GAIN ENGINEERING SERVICES (PRIVATE) LIMITED
MESSAGE FROM THE CEO
“GAIN has a history of responsible business conduct. We strongly believe that the real business success is not just about profits measured in numbers but also,
more importantly, about how those numbers are achieved. Our corporate strategy reflects our commitment to sustainable business practices and balancing
responsibility alongside growth and productivity.
We understand you and your needs to progress. This is why GAIN breeds on the commitment and passion of its people to design insightful and cutting edge
solutions. We plan, optimize and execute to deliver beyond customer expectations. The strength of our people supports the value, objectivity and
ultimate success that we bring to our customers in return.”
Mr. Muhammad Asif Ghazi
CEO
2
ABOUT US
GAIN Control Systems was established in 2006 with a promise to provide
highest standards of services in infrastructure, industrial and energy projects.
Building upon the same brand promise, GAIN Engineering Services (Private)
Limited has been established in 2019 as the parent company of our business
activities and GAIN Control Systems has now become a group company of GAIN
Engineering Services (Private) Limited.
Catering to the market need for dedicated procurement and supply services,
we have also established another company by the name of GAIN Traders.
This arrangement has been done keeping in mind the larger scope of work
GAIN can do and services it can offer.
(contd.)
3
ABOUT US
GAIN Engineering Services (Private) Limited has the resources and skills to
execute the projects with highest standards of quality.
Our production facility is well equipped with all the modern tools &
machinery. This gives us an opportunity to work on the most sophisticated
solutions for our customers.
We aim at delivering industrial and infrastructural projects in civil
engineering with cost effectiveness and timeliness.
Our focus is to stay customer centric at all stages of design, planning &
installation jobs. Customer centricity has become the hallmark of our
organization for which we enjoy admirable reputation in the public as well as
private sectors.
4
VISION AND MISSION
Vision:
“Be the premier engineering, construction, and project management organization by achieving extraordinary results for our customers, building satisfying careers for our people, and earning a
fair return on the value we deliver.”
Mission Statement:
“Our mission is to add value to our clients through the provision of Engineering, Construction, and Project Management services for infrastructure, industrial and energy projects.
We aim to focus on talent development and become a great place to work at by empowering our people to think creatively, take ownership, and most importantly, have fun.
We strive to deliver the best quality to our clients and stay profitable in all our business decisions.
We aim to diversify into new areas that complement and supplement the core business, with the diversification aimed at achieving excellence and industry leader status in the new areas.”
5
CORE VALUES
Be customer centric in all our actions
Trust each other to act in the best interest of the client and business
Treat everyone with dignity and courtesy
Achieving greater results as a team
Empowerment to take decisions and ownership
Commitment to self and others
Ethics and transparency in all our actions
Create happiness for self and others
Continuously improve and learn from the mistakes
6
WHAT WE DO Manufacturing
LV Switchgear Panel
Control Panel
PLC Panel
Others
Supply & Services
Instrumentation and Control Systems
Electrical Field Installation
Data Centers
Construction
Commercial
Residential
Industrial
Project Management
Engineering
Electrical & Instrumentation (E&I)
Mechanical
Civil
7
MANUFACTURING FACILITY
8
BUSINESS SECTORS
Currently, GAIN Engineering Services has three major business areas:
Electrical & Instrumentation (E&I)
Mechanical
Civil and Construction
9
ELECTRICAL & INSTRUMENTATION (E&I)
Instrumentation and Control Engineering
Engineering Services in the field of Electrical and Control Systems
Process Control Instrumentation
Designing & Manufacturing of Low-Voltage (LV) Switchgear Panels
Designing & Manufacturing of Motor Control Center (MCC) & Control Systems
Field Services in the areas of Electrical and Industrial Automation
MEP (Mechanical, Electrical and Piping) Services in the Infrastructure Projects
Engineering Design
Project Management
10
MECHANICAL
Steel Structure Design
Design of plant steel structure, which includes the following:
Equipment Pads
Radial Gate Design
Pump House Structures
Platforms and Pipe Racks
Workshop & Warehouse Sheds
Structure for Overhead Cranes
Telecom Tower Structures
(contd.)
11
MECHANICAL
Mechanical Fabrication & Erection
Heavy Lift Engineering
Equipment Installation
Piping Fabrication & Installation
Piping Layout with Sectional Details
Piping Isometrics
Bill of Material of Plant Piping
Piping Supports
Commissioning Assistance
Plant Maintenance
Transportation
12
CIVIL AND CONSTRUCTION
Engineering
Soil Investigation
Detail Engineering & Designing
Architectural Drawings & Projections
Construction
Residential & Commercial Buildings
Roads & Highways
Bridges, Flyovers & Underpasses
Water & Sewer Drains
Airports
Infrastructure Developments
13
GAIN TRADERS
The company brings with itself an experience of supply chain to better understand the market demand and have a strong network of suppliers to provide you with the cost effective solution.
We deal in:
General Order Supplies
Electrical Supplies
Generator Supplies
Repetitive Supplies
Repair Parts Supplies
Safety Equipment Supplies
Rental Equipment Supplies
Office Equipment Supplies
Construction Material Supplies
Petroleum, Oil and Lubricants (POL) Supplies
IT Equipment Supplies
Import/Export
14
OUR PEOPLE
Blend of experience and innovation provide our clients with the value addition that they need.
Our team of highly skilled individuals strives to deliver the improved productivity for our clients.
We focus on talent development by sending our people for training, workshops and trade fairs.
Performance is highly rewarded; we incentivize our people to continuously improve and grow.
Testimonial
“GAIN is about opportunities where I got to interact with different talented individuals, learn from their experiences, work on large-scale projects and push my limits to attain professional excellence.”
Saba Iqbal
- Proposal Engineer
15
VALUABLE CLIENTS
16
KEY PROJECTS INFRASTRUCTURAL, INDUSTRIAL AND POWER
17
ICI – Nutrico Morinaga
Year of Project: 2018/2019
Complete turn key project for field electrical work and boundary wall pole
lighting (installation and commissioning).
Distribution boxes (DBs) and panels for the complete plant.
Complete Electrical & Instrument (E & I) installation and commissioning
services including instrument calibration services.
18
Arena (Walk n Shop) | LDA
Year of Project: 2018 – present
Complete turn key project for field electrical work.
Supply of all HT/LT panels and distribution boxes (DBs) for all shops.
19
Interchange on Khanewal-Lodhran Road
Year of Project: 2018
Complete electrical installation including lighting poles, street lights, panels
and motor pumps.
20
Railway Flyover Raiwind
Year of Project: 2017
Complete electrical installation including lighting poles, street lights, panels
and motor pumps.
21
Ravi Bridge Extension
Year of Project: 2016/2017
Complete electrical installation including lighting poles, street lights, panels
and motor pumps.
22
Maulana Shaukat Ali Road Extension
Year of Project: 2015
Complete electrical installation including lighting poles, street lights, panels
and motor pumps.
23
DHQ Hospital Jhelum
Year of Project: 2017
Electrical work for Hepatitis Prevention & Treatment (HTPT) Center building.
Ward renovation and upgradation.
Services provided for installation and supply of conduit, laying of cables,
installation of lights, panels and associated work.
24
Citizen Facilitation Centre, Town Hall Lahore
Year of Project: 2015
Complete electrical and networking of Citizen Facilitation Center.
Supply, installation, testing and commissioning of various systems and
panels.
25
Metro Bus Control/Data Center, Arfa Software
Technology Park
Year of Project: 2012/2013
Complete supply & installation of electrical work, distribution boards, power
cables, telephone, networking, voice & data communication setup.
26
Metro Bus Stations
Year of Project: 2012/2013
Electrification work of 11 Metro Bus stations.
Supply, installation and commissioning of control panels, switchgears and
cable trays.
27
Askar Oil Storage Shed
Year of Project: 2017
Complete supply & installation of LT panels, distribution boards, cable trays.
Electrical installation & commissioning services.
28
Information Technology University (ITU), Arfa
Software Technology Park
Year of Project: 2013/2014
Complete supply & installation of electrical work, distribution boards, power
cables, telephone, networking, voice & data communication setup.
29
UCH Power Plant Residential Colony
Year of Project: 2012
Manufacturing, installation and commissioning of electrical equipment.
Internal and external electrical works.
30
Wahga Border Flagpole
Year of Project: 2017
Complete LT panels, VFD and associated electrical work.
31
Hi-Tech Lubricants Blending Plant
Year of Project: 2015
Manufacturing, supply and installation of MCC, LT & power DBs.
32
GIFT University LT System Replacement
Year of Project: 2017
Replacement of LT panels for complete system.
33
Sabirs’ Poultry | Electrical, Instrumentation
& Automation
Year of Project: 2014
Complete plant electrical and instrumentation installation services of all the
field work.
Automation installation services.
34
Phillip Morris Pakistan | Burner Management
System
Year of Project: 2015
Installation of instruments.
Supply and installation of PLC panel with VFD.
Calibration of instruments.
Installation of cable tray & cable mesh.
35
KSB Pumps | Water Filtration Plant
Year of Project: 2010-2013
Manufacturing, installation and commissioning of Water Filtration Plants
Control System for 800 Sites.
36
Nestle Pakistan | Earthing
Year of Project: 2012
Manufacturing, installation and commissioning of Earth Pit for 1400 sites.
37
Engro Foods | Supply and Installation of
Electrical Equipment
Year of Project: 2009
Electrification of all field equipment including shed lights, distribution
boards, main LT panel & cable tray, power cables supply and installation.
38
ICI Polyester | Electrification
Year of Project: 2014
Complete electrical & instrument installation and commissioning services
including instrument calibration services.
39
Raaziq Industrial Enterprises | Supply and
Services
Year of Project: 2017
Supply of MCC & PFI panels, supply and installation of cable tray with cover,
laying and termination of power and control cable.
40
Askar Oil | Electrification
Year of Project: 2016
Complete supply & installation of LT panels, distribution boards, power
cables, electrical installation & commissioning services.
41
PARCO | RTU Installation
Year of Project: 2007
Replacement of all old RTU with new RTU for all PARCO sites (BV, CP and MW)
and termination of field wiring and communication with the MCC.
42
Attock Refinery | Upgradation
Year of Project: 2006
Replacement of all the field instruments, consoles.
Dismantling old DCS and installation of new DCS.
Earthing systems, new cable trays, new cables, impulse lines, air tubing and
installation of explosion proof imported instruments.
43
Head Office: 56 – Pine Villas, opposite Green Forts 2, Canal Bank Road, Lahore - 54000, Pakistan
Engineering Works: Plot no. 5901/2642, 19-KM Multan Road, Lahore - 54000, Pakistan
Website: www.gain.com.pk
Email address: [email protected]
Telephone: (+92) 42 3545 0855-56
GAIN ENGINEERING SERVICES (PRIVATE) LIMITED