30
K AUBURN PORTLAND PORTSMOUTH BOSTON Key Plan Harriman Project No. PA / PE: Drawn By: Harriman Associates c Proj North DORTHEA DIX BUILDING K VENTILATION UPGRADES Revision Description Rev Date APRIL 19, 2019 APRIL 19, 2019 BANGOR, MAINE 18421 G00.1 MDL MMO COVER SHEET 2019 BANGOR, MAINE G00.1 COVER SHEET ARCHITECTURAL DRAWINGS A00.1 ABBREVIATIONS AND LEGENDS A10.1 BUILDING K FLOOR PLANS STRUCTURAL DRAWINGS S20.1 FRAMING PLAN S60.1 FRAMING NOTES AND DETAILS MECHANICAL DRAWINGS M00.1 LEGEND & GENERAL NOTES M05.1 FIRST FLOOR DEMOLITION DUCTWORK M05.2 SECOND FLOOR DEMOLITION DUCTWORK M05.3 THIRD FLOOR DEMOLITION DUCTWORK M06.1 FIRST FLOOR DEMOLITION PIPING M06.2 SECOND FLOOR DEMOLITION PIPING M06.3 THIRD FLOOR DEMOLITION PIPING M10.1 FIRST FLOOR DUCTWORK M10.2 SECOND FLOOR DUCTWORK M10.3 THIRD FLOOR DUCTWORK M10.4 FOURTH FLOOR DUCTWORK M20.1 FIRST FLOOR PIPING M20.2 SECOND FLOOR PIPING M20.3 THIRD FLOOR PIPING M20.4 FOURTH FLOOR PIPING M30.1 DETAILS AND SECTIONS M40.1 SCHEDULES ELECTRICAL DRAWINGS E00.1 ELECTRICAL LEGEND, NOTES AND SCHEDULES E05.1 FIRST FLOOR EXISTING CONDITIONS PLAN E05.2 SECOND FLOOR EXISTING CONDITIONS PLAN E05.3 THIRD FLOOR EXISTING CONDITIONS PLAN E20.1 FIRST FLOOR PLAN POWER AND SYSTEMS E20.2 SECOND FLOOR PLAN POWER AND SYSTEMS E20.3 THIRD FLOOR PLAN POWER AND SYSTEMS E20.4 ROOF PLAN POWER AND SYSTEMS CITY OF BANGOR MAINE DOROTHEA DIX CAMPUS CONSTRUCTION DOCUMENTS CONSTRUCTION DOCUMENTS LIST OF DRAWINGS DORTHEA DIX BUILDING K VENTILATION UPGRADES
Transcript
  • K

    Graphic Scale

    AUBURN PORTLAND PORTSMOUTHBOSTON

    Graphic Scale

    Graphic ScaleGraphic Scale

    Graphic ScaleGraphic Scale

    Key Plan

    Harriman Project No.

    PA / PE:

    Drawn By:Harriman Associates

    c

    Proj North

    DORTHEA DIX BUILDING KVENTILATION UPGRADES

    Revision DescriptionRev Date

    APRIL 19, 2019

    APRIL 19, 2019

    BANGOR, MAINE

    18421

    G00.1

    MDL

    MMO

    COVER SHEET

    2019

    BANGOR, MAINE

    G00.1 COVER SHEET

    ARCHITECTURAL DRAWINGS

    A00.1 ABBREVIATIONS AND LEGENDS

    A10.1 BUILDING K FLOOR PLANS

    STRUCTURAL DRAWINGS

    S20.1 FRAMING PLAN

    S60.1 FRAMING NOTES AND DETAILS

    MECHANICAL DRAWINGS

    M00.1 LEGEND & GENERAL NOTES

    M05.1 FIRST FLOOR DEMOLITION DUCTWORK

    M05.2 SECOND FLOOR DEMOLITION DUCTWORK

    M05.3 THIRD FLOOR DEMOLITION DUCTWORK

    M06.1 FIRST FLOOR DEMOLITION PIPING

    M06.2 SECOND FLOOR DEMOLITION PIPING

    M06.3 THIRD FLOOR DEMOLITION PIPING

    M10.1 FIRST FLOOR DUCTWORK

    M10.2 SECOND FLOOR DUCTWORK

    M10.3 THIRD FLOOR DUCTWORK

    M10.4 FOURTH FLOOR DUCTWORK

    M20.1 FIRST FLOOR PIPING

    M20.2 SECOND FLOOR PIPING

    M20.3 THIRD FLOOR PIPING

    M20.4 FOURTH FLOOR PIPING

    M30.1 DETAILS AND SECTIONS

    M40.1 SCHEDULES

    ELECTRICAL DRAWINGS

    E00.1 ELECTRICAL LEGEND, NOTES AND SCHEDULES

    E05.1 FIRST FLOOR EXISTING CONDITIONS PLAN

    E05.2 SECOND FLOOR EXISTING CONDITIONS PLAN

    E05.3 THIRD FLOOR EXISTING CONDITIONS PLAN

    E20.1 FIRST FLOOR PLAN POWER AND SYSTEMS

    E20.2 SECOND FLOOR PLAN POWER AND SYSTEMS

    E20.3 THIRD FLOOR PLAN POWER AND SYSTEMS

    E20.4 ROOF PLAN POWER AND SYSTEMS

    CITY OF BANGOR MAINE DOROTHEA DIX CAMPUS

    CONSTRUCTION DOCUMENTS

    CONSTRUCTION DOCUMENTS

    LIST OF DRAWINGS

    DORTHEA DIXBUILDING K

    VENTILATION UPGRADES

  • A

    PLAN - SECTION

    A1VIEW TITLEVIEW SCALE

    VIEW TITLE

    BUILDING SECTION

    WALL SECTION

    EXTERIOR ELEVATION

    INTERIOR ELEVATION

    DETAIL

    THE FOLLOWING APPLIES TO THE MARKERS ABOVE:

    A1

    A25.1

    A1

    A30.1

    A1

    A20.1

    A3A1

    A2

    A4

    A81.1

    A1

    A50.1

    A1

    A25.1

    A1

    A50.1

    INDICATES ELEVATION, SECTION OR DETAIL NUMBER

    SEE TITLE BLOCK FOR GRAPHIC SCALE

    INDICATES ELEVATION, SECTION OR DETAIL NUMBER

    INDICATES DRAWING SHEET ON WHICH ELEVATION, SECTION OR DETAIL IS SHOWN

    COLUMN REFERENCE GRID

    LEVEL LINE

    WALL OR PARTITION TYPE

    ROOM NAME AND NUMBER

    EQUIPMENT OR FURNITURE NUMBER

    DOOR OR BORROW LIGHT NUMBER

    WINDOW TYPE

    REVISION

    CEILING TYPE AND HEIGHT AFF

    #

    216

    ROOM NAME

    101

    72

    201

    1

    FLOOR FINISH

    PROJECT NORTH

    10'-0"ACT1

    VCT3

    # KEYNOTE OR MATERIAL TAG

    PLAN - SECTION

    ELEVATIONS

    SPECIAL INDICATIONSPARTITION CONSTRUCTION - PLAN

    EARTH

    POROUS FILL(STONE OR GRAVEL, ETC)

    ROCK

    LIGHTWEIGHT CONCRETE(OR CONCRETE FILL)

    BRICK (COMMON OR FACE)

    CONCRETE MASONRY UNITS

    METAL (LARGE SCALE)

    PLYWOOD (LARGE SCALE)

    WOOD, FINISHED

    WOOD, ROUGH

    INSULATION (LOOSE OR BATT)

    INSULATION (RIGID)

    GLASS (LARGE SCALE)

    CERAMIC TILE

    GYPSUM WALL BOARD(FIBERBOARD, ETC)

    PLASTER, SAND, CEMENT, GROUT

    STRUCTURAL CONCRETE(CAST-IN-PLACE, PRECAST, ETC)

    ACOUSTICAL TILE

    RESILIENT FLOORING

    METAL (SMALL SCALE)

    CONCRETE, PLASTER

    SHEET METAL

    GLAZING

    BRICK

    STEEL STUD

    EXISTING TO REMAIN

    WOOD STUD

    EXISTING TO BE REMOVED

    Graphic Scale

    AUBURN PORTLAND PORTSMOUTHBOSTON

    Graphic Scale

    Graphic ScaleGraphic Scale

    Graphic ScaleGraphic Scale

    Key Plan

    Harriman Project No.

    PA / PE:

    Drawn By:Harriman Associates

    c

    Proj North

    Revision DescriptionRev Date

    APRIL 19, 2019

    BANGOR, MAINE

    18421

    A00.1

    MDL

    CMP

    ABBREVIATIONS ANDLEGENDS

    2019

    A2CONTRACT DRAWING ABBREVIATIONSNO SCALE

    A5GRAPHIC SYMBOLS LEGENDNO SCALE

    A6MATERIALS LEGENDNO SCALE

    RL ROOF LEADER

    RM ROOM

    RO ROUGH OPENING

    ROW RIGHT OF WAY

    RR RETURN REGISTER

    S SANITARY

    S SOIL

    S SOUTH

    S STEAM

    SA SUPPLY AIR

    SD SMOKE DAMPER

    SD STORM DRAIN

    SDMH STORM DRAIN MANHOLE

    SEC SECTION

    SF SUPPLY FAN

    SG SUPPLY GRILLE

    SHT SHEET

    SIM SIMILAR

    SK SINK

    SMU SOLID MASONRY UNIT

    SPEC SPECIFICATION (S)

    SPF SPRUCE PINE FIR

    SQ SQUARE

    SR SUPPLY REGISTER

    SS STAINLESS STEEL

    SSK SERVICE SINK

    STD STANDARD

    STL STEEL

    STOR STORAGE

    SYM SYMMETRY (ICAL)

    SYS SYSTEM

    T TREAD

    T&G TONGUE & GROOVE

    T'STAT THERMOSTAT

    TB TEST BORING

    TD TRANSFER DUCT

    TD TRENCH DRAIN

    TEL TELEPHONE

    TG TRANSFER GRILLE

    THK THICK (NESS)

    TKBD TACKBOARD

    TL TOTAL LOAD

    TOC TOP OF CONCRETE

    TOF TOP OF FOOTING

    TOS TOP OF STEEL

    TP TEST PIT

    TPTN TOILET PARTITION

    TV TELEVISION

    TYP TYPICAL

    UD UNDERDRAIN

    UGD UNDERGROUNDDUCTWORK

    UH UNIT HEATER

    UNO UNLESS NOTEDOTHERWISE

    UR URINAL

    UV UNIT VENTILATOR

    V VENT

    VAV VARIABLE AIR VOLUME

    VB VINYL BASE

    VCT VINYL COMPOSITION TILE

    VD VOLUME DAMPER

    VERT VERTICAL

    VF VINYL FABRIC

    VTR VENT THRU ROOF

    W WEST, WIDTH, WIDE

    W/ WITH

    W/O WITHOUT

    WC WATER CLOSET

    WCH WATER CLOSET HANDICAP

    WCO WALL CLEANOUT

    WD WOOD

    WG WALL GRILLE

    WH WALL HUNG

    WIN WINDOW

    WP WORKING POINT

    WR WALL REGISTER

    WWF WELDED WIRE FABRIC

    LB (S) POUNDS

    LD LINEAR DIFFUSER

    LD LINED DUCT

    LF LAWN FAUCET

    LF LINEAL FEET

    LG LONG

    LL LIVE LOAD

    LPS LOW PRESSURE STEAM

    LTG LIGHTING

    LTL LINTEL

    LTW LOW TEMPERATURE STEAM

    LW LIMIT OF WORK

    M METER (S)

    MAS MASONRY

    MAX MAXIMUM

    MBH 1000 BRITISH THERMALUNIT

    MD MANUAL DAMPER

    MD MOTORIZED DAMPER

    MECH MECHANICAL

    MED MEDIUM

    MET METAL

    MFR MANUFACTURE (R)

    MH MANHOLE

    MIN MINIMUM

    MISC MISCELLANEOUS

    MM MILLIMETER (S)

    MO MASONRY OPENING

    MR MOP RECEPTOR

    MT METAL THRESHOLD

    MTD MOUNTED

    N NORTH

    NA NOT APPLICABLE

    NC NORMALLY CLOSED

    NIC NOT IN CONTRACT

    NO NORMALLY OPEN

    No NUMBER

    NS NEAR SIDE

    NTS NOT TO SCALE

    OC ON CENTER (S)

    OD OUTSIDE DIAMETER

    OED OPEN END DUCT

    OFF OFFICE

    OH OVERHEAD

    OPG OPENING

    OPH OPPOSITE HAND

    OPP OPPOSITE

    P PLATE

    P PLUMBING

    P PUMP

    PAR PARALLEL

    PFN PREFINISHED

    PL PROPERTY LINE

    PLAM PLASTIC LAMINATE

    PNL PANEL

    PNT PAINT (ED)

    PP POINT TO POINT

    PSF POUNDS PER SQUAREFOOT

    PSI POUNDS PER SQUARE INCH

    PT POINT

    PTN PARTITION

    PVC POLYVINYL CHLORIDE

    PWD PLYWOOD

    PWG POLISHED WIRE GLASS

    QT QUARRY TILE

    R RISER

    RA RETURN AIR

    RAD RADIATION

    RAD RADIUS

    RB RUBBER BASE

    RD ROOF DRAIN

    REF REFERENCE

    REFR REFRIGERATOR

    REV REVISION (S)

    RG RETURN GRILLE

    DWG DRAWING

    E EAST

    EB EXPANSION BOLT

    EF EXHAUST FAN

    EIFS EXTERIOR INSULATEDFINISH SYSTEM

    EJ EXPANSION JOINT

    EL ELEVATION (S)

    ELEC ELECTRIC (AL)

    EM ELECTRIC MANHOLE

    EP ELECTRIC PANEL

    EQ EQUAL

    ER EXHAUST REGISTER

    ES EACH SIDE

    EST ESTIMATE

    EWC ELECTRIC WATER COOLER

    EXG EXISTING

    EXP EXPANSION

    EXT EXTERIOR

    FA FIRE ALARM

    FAI FRESH AIR INTAKE

    FC FLEXIBLE CONNECTION

    FCO FLOOR CLEANOUT

    FD FIRE DAMPER

    FD FLOOR DRAIN

    FD FOUNDATION DRAIN

    FE FIRE EXTINGUISHER

    FHS FIRE HOSE STATION

    FIN FINISH (ED)

    FL FINISH LENGTH

    FLG FLASHING

    FLR FLOOR (ING)

    FOC FACE OF CONCRETE

    FOS FACE OF STUD

    FRR FLOOR RETURN REGISTER

    FS FAR SIDE

    FTG FOOTING

    FY MINIMUM YIELD STRESS(KSI)

    GA GAGE, GAUGE

    GALV GALVANIZED

    GB GRAB BAR

    GC GENERAL CONTRACT (OR)

    GL GLASS

    GPDW GYPSUM DRY WALL

    GPM GALLONS PER MINUTE

    GV GATE VALVE

    H HARDENER

    HB HOSE BIB

    HD HUB DRAIN

    HM HOLLOW METAL

    HORIZ HORIZONTAL

    HPS HIGH PRESSURE STEAM

    HT HEIGHT

    HTG HEATING

    HTW HOT TEMPERATURE WATER

    HVAC HEATING - VENTILATING -AIR CONDITIONING

    HW HOT WATER

    HYD HYDRANT

    ID INSIDE DIAMETER

    INS INSULATE (D) (ION)

    INT INTERIOR

    INV INVERT

    IPS IRON PIPE SIZE

    JC JANITOR'S CLOSET

    JT JOINT

    K KIPS

    KIT KITCHEN

    KSI KIPS PER SQUARE INCH

    LAB LABORATORY

    LAM LAMINATE (D)

    LAV (L) LAVATORY

    A/C AIR CONDITIONING

    AB ANCHOR BOLT

    ABT ABOUT

    AC ACOUSTICAL

    ACB ABOVE CEILING BELOW

    ACT ACOUSTICAL TILE

    AD ACCESS DOOR

    ADJ ADJUSTABLE

    AFF ABOVE FINISH FLOOR

    AFG ABOVE FINISH GRADE

    AL ACOUSTICAL LINING

    AL ALUMINUM

    ALT ALTERNATE

    AP ACCESS PANEL

    APX APPROXIMATE

    ARCH ARCHITECT (URAL)

    B/W BOTTOM OF WALL

    BD BOARD

    BDD BACKDRAFT DAMPER

    BIT BITUMINOUS

    BJ BAR JOIST

    BLDG BUILDING

    BLKG BLOCKING

    BM BENCH MARK

    BOF BOTTOM OF FOOTING

    BOT BOTTOM

    BP BEARING PLATE

    BSMT BASEMENT

    BSP BASE PLATE

    BTU BRITISH THERMAL UNIT

    CAB CABINET

    CB CATCHBASIN

    CD CEILING DIFFUSER

    CEM CEMENT (ITIOUS)

    CER CERAMIC

    CF CUBIC FEET

    CFM CUBIC FEET PER MINUTE

    CG CEILING GRILLE

    CHBD CHALKBOARD

    CHT CEILING HEIGHT

    CHWS CHILLED WATER SUPPLY

    CI CAST IRON

    CJT CONTROL JOINT

    CL CLOSET

    CLG CEILING

    CM CENTIMETER (S)

    CMP CORRUGATED METAL PIPE

    CMU CONCRETE MASONRY UNIT

    CO CLEANOUT

    COL COLUMN

    CONC CONCRETE

    CONN CONNECT

    CONST CONSTRUCTION

    CONT CONTINUE (OUS)

    CONTR CONTRACT (OR)

    CORR CORRUGATED

    CPT CARPET (ED)

    CR CONDENSATE RETURN

    CT CERAMIC TILE

    CUH CABINET UNIT HEATER

    CULV CULVERT

    CV CONVECTOR

    CW COLD WATER

    CY CUBIC YARD

    DF DOUGLAS FIR

    DF DRINKING FOUNTAIN

    DG DOOR GRILLE

    DH DOUBLE HUNG

    DIA DIAMETER

    DIAG DIAGONAL

    DIM DIMENSION

    DIV DIVISION

    DL DEAD LOAD

    DMT DEMOUNTABLE

    DN DOWN

    DTL DETAIL

    DW DUCT WRAP

    ANGLE

    CENTERLINE

    CHANNEL

    DIAMETER

    PLATE

    SQUARE

    SYMBOLS USED AS ABBREVIATIONS

    L

    O

    PL

    CONSTRUCTION DOCUMENTS

    DORTHEA DIXBUILDING K

    VENTILATION UPGRADES

  • BEDROOM

    K217

    NURSE STATION

    K211MED

    K212

    BATHROOM

    K213

    SHOWER

    K215

    STAIR

    K216

    OFFICE

    K218

    BEDROOM

    K219

    DAY ROOM

    K220

    BEDROOM

    K221

    SENSORY

    K222

    BEDROOM

    K223

    BEDROOM

    K225

    BEDROOM

    K226

    BATH

    K227

    BEDROOM

    K228

    SECLUSION

    K228A

    STORAGE

    K229

    BATHROOM

    K231

    OPEN AREA

    K232

    KITCHEN

    K233

    CONFERNCE

    K234

    LAUNDRY

    K202

    STAFF BATHROOM

    K203

    BATHROOM

    K205

    BEDROOM

    K206

    BEDROOM

    K207

    BEDROOM

    K208

    BEDROOM

    K209

    TREATMENT

    K210

    STAIR

    K224 K214

    CHASE

    K204

    CHASE

    K201

    FAMILY

    ROOM

    K200

    STAIR

    1 2 3 5 6 7 9 11 12 13

    L

    K

    J

    C17

    C25

    C23

    F

    E

    H

    C24

    B

    C

    D

    A10.1

    D1

    A10.1

    D2

    C26 C27

    C20

    LAUNDRY

    K304

    STAFF BATHROOM

    K305

    CHASE

    K306

    BATHROOM

    K307

    KITCHEN

    K308

    DAY ROOM

    K309

    BEDROOM

    K310

    BEDROOM

    K311

    MED ROOM

    K312

    NURSE STATION

    K313

    TUB ROOM

    K315

    BATHROOM

    K316

    CHASE

    K317

    SHOWER ROOM

    K318 STAIR

    K319

    SALLY PORT

    K320

    STORAGE

    K321

    SENSORY

    K322

    BEDROOM

    K323

    BEDROOM

    K324

    TV LOUNGE

    K325CONFERENCE

    K326

    PHONE

    K327

    BEDROOM

    K328

    BEDROOM

    K329

    BEDROOM

    K330BEDROOM

    K331

    STAIR

    K333

    OFFICE

    K334

    SENSORY

    K335 OFFICE

    K336

    SECLUSION

    K337

    STORAGE

    K338

    TREATMENT

    K339

    STORAGE

    K340

    BEDROOM

    K341

    BEDROOM

    K342

    BEDROOM

    K345

    CONFERENCE

    K346

    STORAGE

    K347

    K300

    STAIRK348

    FAMILY

    ROOM

    1 2 3 5 6 7 9 11 12 13

    L

    K

    J

    C17

    C25

    C23

    F

    E

    H

    C24

    B

    C

    D

    A10.1

    D3

    A10.1

    D4

    C26 C27

    C20

    L

    1' -

    0"

    3' - 5 3/4" +/-213

    213

    ALIGN FACES

    EXISTING PARTITIONS

    CONTINUOUS SEALANT, TYPICAL.

    C25

    B213

    213

    213

    4"

    3' -

    6"

    1' - 9"

    EXISTING PARTITION

    CONTINUOUS SEALANT, TYPICAL

    L

    213

    213

    2' -

    6"

    3' - 6"

    EXISTING PARTITIONS

    CONTINUOUS SEALANT, TYPICAL.C25

    B

    2' - 3"

    2' -

    10

    "

    213

    213

    EXISTING PARTITIONS

    CONTINUOUS SEALANT, TYPICAL.

    PLAN

    SECTION

    CEILING WHERE OCCURS

    RATED/ ACOUSTICAL SEALANT. LEAVE 5/8" GAP FOR SEALANT

    FLOOR LINE

    METAL STUDS @ 16" O.C.

    METAL STUD DEFLECTION TRACK

    STOP STUD SHORT

    5/8" GWB

    SMOKE/ ACOUSTICAL SEALANT

    FILL VOID WITH MINERAL WOOL

    SCRIBE GWB AND PLYWOOD TO DECK PROFILE, LEAVING DETAILED GAP.

    5/8" HIGH ABUSE GWB W/ LEVEL 5 FINISH OVER 1/2" FIRE TREATED PLYWOOD

    5/8" HIGH ABUSE GWB AND FIRE TREATED PLYWOOD FACE ON ALL WALL FACES SUBJECT TO PATIENT OCCUPANCY.

    SMOKE SEAL ALL SMOKE PARTITION WALLS

    5/8" HIGH ABUSE GWB W/ #5 VENEER FINISH OVER 1/2" FIRE TREATED PLYWOOD ONE SIDE

    3 5/8" 20 GA. STEEL STUD W/ S.A.B. 213

    6" 20 GA. STEEL STUD W/ S.A.B. 216

    DESCRIPTION non rated

    METAL STUDS @ 16" O.C.

    GENERAL NOTES

    1. DIMENSIONS ARE FACE OF FINISH OF PARTITION UNLESS OTHERWISE NOTED.

    2. REFER TO A10.1 PARTITION TYPES FOR CONSTRUCTION DESCRIPTIONS.

    3. ALL PARTITIONS (U.N.O.) EXTEND TO THE UNDERSIDE OF THE EXISTING STRUCTURE ABOVE. SEAL PERIMETER OF ALL NEW WALLS WITH CONTINUOUS SEALANT FOR SMOKE AND SOUND CONTROL.

    4. PAINT ALL EXISTING WALLS DISTURBED BY NEW WORK TO NEAREST CORNER. MATCH EXISTING PAINT COLOR.

    5. PROVIDE NEW RESILIENT BASE ON ALL NEW WALLS TO MATCH EXISTING BASE.

    MECH DUCT

    SEE MECH. DWGSVARIES

    NOTE:2 HR RATED UL# CAJ-7027

    STRUCTURAL STEEL, SEE STRUCTURAL DRAWINGS

    COLLAR FLANGE AND SEAL MATERIAL ALL SIZES - SEE MECHANICAL DRAWINGS

    POUR STOP

    ELEVATED CONCERETE SLAB

    ROOF INS REINFORCEDCONCRETE DECK

    ROOFING MEMBRANE

    METAL RAIN HOODTRANSITION FROMDUCT PROFILE TO CURB

    CLAMPING RING

    CONT. SEALANT

    WOOD BLOCKING AS REQUIRED TO MATCH HEIGHT OF ROOF INSUL

    PREFABRICATED ROOF CURB FURNISHED W/ MECH DUCT

    MECHANICAL DUCT

    ROOF FLASHINGFULL HGT OFCURB

    SEE STRUCTURAL PLANS FOR FRAMING AROUND OPENING

    Graphic Scale

    AUBURN PORTLAND PORTSMOUTHBOSTON

    Graphic Scale

    Graphic ScaleGraphic Scale

    Graphic ScaleGraphic Scale

    Key Plan

    Harriman Project No.

    PA / PE:

    Drawn By:Harriman Associates

    c

    Proj North

    Revision DescriptionRev Date

    APRIL 19, 2019

    BANGOR, MAINE

    18421

    A10.1

    MDL

    CMP

    BUILDING K FLOORPLANS

    2019

    SCALE: 1/8" = 1'-0"A1

    BUILDING K SECOND FLOOR PLANSCALE: 1/8" = 1'-0"

    A4BUILDING K THIRD FLOOR PLAN

    SCALE: 3/4" = 1'-0"D1

    SECOND FLOOR PLAN DETAILSCALE: 3/4" = 1'-0"

    D2SECOND FLOOR PLAN DETAIL

    SCALE: 3/4" = 1'-0"D3

    THIRD FLOOR PLAN DETAILSCALE: 3/4" = 1'-0"

    D4THIRD FLOOR PLAN DETAIL

    A3SCALE: 1 1/2" = 1'-0"

    A6FIRESTOP FLOOR SYSTEM F2 21 DETAIL

    CONSTRUCTION DOCUMENTS

    DORTHEA DIXBUILDING K

    VENTILATION UPGRADES

  • ��

    DS

    V

    V

    C17

    C20

    9.54.5

    ��������

    ��������

    W10X12

    W10X12

    ������

    W10X12

    W10X12

    ������

    E W21X73

    E W21X93

    �����

    �����

    ��������

    ���

    ��������

    32'-9 5/8"

    ������

    SLAB OPENING (TYP.)(SEE A3 S60.1)

    A1

    S60.1TYP.

    C17

    C20

    9.54.5 4.9 9.27.26.2

    C17.3

    C19

    2'-6" 10'-9 1/8" 8'-0 1/2"

    ��������

    ���

    �����

    ��������

    W12X35

    W12X35

    ������

    ������

    W10X19

    W10X19

    HSS4x4x1/4

    HSS4x4x1/4

    HSS4x4x1/4

    HSS4x4x1/4

    W10X19

    W10X19

    4'-9 7/8" ±

    9'-0" 2'-6"

    �����������

    A4

    S60.1

    TYP.

    PROVIDE A 6"x1/4"x6" LONG BASE PLATE WELDED ALL AROUND TO EXISTING BEAM*

    *

    *

    * *

    13

    L

    C17

    C20

    9.54.5

    B

    7.26.2

    C17.3

    C19

    S20.1

    A1A2

    S20.1

    S20.1

    D2

    S20.1

    D1

    D3

    S20.1

    C1

    S20.1

    D4

    S20.1

    C2

    S20.1

    13

    L

    EW10

    �������������

    ��

    �����

    ���

    ������ W10X12

    A2

    S60.1

    TYP.

    SLAB OPENING (TYP.)(SEE A3 S60.1)

    B

    �������������

    ��

    ����

    ���

    ����

    EW18

    W10X12

    ������

    A1

    S60.1

    TYP.

    SLAB OPENING (TYP.)(SEE A3 S60.1)

    13

    L

    �������

    E W10X12

    ������

    W10X12

    A2

    S60.1

    TYP.

    SLAB OPENING (TYP.)(SEE A3 S60.1)

    BE W18X76

    �������

    ��������

    W10X12

    ������

    A1

    S60.1

    TYP.

    SLAB OPENING (TYP.)(SEE A3 S60.1)

    13

    L

    �������

    E W10X12

    ������

    W10X12

    A2

    S60.1

    TYP.

    SLAB OPENING (TYP.)(SEE A3 S60.1)

    BE W18X76

    �������

    ��������

    W10X12

    ������

    A1

    S60.1

    TYP.

    SLAB OPENING (TYP.)(SEE A3 S60.1)

    Graphic Scale

    AUBURN PORTLAND PORTSMOUTHBOSTON

    Graphic Scale

    Graphic ScaleGraphic Scale

    Graphic ScaleGraphic Scale

    Key Plan

    Harriman Project No.

    PA / PE:

    Drawn By:Harriman Associatesc

    Proj North

    ���������

    Revision DescriptionRev Date

    APRIL 19, 2019

    ����������������

    BANGOR, MAINE

    18421

    S20.1

    RMP

    PLS

    FRAMING PLAN

    2019

    DOROTHEA DIXBUILDING K

    VENTILATION UPGRADES

    SCALE: 1/4" = 1'-0"A2 ROOF FRAMING

    SCALE: 1/4" = 1'-0"A1 PLATFORM FRAMING

    NO SCALEA4 KEY PLAN

    SCALE: 1/4" = 1'-0"D1 SECOND FLOOR FRAMING

    SCALE: 1/4" = 1'-0"D2 SECOND FLOOR FRAMING

    SCALE: 1/4" = 1'-0"D3 THIRD FLOOR FRAMING

    SCALE: 1/4" = 1'-0"D4 THIRD FLOOR FRAMING

    SCALE: 1/4" = 1'-0"C1 FORTH FLOOR FRAMING

    SCALE: 1/4" = 1'-0"C2 FORTH FLOOR FRAMING

    CONSTRUCTION DOCUMENTS

  • ����

    ������

    ������

    1/4" CAP PLATE(2) 3/4" A325N BOLTS (TYP.)

    4x1/4x6" LONG PLATE

    HSS COLUMN (SEE PLAN)

    �����

    ��

    EXISTING ROOF ELEV.

    C4x5.4 CONTINUOUS AROUND OPENINGHILTI HIT-HY 200 ADHESIVE WITH

    3/8"Ø HAS RODS AT 12" O.C. (3 3/8" EMBEDMENT)

    1/2"

    3"@12"

    EXISTING SLAB

    L6x6x3/8x8" LONG WITH HILTI HIT-HY ADHESIVE

    AND (2) 3/8"Ø HAS RODS

    W10x12EXISTING WALL

    ����

    ������

    ������

    FIELD WELDTO EXISTINGBEAM

    (2) 3/4" A325N BOLTS TYP.

    4x1/4x6" LONG PLATE

    NEW OR EXISTING BEAM (SEE PLAN)

    STRUCTURAL STEEL

    1. STRUCTURAL STEEL SHALL BE ASTM A992, GR. 50 (Fy=50 KSI).2. STRUCTURAL TUBING TO BE ASTM B500, GR46 (Fy=46 KSI).3. MISC. STEEL PLATES AND ANGLES SHALL BE ASTM A36 (Fy=36KSI).4. ALL EXTERIOR STEEL INCLUDING CONNECTION PLATES AND BOLTS SHALL BE HOT DIPPED GALVANIZED.5. VERIFY WITH MECHANICAL DRAWINGS FOR LOCATION OF DUCTS, PIPING, ETC.

    THROUGH FLOOR AND ROOF CONSTRUCTION.

    MISCELLANEOUS

    1. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONSBEFORE PROCEEDING WITH THE WORK.

    2. CONTRACTOR SHALL REPORT ANY VARIATIONS FOUND AT THE SITE BEFOREPROCEEDING WITH THAT PART OF THE WORK.

    DESIGN INFORMATION

    DESIGN CODE = 2015 IBC AND ASCE 7-10

    Graphic Scale

    AUBURN PORTLAND PORTSMOUTHBOSTON

    Graphic Scale

    Graphic ScaleGraphic Scale

    Graphic ScaleGraphic Scale

    Key Plan

    Harriman Project No.

    PA / PE:

    Drawn By:Harriman Associatesc

    Proj North

    ���������

    Revision DescriptionRev Date

    APRIL 19, 2019

    ����������������

    BANGOR, MAINE

    18421

    S60.1

    RMP

    PLS

    FRAMING NOTES ANDDETAILS

    2019

    DOROTHEA DIXBUILDING K

    VENTILATION UPGRADES

    SCALE: 1 1/2" = 1'-0"A4 BEAM TO COLUMN CONNECTION

    SCALE: 1 1/2" = 1'-0"A3 TYP. SLAB OPENING DETAIL

    SCALE: 1 1/2" = 1'-0"A2 TYP. BEAM TO WALL CONNECTIONSCALE: 1 1/2" = 1'-0"A1

    TYP. BEAM TO BEAM CONNECTION

    W10x12

    SCALE: 3/4" = 1'-0"B4 GENERAL FRAMING NOTES

    CONSTRUCTION DOCUMENTS

  • AMS

    TIGHT SHUT-OFF VALVE

    V

    T

    ACV 2 - WAY

    ACV 3 - WAY

    CAP - PIPE

    CHECK VALVE

    COMBINATION BALANCING, FLOW MEASURING &

    FLOAT & THERMOSTATIC TRAP

    ISOLATION VALVE

    GLOBE VALVE

    LOCKSHIELD GATE VALVE

    MANUAL AIR VENT

    OS&Y GATE VALVE

    PETCOCK FOR GAUGE CONNECTION

    PIPE ANCHOR

    PIPE GUIDE

    PLUG VALVE

    PRESSURE GAUGE

    PRESSURE REDUCING VALVE

    PRESSURE RELIEF VALVE

    STRAINER

    TAKE - OFF FROM BOTTOM OF PIPE

    TAKE - OFF FROM TOP OF PIPE

    THERMOMETER

    THERMOMETER WELL

    THERMOSTATIC TRAP

    UNION

    DESCRIPTIONSYMBOL

    EXISTING SUPPLY PIPING TO REMAIN

    EXISTING RETURN PIPING TO REMAIN

    NEW SUPPLY PIPING

    NEW RETURN PIPING

    PIPE DOWN

    PIPE UP

    DIFFERENTIAL PRESSURE SENSORDPS

    INVERTED BUCKET TRAP

    PIPING LEGEND

    REDUCER - CONCENTRIC

    REDUCER - ECCENTRIC

    10'-0" FL1.2 GPM

    RADIATION I.D. ( TYPE A, 10'-0" FINNED LENGTH, BALANCED TO 1.2 GPM) WITH DAMPERA

    10'-0" FL/D1.2 GPM

    A RADIATION I.D. ( TYPE A, 10'-0" FINNED LENGTH, BALANCED TO 1.2 GPM) WITHOUT DAMPER

    FD (3 HR) FIRE DAMPER (3 HOUR RATED)

    FIRE DAMPER (1 1/2 HOUR RATED)

    BD

    V

    ACOUSTICALLY LINED DUCT

    BACKDRAFT DAMPER

    DUCT SECTION - SUPPLY/OUTDOOR AIR

    DUCT SECTION - RETURN AIR

    DUCT TURNING VANES

    FLEXIBLE DUCT

    LOUVER

    MOTORIZED DAMPER

    PRESSURE RELIEF DAMPER

    RETURN OR EXHAUST AIR

    SMOKE DAMPER

    STRAINER

    SUPPLY OR OUTSIDE AIR

    VOLUME DAMPER

    SPIRAL DUCT DIAMETER

    CB COUNTERBALANCED DAMPER

    DESCRIPTIONSYMBOL

    S

    PRD

    M

    F

    AIRFLOW MEASURING STATION

    DUCT MOUNTED SMOKE DETECTORSD

    EXISTING DUCTWORK TO REMAIN

    NEW DUCTWORK

    DUCT SECTION - EXHAUST AIR

    STATIC PRESSURE SENSORSPS

    Ø

    FIRE AND SMOKE DAMPER (1 1/2 HOUR RATED)F/S

    DUCTWORK LEGEND

    S2 4400

    SUPPLY DIFFUSER ( TYPE 2 )

    400 CFM EA

    DIFFUSER DESCRIPTION

    QUANTITY

    ( SEE REG., GRILLES & DIFF SCHEDULE )

    S (SUPPLY) R (RETURN)E (EXHAUST) T (TRANSFER)

    H

    HS

    HUMIDISTAT

    HUMIDITY SENSOR

    TEMPERATURE SENSOR

    THERMOSTAT

    THERMOSTAT COOLING

    THERMOSTAT HEATING

    THERMOSTAT - NIGHT

    THERMOSTAT - HEATING/COOLING

    T

    TS

    TC

    H

    N

    H/C

    T

    T

    T

    DESCRIPTIONSYMBOL

    CONTROLS LEGEND

    AM10.1 SECTION I.D. ( SECTION A SHOWN ON DWG. M10.1)

    DESCRIPTIONSYMBOL

    EXISTING EQUIPMENT TO REMAIN

    NEW EQUIPMENT

    DEMOLISHED EQUIPMENT, DUCTWORK, OR PIPING

    GENERIC LEGEND

    CONNECT NEW TO EXISTING

    Graphic Scale

    AUBURN PORTLAND PORTSMOUTHBOSTON

    Graphic Scale

    Graphic ScaleGraphic Scale

    Graphic ScaleGraphic Scale

    Harriman Project No.

    PA / PE:

    Drawn By: Harriman Associatesc

    Proj North

    Plo

    t Dat

    e:

    Revision DescriptionRev Date

    APRIL 19, 2019

    4/23

    /201

    9 1:

    39:5

    2 PM

    BANGOR, MAINE

    18421

    M00.1

    CG

    JSL

    LEGEND & GENERALNOTES

    2019

    DOROTHEA DIXBUILDING K

    VENTILATION UPGRADES

    ABBREV DESCRIPTIONLAT LEAVING AIR TEMPERATURE

    LPCR LOW PRESSURE CONDENSATERETURN (LESS THAN 15 PSI)

    LPS LOW PRESSURE STEAM(LESS THAN15 PSI)LRA LOCKED ROTOR AMPSLSGV LOCK & SHIELD GATE VALVELWT LEAVING WATER TEMPERATURE

    M MOTORIZED DAMPERMAX MAXIMUMMBH 1000 BRITISH THERMAL UNITSMCA MINIMUM CIRCUIT AMPSMIN MINIMUM

    MOPD MAXIMUM OVERCURRENTPROTECTIVE DEVICE

    MPCR MEDIUM PRESSURE CONDENSATERETURN(16-30 PSIG)

    MPS MEDIUM PRESSURE STEAM (16-30PSIG)

    NA NOT APPLICABLENC NOISE CRITERIANIC NOT IN CONTRACTNO NORMALLY OPENNTS NOT TO SCALE

    OA OUTSIDE AIROC ON CENTEROED OPEN END DUCT

    OS&Y OUTSIDE SCREW & YOKE GATEVALVE

    PD PRESSURE DROPPRD PRESSURE RELIEF DAMPERPRV PRESSURE REDUCING VALVEPSI POUNDS PER SQUARE INCHPSIG POUNDS PER SQUARE INCH GAUGE

    RET RETURNRET RETURNRL REFRIGERANT LIQUIDRLA RATED LOAD AMPERESRPM REVOLUTIONS PER MINUTERS REFRIGERANT SUCTION

    S SMOKE DAMPERSP STATIC PRESSURESS STAINLESS STEELSUP SUPPLY

    TEMP TEMPERATURETT THERMOSTATIC TRAPTYP TYPICAL

    V VOLUME DAMPERVFD VARIABLE FREQUENCY DRIVE

    W/ WITHW/O WITHOUTWC WATER COLUMNWG WATER GAUGEWMS WELDED WIRE MESH SCREENWPD WATER PRESSURE DROP

    Z ZONE DAMPER

    PREFIX OF X EXISTING

    ABBREV DESCRIPTIONACV AUTOMATIC CONTROL VALVEAFF ABOVE FINISHED FLOORAFG ABOVE FINISHED GRADEALD ACOUSTICAL LINED DUCTAMS AIRFLOW MEASURING STATIONAPD AIR PRESSURE DROP

    ATC AUTOMATIC TEMPERATURECONTROL

    B BAROMETRIC DAMPERBD BACKDRAFT DAMPERBHP BRAKE HORSEPOWERBPD BYPASS DAMPERBTU BRITISH THERMAL UNITS

    CBD COUNTERBALANCED BACKDRAFTDAMPERCFM CUBIC FEET PER MINUTECHWR CHILLED WATER RETURNCHWS CHILLED WATER SUPPLYCO CLEANOUTCTE CONNECT TO EXISTINGCWR CONDENSER WATER RETURNCWS CONDENSER WATER SUPPLY

    DCW DOMESTIC COLD WATERDEG.F DEGREES FAHRENHEITDHW DOMESTIC HOT WATERDIA DIAMETERDN DOWN

    EAT ENTERING AIR TEMPERATUREESP EXTERNAL STATIC PRESSUREEWT ENTERING WATER TEMPERATUREEXG EXISTINGEXH EXHAUST

    F&T FLOAT & THERMOSTATIC TRAP

    F/S FIRE AND SMOKE COMBINATIONDAMPERFC FLEXIBLE CONNECTIONFD FIRE DAMPERFL FINNED LENGTH OF RADIATIONFM FLOW METERFOR FUEL OIL RETURNFOS FUEL OIL SUPPLYFPF FINS PER FOOTFPI FINS PER/INCHFPM FEET PER MINUTEFT FEETFT-HD FEET OF HEADFT-WG FEET WATER GAUGEFTR FIN TUBE RADIATOR

    GAL GALLONSGPM GALLONS PER MINUTE

    HP HORSEPOWER

    HPCR HIGH PRESSURE CONDENSATERETURN (OVER 30 PSIG)

    HPS HIGH PRESSURE STEAM (OVER30PSIG)HRR HEAT RECOVERY RETURNHRS HEAT RECOVERY SUPPLYHWR HOT WATER RETURNHWS HOT WATER SUPPLY

    IN INCHES

    GENERAL NOTES1. VISIT THE BUILDING SITE PRIOR TO BIDDING TO BECOME FAMILIAR WITH

    EXISTING CONDITIONS, AND TO TAKE MEASUREMENTS AS NECESSARY FORCOMPLETION OF THE WORK ASSOCIATED WITH THE DESIGN INTENT OF THECONTRACT DOCUMENTS.

    2. COORDINATE WORK OF MECHANICAL SUBCONTRACTOR WITH WORK OF OTHERTRADES.

    3. DUCTWORK, PIPING AND EQUIPMENT ARE INDICATED DIAGRAMMATICALLY.FIELD-VERIFY LOCATIONS.

    4. PRIOR TO FABRICATING DUCTWORK, COORDINATE WITH OTHER TRADES TOENSURE THAT THE DUCTWORK CAN BE INSTALLED WITH THE INDICATED SIZESAND LOCATIONS.FIELD-VERIFY EXISTING DUCT SIZES AND CONDITIONS.SUBMITANY DISCREPANCIES OR PROPOSED CHANGES.

    5. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR LOCATIONS OFCEILING DIFFUSERS AND REGISTERS.PROVIDE VOLUME DAMPERS SO THATEVERY REGISTER, GRILLE AND DIFFUSER (SUPPLY, RETURN, AND EXHAUST)CAN BE INDIVIDUALLY BALANCED.

    6. VERIFY INSTALLATION OF EXISTING VOLUME DAMPERS AT EACH BRANCH INEXISTING SUPPLY DUCT. PROVIDE ADDITIONAL VOLUME DAMPERS WHEREREQUIRED.

    7. LOCATE VOLUME DAMPERS AS FAR AWAY FROM REGISTERS, GRILLES ANDDIFFUSERS AS POSSIBLE TO MINIMIZE NOISE. LOCATE TO BE UNOBSTRUCTEDAND EASILY ACCESSIBLE FOR TESTING AND BALANCING. LOCATE POSSIBLE.WHERE VOLUME DAMPERS MUST BE LOCATED ABOVE HARD CEILINGS SUCH ASGYPSUM WALLBOARD, PROVIDE ACCESS PANELS AS SPECIFIED, AND NOTIFYTHE ARCHITECT OF SUCH LOCATIONS VERBALLY AND IN WRITING. OBTAINPERMISSION FROM THE ARCHITECT BEFORE INSTALLING ACCESS PANELS.

    8. DUCT ELBOWS SHALL BE LONG-RADIUS TYPE (THROAT RADIUS EQUAL TO ORGREATER THAN DUCT WIDTH IN THE PLANE OF THE TURN) WHEREVER SPACEALLOWS. IF SPACE IS NOT ADEQUATE, PROVIDE MITERED ELBOWS WITHTURNING VANES.

    9. PROVIDE 16 GAUGE SINGLE-THICKNESS TURNING VANES AT MITERED DUCTELBOWS. VANE EDGES (LEADING AND TRAILING) SHALL BE TANGENTIAL TOAIRFLOW.

    10. FLEXIBLE DUCT LENGTHS SHALL NOT EXCEED 5'-0"

    11. PAINT DUCTWORK VISIBLE THRU CEILING OPENINGS, DUCT OPENINGS, ANDREGISTERS, GRILLES, AND DIFFUSERS WITH BLACK PAINT IN ACCORDANCEWITH DIVISION 09 SECTION "PAINTING."

    12. MOUNT THERMOSTATS AND TEMPERATURE AND HUMIDITY SENSORS AT 48INCHES AFF TO TOP OF ITEM. PROVIDE ELECTRICAL WALL BOX ATTACHED TOFRAMING.

    13. WHERE THERMOSTATS/TEMPERATURE SENSORS ARE LOCATED NEAR LIGHTSWITCHES, INSTALL SO THAT LIGHT SWITCHES ARE NEARER TO THE DOORJAMBS. THE INTENT IS TO LOCATE THERMOSTATS/ TEMPERATURE SENSORS SOTHEY WILL NOT INTERFERE WITH ACCESSIBILITY OF LIGHT SWITCHES.

    14. PIPING INDICATED IN OUTSIDE WALLS SHALL BE RUN ON THE WARM SIDE OFBUILDING INSULATION AND VAPOR BARRIER. BUILDING INSULATION BEHINDSUCH PIPING SHALL BE CONTINUOUS, WITHOUT JOINTS OR GAPS.

    15. PIPING SHALL BE CONCEALED EXCEPT IN MECHANICAL ROOMS AND ASINDICATED. WHERE PIPES DROP IN BLOCK WALLS, PROVIDE 1/2" THICKINSULATION MINIMUM.

    16. SEAL DUCTWORK AND PIPING THRU MECHANICAL ROOM FLOORS ANDPARTITIONS, AND THRU FIRE-RATED ASSEMBLIES, WITH FIRESTOP MATERIAL ASSPECIFIED.

    17. A BUILDER'S RISK CERTIFICATE OF INSURANCE WILL BE FURNISHED TO THECONTRACTOR UPON REQUEST.

    18. THE FLOOR SLABS ARE 4" OF REINFORCED CONCRETE AND THE ROOF SLABALSO INCLUDES A 4" REINFORCED CONCRETE SLAB. HOWEVER, THERE IS ALSOCINDER CONCRETE APPLIED OVER THE ROOF SLABS AND THE CINDERCONCRETE IS PITCHED SO THE ELEVATION VARIES. CONTRACTOR TO REFER TOGENERAL FRAMIN NOTES B4/S60.1 - MISCELLANEOUS-NOTE 1: "CONTRACTORSHALL VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS BEFOREPROCEEDING WITH THE WORK".

    19. ALL OF THE VERTICAL AND HORIZONTAL DUCT IS EXPOSED ON THE 4TH FLOOR.

    20. THERE IS NO CURRENT WARRANTY ON THE BUILDING K ROOF.

    CONSTRUCTION DOCUMENTS

  • MD

    VD

    VD

    VD

    VDVD

    1 2 3 5 6 7 9 11 12 13

    L

    K

    J

    C17

    C25

    C23

    F

    E

    H

    C24

    B

    C

    D

    C26 C27

    C20

    9

    H

    12

    13

    K

    L

    11765321

    J

    C17

    C20

    C23

    9.54.5 4.9 9.2

    B

    7.26.2

    C17.3

    C19

    REMOVE CAP

    REMOVE DUCTLESS A/CIN ITS ENTIRETY

    REMOVE UNIT VENTILATORIN ITS ENTIRETY. CAP WALLOPENING OVER LOUVER.

    REMOVE UNIT VENTILATORIN ITS ENTIRETY. CAP WALLOPENING OVER LOUVER.

    REMOVE UNIT VENTILATORIN ITS ENTIRETY. CAP WALLOPENING OVER LOUVER.

    REMOVE CAP

    Graphic Scale

    AUBURN PORTLAND PORTSMOUTHBOSTON

    Graphic Scale

    Graphic ScaleGraphic Scale

    Graphic ScaleGraphic Scale

    Harriman Project No.

    PA / PE:

    Drawn By: Harriman Associatesc

    Proj North

    Plo

    t Dat

    e:

    Revision DescriptionRev Date

    APRIL 19, 2019

    4/23

    /201

    9 1:

    40:1

    5 PM

    BANGOR, MAINE

    18421

    M05.1

    CG

    JSL

    FIRST FLOORDEMOLITION DUCTWORK

    2019

    DOROTHEA DIXBUILDING K

    VENTILATION UPGRADES

    SCALE: 1/8" = 1'-0"1FIRST FLOOR DUCT DEMOLITION

    CONSTRUCTION DOCUMENTS

  • MD

    VD

    VD

    VD

    VDVD

    1 2 3 5 6 7 9 11 12 13

    L

    K

    J

    C17

    C25

    C23

    F

    E

    H

    C24

    B

    C

    D

    C26 C27

    C20

    9

    H

    12

    13

    K

    L

    11765321

    J

    C17

    C20

    C23

    9.54.5 4.9 9.2

    B

    7.26.2

    C17.3

    C19

    REMOVE CAP

    REMOVE DUCTLESS A/CIN ITS ENTIRETY

    REMOVE UNIT VENTILATORIN ITS ENTIRETY. CAP WALLOPENING OVER LOUVER.

    REMOVE UNIT VENTILATORIN ITS ENTIRETY. CAP WALLOPENING OVER LOUVER.

    REMOVE UNIT VENTILATORIN ITS ENTIRETY. CAP WALLOPENING OVER LOUVER.

    REMOVE CAP

    Graphic Scale

    AUBURN PORTLAND PORTSMOUTHBOSTON

    Graphic Scale

    Graphic ScaleGraphic Scale

    Graphic ScaleGraphic Scale

    Harriman Project No.

    PA / PE:

    Drawn By: Harriman Associatesc

    Proj North

    Plo

    t Dat

    e:

    Revision DescriptionRev Date

    APRIL 19, 2019

    4/23

    /201

    9 1:

    40:3

    9 PM

    BANGOR, MAINE

    18421

    M05.2

    CG

    JSL

    SECOND FLOORDEMOLITION DUCTWORK

    2019

    DOROTHEA DIXBUILDING K

    VENTILATION UPGRADES

    SCALE: 1/8" = 1'-0"1SECOND FLOOR DUCT DEMOLITION

    CONSTRUCTION DOCUMENTS

  • MD

    MD

    VD VD VD

    VD VD

    VD

    VD

    VD

    1 2 3 5 6 7 9 11 12 13

    L

    K

    J

    C17

    C25

    C23

    F

    E

    H

    C24

    B

    C

    D

    C26 C27

    C20

    9

    H

    12

    13

    K

    L

    11765321

    J

    C17

    C20

    C23

    9.54.5 4.9 9.2

    B

    7.26.2

    C17.3

    C19

    REMOVE DUCT

    REMOVE CAP

    REMOVE DUCTLESS A/CIN ITS ENTIRETY

    REMOVE DUCTLESS A/CIN ITS ENTIRETY

    1M30.1

    2M30.1

    3M30.1

    REMOVE DUCT

    Graphic Scale

    AUBURN PORTLAND PORTSMOUTHBOSTON

    Graphic Scale

    Graphic ScaleGraphic Scale

    Graphic ScaleGraphic Scale

    Harriman Project No.

    PA / PE:

    Drawn By: Harriman Associatesc

    Proj North

    Plo

    t Dat

    e:

    Revision DescriptionRev Date

    APRIL 19, 2019

    4/23

    /201

    9 1:

    41:0

    2 PM

    BANGOR, MAINE

    18421

    M05.3

    CG

    JSL

    THIRD FLOORDEMOLITION DUCTWORK

    2019

    DOROTHEA DIXBUILDING K

    VENTILATION UPGRADES

    SCALE: 1/8" = 1'-0"1THIRD FLOOR DUCT DEMOLITION

    CONSTRUCTION DOCUMENTS

  • TSTSTSTSTSTS

    TS

    TS TS

    TSTS

    TS

    TS

    TSTS

    TS

    TS

    TS

    TSTS

    TSTS

    TS

    TS TS

    TSTS

    TSTS

    1 2 3 5 6 7 9 11 12 13

    L

    K

    J

    C17

    C25

    C23

    F

    E

    H

    C24

    B

    C

    D

    C26 C27

    C20

    9

    H

    12

    13

    K

    L

    11765321

    J

    C17

    C20

    C23

    9.54.5 4.9 9.2

    B

    7.26.2

    C17.3

    C19

    REMOVE UNIT VENTILATORIN ITS ENTIRETY. PIPINGCONNECTIONS TO BE REUSED.

    REMOVE UNIT VENTILATORIN ITS ENTIRETY. PIPINGCONNECTIONS TO BE REUSED.

    REMOVE UNIT VENTILATORIN ITS ENTIRETY. PIPINGCONNECTIONS TO BE REUSED.

    REMOVE DUCTLESS A/CIN ITS ENTIRETY ALONGWITH CONDENSING UNIT,ASSOCIATED PIPING,CONTROLS & ACCESSORIESUNDER ALTERNATE #1.

    REMOVECAP

    Graphic Scale

    AUBURN PORTLAND PORTSMOUTHBOSTON

    Graphic Scale

    Graphic ScaleGraphic Scale

    Graphic ScaleGraphic Scale

    Harriman Project No.

    PA / PE:

    Drawn By: Harriman Associatesc

    Proj North

    Plo

    t Dat

    e:

    Revision DescriptionRev Date

    APRIL 19, 2019

    4/23

    /201

    9 1:

    41:2

    6 PM

    BANGOR, MAINE

    18421

    M06.1

    CG

    JSL

    FIRST FLOORDEMOLITION PIPING

    2019

    DOROTHEA DIXBUILDING K

    VENTILATION UPGRADES

    SCALE: 1/8" = 1'-0"1FIRST FLOOR PIPING DEMOLITION

    CONSTRUCTION DOCUMENTS

  • TSTSTS

    TS

    TSTS

    TS

    TS TS

    TSTS

    TS

    TS

    TS

    TSTS

    TSTS

    TSTS

    TSTS

    TS TS

    TS

    TS

    TS

    TS

    1 2 3 5 6 7 9 11 12 13

    L

    K

    J

    C17

    C25

    C23

    F

    E

    H

    C24

    B

    C

    D

    C26 C27

    C20

    9

    H

    12

    13

    K

    L

    11765321

    J

    C17

    C20

    C23

    9.54.5 4.9 9.2

    B

    7.26.2

    C17.3

    C19

    REMOVECAP

    REMOVE UNIT VENTILATORIN ITS ENTIRETY. PIPINGCONNECTIONS TO BE REUSED.

    REMOVE UNIT VENTILATORIN ITS ENTIRETY. PIPINGCONNECTIONS TO BE REUSED.

    REMOVE UNIT VENTILATORIN ITS ENTIRETY. PIPINGCONNECTIONS TO BE REUSED.

    REMOVE DUCTLESS A/CIN ITS ENTIRETY ALONGWITH CONDENSING UNIT,ASSOCIATED PIPING,CONTROLS & ACCESSORIESUNDER ALTERNATE #1.

    Graphic Scale

    AUBURN PORTLAND PORTSMOUTHBOSTON

    Graphic Scale

    Graphic ScaleGraphic Scale

    Graphic ScaleGraphic Scale

    Harriman Project No.

    PA / PE:

    Drawn By: Harriman Associatesc

    Proj North

    Plo

    t Dat

    e:

    Revision DescriptionRev Date

    APRIL 19, 2019

    4/23

    /201

    9 1:

    41:4

    5 PM

    BANGOR, MAINE

    18421

    M06.2

    CG

    JSL

    SECOND FLOORDEMOLITION PIPING

    2019

    DOROTHEA DIXBUILDING K

    VENTILATION UPGRADES

    SCALE: 1/8" = 1'-0"1SECOND FLOOR PIPING DEMOLITION

    CONSTRUCTION DOCUMENTS

  • TS

    TS

    TS

    1 2 3 5 6 7 9 11 12 13

    L

    K

    J

    C17

    C25

    C23

    F

    E

    H

    C24

    B

    C

    D

    C26 C27

    C20

    9

    H

    12

    13

    K

    L

    11765321

    J

    C17

    C20

    C23

    9.54.5 4.9 9.2

    B

    7.26.2

    C17.3

    C19

    REMOVE DUCTLESS A/CIN ITS ENTIRETY ALONGWITH CONDENSING UNIT,ASSOCIATED PIPING,CONTROLS & ACCESSORIESUNDER ALTERNATE #1.

    REMOVE DUCTLESS A/CIN ITS ENTIRETY ALONGWITH CONDENSING UNIT,ASSOCIATED PIPING,CONTROLS & ACCESSORIESUNDER ALTERNATE #1.

    1M30.1

    2M30.1

    3M30.1

    Graphic Scale

    AUBURN PORTLAND PORTSMOUTHBOSTON

    Graphic Scale

    Graphic ScaleGraphic Scale

    Graphic ScaleGraphic Scale

    Harriman Project No.

    PA / PE:

    Drawn By: Harriman Associatesc

    Proj North

    Plo

    t Dat

    e:

    Revision DescriptionRev Date

    APRIL 19, 2019

    4/23

    /201

    9 1:

    42:1

    2 PM

    BANGOR, MAINE

    18421

    M06.3

    CG

    JSL

    THIRD FLOORDEMOLITION PIPING

    2019

    DOROTHEA DIXBUILDING K

    VENTILATION UPGRADES

    SCALE: 1/8" = 1'-0"1THIRD FLOOR PIPING DEMOLITION

    CONSTRUCTION DOCUMENTS

  • MD

    VD

    VD

    VD

    VDVD

    V

    V

    V

    V

    1 2 3 5 6 7 9 11 12 13

    L

    K

    J

    C17

    C25

    C23

    F

    E

    H

    C24

    B

    C

    D

    C26 C27

    C20

    9

    H

    12

    13

    K

    L

    11765321

    J

    C17

    C20

    C23

    9.54.5 4.9 9.2

    B

    7.26.2

    C17.3

    C19

    24"x10"

    24"x10" UP

    24"x10" UP

    BALANCE TO1400 CFM

    BALANCE TO1400 CFM

    AC1-3

    12"x

    8"

    12"x

    8"

    R1400

    1 S1400

    1

    NOTE: SCOPE OF WORK INCLUDINGDUCTWORK, GRILLES, AND ACCESSORIESFOR AC1-3 SHALL BE PRICED UNDERALTERNATE #1.

    24"x

    10"

    Graphic Scale

    AUBURN PORTLAND PORTSMOUTHBOSTON

    Graphic Scale

    Graphic ScaleGraphic Scale

    Graphic ScaleGraphic Scale

    Harriman Project No.

    PA / PE:

    Drawn By: Harriman Associatesc

    Proj North

    Plo

    t Dat

    e:

    Revision DescriptionRev Date

    APRIL 19, 2019

    4/23

    /201

    9 1:

    42:3

    4 PM

    BANGOR, MAINE

    18421

    M10.1

    CG

    JSL

    FIRST FLOOR DUCTWORK

    2019

    DOROTHEA DIXBUILDING K

    VENTILATION UPGRADES

    SCALE: 1/8" = 1'-0"1FIRST FLOOR DUCT PLAN

    CONSTRUCTION DOCUMENTS

  • MD

    VD

    VD

    VD

    VDVD

    V

    V

    V

    V

    1 2 3 5 6 7 9 11 12 13

    L

    K

    J

    C17

    C25

    C23

    F

    E

    H

    C24

    B

    C

    D

    C26 C27

    C20

    9

    H

    12

    13

    K

    L

    11765321

    J

    C17

    C20

    C23

    9.54.5 4.9 9.2

    B

    7.26.2

    C17.3

    C19

    24"x10"

    24"x16" UP,24"x10" DOWN

    24"x16" UP,24"x10" DOWN

    BALANCE TO1400 CFM

    BALANCE TO1400 CFM

    AC2-3

    12"x

    8"

    12"x

    8"

    FIRE DAMPER AT FLOOR LEVELWITH ACCESS DOOR IN DUCT

    FIRE DAMPER AT FLOOR LEVELWITH ACCESS DOOR IN DUCT

    PROVIDE TAMPER RESISTANTACCESS DOOR IN CHASE

    PROVIDE TAMPER RESISTANTACCESS DOOR IN CHASE

    R1400

    1 S1400

    1

    NOTE: SCOPE OF WORK INCLUDINGDUCTWORK, GRILLES, AND ACCESSORIESFOR AC2-3 SHALL BE PRICED UNDERALTERNATE #1.

    24"x

    10"

    Graphic Scale

    AUBURN PORTLAND PORTSMOUTHBOSTON

    Graphic Scale

    Graphic ScaleGraphic Scale

    Graphic ScaleGraphic Scale

    Harriman Project No.

    PA / PE:

    Drawn By: Harriman Associatesc

    Proj North

    Plo

    t Dat

    e:

    Revision DescriptionRev Date

    APRIL 19, 2019

    4/23

    /201

    9 1:

    43:0

    2 PM

    BANGOR, MAINE

    18421

    M10.2

    CG

    JSL

    SECOND FLOORDUCTWORK

    2019

    DOROTHEA DIXBUILDING K

    VENTILATION UPGRADES

    SCALE: 1/8" = 1'-0"1SECOND FLOOR DUCT PLAN

    CONSTRUCTION DOCUMENTS

  • MD

    MD

    VD VD VD

    VD VD

    VD

    VD

    VD

    V

    V

    V V

    V V

    1 2 3 5 6 7 9 11 12 13

    L

    K

    J

    C17

    C25

    C23

    F

    E

    H

    C24

    B

    C

    D

    C26 C27

    C20

    9

    H

    12

    13

    K

    L

    11765321

    J

    C17

    C20

    C23

    9.54.5 4.9 9.2

    B

    7.26.2

    C17.3

    C19

    24"x20" UP,24"x16" DOWN

    24"x20" UP,24"x16" DOWN

    BALANCE TO1200 CFM

    BALANCE TO1200 CFM

    AC3-4AC3-5

    10"x

    8"

    10"x

    8"

    10"x

    8"

    10"x

    8"

    FIRE DAMPER AT FLOOR LEVELWITH ACCESS DOOR IN DUCT

    FIRE DAMPER AT FLOOR LEVELWITH ACCESS DOOR IN DUCT

    PROVIDE TAMPER RESISTANTACCESS DOOR IN CHASE

    PROVIDE TAMPER RESISTANTACCESS DOOR IN CHASE

    R1300

    1

    S1300

    1

    R1300

    1

    S1300

    1

    1M30.1

    2M30.1

    3M30.1

    NOTE: SCOPE OF WORK INCLUDINGDUCTWORK, GRILLES, AND ACCESSORIESFOR AC3-4 & AC3-5 SHALL BE PRICEDUNDER ALTERNATE #1.

    24"x10"

    24"x

    10"

    CAP

    Graphic Scale

    AUBURN PORTLAND PORTSMOUTHBOSTON

    Graphic Scale

    Graphic ScaleGraphic Scale

    Graphic ScaleGraphic Scale

    Harriman Project No.

    PA / PE:

    Drawn By: Harriman Associatesc

    Proj North

    Plo

    t Dat

    e:

    Revision DescriptionRev Date

    APRIL 19, 2019

    4/23

    /201

    9 1:

    43:3

    1 PM

    BANGOR, MAINE

    18421

    M10.3

    CG

    JSL

    THIRD FLOOR DUCTWORK

    2019

    DOROTHEA DIXBUILDING K

    VENTILATION UPGRADES

    SCALE: 1/8" = 1'-0"1THIRD FLOOR DUCT PLAN

    CONSTRUCTION DOCUMENTS

  • DS

    DS

    1 2 3 5 6 7 9 11 12 13

    L

    K

    J

    C17

    C25

    C23

    F

    E

    H

    C24

    B

    C

    D

    C26 C27

    C20

    9

    H

    12

    13

    K

    L

    11765321

    J

    C17

    C20

    C23

    9.54.5 4.9 9.2

    B

    7.26.2

    C17.3

    C19OUTLINE OF ERV-1ON ROOF ABOVE

    20"x

    24"

    20"x24"20"x24" DOWN

    24"x

    20"

    24"x20"

    24"x20" DOWN

    FIRE DAMPER AT FLOOR LEVELWITH ACCESS DOOR IN DUCT

    FIRE DAMPER AT FLOOR LEVELWITH ACCESS DOOR IN DUCT

    DUCT SMOKEDETECTOR

    DUCT SMOKEDETECTOR

    1M30.1

    2M30.1

    3M30.1

    Graphic Scale

    AUBURN PORTLAND PORTSMOUTHBOSTON

    Graphic Scale

    Graphic ScaleGraphic Scale

    Graphic ScaleGraphic Scale

    Harriman Project No.

    PA / PE:

    Drawn By: Harriman Associatesc

    Proj North

    Plo

    t Dat

    e:

    Revision DescriptionRev Date

    APRIL 19, 2019

    4/23

    /201

    9 1:

    43:5

    8 PM

    BANGOR, MAINE

    18421

    M10.4

    CG

    JSL

    FOURTH FLOORDUCTWORK

    2019

    DOROTHEA DIXBUILDING K

    VENTILATION UPGRADES

    SCALE: 1/8" = 1'-0"1FOURTH FLOOR DUCT PLAN

    CONSTRUCTION DOCUMENTS

  • TSTSTSTSTS

    TS

    TS TS

    TSTS

    TS

    TS

    TSTS

    TS

    TS

    TS

    TSTS

    TSTS

    TS

    TS TS

    TSTS

    TS

    TS

    T

    1 2 3 5 6 7 9 11 12 13

    L

    K

    J

    C17

    C25

    C23

    F

    E

    H

    C24

    B

    C

    D

    C26 C27

    C20

    9

    H

    12

    13

    K

    L

    11765321

    J

    C17

    C20

    C23

    9.54.5 4.9 9.2

    B

    7.26.2

    C17.3

    C19

    BSB1-3

    AC1-31/2" SUCTION,1/4" LIQUID

    3/4" CONDENSATEDRAIN

    3/8"

    1/2"

    5/8"

    NOTE: SCOPE OF WORK ASSOCIATED WITH BSB1-3& AC1-3 SHALL BE PRICED UNDER ALTERNATE #1.

    A 5' - 0" FL0.7 GPM

    A 5' - 0" FL0.7 GPM

    A 5' - 0" FL0.7 GPM

    7.15 MBH

    7.15 MBH

    7.15 MBH

    3/4" LPC RUNUNDER ELEMENT

    3/4" LPC RUNUNDER ELEMENT

    3/4" LPC RUNUNDER ELEMENT

    3/4" LPS OFFSETWITHIN CHASE

    3/4" LPS OFFSETWITHIN CHASE

    3/4" LPS OFFSETWITHIN CHASE

    WIRE CONTROL VALVETO EXISTING THERMOSTAT

    WIRE CONTROL VALVETO EXISTING THERMOSTAT

    WIRE CONTROL VALVETO EXISTING THERMOSTAT

    Graphic Scale

    AUBURN PORTLAND PORTSMOUTHBOSTON

    Graphic Scale

    Graphic ScaleGraphic Scale

    Graphic ScaleGraphic Scale

    Harriman Project No.

    PA / PE:

    Drawn By: Harriman Associatesc

    Proj North

    Plo

    t Dat

    e:

    Revision DescriptionRev Date

    APRIL 19, 2019

    4/23

    /201

    9 1:

    44:2

    0 PM

    BANGOR, MAINE

    18421

    M20.1

    CG

    JSL

    FIRST FLOOR PIPING

    2019

    DOROTHEA DIXBUILDING K

    VENTILATION UPGRADES

    SCALE: 1/8" = 1'-0"1FIRST FLOOR PIPING PLAN

    CONSTRUCTION DOCUMENTS

  • TSTSTSTSTS

    TS

    TS TS

    TSTS

    TSTS

    TS

    TSTS

    TSTS

    TSTS

    TSTS

    TS TS

    TS

    TS

    TS

    TST

    1 2 3 5 6 7 9 11 12 13

    L

    K

    J

    C17

    C25

    C23

    F

    E

    H

    C24

    B

    C

    D

    C26 C27

    C20

    9

    H

    12

    13

    K

    L

    11765321

    J

    C17

    C20

    C23

    9.54.5 4.9 9.2

    B

    7.26.2

    C17.3

    C19

    BSB2-3

    AC2-3

    1/2" SUCTION,1/4" LIQUID

    3/4" CONDENSATEDRAIN

    3/8"

    1/2"

    5/8"

    NOTE: SCOPE OF WORK ASSOCIATED WITH BSB2-3& AC2-3 SHALL BE PRICED UNDER ALTERNATE #1.

    A 5' - 0" FL0.7 GPM

    A 5' - 0" FL0.7 GPM

    A 5' - 0" FL0.7 GPM

    7.15 MBH

    7.15 MBH

    7.15 MBH

    3/4" LPS OFFSETWITHIN CHASE

    3/4" LPC RUNUNDER ELEMENT

    3/4" LPC RUNUNDER ELEMENT

    3/4" LPS OFFSETWITHIN CHASE

    3/4" LPS OFFSETWITHIN CHASE

    3/4" LPC RUNUNDER ELEMENT

    WIRE CONTROL VALVETO EXISTING THERMOSTAT

    WIRE CONTROL VALVETO EXISTING THERMOSTAT

    WIRE CONTROL VALVETO EXISTING THERMOSTAT

    Graphic Scale

    AUBURN PORTLAND PORTSMOUTHBOSTON

    Graphic Scale

    Graphic ScaleGraphic Scale

    Graphic ScaleGraphic Scale

    Harriman Project No.

    PA / PE:

    Drawn By: Harriman Associatesc

    Proj North

    Plo

    t Dat

    e:

    Revision DescriptionRev Date

    APRIL 19, 2019

    4/23

    /201

    9 1:

    44:4

    7 PM

    BANGOR, MAINE

    18421

    M20.2

    CG

    JSL

    SECOND FLOOR PIPING

    2019

    DOROTHEA DIXBUILDING K

    VENTILATION UPGRADES

    SCALE: 1/8" = 1'-0"1SECOND FLOOR PIPING PLAN

    CONSTRUCTION DOCUMENTS

  • TS

    TS

    TS

    T T

    1 2 3 5 6 7 9 11 12 13

    L

    K

    J

    C17

    C25

    C23

    F

    E

    H

    C24

    B

    C

    D

    C26 C27

    C20

    9

    H

    12

    13

    K

    L

    11765321

    J

    C17

    C20

    C23

    9.54.5 4.9 9.2

    B

    7.26.2

    C17.3

    C19

    BSB3-2

    AC3-4BSB3-3

    AC3-5

    1/2" SUCTION,1/4" LIQUID

    1/2" SUCTION,1/4" LIQUID

    3/4" CONDENSATEDRAIN

    3/8"

    1/2"

    5/8"

    3/8"

    1/2"

    5/8"

    NOTE: SCOPE OF WORK ASSOCIATED WITH BSB3-2, BSB3-3,AC3-4 & AC3-5 SHALL BE PRICED UNDER ALTERNATE #1.

    NOTE: BASEBOARD RADIATIONBEING REPLACED UNDER A SEPARATE PROJECT

    NOTE: BASEBOARD RADIATIONBEING REPLACED UNDER A SEPARATE PROJECT

    1M30.1

    2M30.1

    3M30.1

    Graphic Scale

    AUBURN PORTLAND PORTSMOUTHBOSTON

    Graphic Scale

    Graphic ScaleGraphic Scale

    Graphic ScaleGraphic Scale

    Harriman Project No.

    PA / PE:

    Drawn By: Harriman Associatesc

    Proj North

    Plo

    t Dat

    e:

    Revision DescriptionRev Date

    APRIL 19, 2019

    4/23

    /201

    9 1:

    45:1

    6 PM

    BANGOR, MAINE

    18421

    M20.3

    CG

    JSL

    THIRD FLOOR PIPING

    2019

    DOROTHEA DIXBUILDING K

    VENTILATION UPGRADES

    SCALE: 1/8" = 1'-0"1THIRD FLOOR PIPING PLAN

    CONSTRUCTION DOCUMENTS

  • 1 2 3 5 6 7 9 11 12 13

    L

    K

    J

    C17

    C25

    C23

    F

    E

    H

    C24

    B

    C

    D

    C26 C27

    C20

    9

    H

    12

    13

    K

    L

    11765321

    J

    C17

    C20

    C23

    9.54.5 4.9 9.2

    B

    7.26.2

    C17.3

    C19

    CONNECT 1" LPS TOEXISTING LPS RISER

    CONNECT 3/4" LPC TOEXISTING LPC RISER

    1 1/4" GLYCOLHWS

    1 1/4" GLYCOLHWR

    AIR SCOOP EQUAL TO TACO #432AND EXPANSION TANK EQUAL TOAMTROL ST-12-C

    HX-1

    P-1

    OUTLINE OF ERV-1ON ROOF ABOVE

    1 1/4" GLYCOL HWS &1 1/4" GLYCOL HWR UPTO ERV-1 ON ROOF 1

    M30.1

    2M30.1

    3M30.1

    Graphic Scale

    AUBURN PORTLAND PORTSMOUTHBOSTON

    Graphic Scale

    Graphic ScaleGraphic Scale

    Graphic ScaleGraphic Scale

    Harriman Project No.

    PA / PE:

    Drawn By: Harriman Associatesc

    Proj North

    Plo

    t Dat

    e:

    Revision DescriptionRev Date

    APRIL 19, 2019

    4/23

    /201

    9 1:

    45:4

    4 PM

    BANGOR, MAINE

    18421

    M20.4

    CG

    JSL

    FOURTH FLOOR PIPING

    2019

    DOROTHEA DIXBUILDING K

    VENTILATION UPGRADES

    SCALE: 1/8" = 1'-0"1FOURTH FLOOR PIPING PLAN

    CONSTRUCTION DOCUMENTS

  • C17

    C20

    4 T/STL34'-0"

    ROOF T/STL46'-0"

    C17 C20C17.3 C19

    ERV-1

    2M30.1

    SUPPLY DUCT EXHAUST DUCT

    3M30.1

    4 T/STL34'-0"

    ROOF T/STL46'-0"

    76 7.26.2

    1M30.1

    ERV-1

    EXHAUST DUCT

    C24C279

    4 T/STL34'-0"

    ROOF T/STL46'-0"

    76 9.59.27.26.2

    1M30.1

    ERV-1

    SUPPLY DUCT

    P-1

    HX-1

    EXPANSION TANK

    AIR SCOOP

    DUCT SMOKEDETECTOR

    NOZZLE CONNECTIONS AREINDICATED SCHEMATICALLY.FIELD VERIFY CONNECTION

    LOCATIONS AND FLOW DIRECTIONON HEAT EXCHANGER PER MFR'S

    INSTRUCTIONS

    BALL VALVE WITH HOSEEND CONNECTIONFOR GLYCOL FEED

    1/4" MIN.GAUGE

    W

    G

    F2

    F1

    V

    W

    G

    F3

    F4

    STEAMCONTROL VALVE

    LPS

    GLYCOL HWS

    GLYCOL HWR

    T

    T

    P

    PUMP P-1

    NOTES:1. CONTROL VALVES SHALL HAVE THREADED OR FLANGED BODIES.

    ASME PRESSURE RELIEFVALVE, PIPE FULL SIZETO 6" AFF

    AUTOMATIC AIR VENTEQUAL TO AMTROL 700

    STEAM TRAP (TYP.)

    EXPANSION TANK

    V

    AIR SCOOP

    COMBINATIONPRESSURE REDUCINGVALVE & FAST FILLEQUAL TO B&G FB-38TU COLD WATER MAKEUP

    1/2"

    HEAT EXCHANGER HX-1LPC

    FLOOR

    MIN 1 1/2" x 1 1/2" x 1/8"ANGLE IRON FASTENED TO

    SLEEVE ON ALL FOUR SIDESWITH 1/4" DIA. BOLTS & NUTS 8" O.C

    18 GAUGE MIN DUCTADAPTER COLLAR

    DUCT ACCESS DOOR, 12"x12" MINIMUM EXCEPT WHERE SMALLER SIZE IS

    REQUIRED IF DUCT'S LARGEST DIMENSION IS

    TOO SMALL

    S-SLIP BREAKAWAYDUCT CONNECTION

    NOTE: INSTALLATION & MATERIALSSHALL CONFORM WITH U.L. & NFPA REQUIREMENTS

    18 GAUGE MIN.DUCT SLEEVE

    TYPE B UL RATED FIREDAMPER. DAMPER RATING SHALL NOT BE LESS THAN WALL RATING

    AD

    RADIATION ENCLOSURE

    STEAMSUPPLY

    DN CONDENSATERETURN

    FIN. FLOOR

    1/2" TT

    PITCH

    COORDINATE TO INSURE THATVALES, PIPING, UNIONS, AND

    TRAPS FIT INSIDE ENCLOSURE.

    Graphic Scale

    AUBURN PORTLAND PORTSMOUTHBOSTON

    Graphic Scale

    Graphic ScaleGraphic Scale

    Graphic ScaleGraphic Scale

    Harriman Project No.

    PA / PE:

    Drawn By: Harriman Associatesc

    Proj North

    Plo

    t Dat

    e:

    Revision DescriptionRev Date

    APRIL 19, 2019

    4/23

    /201

    9 1:

    46:1

    1 PM

    BANGOR, MAINE

    18421

    M30.1

    CG

    JSL

    DETAILS AND SECTIONS

    2019

    DOROTHEA DIXBUILDING K

    VENTILATION UPGRADES

    SCALE: 1/2" = 1'-0"1SECTION 1

    SCALE: 1/2" = 1'-0"2SECTION 2

    SCALE: 1/2" = 1'-0"3SECTION 3

    NO SCALE4STEAM TO HOT WATER HEATING SYSTEM DETAIL

    NO SCALE5FIRE DAMPER IN FLOOR

    NO SCALE6STEAM RADIATION BASEBOARD

    CONSTRUCTION DOCUMENTS

  • Graphic Scale

    AUBURN PORTLAND PORTSMOUTHBOSTON

    Graphic Scale

    Graphic ScaleGraphic Scale

    Graphic ScaleGraphic Scale

    Harriman Project No.

    PA / PE:

    Drawn By: Harriman Associatesc

    Proj North

    Plo

    t Dat

    e:

    Revision DescriptionRev Date

    APRIL 19, 2019

    4/23

    /201

    9 1:

    46:3

    9 PM

    BANGOR, MAINE

    18421

    M40.1

    CG

    JSL

    SCHEDULES

    2019

    DOROTHEA DIXBUILDING K

    VENTILATION UPGRADES

    VRV SCHEDULE

    TAG MANUFACTURER MODEL

    TOTALHEATING

    CAPACITY(MBH)

    TOTALCOOLINGCAPACITY

    (MBH)

    TOTALSENSIBLECAPACITY

    (MBH)

    DIMENSIONS(W x H x D)

    inMOUNTING

    TYPE

    ELECTRICAL

    NOTESMOPD PHASE VOLTSAC1-3 Daikin FXMQ12PBVJU 13.5 12 9.7 27.5x12x27.5 HUNG FROM

    STRUCTURE15 1 208 V 1.4 MCA

    AC2-3 Daikin FXMQ12PBVJU 13.5 12 9.7 27.5x12x27.5 HUNG FROMSTRUCTURE

    15 1 208 V 1.4 MCA

    AC3-4 Daikin FXMQ07PBVJU 8.5 7.2 6.4 21.5x12x27.5 HUNG FROMSTRUCTURE

    15 1 208 V 0.6 MCA

    AC3-5 Daikin FXMQ07PBVJU 8.5 7.2 6.4 21.5x12x27.5 HUNG FROMSTRUCTURE

    15 1 208 V 0.6 MCA

    BSB1-3 DAIKIN AC (AMERICAS), INC. BSQ36TVJ N/A N/A N/A 15x8x13 HUNG FROMSTRUCTURE

    15 1 208 V 0.1 MCA

    BSB2-3 DAIKIN AC (AMERICAS), INC. BSQ36TVJ N/A N/A N/A 15x8x13 HUNG FROMSTRUCTURE

    15 1 208 V 0.1 MCA

    BSB3-2 DAIKIN AC (AMERICAS), INC. BSQ36TVJ N/A N/A N/A 15x8x13 HUNG FROMSTRUCTURE

    15 1 208 V 0.1 MCA

    BSB3-3 DAIKIN AC (AMERICAS), INC. BSQ36TVJ N/A N/A N/A 15x8x13 HUNG FROMSTRUCTURE

    15 1 208 V 0.1 MCA

    FINTUBE RADIATION SCHEDULE

    TAG MANUFACTURER MODELPIPE SIZE

    (IN.)CAPACITY

    BTU/FT

    FINDIMENSIONS WxH (IN) FPF ROWS

    ENCLOSUREDIMENSIONS

    W x H (IN.) NOTESA STERLING GUARDIAN GSBS-P, C3/4 435 3/4" 1430 3-1/4" SQ. 50 1 5-5/16"x 12" STEAM

    REGISTERS, GRILLES & DIFFUSERS SCHEDULETAG MANUFACTURER MODEL TYPE

    NECKSIZE (IN)

    DIRECTIONOF BLOW MAX NC MAX SP DAMPER FINISH BORDER NOTES

    R1 PRICE INDUSTRIES MSRRP SECURITY 12 x 12 N/A 20 0.09 in-wg NONE BAKED ENAMELWHITE

    SURFACEMOUNT

    1/ S1

    HEAT EXCHANGER SCHEDULE

    TAG MANUFACTURER MODEL SERVICECAPACITY(MBTUH)

    STEAM GLYCOL HOT WATER

    NOTES

    STEAMFLOW

    (LB/HR)

    INLETTEMP.

    (DEG. F)

    OUTLETTEMP

    (DEG. F)

    OPERATINGPRESSURE

    (PSI)EWT

    (DEG.F)LWT

    (DEG.F)FLOW(GPM)

    FLUIDTYPE

    HX-1 BELL & GOSSETT BP405-20 ERV-1 200 209 239 239 10 140 183 10 30% PG

    PUMP SCHEDULE

    TAG MANUFACTURER MODEL SERVICEFLOW(GPM)

    HEAD(FT.WG)

    SUCTIONFLANGE

    (IN)SPEED(RPM)

    ELECTRICMOTOR

    CONTROL NOTESHP PHASE VOLTSP-1 Taco 0013 ERV-1 10.0 GPM 20 1 1/4" 3250 0.17 1 115 V STARTER

    ENERGY RECOVERY VENTILATOR SCHEDULE

    TAG MFR MODEL

    SUPPLYAIR FLOW

    (CFM)

    SUPPLYEXT SP

    (IN)SUPPLY

    HP

    EXHAUSTAIR FLOW

    (CFM)

    EXHAUSTEXT SP

    (IN)EXHAUST

    HP

    OUTDOOR AIR INDOOR AIR SUPPLY AIR ELECTRICAL FILTER

    WEIGHT(LBS) NOTES

    SUMMERDB

    (DEG.F)

    SUMMERWB

    (DEG.F)

    WINTERDB

    (DEG.F)

    WINTERWB

    (DEG.F)

    SUMMERDB

    (DEG.F)

    SUMMERRH(%)

    WINTERDB

    (DEG.F)

    WINTERRH(%)

    SUMMERDB

    (DEG.F)

    SUMMERWB

    (DEG.F)

    WINTERDB

    (DEG.F)

    WINTERWB

    (DEG.F) VOLTS PHASE MCA EFF'YERV-1 DAIKIN DPS010A 4000 1 4 4000 1 4 90 °F 74 °F -10 °F -10 °F 75 °F 62 70 °F 20 81 °F 67 °F 36 °F 29 °F 208 V 3 53.5 MERV 8 1.00 lb/ft³2490 LBS

    CONSTRUCTION DOCUMENTS

  • REF:A1

    --

    1.

    2.

    3.

    4.

    5.

    6.

    7.

    8.

    UNLESS OTHERWISE NOTED, WIRING SHALL BE 2#12 AWG

    CONDUCTORS & #12 GND. HOMERUNS FED FROM 20A, SINGLE

    POLE CIRCUITS IN EXCESS OF 100 FEET SHALL BE #10 AWG

    UNLESS INDICATED OTHERWISE. INSULATION TYPE SHALL BE

    THHN/TWHN, 75 DEG. C, AND 600V CLASS UNLESS SPECIFIED

    OTHERWISE.

    FLEXIBLE CONNECTIONS TO MOTORS SHALL BE

    FLEXIBLE LIQUID TIGHT CONDUIT.

    9.

    10.

    11.

    12.

    13.

    14.

    15.

    16.

    17.

    UNLESS OTHERWISE NOTED, ALL WIRING SHALL

    BE 600V, COPPER WITH THHN-THWN INSULATION.

    WHERE A DISCREPANCY OCCURS BETWEEN THE

    DRAWINGS AND THE SPECIFICATIONS, THE

    SPECIFICATIONS SHALL PREVAIL. CONTACT THE

    ENGINEER FOR CLARIFICAION WHEN SUCH A

    SITUATION OCCURS.

    WHERE IT IS INDICATED THAT EXISTING WIRING

    IS TO BE REUSED, THE ELECTRICAL SUBCONTRACTOR

    SHALL VERIFY THAT THE INTEGRITY OF THE INSULATION

    IS ADEQUATE FOR REUSE. ALL SUSPECT WIRING SHALL

    BE REPLACED BY THE SUBCONTRACTOR.

    NOTES

    FIRE ALARM RED

    BLUE

    SIGNAL (NURSE CALL, PA)

    AUDIO VISUAL

    480V

    277V

    120V

    208V

    PURPLE

    WHITE

    BROWN

    ORANGE

    BLACK

    GENERAL NOTES GENERAL NOTES (CON'T)

    REF:B2

    --

    LEGEND

    JUNCTION BOX IDENTIFICATION

    COLOR CODE CHART

    ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH

    THE LATEST EDITION OF NFPA 70, NATIONAL ELECTRICAL

    CODE (NEC), OSHA REGULATIONS, AS WELL AS APPLICABLE

    REGULATIONS OF THE PERTINENT FEDERAL, STATE, COUNTY,

    AND CITY AGENCIES. PROVIDE MATERIALS AND EQUIPMENT

    THAT COMPLY WITH ANSI, IEEE, IES, AND NEMA STANDARDS.

    WHERE APPLICABLE, PROVIDE ONLY MATERIALS THAT ARE

    U.L. LISTED AND LABELED.

    THE ELECTRICAL SUBCONTRACTOR SHALL VISIT THE SITE

    AND INSPECT EXISTING CONDITIONS, SERVICES, CONDUITS,

    SPATIAL CONSIDERATIONS AND ALL OTHER PERTINENT

    CONDITIONS TO FULLY FAMILIARIZE HIMSELF WITH

    CONDITIONS TO BE ENCOUNTERED IN THE PERFORMANCE

    OF THIS WORK. THE ELECTRICAL SUBCONTRACTOR SHALL

    COORDINATE THIS WORK WITH THE GENERAL CONTRACTOR

    DURING CONSTRUCTION. FAILURE TO DO SO WILL NOT

    RELIEVE THE ELECTRICAL SUBCONTRACTOR OF THE

    RESPONSIBILITY FOR FULL COMPLETION OF THE WORK

    IN ACCORDANCE WITH APPLICABLE DRAWINGS AND

    SPECIFICATIONS. VERIFY EXISTING SYSTEMS THAT WILL BE

    UTILIZED FOR CONNECTION TO THE NEW SYSTEM. IF

    DISCREPANCIES EXIST BETWEEN THE CONTRACT DRAWINGS

    AND THE ACTUAL EXISTING CONDITIONS, THE ELECTRICAL

    SUBCONTRACTOR SHALL NOTIFY THE ENGINEER/OWNER

    PRIOR TO PROCEEDING WITH THE INSTALLATION.

    CONDUIT RUNS ARE SHOWN DIAGRAMATICALLY. INSTALL

    CONDUIT WITH A MINIMUM OF BENDS IN THE SHORTEST

    PRACTICAL DISTANCE CONSIDERING THE BUILDINGS

    CONSTRUCTION AND OBSTRUCTIONS, EXCEPT WHERE

    OTHERWISE NOTED.

    ALL MOTOR SAFETY SWITCHES, DISCONNECTS AND MOTOR

    STARTERS THAT ARE NOT PROVIDED BY OTHER DIVISIONS,

    SHALL BE PROVIDED BY DIVISION 26, UNLESS SPECIFICALLY

    NOTED OTHERWISE.

    ALL PENETRATIONS THROUGH FIRE-RATED FLOORS, WALLS

    AND PARTITIONS SHALL BE SEALED WITH UL APPROVED

    FIRE SEALANT MATERIAL TO MAINTAIN THE RATING

    OF THE SEPARATION.

    WHERE MATERIAL IS CALLED OUT IN THE LEGEND BY

    MANUFACTURER, TYPE OR CATALOG NUMBER, SUCH

    DESIGNATIONS ARE TO ESTABLISH STANDARDS OR

    DESIRED QUALITY. ACCEPTANCE OR REJECTION OF

    THE PROPOSED SUBSTITUTIONS SHALL BE SUBJECT

    TO THE APPROVAL OF THE OWNER.

    REFER TO ARCHITECTURAL DRAWINGS FOR EXACT

    LOCATION OF EQUIPMENT, DEVICES, AND FURNITURE

    REQUIREMENTS, PRIOR TO ROUGHING IN FOR SAME.

    ALL GENERAL NOTES, SYMBOLS, LISTS, ABBREVIATIONS

    AND DETAILS ARE TO BE CONSIDERED APPLICABLE TO

    ALL ELECTRICAL DRAWINGS FOR THIS PROJECT.

    IN AREAS AFFECTED BY THIS RENOVATION, THE

    ELECTRICAL SUBCONTRACTOR SHALL MAINTAIN

    CONTINUITY OF EXISTING ELECTRICAL SERVICE.

    PRIOR TO REMOVAL OF EQUIPMENT, THE OWNER WILL

    INDICATE WHICH EXISTING DEVICES OR MATERIALS

    SHALL BE SALVAGED AND TURNED OVER FOR STORAGE.

    WHERE EXISTING EQUIPMENT AND DEVICES ARE TO BE

    RELOCATED, ALL ASSOCIATED WIRING, CONDUIT AND

    ACCESSORIES SHALL BE EXTENDED, RELOCATED OR

    REPLACED WHERE REQUIRED.

    ALL VARIABLE FREQUENCY DRIVES (VFD) SHALL BE

    PROVIDED BY MECHANICAL CONTRACTOR AND

    INSTALLED BY ELECTRICAL CONTRACTOR. ELECTRICAL

    CONTRACTOR SHALL CIRCUIT ALL VFDS AND PROVIDE

    ALL MOTOR RATED SWITCHES AND DISCONENCT SWITCHES.

    E L E C T R I C A L L E G E N D

    LP#1,3 HOMERUN TO PNLBRD - ARROWS INDICATE NUMBER OF CIRCUITS. CROSS LINES INDICATE NUMBER OF

    CONDUCTORS OTHER THAN TWO (PROVIDE NUMBER OF WIRES REQUIRED TO ALLOW SWITCHING SHOWN).

    CIRCUIT NUMBER(S)

    PANEL DESIGNATION

    DUPLEX RECEPTACLE MOUNTED C/L UP 24" AFF

    QUAD DOUBLE DUPLEX RECEPTACLE MOUNTED C/L UP 24" AFF

    GFI GFI DUPLEX RECEPTACLE MOUNTED C/L UP 24" AFF

    J JUNCTION BOX

    FUSED DISCONNECT

    UNFUSED DISCONNECT

    MANUAL MOTOR STARTER OR APPLIANCE CONTROL

    PANELBOARD

    WP "WP" INDICATES WEATHER PROOF

    EXISTING ITEMS SHOWN DASHED

    18.PROVIDE TEMPORARY LIGHT AND POWER AS REQUIRED

    WITHIN THE CONSTRUCTION SCOPE OF WORK AREA.

    FIRE ALARM DUCT SMOKE DETECTOR

    1.

    a.

    2.

    b.

    c.

    FIRE ALARM

    SYSTEM NOTES

    REFER TO ELECTRICAL DRAWINGS FOR QUANTITIES

    AND LOCATIONS OF ALL FIRE ALARM DEVICES

    ASSOCIATED WITH FIRE PROTECTION SYSTEMS.

    MAKE ALL CONNECTIONS AS REQUIRED.

    PROVIDE ALL REQUIRED PROGRAMMING.

    MODIFY THE EXISTING NOTIFIER

    MAIN FIRE ALARM CONTROL PANEL TO

    ACCOMMODATE THE NEW DEVICES INDICATED.

    PROVIDE NEW ZONES(IDENTIFY AS REQUIRED).

    NEW CONTACTS, ADDITIONAL POWER SUPPLIES

    AND ALL OTHER ACCESSORIES FOR A COMPLETE

    AND OPERATIONAL SYSTEM.

    PROVIDE NEW FIRE ALARM DUCT SMOKE

    DETECTORS WHERE INDICATED.

    Drawing Scales

    PA / PE:

    Drawn By:Harriman Associates

    c 2019

    AUBURN

    Harriman Project No.

    Proj NorthKey Plan

    BOSTON PORTLAND PORTSMOUTH

    Rev Date Revision Description

    18421

    APRIL 19, 2019

    BANGOR, MAINE

    VENTILATION UPGRADES

    BUILDING K

    DOROTHEA DIX

    CONSTRUCTION DOCUMENTS

    JWT

    APG

    E00.1

    ELECTRICAL LEGEND,

    NOTES AND

    SCHEDULES

  • 1 2 3 5 6 7 9 11 12 13

    L

    K

    J

    I

    4 8

    H

    G

    F

    E

    A

    10

    B

    C

    D

    40,42

    DEMOLISH POWER TO EXISITNG UNIT VENTILATOR

    DEMOLISH POWER TO EXISTING DUCTLESS AC UNIT

    DEMOLISH POWER TO EXISTING UNIT VENTILATOR

    DEMOLISH POWER TO EXISITNG UNIT VENTILATOR

    DEMOLITION NOTES:

    1. ELECTRICAL INDICATED IS AS GENERALLY FOUND (APRIL

    2017). THE INTENT OF THE DEMOLITION PLAN(S) IS TO

    DOCUMENT EXISTING CONDITIONS. HOWEVER, ALL ELECTRICAL

    DEVICES MAY NOT NECESSARILY BE INDICATED ON THE

    DRAWINGS. FIELD VERIFY AND ADJUST WORK TO SUIT ALL FOUND.

    2. REFER TO FLOOR PLANS TO DETERMINE EXTENT OF WORK

    IN EACH AREA, INCLUDING WHETHER DEVICES ARE TO REMAIN,

    BE REMOVED, REPLACED, ETC... EXCEPT AS NOTED, GENERALLY

    THE INTENT IS THAT IF EXISTING DEVICES ARE SHOWN ON THE

    DEMOLITION PLANS AND NEW DEVICES ARE SHOWN ON THE FLOOR

    PLANS THEN EXISTING DEVICES ARE TO BE REMOVED. IF EXISTING

    DEVICES ARE SHOWN ON BOTH THEN DEVICES ARE TO REMAIN.

    3. ALL EXISTING ITEMS INTENDED FOR REMOVAL SHALL BE REMOVED

    WITH ALL ASSOCIATED HARDWARE INCLUDING, BUT NOT LIMITED TO:

    CONDUIT, BOXES, WIRING, CABLES, HANGERS, ETC...

    4. COORDINATE WITH MECHANICAL AND PLUMBING DRAWINGS FOR

    MECHANICAL AND PLUMBING EQUIPMENT TO BE REMOVED. REMOVE

    ALL ASSOCIATED CONDUIT, BOXES, WIRING, ETC...

    5. CONDUIT IN GOOD CONDITION AND PROPERLY LOCATED MAY BE

    REUSED WHERE APPLICABLE, UNLESS NOTED OTHERWISE.

    6. IN AREAS NOT RENOVATED BY THIS CONTRACT VERIFY THAT

    ELECTRICAL POWER, LIGHTING AND SYSTEMS ARE NOT AFFECTED

    BY THE ALTERATIONS. PROVIDE ALL WORK AS REQUIRED TO

    MAINTAIN POWER AND PROPER OPERATION OF SYSTEMS.

    LEGEND:

    EXISTING EQUIPMENT TO BE DEMOLISHED IS INDICATED AS BOLD AND DASHED:

    EXISTING EQUIPMENT TO REMAIN IS INDICATED BY LIGHT AND DASHED:

    EXISTING EQUIPMENT TO BE BE MODIFIED IS INDICATED AS BOLD AND DASHED WITH TEXT ADJACENT:(XRE)

    EXISTING BSB1-1 TO REMAIN

    ALTERNATE #1

    Drawing Scales

    PA / PE:

    Drawn By:Harriman Associates

    c 2019

    AUBURN

    Harriman Project No.

    Proj NorthKey Plan

    BOSTON PORTLAND PORTSMOUTH

    Rev Date Revision Description

    18421

    APRIL 19, 2019

    BANGOR, MAINE

    VENTILATION UPGRADES

    BUILDING K

    DOROTHEA DIX

    CONSTRUCTION DOCUMENTS

    JWT

    APG

    E05.1

    1/8" = 1'-0"

    0 4' 8' 12'

    FIRST FLOOR

    EXISTING CONDITIONS

    PLAN

  • 1 2 3 5 6 7 9 11 12 13

    L

    K

    J

    I

    4 8

    H

    G

    F

    E

    A

    10

    B

    C

    D

    11,13

    DEMOLISH POWER TO EXISITNG UNIT VENTILATOR

    DEMOLISH POWER TO EXISTING DUCTLESS AC UNIT

    DEMOLISH POWER TO EXISTING UNIT VENTILATOR

    DEMOLISH POWER TO EXISITNG UNIT VENTILATOR

    DEMOLITION NOTES:

    1. ELECTRICAL INDICATED IS AS GENERALLY FOUND (APRIL

    2017). THE INTENT OF THE DEMOLITION PLAN(S) IS TO

    DOCUMENT EXISTING CONDITIONS. HOWEVER, ALL ELECTRICAL

    DEVICES MAY NOT NECESSARILY BE INDICATED ON THE

    DRAWINGS. FIELD VERIFY AND ADJUST WORK TO SUIT ALL FOUND.

    2. REFER TO FLOOR PLANS TO DETERMINE EXTENT OF WORK

    IN EACH AREA, INCLUDING WHETHER DEVICES ARE TO REMAIN,

    BE REMOVED, REPLACED, ETC... EXCEPT AS NOTED, GENERALLY

    THE INTENT IS THAT IF EXISTING DEVICES ARE SHOWN ON THE

    DEMOLITION PLANS AND NEW DEVICES ARE SHOWN ON THE FLOOR

    PLANS THEN EXISTING DEVICES ARE TO BE REMOVED. IF EXISTING

    DEVICES ARE SHOWN ON BOTH THEN DEVICES ARE TO REMAIN.

    3. ALL EXISTING ITEMS INTENDED FOR REMOVAL SHALL BE REMOVED

    WITH ALL ASSOCIATED HARDWARE INCLUDING, BUT NOT LIMITED TO:

    CONDUIT, BOXES, WIRING, CABLES, HANGERS, ETC...

    4. COORDINATE WITH MECHANICAL AND PLUMBING DRAWINGS FOR

    MECHANICAL AND PLUMBING EQUIPMENT TO BE REMOVED. REMOVE

    ALL ASSOCIATED CONDUIT, BOXES, WIRING, ETC...

    5. CONDUIT IN GOOD CONDITION AND PROPERLY LOCATED MAY BE

    REUSED WHERE APPLICABLE, UNLESS NOTED OTHERWISE.

    6. IN AREAS NOT RENOVATED BY THIS CONTRACT VERIFY THAT

    ELECTRICAL POWER, LIGHTING AND SYSTEMS ARE NOT AFFECTED

    BY THE ALTERATIONS. PROVIDE ALL WORK AS REQUIRED TO

    MAINTAIN POWER AND PROPER OPERATION OF SYSTEMS.

    LEGEND:

    EXISTING EQUIPMENT TO BE DEMOLISHED IS INDICATED AS BOLD AND DASHED:

    EXISTING EQUIPMENT TO REMAIN IS INDICATED BY LIGHT AND DASHED:

    EXISTING EQUIPMENT TO BE BE MODIFIED IS INDICATED AS BOLD AND DASHED WITH TEXT ADJACENT:(XRE)

    ALTERNATE #1

    EXISTING BSB2-1 TO REMAIN

    Drawing Scales

    PA / PE:

    Drawn By:Harriman Associates

    c 2019

    AUBURN

    Harriman Project No.

    Proj NorthKey Plan

    BOSTON PORTLAND PORTSMOUTH

    Rev Date Revision Description

    18421

    APRIL 19, 2019

    BANGOR, MAINE

    VENTILATION UPGRADES

    BUILDING K

    DOROTHEA DIX

    CONSTRUCTION DOCUMENTS

    JWT

    APG

    E05.2

    1/8" = 1'-0"

    0 4' 8' 12'

    SECOND FLOOR

    EXISITNG CONDITIONS

    PLAN

  • 1 2 3 5 6 7 9 11 12 13

    L

    K

    J

    I

    4 8

    H

    G

    F

    E

    A

    10

    B

    C

    D

    EXISTING PANEL K3C

    7,9

    DEMOLISH POWER TO EXISTING DUCTLESS AC UNIT DEMOLISH POWER TO EXISTING DUCTLESS AC UNIT

    DEMOLITION NOTES:

    1. ELECTRICAL INDICATED IS AS GENERALLY FOUND (APRIL

    2017). THE INTENT OF THE DEMOLITION PLAN(S) IS TO

    DOCUMENT EXISTING CONDITIONS. HOWEVER, ALL ELECTRICAL

    DEVICES MAY NOT NECESSARILY BE INDICATED ON THE

    DRAWINGS. FIELD VERIFY AND ADJUST WORK TO SUIT ALL FOUND.

    2. REFER TO FLOOR PLANS TO DETERMINE EXTENT OF WORK

    IN EACH AREA, INCLUDING WHETHER DEVICES ARE TO REMAIN,

    BE REMOVED, REPLACED, ETC... EXCEPT AS NOTED, GENERALLY

    THE INTENT IS THAT IF EXISTING DEVICES ARE SHOWN ON THE

    DEMOLITION PLANS AND NEW DEVICES ARE SHOWN ON THE FLOOR

    PLANS THEN EXISTING DEVICES ARE TO BE REMOVED. IF EXISTING

    DEVICES ARE SHOWN ON BOTH THEN DEVICES ARE TO REMAIN.

    3. ALL EXISTING ITEMS INTENDED FOR REMOVAL SHALL BE REMOVED

    WITH ALL ASSOCIATED HARDWARE INCLUDING, BUT NOT LIMITED TO:

    CONDUIT, BOXES, WIRING, CABLES, HANGERS, ETC...

    4. COORDINATE WITH MECHANICAL AND PLUMBING DRAWINGS FOR

    MECHANICAL AND PLUMBING EQUIPMENT TO BE REMOVED. REMOVE

    ALL ASSOCIATED CONDUIT, BOXES, WIRING, ETC...

    5. CONDUIT IN GOOD CONDITION AND PROPERLY LOCATED MAY BE

    REUSED WHERE APPLICABLE, UNLESS NOTED OTHERWISE.

    6. IN AREAS NOT RENOVATED BY THIS CONTRACT VERIFY THAT

    ELECTRICAL POWER, LIGHTING AND SYSTEMS ARE NOT AFFECTED

    BY THE ALTERATIONS. PROVIDE ALL WORK AS REQUIRED TO

    MAINTAIN POWER AND PROPER OPERATION OF SYSTEMS.

    LEGEND:

    EXISTING EQUIPMENT TO BE DEMOLISHED IS INDICATED AS BOLD AND DASHED:

    EXISTING EQUIPMENT TO REMAIN IS INDICATED BY LIGHT AND DASHED:

    EXISTING EQUIPMENT TO BE BE MODIFIED IS INDICATED AS BOLD AND DASHED WITH TEXT ADJACENT:(XRE)

    ALTERNATE #1

    EXISTING AC3-1 TO REMAIN

    EXISTING PANEL K3E

    Drawing Scales

    PA / PE:

    Drawn By:Harriman Associates

    c 2019

    AUBURN

    Harriman Project No.

    Proj NorthKey Plan

    BOSTON PORTLAND PORTSMOUTH

    Rev Date Revision Description

    18421

    APRIL 19, 2019

    BANGOR, MAINE

    VENTILATION UPGRADES

    BUILDING K

    DOROTHEA DIX

    CONSTRUCTION DOCUMENTS

    JWT

    APG

    E05.3

    1/8" = 1'-0"

    0 4' 8' 12'

    THIRD FLOOR

    EXISTING CONDITIONS

    PLAN

  • 1 2 3 5 6 7 9 11 12 13

    L

    K

    J

    I

    4 8

    H

    G

    F

    E

    A

    10

    B

    C

    D

    BEDROOM

    K117

    STAIR

    K116

    STAIR

    K124

    STAIR

    K100

    OFFICE

    K118

    BEDROOM

    K119

    SHOWER

    K115

    TOILET

    K113

    MED ROOM

    K112

    ACTIVITY ROOM

    K120

    BEDROOM

    K122

    BEDROOM

    K121

    SENSORY

    K123

    BEDROOM

    K125

    BEDROOM

    K126BATHROOM

    K127

    BEDROOM

    K129

    BATHROOM

    K130

    OBSERVATION ROOM

    K128

    CONFERENCE

    K133

    MEDICATION

    M132

    DAY ROOM

    K131

    BATHROOM

    K103

    LAUNDRY

    K102

    TOILET

    K105

    STORAGE

    K106

    BEDROOM

    K107

    BEDROOM

    K108

    BEDROOM

    K109

    TREATMENT

    K110

    NURSE STATION

    K111

    FAMILY ROOM

    K101

    CHASE

    K114

    40,42

    AC1-3

    BSB1-3

    40,42

    40,42

    SHOWN ONLY FOR LOCATION REFERENCE

    2#12+1#12G IN 3/4"C

    CONNECT TO EXISTING CIRCUIT SERVING EXISTING HVAC UNIT BSB-1 ALTERNATE #1

    Drawing Scales

    PA / PE:

    Drawn By:Harriman Associates

    c 2019

    AUBURN

    Harriman Project No.

    Proj NorthKey Plan

    BOSTON PORTLAND PORTSMOUTH

    Rev Date Revision Description

    18421

    APRIL 19, 2019

    BANGOR, MAINE

    VENTILATION UPGRADES

    BUILDING K

    DOROTHEA DIX

    CONSTRUCTION DOCUMENTS

    JWT

    APG

    E20.1

    1/8" = 1'-0"

    0 4' 8' 12'

    FIRST FLOOR

    PLAN

    POWER AND SYSTEMS

  • 1 2 3 5 6 7 9 11 12 13

    L

    K

    J

    I

    4 8

    H

    G

    F

    E

    A

    10

    B

    C

    D

    AC2-3

    BSB2-3

    11,13

    11,13

    2#12+1#12G IN 3/4"C

    SHOWN ONLY FOR LOCATION REFERENCE

    CONNECT TO EXISTING CIRCUIT SERVING EXISTING HVAC UNIT BSB2-1 ALTERNATE #1

    Drawing Scales

    PA / PE:

    Drawn By:Harriman Associates

    c 2019

    AUBURN

    Harriman Project No.

    Proj NorthKey Plan

    BOSTON PORTLAND PORTSMOUTH

    Rev Date Revision Description

    18421

    APRIL 19, 2019

    BANGOR, MAINE

    VENTILATION UPGRADES

    BUILDING K

    DOROTHEA DIX

    CONSTRUCTION DOCUMENTS

    JWT

    APG

    E20.2

    1/8" = 1'-0"

    0 4' 8' 12'

    SECOND FLOOR

    PLAN

    POWER AND SYSTEMS

  • 1 2 3 5 6 7 9 11 12 13

    L

    K

    J

    I

    4 8

    H

    G

    F

    E

    A

    10

    B

    C

    D

    LAUNDRY

    K304

    STAFF BATHROOM

    K305

    CHASE

    K306

    BATHROOM

    K307

    KITCHEN

    K308

    DAY ROOM

    K309

    BEDROOM

    K310

    BEDROOM

    K311

    MED ROOM

    K312

    NURSE STATION

    K313

    TUB ROOM

    K315

    BATHROOM

    K316

    CHASE

    K317

    SHOWER ROOM

    K318 STAIR

    K319

    SALLY PORT

    K320

    STORAGE

    K321

    SENSORY

    K322

    BEDROOM

    K323

    BEDROOM

    K324

    TV LOUNGE

    K325CONFERENCE

    K326

    PHONE

    K327

    BEDROOM

    K328

    BEDROOM

    K329

    BEDROOM

    K330BEDROOM

    K331

    STAIR

    K333

    OFFICE

    K334

    SENSORY

    K335OFFICE

    K336

    SECLUSION

    K337

    STORAGE

    K338

    TREATMENT

    K339

    STORAGE

    K340

    BEDROOM

    K341

    BEDROOM

    K342

    BEDROOM

    K345

    CONFERENCE

    K346

    STORAGE

    K347

    STAIR

    K300

    FAMILY ROOM

    K348

    CORRIDOR

    M133

    EXISTING PANEL K3C

    EXISTING PANEL K3E

    AC3-5

    BSB3-2

    7,9

    7,9

    BSB3-3

    7,9

    AC3-4

    7,9

    CONNECT TO EXISTING CIRCUIT SERVING EXISTING HVAC UNIT BSB-1

    2#12+1#12G IN 3/4"C

    SHOWN ONLY FOR LOCATION REFERENCE

    2#12+1#12G IN 3/4"C

    2#12+1#12G IN 3/4"C

    AND SPARE 20, 1-POLE BREAKER IN SPACE 42 TO SERVE NEW PUMP P-1 LOCATEDON 4TH FLOOR.

    REUTILIZE EXISITNG 70A, 3-POLE BREAKER IN SPACES 36,38,40 TO SERVE NEW ERV-1 ON ROOF

    ALTERNATE #1

    Drawing Scales

    PA / PE:

    Drawn By:Harriman Associates

    c 2019

    AUBURN

    Harriman Project No.

    Proj NorthKey Plan

    BOSTON PORTLAND PORTSMOUTH

    Rev Date Revision Description

    18421

    APRIL 19, 2019

    BANGOR, MAINE

    VENTILATION UPGRADES

    BUILDING K

    DOROTHEA DIX

    CONSTRUCTION DOCUMENTS

    JWT

    APG

    E20.3

    1/8" = 1'-0"

    0 4' 8' 12'

    THIRD FLOOR

    PLAN

    POWER AND SYSTEMS

  • 1 2 3 5 6 7 9 11 12 13

    L

    K

    J

    I

    4 8

    H

    G

    F

    E

    A

    10

    B

    C

    D

    (LOCATED ON ROOF)

    ERV-1

    WP

    P-13#4+1#8G IN 1"C

    K3E#36,38,40

    36,38,40

    2#12+1#12G

    K3E#42

    42

    DISCONNECT SWITCH PROVIDED BY HVAC UNIT MANUFACTURER

    TO SERVE ERV-1 SUPPLY AND RETURN.

    LOCATE DUCT SMOKE DETECTORS

    Drawing Scales

    PA / PE:

    Drawn By:Harriman Associates

    c 2019

    AUBURN

    Harriman Project No.

    Proj NorthKey Plan

    BOSTON PORTLAND PORTSMOUTH

    Rev Date Revision Description

    18421

    APRIL 19, 2019

    BANGOR, MAINE

    VENTILATION UPGRADES

    BUILDING K

    DOROTHEA DIX

    CONSTRUCTION DOCUMENTS

    JWT

    APG

    E20.4

    1/8" = 1'-0"

    0 4' 8' 12'

    ROOF

    PLAN

    POWER AND SYSTEMS

    00_G00-1SheetsG00.1 - COVER SHEET

    22_A00-1SheetsA00.1 - ABBREVIATIONS AND LEGENDSA10.1 - BUILDING K FLOOR PLANSG00.1 - COVER SHEET

    22_A10-1SheetsA00.1 - ABBREVIATIONS AND LEGENDSA10.1 - BUILDING K FLOOR PLANSG00.1 - COVER SHEET

    32_S20-1SheetsS20.1 - FRAMING PLANS60.1 - FRAMING NOTES AND DETAILS

    32_S60-1SheetsS20.1 - FRAMING PLANS60.1 - FRAMING NOTES AND DETAILS

    62_M00-1SheetsM00.1 - LEGEND & GENERAL NOTESM05.1 - FIRST FLOOR DEMOLITION DUCTWORKM05.2 - SECOND FLOOR DEMOLITION DUCTWORKM05.3 - THIRD FLOOR DEMOLITION DUCTWORKM06.1 - FIRST FLOOR DEMOLITION PIPINGM06.2 - SECOND FLOOR DEMOLITION PIPINGM06.3 - THIRD FLOOR DEMOLITION PIPINGM10.1 - FIRST FLOOR DUCTWORKM10.2 - SECOND FLOOR DUCTWORKM10.3 - THIRD FLOOR DUCTWORKM10.4 - FOURTH FLOOR DUCTWORKM20.1 - FIRST FLOOR PIPINGM20.2 - SECOND FLOOR PIPINGM20.3 - THIRD FLOOR PIPINGM20.4 - FOURTH FLOOR PIPINGM30.1 - DETAILS AND SECTIONSM40.1 - SCHEDULES

    62_M05-1SheetsM00.1 - LEGEND & GENERAL NOTESM05.1 - FIRST FLOOR DEMOLITION DUCTWORKM05.2 - SECOND FLOOR DEMOLITION DUCTWORKM05.3 - THIRD FLOOR DEMOLITION DUCTWORKM06.1 - FIRST FLOOR DEMOLITION PIPINGM06.2 - SECOND FLOOR DEMOLITION PIPINGM06.3 - THIRD FLOOR DEMOLITION PIPINGM10.1 - FIRST FLOOR DUCTWORKM10.2 - SECOND FLOOR DUCTWORKM10.3 - THIRD FLOOR DUCTWORKM10.4 - FOURTH FLOOR DUCTWORKM20.1 - FIRST FLOOR PIPINGM20.2 - SECOND FLOOR PIPINGM20.3 - THIRD FLOOR PIPINGM20.4 - FOURTH FLOOR PIPINGM30.1 - DETAILS AND SECTIONSM40.1 - SCHEDULES

    62_M05-2SheetsM00.1 - LEGEND & GENERAL NOTESM05.1 - FIRST FLOOR DEMOLITION DUCTWORKM05.2 - SECOND FLOOR DEMOLITION DUCTWORKM05.3 - THIRD FLOOR DEMOLITION DUCTWORKM06.1 - FIRST FLOOR DEMOLITION PIPINGM06.2 - SECOND FLOOR DEMOLITION PIPINGM06.3 - THIRD FLOOR DEMOLITION PIPINGM10.1 - FIRST FLOOR DUCTWORKM10.2 - SECOND FLOOR DUCTWORKM10.3 - THIRD FLOOR DUCTWORKM10.4 - FOURTH FLOOR DUCTWORKM20.1 - FIRST FLOOR PIPINGM20.2 - SECOND FLOOR PIPINGM20.3 - THIRD FLOOR PIPINGM20.4 - FOURTH FLOOR PIPINGM30.1 - DETAILS AND SECTIONSM40.1 - SCHEDULES

    62_M05-3SheetsM00.1 - LEGEND & GENERAL NOTESM05.1 - FIRST FLOOR DEMOLITION DUCTWORKM05.2 - SECOND FLOOR DEMOLITION DUCTWORKM05.3 - THIRD FLOOR DEMOLITION DUCTWORKM06.1 - FIRST FLOOR DEMOLITION PIPINGM06.2 - SECOND FLOOR DEMOLITION PIPINGM06.3 - THIRD FLOOR DEMOLITION PIPINGM10.1 - FIRST FLOOR DUCTWORKM10.2 - SECOND FLOOR DUCTWORKM10.3 - THIRD FLOOR DUCTWORKM10.4 - FOURTH FLOOR DUCTWORKM20.1 - FIRST FLOOR PIPINGM20.2 - SECOND FLOOR PIPINGM20.3 - THIRD FLOOR PIPINGM20.4 - FOURTH FLOOR PIPINGM30.1 - DETAILS AND SECTIONSM40.1 - SCHEDULES

    62_M06-1SheetsM00.1 - LEGEND & GENERAL NOTESM05.1 - FIRST FLOOR DEMOLITION DUCTWORKM05.2 - SECOND FLOOR DEMOLITION DUCTWORKM05.3 - THIRD FLOOR DEMOLITION DUCTWORKM06.1 - FIRST FLOOR DEMOLITION PIPINGM06.2 - SECOND FLOOR DEMOLITION PIPINGM06.3 - THIRD FLOOR DEMOLITION PIPINGM10.1 - FIRST FLOOR DUCTWORKM10.2 - SECOND FLOOR DUCTWORKM10.3 - THIRD FLOOR DUCTWORKM10.4 - FOURTH FLOOR DUCTWORKM20.1 - FIRST FLOOR PIPINGM20.2 - SECOND FLOOR PIPINGM20.3 - THIRD FLOOR PIPINGM20.4 - FOURTH FLOOR PIPINGM30.1 - DETAILS AND SECTIONSM40.1 - SCHEDULES

    62_M06-2SheetsM00.1 - LEGEND & GENERAL NOTESM05.1 - FIRST FLOOR DEMOLITION DUCTWORKM05.2 - SECOND FLOOR DEMOLITION DUCTWORKM05.3 - THIRD FLOOR DEMOLITION DUCTWORKM06.1 - FIRST FLOOR DEMOLITION PIPINGM06.2 - SECOND FLOOR DEMOLITION PIPINGM06.3 - THIRD FLOOR DEMOLITION PIPINGM10.1 - FIRST FLOOR DUCTWORKM10.2 - SECOND FLOOR DUCTWORKM10.3 - THIRD FLOOR DUCTWORKM10.4 - FOURTH FLOOR DUCTWORKM20.1 - FIRST FLOOR PIPINGM20.2 - SECOND FLOOR PIPINGM20.3 - THIRD FLOOR PIPINGM20.4 - FOURTH FLOOR PIPINGM30.1 - DETAILS AND SECTIONSM40.1 - SCHEDULES

    62_M06-3SheetsM00.1 - LEGEND & GENERAL NOTESM05.1 - FIRST FLOOR DEMOLITION DUCTWORKM05.2 - SECOND FLOOR DEMOLITION DUCTWORKM05.3 - THIRD FLOOR DEMOLITION DUCTWORKM06.1 - FIRST FLOOR DEMOLITION PIPINGM06.2 - SECOND FLOOR DEMOLITION PIPINGM06.3 - THIRD FLOOR DEMOLITION PIPINGM10.1 - FIRST FLOOR DUCTWORKM10.2 - SECOND FLOOR DUCTWORKM10.3 - THIRD FLOOR DUCTWORKM10.4 - FOURTH FLOOR DUCTWORKM20.1 - FIRST FLOOR PIPINGM20.2 - SECOND FLOOR PIPINGM20.3 - THIRD FLOOR PIPINGM20.4 - FOURTH FLOOR PIPINGM30.1 - DETAILS AND SECTIONSM40.1 - SCHEDULES

    62_M10-1SheetsM00.1 - LEGEND & GENERAL NOTESM05.1 - FIRST FLOOR DEMOLITION DUCTWORKM05.2 - SECOND FLOOR DEMOLITION DUCTWORKM05.3 - THIRD FLOOR DEMOLITION DUCTWORKM06.1 - FIRST FLOOR DEMOLITION PIPINGM06.2 - SECOND FLOOR DEMOLITION PIPINGM06.3 - THIRD FLOOR DEMOLITION PIPINGM10.1 - FIRST FLOOR DUCTWORKM10.2 - SECOND FLOOR DUCTWORKM10.3 - THIRD FLOOR DUCTWORKM10.4 - FOURTH FLOOR DUCTWORKM20.1 - FIRST FLOOR PIPINGM20.2 - SECOND FLOOR PIPINGM20.3 - THIRD FLOOR PIPINGM20.4 - FOURTH FLOOR PIPINGM30.1 - DETAILS AND SECTIONSM40.1 - SCHEDULES

    62_M10-2SheetsM00.1 - LEGEND & GENERAL NOTESM05.1 - FIRST FLOOR DEMOLITION DUCTWORKM05.2 - SECOND FLOOR DEMOLITION DUCTWORKM05.3 - THIRD FLOOR DEMOLITION DUCTWORKM06.1 - FIRST FLOOR DEMOLITION PIPINGM06.2 - SECOND FLOOR DEMOLITION PIPINGM06.3 - THIRD FLOOR DEMOLITION PIPINGM10.1 - FIRST FLOOR DUCTWORKM10.2 - SECOND FLOOR DUCTWORKM10.3 - THIRD FLOOR DUCTWORKM10.4 - FOURTH FLOOR DUCTWORKM20.1 - FIRST FLOOR PIPINGM20.2 - SECOND FLOOR PIPINGM20.3 - THIRD FLOOR PIPINGM20.4 - FOURTH FLOOR PIPINGM30.1 - DETAILS AND SECTIONSM40.1 - SCHEDULES

    62_M10-3SheetsM00.1 - LEGEND & GENERAL NOTESM05.1 - FIRST FLOOR DEMOLITION DUCTWORKM05.2 - SECOND FLOOR DEMOLITION DUCTWORKM05.3 - THIRD FLOOR DEMOLITION DUCTWORKM06.1 - FIRST FLOOR DEMOLITION PIPINGM06.2 - SECOND FLOOR DEMOLITION PIPINGM06.3 - THIRD FLOOR DEMOLITION PIPINGM10.1 - FIRST FLOOR DUCTWORKM10.2 - SECOND FLOOR DUCTWORKM10.3 - THIRD FLOOR DUCTWORKM10.4 - FOURTH FLOOR DUCTWORKM20.1 - FIRST FLOOR PIPINGM20.2 - SECOND FLOOR PIPINGM20.3 - THIRD FLOOR PIPINGM20.4 - FOURTH FLOOR PIPINGM30.1 - DETAILS AND SECTIONSM40.1 - SCHEDULES

    62_M10-4SheetsM00.1 - LEGEND & GENERAL NOTESM05.1 - FIRST FLOOR DEMOLITION DUCTWORKM05.2 - SECOND FLOOR DEMOLITION DUCTWORKM05.3 - THIRD FLOOR DEMOLITION DUCTWORKM06.1 - FIRST FLOOR DEMOLITION PIPINGM06.2 - SECOND FLOOR DEMOLITION PIPINGM06.3 - THIRD FLOOR DEMOLITION PIPINGM10.1 - FIRST FLOOR DUCTWORKM10.2 - SECOND FLOOR DUCTWORKM10.3 - THIRD FLOOR DUCTWORKM10.4 - FOURTH FLOOR DUCTWORKM20.1 - FIRST FLOOR PIPINGM20.2 - SECOND FLOOR PIPINGM20.3 - THIRD FLOOR PIPINGM20.4 - FOURTH FLOOR PIPINGM30.1 - DETAILS AND SECTIONSM40.1 - SCHEDULES

    62_M20-1SheetsM00.1 - LEGEND & GENERAL NOTESM05.1 - FIRST FLOOR DEMOLITION DUCTWORKM05.2 - SECOND FLOOR DEMOLITION DUCTWORKM05.3 - THIRD FLOOR DEMOLITION DUCTWORKM06.1 - FIRST FLOOR DEMOLITION PIPINGM06.2 - SECOND FLOOR DEMOLITION PIPINGM06.3 - THIRD FLOOR DEMOLITION PIPINGM10.1 - FIRST FLOOR DUCTWORKM10.2 - SECOND FLOOR DUCTWORKM10.3 - THIRD FLOOR DUCTWORKM10.4 - FOURTH FLOOR DUCTWORKM20.1 - FIRST FLOOR PIPINGM20.2 - SECOND FLOOR PIPINGM20.3 - THIRD FLOOR PIPINGM20.4 - FOURTH FLOOR PIPINGM30.1 - DETAILS AND SECTIONSM40.1 - SCHEDULES

    62_M20-2SheetsM00.1 - LEGEND & GENERAL NOTESM05.1 - FIRST FLOOR DEMOLITION DUCTWORKM05.2 - SECOND FLOOR DEMOLITION DUCTWORKM05.3 - THIRD FLOOR DEMOLITION DUCTWORKM06.1 - FIRST FLOOR DEMOLITION PIPINGM06.2 - SECOND FLOOR DEMOLITION PIPINGM06.3 - THIRD FLOOR DEMOLITION PIPINGM10.1 - FIRST FLOOR DUCTWORKM10.2 - SECOND FLOOR DUCTWORKM10.3 - THIRD FLOOR DUCTWORKM10.4 - FOURTH FLOOR DUCTWORKM20.1 - FIRST FLOOR PIPINGM20.2 - SECOND FLOOR PIPINGM20.3 - THIRD FLOOR PIPINGM20.4 - FOURTH FLOOR PIPINGM30.1 - DETAILS AND SECTIONSM40.1 - SCHEDULES

    62_M20-3SheetsM00.1 - LEGEND & GENERAL NOTESM05.1 - FIRST FLOOR DEMOLITION DUCTWORKM05.2 - SECOND FLOOR DEMOLITION DUCTWORKM05.3 - THIRD FLOOR DEMOLITION DUCTWORKM06.1 - FIRST FLOOR DEMOLITION PIPINGM06.2 - SECOND FLOOR DEMOLITION PIPINGM06.3 - THIRD FLOOR DEMOLITION PIPINGM10.1 - FIRST FLOOR DUCTWORKM10.2 - SECOND FLOOR DUCTWORKM10.3 - THIRD FLOOR DUCTWORKM10.4 - FOURTH FLOOR DUCTWORKM20.1 - FIRST FLOOR PIPINGM20.2 - SECOND FLOOR PIPINGM20.3 - THIRD FLOOR PIPINGM20.4 - FOURTH FLOOR PIPINGM30.1 - DETAILS AND SECTIONSM40.1 - SCHEDULES

    62_M20-4SheetsM00.1 - LEGEND & GENERAL NOTESM05.1 - FIRST FLOOR DEMOLITION DUCTWORKM05.2 - SECOND FLOOR DEMOLITION DUCTWORKM05.3 - THIRD FLOOR DEMOLITION DUCTWORKM06.1 - FIRST FLOOR DEMOLITION PIPINGM06.2 - SECOND FLOOR DEMOLITION PIPINGM06.3 - THIRD FLOOR DEMOLITION PIPINGM10.1 - FIRST FLOOR DUCTWORKM10.2 - SECOND FLOOR DUCTWORKM10.3 - THIRD FLOOR DUCTWORKM10.4 - FOURTH FLOOR DUCTWORKM20.1 - FIRST FLOOR PIPINGM20.2 - SECOND FLOOR PIPINGM20.3 - THIRD FLOOR PIPINGM20.4 - FOURTH FLOOR PIPINGM30.1 - DETAILS AND SECTIONSM40.1 - SCHEDULES

    62_M30-1SheetsM00.1 - LEGEND & GENERAL NOTESM05.1 - FIRST FLOOR DEMOLITION DUCTWORKM05.2 - SECOND FLOOR DEMOLITION DUCTWORKM05.3 - THIRD FLOOR DEMOLITION DUCTWORKM06.1 - FIRST FLOOR DEMOLITION PIPINGM06.2 - SECOND FLOOR DEMOLITION PIPINGM06.3 - THIRD FLOOR DEMOLITION PIPINGM10.1 - FIRST FLOOR DUCTWORKM10.2 - SECOND FLOOR DUCTWORKM10.3 - THIRD FLOOR DUCTWORKM10.4 - FOURTH FLOOR DUCTWORKM20.1 - FIRST FLOOR PIPINGM20.2 - SECOND FLOOR PIPINGM20.3 - THIRD FLOOR PIPINGM20.4 - FOURTH FLOOR PIPINGM30.1 - DETAILS AND SECTIONSM40.1 - SCHEDULES

    62_M40-1SheetsM00.1 - LEGEND & GENERAL NOTESM05.1 - FIRST FLOOR DEMOLITION DUCTWORKM05.2 - SECOND FLOOR DEMOLITION DUCTWORKM05.3 - THIRD FLOOR DEMOLITION DUCTWORKM06.1 - FIRST FLOOR DEMOLITION PIPINGM06.2 - SECOND FLOOR DEMOLITION PIPINGM06.3 - THIRD FLOOR DEMOLITION PIPINGM10.1 - FIRST FLOOR DUCTWORKM10.2 - SECOND FLOOR DUCTWORKM10.3 - THIRD FLOOR DUCTWORKM10.4 - FOURTH FLOOR DUCTWORKM20.1 - FIRST FLOOR PIPINGM20.2 - SECOND FLOOR


Recommended