G N 200 1\11 uio 3 6hu %-~ 1>~ ~/' <1C "' t: 400 2 7hu 500 2 1hu / 124 151$ Bm2 501 S 1'18 4m 2 10 zo ,o 40 IMPORT ANT NOTES THIS PLAN rs NOT TO BE COPIED WITHOUT THESE NOTES. 2. THIS PLAN IS PREPARED FOR MAAS GROUP PTY LTD FROM A COMBINATION OF FIELD SURVEY /\ND EXISTING RECORDS FOR PLANNING AND DA PURPOSES AND SHOULD NOT BE USED FOR ANY OTHER PURPOSE '3. THE 1 ITLE BOUNDARIES WERE NOT MARKED BY THE AUTHOR AT THE TIME OF SURVEY. DISTANCES AND AREAS ARE APPROXIMATE AND ARE TO BE CONFIRMED BY SURVEY. DO r~OT SCALE FROM THIS PLAN. WHERE DIMENSIONS OR OFFSETS ARE CRITICAL THEY SH DUL D BE CONFIRMED BY FURTHER SURVEY. THESE NOTES ARE AN INTEGRAL PART OF THE PLAN. PLAN 1:?00 at Al SCALES: APPROVED: M.P.F. 1:SOO AT Al DATE: 07-0S-19 CLIENT: MAAS GROUP PTY LTD DRAWING TITLE: "WESTWINDS" ST AGE I PROPOSED LAYOUT MPFSURVEYING M.P.F SURVEYING PTY LTD ABN 92 109 448 372 Land and Engineering Surveyors Town Planning Consultants Sheet No. of CJ Sheets No. DA TE APP'D DETAILS OF AMENDMENTS PERMANENT MARK: R.L. DA TUM: A.H.D. SURVEY: DESIGN: J.S.V. DRAWING: J.S.V. DA TE: DA TE: 0'3-0S-19 DA TE: 07 -OS-19 PROJECT: 186 MOLONG RD, ORANGE NSW LOT 81 IN DP 1202'584 & LOT 6 IN DP 106SS78 REFERENCE No. 19019-SI-MOD 11-0&-1'< M.P.F. STAGE 2. l, AND 6 LOTS ALTERED 07-06-19 M.PS. DlMCNS:ONS ROUNDED TO 0.1: LOTS 105.107,118,&119 ALTERED 11-05-19 M.P.F. STAGING ADDED, INTSN NOR MODJFlEO. 100 TO 105 DEPTHS 07-0'i-19 M.P.F. ISSUED FOR REVIEW
Transcript
Page 1: G N 200 uio - orange.nsw.gov.au · s 1'18 4m 2 10 zo ,o 40 import ant notes this plan rs not to be copied without these notes. 2. this plan is prepared for maas group pty ltd from

G N

200 1\11

uio 3 6hu

%-~ 1>~ ~/' <1C

"' t:

400 2 7hu

500 2 1hu

/

124 151$ Bm2

501 S 1'18 4m 2

10 zo ,o 40

IMPORT ANT NOTES

THIS PLAN rs NOT TO BE COPIED WITHOUT THESE NOTES.

2. THIS PLAN IS PREPARED FOR MAAS GROUP PTY LTD FROM A COMBINATION OF FIELD SURVEY /\ND EXISTING RECORDS FOR PLANNING AND DA PURPOSES AND SHOULD NOT BE USED FOR ANY OTHER PURPOSE

'3. THE 1 ITLE BOUNDARIES WERE NOT MARKED BY THE AUTHOR AT THE TIME OF SURVEY.

DISTANCES AND AREAS ARE APPROXIMATE AND ARE TO BE CONFIRMED BY SURVEY.

DO r~OT SCALE FROM THIS PLAN. WHERE DIMENSIONS OR OFFSETS ARE CRITICAL THEY SH DUL D BE CONFIRMED BY FURTHER SURVEY.

THESE NOTES ARE AN INTEGRAL PART OF THE PLAN.

PLAN 1:?00 at Al

SCALES: APPROVED: M.P.F.

1:SOO AT Al DATE: 07-0S-19

CLIENT:

MAAS GROUP PTY LTD DRAWING TITLE:

"WESTWINDS" ST AGE I

PROPOSED LAYOUT MPFSURVEYING

M.P.F SURVEYING PTY LTD ABN 92 109 448 372

Land and Engineering Surveyors Town Planning Consultants

Sheet No.

of CJ Sheets

No. DA TE APP'D DETAILS OF AMENDMENTS

PERMANENT MARK:

R.L.

DA TUM: A.H.D.

SURVEY:

DESIGN: J.S.V.

DRAWING: J.S.V.

DA TE:

DA TE: 0'3-0S-19

DA TE: 07 -OS-19

PROJECT: 186 MOLONG RD, ORANGE NSW

LOT 81 IN DP 1202'584 & LOT 6 IN DP 106SS78

REFERENCE No.

19019-SI-MOD

11-0&-1'< M.P.F. STAGE 2. l, AND 6 LOTS ALTERED 07-06-19 M.PS. DlMCNS:ONS ROUNDED TO 0.1: LOTS 105.107,118,&119 ALTERED 11-05-19 M.P.F. STAGING ADDED, INTSN NOR MODJFlEO. 100 TO 105 DEPTHS 07-0'i-19 M.P.F. ISSUED FOR REVIEW

Page 2: G N 200 uio - orange.nsw.gov.au · s 1'18 4m 2 10 zo ,o 40 import ant notes this plan rs not to be copied without these notes. 2. this plan is prepared for maas group pty ltd from

STAGE TOTAL LOTS TOTALAREA(ex. ROSI

1 27 2.49 ha 2 39 2.52 ha 3 32 1.81 ha 4 1 2.69 ha s 2 2.66 ha 6 z 0.13 ha

•.

l·llSO(AI) 1,lSOGlAl)

D FIRSl SlASE - LOTS 100 TO '" ICOLOURED BLUEi

APPROVED: M.P.F. CL JENT: MAAS GROUP PTY LTD

DRAWING TITLE: "WESTWINDS"

OVERALL ST AGING PROPOSED LAYOUT

MPFSU'1VEYING

LINES SHOl,'N RED DENOTE INITIAL LAYOUT 4 MARCH 2019 DA 178/2018(2)

IMPORTANT NOTES

THIS PLAN IS NOT TO BE COPIED WITHOUT THESE NOTES.

2. THIS PLAN IS PREPARED FOR MAAS GROUP PTY LTD FROM A COMt3lNATION OF FIELD SURVEY AND EXISTING RECORDS FOR PLANNING AND DA PURPOSES AND SHOULD NOT BE USED FOR ANY OTHER PURPOSE

3. THE TITLE BOUr\DA~IES WERE ~OT MARKED BY THE AUTHOR AT THE TIME OF SURVEY.

4. DISTANCES AND AREAS ARE APPROXIMATE AND ARE TO BE CONFIRMED BY SURVEY

S. DO NOT SCALE FROM THIS PLAN. WHERE DIMENSIONS OR OFFSETS ARE CRITICAL THEY SHOULD BE C0NFIR:-1E.D BY FURTHtR SURVEY

THFSE NOTES ARE AN INTEGRAL PART CF THE PL AN

11-0b-19 M.P.F LOT SOO CHANGED TO LOTS SOO AND SOI 07-0b-19 M.P.F. FUTURE STAGES AMENDED: DIMENSIONS ROUND(O TO 0.1 IJ-05-19 11.P.F. STAGING ADDED. INTSN NDR MODIFJED, 100 TO 105 DEPTHS 07-0S-19 M.P.F. ISSUED FOR REVIEW"

SCALES:

1:IZSO AT Al M.P.F SURVEYING PTY LTD ABN 92 109 448 372

Land and Engineering Surveyors Town Planning Consultants

DATE: 07-0S-19 Sheet vo. 2

of 3 Sheets

REFERENCE No.

19019-SI-MOD

PERMANENT MARK:

R.L.

DA !UM: A.H.D.

SURVEY:

DESIGN: J. S. V.

DRAWING: J.S.V.

DATE:

DATE: 0'3 OS-19

DA TE: 07 OS-19

PROJECT: ~86 MOLONG RD, ORANGE NSW

LOT 81 IN DP 1202S84 & LOT 6 IN DP 106SS78 No. DA TE APP'D DETAILS OF AMENDMENTS

Page 3: G N 200 uio - orange.nsw.gov.au · s 1'18 4m 2 10 zo ,o 40 import ant notes this plan rs not to be copied without these notes. 2. this plan is prepared for maas group pty ltd from

D FIRST STAGE LOTS ,oo TO '" ICOLDURED BLUE)

\ LINES SHOWN RED OENOff INITIAL LMDUT S MARCH 20" OA 'TBl20,8J2)

IMPORTANT NOTES

THIS PLAN IS NOT TO BE COPIED WITHOUT THESE NOTES.

2. THIS PLAN IS PREP/I.RED FOR MAAS GROUP PTY LTD FROM A COM3INATION OF FIELD SURVEY AND EXISTING RECORDS FOR PLANNlNG AND DA PURPOSES AND SHOULD NOT BE USED FOR ANY JTHER PURPOSE

l. THE TITLE BDU~DARIES WERE NOT MARKED BY THE AUTHOR AT THE TIME OF SLRVEY

4. DISTANCFS AND AREAS ARE ArPROXIMATE AND ARE TO BE CONFIRMED BY SURVEY.

S. DO NOT SCALE FROM THIS PLAN. WHERE DIMENSIONS OR OFFSETS ARE CRITICAL THEY SHOULD BE (ONF-!RME.L) BY FURTHER SURVEY.

6. THE.SE NOTES ARE AN INTEGRAL PART OF THE PLAN.

~o "o

SCALES: APPROVED: M.P.F. CLIENT: DRAWING TITLE: DA TE: 07 OS-19 MAAS GROUP PTY LTD "WESTWINDS" DATE: PROJECT: OVERALL ST AGING

186 MOLONG RD, ORANGE NSW PROPOSED LAYOUT DA TE: o, OS-19 LOT 81 IN DP 1202S84 DA TE: 07 -OS-19 & LOT 6 IN DP 106SS78

Sheet No. ,

MPFSU'iVEYING

M.P.F SURVEYING PTY LTD ABN 92 I 09 448 372

Land and Engineering Surveyors Town Planning Consultants

of Sheets l:12SO AT Al

No. DA TE APP'D DETAILS OF AMENDMENTS

PERMANENT MARK:

R.L.

DA TUM: A.H.D.

SURVEY:

DESIGN: J.S.V.

DRAWING: J.S.V.

n-oe-rs H.P.F. STAGE 2. 1, AND e LOTS ALl[RED 07-0&-l'l M.P.F. FUTURE STAGES AMENDED; D1t1[NSIONS ROUND[D TO 0.1 11-05-19 M.P.F. STAGING ADDED. !NTSN NOR MODIFIED. 100 TO 105 DEPTHS 07-0S-l'l M.P.F. ISSUED FOR REV!Ew'