Des Number
M25-20 Transpo 2001738 Transit Operating Education and Training St. Joseph 5307 NA $ 16,000 $ 4,000 $ 20,000 Add Des Number
M24-20 Transpo 2001736 Transit OperatingPurchase Misc. Support
EquipmentSt. Joseph 5307 NA $ 40,000 $ 10,000 $ 50,000 Add Des Number
M23-20 Transpo 2001735 Transit Operating Tire Lease St. Joseph 5307 NA $ 64,000 $ 16,000 $ 80,000 Add Des Number
M22-20 INDOT 2000327
Fort Wayne Grpd Proj
Bridge, Culvert, and Small
Structure Preservation
SR 13over UNT Koontz
Ditch, 3.49 mi N of SR 14Kosciusko ST STBG VAR $ 26,390,318 $ 6,359,886 $ 7,974,749 $ 8,964,530 $ 7,870,034 $ 2,356,130 $ 5,522,246
Add Grouped Project to TIP, Increase
Federal Funding by $47,068
M21-20Kosciusko
County1702866
Bridge Rehabilition or
Repair
Bridge #227: on S Hand St.
over Walnut CreekKosciusko Bridge RW $ 48,000 $ 12,000 $ 60,000
Move RW from SFY 2021 to SFY
2022
M20-20 INDOT VAR
LaPorte Grpd Proj Bridge,
Culvert, and Small
Structure Preservation
Various Locations
throughout the LaPorte
District
Marshall and St.
JosephVarious VAR $ 66,354,088 $ 16,648,625 $ 31,589,414 $ 26,927,512 $ 8,839,991 $ 7,432,226 $ 8,518,389
Add Grouped Projects to TIP.
Increase Federal Funding by
$6,750,275
M19-20Elkhart
County1401749
Intersection
Improvement
CR 18 at CR 13 and CR 115
IntersectionElkhart CMAQ RW $ 400,000 $ 100,000 $ 500,000
Move RW from SFY 2022 to SFY
2021
M18-20 INDOT VAR
Fort Wayne Grpd Proj
Bridge, Culvert, and Small
Structure Preservation
Various Locations
throughout the Fort Wayne
District
Elkhat NHPP VAR $ 26,343,250 $ 6,348,119 $ 7,974,749 $ 8,953,280 $ 7,822,469 $ 2,356,130 $ 5,522,249
Add Grouped Projects to TIP,
Increase Federal Funding by
$221,189
M17-20Elkhart
County1700310 Bike/Pedestrian Facilities
CR 17 at US 33 Multi-Use
PathElkhart CMAQ RW $ 154,040 $ 38,510 $ 192,550
Add $82,040 in additional Federal
Funding and move to FY 2021
M16-20Marshall
County1600931
Bridge Replacement,
Other Construction
Bridge No. 73 Carying King
Rd over the Yellow RiverMarshall Bridge RW $ 52,260 $ 13,065 $ 65,325
Add $2,660 in additional Federal
Funding
M15-20Elkhart
County1900465
Bridge Repl Comp. Cont.
Conc. Construction
Bridge 312: on CR 142 over
Turkey CreekElkhart ST STBG PE $ 259,385 $ 64,846 $ 324,231 Move PE from FY 2020 to FY 2021
M14-20 INDOT VARLaPorte Grpd Proj Bridge,
Culvert, and Small Structure
Preservation
Various Locations throughout
the LaPorte DistrictVarious VAR VAR $ 59,603,813 $ 14,961,053 $ 31,589,414 $ 25,525,552 $ 8,799,991 $ 7,307,226 $ 1,148,002
Add Grouped Projects to TIP,
Increase Federal Funding by
$4,295,585
Printed 3/10/2022
TIP Administrative Modifications
M13-20 INDOT VAR
Fort Wayne Grpd Proj
Median Guardrail/Cable
Projects with no Change to
Access
Various Locations within the
Fort Wayne DistrictVarious ST STBG VAR $ 2,091,414 $ 725,354 $ 530,000 $ 670,000 $ 1,250,000 $ 1,088,384
Add Grouped Projects to TIP,
Increase Federal Funding by
$2,091,414
M12-20 INDOT VARFort Wayne Grpd Proj
Bridge, Culvert, and Small
Structure Preservation
Various Locations within the
Fort Wayne DistrictVarious VAR VAR $ 26,122,061 $ 6,292,822 $ 7,974,749 $ 8,900,280 $ 7,604,983 $ 2,356,130 $ 5,522,246
Add Grouped Projects to TIP,
Increase Federal Funding by
$5,827,181
M11-20 INDOT 1900459Fort Wayne Traffic Signal
System and Lighting
Improvements
Various Locations within the
Fort Wayne DistrictVarious ST STBG VAR $ 5,384,409 $ 1,346,102 $ 3,877,824 $ 2,852,687
Add Grouped Projects to TIP,
Increase Federal Funding by
$2,282,150
M10-20Elkhart
County1401749 Intersection Improvement
CR 18 at CR 13 and CR 115
IntersectionElkhart CMAQ RW $ 400,000 $ 100,000 $ 500,000
Move Federal Funding from FY 2020
to FY 2022
M09-20 INDOT 1006761LaPorte Grpd Proj Bridge,
Culvert, and Small Structure
Preservation
District Small Structure Project Marshall NHS CN $ 55,308,228 $ 13,887,157 $ 31,589,414 $ 24,083,352 $ 8,529,991 $ 3,001,945 $ 1,148,002 Add Grouped Project to TIP, Increase
Federal Funding by $967,584
M08-20Winona
Lake160788
Intersection Improvement,
Roundabout
Intersection of Argonne Rd,
Winona Ave, Kings Highway
and Park Ave
Kosciusko ST STBG RW $ 248,314 $ 62,078 $ 310,392 Move RW to FY 21 and increase
Federal Funding by $32,314
M07-20 INDOT VARLaPorte Grpd Proj Bridge,
Culvert, and Small Structure
Preservation
Various locations within the
LaPorte DistrictMarshall NHS VAR $ 54,340,644 $ 13,645,261 $ 30,379,934 $ 24,083,352 $ 8,529,991 $ 3,001,945 $ 1,148,002
Add Grouped Projects to TIP,
Increase Federal Funding by
$337,040
M06-20Elkhart
County1700309
Bridge Repl, Comp. Cont.
Conc. Construction
Bridge 152 on Mishawaka over
Yellow CreekElkhart STBG CN $ 1,888,000 $ 472,000 $ 2,360,000
Move Federal Funding form FY 2023
to FY 2022
M05-20Elkhart
County1401749 Intersection Improvement
CR 18 at CR 13 and CR 115
IntersectionElkhart CMAQ CN $ 2,340,000 $ 585,000 $ 2,925,000
Move Federal Funding from FY 2021
to FY 2022
M04-20Elkhart
County1401749 Intersection Improvement
CR 18 at CR 13 and CR 115
IntersectionElkhart CMAQ RW $ 400,000 $ 100,000 $ 500,000
Move Federal Funding from FY 2020
to FY 2021
M03-20St Joseph
County1900506 Added Travel Lanes
Douglas Rd from Ivy to SR 23
CorridorSt. Joseph STBG CN $ 3,700,000 $ 925,000 $ 4,625,000
Move from 2022 to 2021, Fix Clerical
Error in Des Number
M02-20 INDOT 2000038Fort Wayne Grpd Proj
Bridge, Culvert, and Small
Structure Preservation
0.43 Miles West of SR 10
(Pumpkinvine Train Structure)Elkhart NHPP CN $ 20,470,602 $ 4,879,957 $ 7,974,749 $ 7,736,530 $ 6,584,983 $ 1,387,664 $ 1,646,138
Add Project to TIP, Increase Federal
Funding by $175,722
M01-20 INDOT 2000016LaPorte Grpd Proj Bridge,
Culvert, and Small Structure
Preservation
Various Locations throughout
the LaPorte DistrictVarious ST STBG CN $ 54,003,604 $ 13,561,001 $ 30,379,934 $ 23,017,052 $ 8,174,991 $ 3,001,945 $ 1,148,002
Increase Federal Funding in FY 2021
by $800,000
M32-19 INDOT VARFort Wayne Grpd Proj
Bridge, Culvert, and Small
Structure Preservation
Various Locations within the
Fort Wayne District
Elkhart and
KosciuskoVAR CN $ 20,294,880 $ 4,836,027 $ 7,974,749 $ 7,736,530 $ 6,584,983 $ 1,387,664 $ 1,426,486
Increase Federal Funding in FY 2022
by $227,400
M31-19St Joseph
County1702832
Road Reconstruction (3R/4R
Standards)
Pierce Road from US 31 to
Miami HwySt Joseph ST STBG RW $ 174,400 $ 76,823 $ 251,233 Move RW to FY 2021
Printed 3/10/2022
TIP Administrative Modifications
M30-19Marshall &
St. Joseph1902632
LaPorte Grpd Proj Traffic
Signal System and Lighting
Improvements
Various locations within the
LaPorte District
Marshall and St.
JosephHSIP CN $ 3,522,062 $ 880,515 $ 51,200 $ 640,000 $ 3,711,377
Increase Federal Funding in 2023 by
$2,969,102
M29-19Marshall
County1702839
Bridge Replacement, Other
Construction
Marshall County Bridge #120:
South Upas Rd over the Yellow
River
Marshall ST Bridge RW $ 48,000 $ 12,000 $ 60,000 Move RW to FY 2021
M28-19Marshall
County1702838
Bridge Replacement, Other
Construction
Marshall County Bridge #87:
11th Rd over the Yellow RiverMarshall ST Bridge RW $ 48,000 $ 12,000 $ 60,000 Move RW to FY 2021
M27-19 INDOT 1800942Fort Wayne Grpd Proj Traffic
Signal System and Lighting
Improvements
Various Locations within the
Fort Wayne District
Elkhart &
KosciuskoSTBG PE $ 276,000 $ 69,000 $ 245,000
Adding PE for project with CN in
TIP/STIP already
M26-19 Culver 1801120 Bike/Pedestrian FacilitiesLake Max Trail Phase II, Culver
Park to W. Shore DrMarshall ST TAP RW $ 60,000 $ 15,000 $ 75,000 Move RW to FY 2021
M25-19Marshall
County1600931
Bridge Replacement, Other
Construction
Bridge No. 73 Carying King Rd
over the Yellow RiverMarshall Bridge RW $ 49,600 $ 12,400 $ 60,000 Move RW to FY 2021
M24-19Kosciusko
County1801935 Bridge
CR 1300 N Extension over NS
RR and Main StKosciusko Local Trax PE $ 701,760 $ 175,440 $ 877,200
Change Funding type to State Local
Trax
M24-19Kosciusko
County1801935 Bridge
CR 1300 N Extension over NS
RR and Main StKosciusko Local Trax RW $ 334,796 $ 83,699 $ 418,495
Change Funding type to State Local
Trax
M24-19Kosciusko
County1801935 Bridge
CR 1300 N Extension over NS
RR and Main StKosciusko Local Trax CN $ 4,857,160 $ 1,214,290 $ 6,071,450
Change Funding type to State Local
Trax
M23-19Elkhart
County1801913 Bridge
Sunnyside Ave/Mall Dr at US
33 (Main St) over NS RailroadElkhart Local Trax PE $ 1,920,000 $ 480,000 $ 2,400,000
Change Funding type to State Local
Trax
M23-19Elkhart
County1801913 Bridge
Sunnyside Ave/Mall Dr at US
33 (Main St) over NS RailroadElkhart Local Trax RW $ 1,328,000 $ 332,000 $ 1,660,000
Change Funding type to State Local
Trax
M23-19Elkhart
County1801913 Bridge
Sunnyside Ave/Mall Dr at US
33 (Main St) over NS RailroadElkhart Local Trax CN $ 9,942,400 $ 2,485,600
Change Funding type to State Local
Trax
M22-19 Elkhart 1801933 BrdigeHively Ave., east of Main St.,
crossing the NS RailroadElkhart Local Trax PE $ 1,252,922 $ 313,248 $ 1,566,240
Change Funding type to State Local
Trax
M22-19 Elkhart 1801933 BrdigeHively Ave., east of Main St.,
crossing the NS RailroadElkhart Local Trax RW $ 984,000 $ 246,000 $ 1,230,000
Change Funding type to State Local
Trax
M22-19 Elkhart 1801933 BrdigeHively Ave., east of Main St.,
crossing the NS RailroadElkhart Local Trax CN $ 8,827,200 $ 2,206,800 $ 11,034,000
Change Funding type to State Local
Trax
Printed 3/10/2022
TIP Administrative Modifications
M21-19St Joseph
County1400638 Bike/Pedestrian Facilities
Auten Rd Multi-Use path from
Laurel Rd to SR933St. Joseph TAP RW $ 48,264 $ 12,066 $ 60,330 Move Funding Year to FY 2020
M20-19St Joseph
County1801613 Auxiliary Lanes
US 33: from Fairfield to
Plymouth AveElkhart CMAQ CN $ 660,160 $ 165,040 $ 825,200 Move Funding Year to FY 2023
M19-19 Goshen 1400715Road Reconstruction (3R/4R
Standards)
Wilden Ave. from Rock Run
Creek to 6th StElkhart STBG CN $ 4,343,920 $ 1,085,980 $ 5,429,900
Move Funding Year from FY 2021 to
FY 2022
M18-19 INDOT VARLaPorte Grpd Proj Bridge,
Culvert, and Small Structure
Preservation
LaPorte District - VariousMarshall and St.
JosephVarious VAR $ 53,203,604 $ 13,361,001 $ 30,379,934 $ 23,017,052 $ 8,174,991 $ 3,001,945 $ 1,148,002
Increase Federal Funding by
$5,317,006
M17-19 INDOT 1700709ADA Sidewalk Ramp
Construction
ADA Curb Ramps Along SR 23
in South Bend (St. Joseph
County)
St. Joseph NHS CN $ - $ 278,641 $ 278,641 Modify CN from FY 20 to FY 22
M17-19 INDOT 1700709ADA Sidewalk Ramp
Construction
ADA Curb Ramps Along SR 23
in South Bend (St. Joseph
County)
St. Joseph NHS RW $ - $ 175,000 $ 175,000 Modify RW from FY 19 to FY 20
M16-19 INDOT VARLaPorte Grpd Proj Bridge,
Culvert, and Small Structure
Preservation
LaPorte District - VariousMarshall and St.
JosephVarious VAR $ 47,886,598 $ 12,031,751 $ 29,523,534 $ 22,897,052 $ 2,505,135 $ 3,001,945
Increase Federal Funding by
$1,749,188
M15-19 Plymouth 1600926 Road Reconstruction
Hoham Drive starting at North
Michigan St to 400' west of
Western Ave
Marshall ST STBG RW $ 392,160 $ 98,040 $ 490,200 Move RW Funds for appraising and
review appraising to PE
M14-19 Plymouth 1600926 Road Reconstruction
Hoham Drive starting at North
Michigan St to 400' west of
Western Ave
Marshall ST STBG PE $ 31,840 $ 7,960 $ 39,800 Move RW Funds for appraising and
review appraising to PE
M13-19 Culver 1801239 Bike/Pedestrian FacilitiesWest Jefferson Streetscape
ImprovementsMarshall ST TAP CN $ 580,869 $ 145,217 $ 726,086
Move CN from SFY 2022 to
SFY 2021
M12-19 Culver 1801238 Bike/Pedestrian FacilitiesSR 10 Sidewalks from School
St to N Lakeshore DrMarshall ST TAP CN $ 165,742 $ 41,435 $ 207,177
Move CN from SFY 2022 to
SFY 2021
M11-19 INDOT VARFort Wayne Grpd Proj Traffic
Signal System and Lighting
Improvements
Fort Wayne District - Various Kosciusko STBG RW $ 2,826,259 $ 706,565 $ 3,532,824 Increase Federal Funding by $8,000
M10-19 INDOT VARFort Wayne Grpd Proj
Bridge, Culvert, and Small
Structure Preservation
Fort Wayne District - VariousElkhart and
KosciuskoVarious VAR $ 30,551,035 $ 7,273,344 $ 4,918,589 $ 5,654,798 $ 6,300,646 $ 1,387,664 $ 1,426,486
Increase Federal Funding by
$6,558,278
M09-19 Culver 1802913 Bike/Pedestrian Facilities
Lake Max Trail Phase III,
Academy Road to SR 10/117
West of Town
Marshall TAP PE $ 130,914 $ 32,728 $ 163,642 Increase Federal Funding by $12,914
M08-19 Goshen 1900739 Added Travel Lanes
College Ave from US 33 to NS
Railroad Line (East Entrance of
parking lot)
Elkhart STBG PE $ 300,000 $ 75,000 $ 375,000 Add Des Number to TIP
Printed 3/10/2022
TIP Administrative Modifications
M07-19MACOG
Transit1500577
Transit Communications
EquipmentComputer Software Elkhart Trasit _ $ 43,788 $ 10,947 INDOT Changed Des #
M06-19MACOG
Transit1801737
Elkhart-Goshen Urbanized
AreaTransit Operating Elkhart CMAQ _ $ 420,000 $ 105,000 Increase Federal Funding by $95,562
M05-19North
Liberty1592436 Bike/Pedestrian Facilities Stellar Trail St Joseph TAP (INDOT) RW $ 346,640 $ 86,660 $ 433,300
Change Trail name and
move FY to 2020
M05-19North
Liberty1592436 Bike/Pedestrian Facilities Stellar Trail St Joseph TAP (INDOT) CN $ 764,160 $ 191,040 $ 955,200
Change Trail name,
Increase Federal Funds by $35,440
move FY to 2021
M04-19 INDOT 1700367LaPorte Grpd Proj Bridge,
Culvert, and Small Structure
Preservation
US 20, 0.5 mi E of SR 23 St Joseph Bridge RW $ 43,843,815 $ 10,982,560 $ 18,298,252.00 $ 18,716,402.00 Increase Federal Funding by $12,765
M03-19 INDOT 1900391Fort Wayne Grouped
Projects Rail Crossing
Protection
Madison St at NS RR DOT
510039L in GoshenElkhart STPBG PE $ 1,976,400 $ 41,600 $ 360,000
Add Project to TIP, increase Federal
Funding by $14,000
M03-19 INDOT 1900391Fort Wayne Grouped
Projects Rail Crossing
Protection
Madison St at NS RR DOT
510039L in GoshenElkhart STPBG CN $ 2,253,600 $ 110,900 $ 706,500
Add Project to TIP, increase Federal
Funding by $227,200
M02-19St Joseph
County1702832
Road Reconstruction (3R/4R
Standards)
Pierce Road from US 31 to
Miami HwySt Joseph STPBG PE $ 921,880 $ 230,470 $ 238,000 $ 476,000
Add $160,280 in Federal Funding to
PE in FY 2019
M01-19 South Bend 1401810 Bike/Pedestrian Facilities
Coal Line Trail (Phase I) from
Lincolnway West to Riverside
Dr
St Joseph CMAQ PE $ 18,252 $ 4,563 Add $18,252 from RW to PE
M01-19 South Bend 1401810 Bike/Pedestrian Facilities
Coal Line Trail (Phase I) from
Lincolnway West to Riverside
Dr
St Joseph CMAQ RW $ 841,748 $ 210,437 Remove $18,252 from RW for PE
M01-19 South Bend 1401811 Bike/Pedestrian FacilitiesCoal Line Trail (Phase II) From
Riverside Dr to Angela BlvdSt Joseph CMAQ PE $ 4,512 $ 1,128 Add $4,512 from RW to PE
M01-19 South Bend 1401811 Bike/Pedestrian FacilitiesCoal Line Trail (Phase II) From
Riverside Dr to Angela BlvdSt Joseph CMAQ RW $ 627,488 $ 156,872
Remove $4,512 from RW for PE and
move FY to 2019
M01-19St Joseph
County1400638 Bike/Pedestrian Facilities
Auten Rd Multi-Use path from
Laurel Rd to SR933St Joseph TAP PE $ 129,404 $ 32,351 Add additional PE funds
M29-18 South Bend 1801240 Safety ImprovementSchool Zone Flashing Beacons
at 39 SchoolsSt Joseph HSIP PE $ 90,000 $ 10,000
Change Funding Type from GRP I STP
to HSIP Funds. Federal Funding
Increase by $10,000
M28-18Elkhart
County1401749 Intersection Improvement CR 18 at CR 13 and CR 115 Elkhart CMAQ RW $ 400,000 $ 100,000 $ 500,000 Move Fiscal Year from 2019 to 2020
Printed 3/10/2022
TIP Administrative Modifications
M27-18Elkhart
County1401749 Intersection Improvement CR 18 at CR 13 and CR 115 Elkhart CMAQ CN $ 2,340,000 $ 585,000 $ 2,925,000 Move Fiscal Year from 2020 to 2021
M26-18Marshall
County1600931 Bridge Replacement
BR #73 carying King Rd over
Yellow CreekMarshall Bridge RW $ 49,600 $ 12,400 $ 62,000 Move fiscal year to 2020
M25-18 Plymouth 1600926 Road Reconstruction
Hoham Drive starting at North
Michigan St to 400' west of
Western Ave
Marshall STP RW $ 424,000 $ 106,000 $ 530,000 Move Fiscal year to 2020. Increase
Federal Funding by $93,720
M24-18 INDOT VARLaPorte Grpd Proj Bridge,
Culvert, and Small Structure
Preservation
Various locations within the
LaPorte DistrictMarshall VAR VAR $ 43,833,603 $ 10,980,007 $ 18,298,252 $ 18,716,402
Increase Federal Funding by
$2,811,807.20
M23-18 INDOT 1800869LaPorte Grpd Proj Bridge,
Culvert, and Small Structure
Preservation
SR 106 at Armey Ditch, 0.07 mi
E of SR 331Marshall Bridge VAR $ 41,021,796 $ 10,277,055 $ 15,058,793 $ 18,716,402
Increase Federal Funding by
$527,040.00
M22-18 INDOT 1700367LaPorte Grpd Proj Bridge,
Culvert, and Small Structure
Preservation
US 20, .5 mi E of SR 23 St Joseph Bridge VAR $ 40,494,756 $ 10,145,295 $ 15,058,793 $ 18,106,402 Increase Federal Funding by
$192.106.40
M21-18Marshall
County1702839
Bridge Replacement, Other
Construction
Marshall County Bridge #87:
11th Rd over the Yellow RiverMarshall Bridge PE $ 229,961 $ 57,490 $ 157,451
Decrease Federal Funding by
$82,039 - (26%)
Move funds out of SFY 2021
M20-18Marshall
County1802838
Bridge Replacement, Other
Construction
Marshall County Bridge #120:
South Upas Rd over the Yellow
River
Marshall Bridge PE $ 225,681 $ 56,420 $ 141,051
Decrease Federal Funding by
$23,319 - (9%)
Move funds out of SFY 2021
M19-18 INDOT VARLaPorte Grpd Proj Bridge,
Culvert, and Small Structure
Preservation
LaPorte District - VariousSt. Joseph/
MarshallVAR PE $ 40,302,650 $ 10,097,268 $ 14,919,960 $ 18,106,402
Increase Federal Funding by
$207,264
M18-18 Goshen 1801613Intersection Improvement w/
Added Turn Lanes
US 33: from Fairfield to
Plymouth AveElkhart CMAQ PE $ 165,040 $ 41,260
Update Work Type, Des Number &
Federal Funding Type
M17-18 Goshen 1601613 Added Travel LanesUS 33: from Fairfield to
Plymouth AveElkhart STP PE $ 165,040 $ 41,260
Updated Des#, Work Type and
Location to match SPMS
M17-18Elkhart
County1801612
Other Type Project
(Miscellaneous)CR 13 @ NF&S Railroad Elkhart STP PE $ 2,500,000 $ 625,000 $ 2,125,000 $ 750,000
Updated Des#, Work Type and
Location to match SPMS
M17-18 Elkhart 1801611 Added Travel LanesBristol St: from Jeanwood Dr. to
CR 15Elkhart STP PE $ 640,000 $ 160,000 $ 550,000
Updated Des# and Location to match
SPMS
M17-18 Elkhart 1801611 Added Travel LanesBristol St: from Jeanwood Dr. to
CR 15Elkhart STP RW $ 480,000 $ 120,000 $ 600,000
Updated Des# and Location to match
SPMS
M16-18 INDOT 1700315Fort Wayne Grpd Proj
Signing, Marking, Striping
and Rumble Strips
Fort Wayne District - Various Elkhart/ Kosciusko ST STP CN $ 96,153 $ 24,038 Decrease in Federal Funds by
$143,847
Printed 3/10/2022
TIP Administrative Modifications
M15-18 INDOT 1801683LaPorte Grpd Proj Traffic
Signal System and Lighting
Improvements
LaPorte District - Various St. Joseph HSIP VAR $ 691,200 $ - $ 51,200 $ 640,000 Increase in Federal Funds by
$691,200
M14-18 INDOT VARLaPorte Grpd Proj Signing,
Marking, Striping and
Rumble Strips
LaPorte District - VariousSt. Joseph/
MarshallHSIP VAR $ 1,190,000 $ - $ 610,000 $ 570,000
Increase in Federal Funds by
$1,190,000
M13-18 MACOG 1801362 UPWP Partners for Clean Air Program Elkhart CMAQ PE $ 50,000 $ 12,500 Add Des Number to TIP
M12-18 MACOG 1801362 UPWP Partners for Clean Air Program St. Joseph CMAQ PE $ 50,000 $ 12,500 Add Des Number to TIP
M11-18 INDOT VARLaPorte Grpd Proj Bridge,
Culvert, and Small Structure
Preservation
LaPorte District - Various Various VAR VAR $ 40,095,386 $ 10,023,852 $ 14,660,880 $ 18,106,402 Increased Federal Funds by
$16,190,599
M10-18 INDOT 1801265Fort Wayne Grpd Proj Rail
Crossing Protection
Beaver Lane at NS RR DOT#
510019A in GoshenElkhart
HSIP -
Section 130VAR $ 1,962,000 $ 38,000 $ 360,000 $ - Increase Federal Funds by $380,000
M09-18 INDOT VARFort Wayne Grpd Proj
Bridge, Culvert, and Small
Structure Preservation
Fort Wayne District - Various Elkhart VAR VAR $ 24,123,397 $ 5,666,434 $ 3,693,589 $ 5,208,580 Increase Federal Funds by
$2,539,380
M08-18 Transpo 1700308 Transit Operating Sunday Service Pilot St Joseph CMAQ N/A $ 550,000 $ 137,500 Increase Federal Funds by $150,000
M08-18 Transpo 1700307 Transit Purchase VehiclesPurchase of up to 3 fixed route
vehiclesSt Joseph CMAQ N/A $ 282,081 $ 70,520
Change FY to 2018 for $205,150 in
Federal Funds and add $76,931 in
Federal Funding
M07-18 South Bend 1600074 Intersection ImprovementCorby Blvd, Ironwood Dr,
Rockne DrSt Joseph STP PE $ 122,352 $ 30,588 Increase Federal Funds by $34,260
M07-18St Joseph
County1400639 Added Travel Lanes
Douglas Rd at Ironwood Rd &
ATL from Ivy Rd to SR 23St Joseph STP RW $ 2,060,000 $ 515,000
Move FY 2019 RW to FY 2018 and
increased RW by $348,000
M06-18 South Bend 1400637 Road Reconstruction
Olive Street from Prairie Ave
(SR23) to RR south of Tucker
Dr
St Joseph STP RW $ 224,000 $ 56,000 Increase Federal Funding by
$144,000
M06-18 South Bend 1600074 Intersection ImprovementCorby Blvd, Ironwood Dr,
Rockne DrSt Joseph STP RW $ 652,000 $ 163,000 Change FY to 2019 for RW
M05-18 INDOT VARFort Wayne Grpd Proj
Bridge, Culvert, and Small
Structure Preservation
Fort Wayne District - VariousElkhart and
KosciuskoVAR VAR $ 21,584,017 $ 5,031,589 $ 3,693,589 $ 2,484,355
Increased Federal Funding by
$804,296
M04-18Elkhart
County1700309
Bridge Replacement,
Concrete
Bridge 152 on Mishawaka Rd
over the Yellow CreekElkhart STP PE $ 249,120 $ 62,280
Increased Federal Funding By
$57,120
Printed 3/10/2022
TIP Administrative Modifications
M04-18Elkhart
County1700310 Bike/Pedestrian Facilities CR 17 at US 33 Multi-Use Path Elkhart CMAQ PE $ 256,880 $ 64,220
Increased Federal Funding By
$72,880
M03-18 INDOT VARLaPorte Grpd Proj Bridge,
Culvert, and Small Structure
Preservation
LaPorte District - VariousSt. Joseph and
Marshall VAR VAR $ 664,154 $ 166,038 $ 746,600
Increased Federal Funding By
$664,154
M03-18St Joseph
County1400638 Bike/Pedestrian Facilities
Auten Rd Multi-Use path from
Laurel Rd to SR933St Joseph TAP RW $ 80,000 $ 20,000 Change RW FY from 2018 to 2019
M03-18St Joseph
County1400639 Added Travel Lanes
Douglas Rd at Ironwood Rd &
ATL from Ivy Rd to SR 23St Joseph STP CN $ 6,930,000 $ 1,740,000 $ 8,700,000
Increase in funding by 1,648,000
from 5,282,000 to 6,930,000
M03-18 Transpo 1702697 5310 Funding
Puchase Transit Vehicles and
Program Administration (16 &
17 funds)
St Joseph 5310 N/A $ 525,059 $ 297,746 Increase in local match by $5,803
from $291,943 to $297,746
M02-18Elkhart
County1700310 Bike/Pedestrian Facilities CR 17 at US 33 Multi-Use Path Elkhart CMAQ RW $ 72,000 $ 18,000 $ 90,000 Change RW FY from 2019 to 2020
M01-18 Warsaw 1400786 Road ReconstructionEast Market St between
Hickory St and Bronson StKosciusko Grp III CN $ 1,547,440 $ 386,860 Move CN from SYF 2018 to SFY 2019
M01-18Elkhart
County1700309
Bridge Replacement,
Concrete
Bridge 152 on Mishawaka Rd
over the Yellow CreekElkhart Grp II RW $ 80,000 $ 20,000 $ 100,000
Move RW from SFY 2019 to SFY
2020
M01-18Elkhart
County1401749 Intersection Improvement CR 18 at CR 13 and CR 115 Elkhart CMAQ RW $ 400,000 $ 100,000 $ 500,000 Move RW to SFY 2020
M01-18 Goshen 1400713 Road ReconstructionKercher Rd from NS RRXing to
Dierdorff RoadElkhart Grp II CN $ 4,142,840 $ 1,035,710
Increased Federal Funding By
$464,230 (21%)
M16111-17 MACOG 1400730Vehicle Replacement -
ParatransitElkhart-Goshen Urbanized Area Elkhart 5307 N/A $ 88,000 $ 22,000
Decrease Federal Funding By
$62,000
M16111-17 MACOG 1400732 Computer Software Elkhart-Goshen Urbanized Area Elkhart 5307 N/A $ 30,000 $ 7,500 Decrease Federal Funding By
$13,788
M1511-17 INDOT 1700318Traffic Signal Visibility
Improvements
VA VARI, FY 2019 Various
Locations with the Fort Wayne
District
Various (INDOT) STP CN $ 800,000 $ 200,000 Traffic Signal Visibility Improvements
M1511-17 INDOT 1600211HMA Overlay, Preventive
Maintenance4.63 miles N of US 30 to US 6 Elkhart (INDOT) STP PE $ 172,000 $ 43,000
Increase Federal Funding by $12,000
M1511-17 INDOT 1602253 Replace Superstructure0.59 miles E of US 33, over
Yellow Creek, EBElkhart NHPP CN $ 1,951,330 $ 487,832 $ 2,439,162
Decrease Federal Funding by
$73,670
Corrected for 80/20 Split
Printed 3/10/2022
TIP Administrative Modifications
M1511-17 INDOT 1602255 Replace Superstructure.059 miles E of US 33, over
Yellow Creek, WBElkhart NHPP CN $ 1,951,330 $ 487,832 $ 2,439,162
Decrease Federal Funding by
$73,670
Corrected for 80/20 Split
M1511-17 INDOT VARFort Wayne Grpd Proj
Bridge, Culvert, and Small
Structure Preservation
Fort Wayne District - VariousElkhart and
KosciuskoVAR VAR $ 800,000 $ 200,000
Increased Federal Funding By
$800,000
M1410-17 Warsaw 1400786 Road ReconstructionEast Market St between
Hickory St and Bronson StKosciusko Grp III RW $ 40,000 $ 10,000
Moving RW phase from previous TIP
into new TIP (Changing from FY 17 to
FY 18)
M1308-17 INDOT 1700315Fort Wayne Grpd Proj
Signing, Marking, Striping
and Rumble Strips
Various Locations within the
Fort Wayne DistrictElkhart/ Kosciusko ST STP CN $ 240,000 $ 60,000 Increase Federal Funds by $240,000
M1108-17 INDOT VARFort Wayne Grpd Proj
Bridge, Culvert, and Small
Structure Preservation
Fort Wayne District - VariousElkhart and
KosciuskoVAR VAR $ 956,856 $ 241,464 $ 36,500 $ 25,000
Increased Federal Funding By
$965,856
M1008-17 INDOT VARLaPorte Grpd Proj Bridge,
Culvert, and Small Structure
Preservation
LaPorte District - VariousSt. Joseph and
Marshall VAR VAR $ 10,191,286 $ 2,451,938 $ 7,380,812 $ 12,331,548
Increased Federal Funding By
$10,191,286
M0907-17 INDOT VARFort Wayne Grpd Proj Traffic
Signal System and Lighting
Improvements
Fort Wayne District - VariousElkhart and
KosciuskoVAR VAR $ 1,802,744 $ 450,686 $ 1,074,000
Increased Federal Funding By
$1,802,744
M0907-17 INDOT VARFort Wayne Grpd Proj
Bridge, Culvert, and Small
Structure Preservation
Fort Wayne District - VariousElkhart and
KosciuskoVAR VAR $ 20,304,089 $ 4,711,607 $ 2,951,719 $ 2,459,355
Increased Federal Funding By
$7,766,884
Printed 3/10/2022