Gama General PresentationApril 2016
Contents
• Business Sectors
• Scope of Work by Trade
• Quality, Safety & Environment Policy
• HSE Statistics
• Safety Certificates
• ISO Certificates
• Company Clients Logos
• Ongoing Projects
• Experience Projects
• Overview
• Vision and Mission
• Milestones
• Growth Chart
• Manpower & Assets
• Triangle Group
• New Strategy, Restructuring & Achievements
• Board of Directors & Executives
• Executives Organization Chart
• Organization Chart
• Egyptian company founded in 1991• Member of Triangle Group since Aug. 2010 • Branch in Qatar & regional expansion plans in MENA region• Multi-discipline Construction Company (Civil – Infrastructure – Electro-Mechanical)• Jumped from a turnover of 180M EGP in 2011 to a net turnover in 2015 of 450M EGP
and an expectation to exceed 600M EGP by end of 2016.
New Group Headquarters – Moving in 2016
Overview
Vision and Mission
Vision: To be one of the top 3 contractors in Egypt within the coming 5 years with a regional presence; and become an efficient general contractor to earn the privilege of being ‘contractor of choice’.
Mission:1. Company:
Use value engineering, effective construction practice and hard work to deliver highest quality construction while preserving the environment
2. Clients: Strive to meet and exceed Client expectations to foster long term partnership
3. Employees: Create an enjoyable and safe work environment to allow personnel personal fulfillment that leads to loyal and productive workforce
4. Suppliers and Sub-Contractors: Treat sub-contractors / suppliers with respect to cultivate a team approach where experience is applied with dedicated enthusiasm
Milestones
Growth Chart
Manpower & Assets
Year 2013 2014 2015
Assets 12,996,942 29,416,867 36,511,204
Manpower
Assets
Departments 2011 2012 2013 2014 2015 2016
Quality 10 15 25 27 29 33
HSE 8 10 12 14 25 50
Technical 150 175 188 207 240 270
Commercial 5 7 10 13 16 20
Control[Planning, Cost & Contract]
3 5 7 9 13 15
Site Operation 57 65 77 81 95 107
Others 45 50 55 62 68 73
Permanent Total Person 278 327 386 413 486 568
Direct Work ForceTemporary: [Skilled &
Unskilled]1095 1230 1480 1900 2350 2500
Grand Total 1373 1557 1866 2313 2836 3086
Engineering, Construction & ServicesEnergy Infrastructure
Triangle Offshore Projects Triangle Onshore Projects Triangle Drilling Services Aerospace Airports & Airlines
Triangle Power & RenewableEnergy
Triangle Infrastructure Transportation Aman Trading & Engineering
• Established 1810, Nationalized in 1962, Re-established 1970• One of the largest private sector groups in Egypt• Group active in Iraq, Libya, Qatar, KSA, Algeria (RAYA), UAE, East Africa, Lebanon and
Cyprus• Expansion plans into Oman • Major shareholder of Gama providing following support:
- Financial Support - Procurement Support- Technical Support - New Local National & International Markets
Triangle Group
Triangle Group Regional Footprint
Iraq
Qatar
UAE
Algeria(RAYA)
Libya
Egypt
Saudi Arabia
East Africa
LebanonCyprus
Mozambique
Triangle Group
• Gama commenced application of Corporate Governance in 2013
• Restructuring and strengthening the company board of directors and
departments inclusive of:
- Financial Department
- Commercial and Tendering Department
- Business Development
- Projects Control Department
- Operations Department
- Procurement Department
- Human Recourses Department
- Safety Department
- Quality Department
- Introducing in-house contract administration
• During 2015, company exceeded a volume of 450 million EGP
New Strategy, Restructuring & Achievements
• The company now concentrates on executing in hand projects with the highest
quality standard, with a target to elevate the company position and image in the
market.
• We delivery our clients expectations and requirements with the aid of our
consultancy partners on the front end, providing creative ideas and expert
solutions to ensure the most efficient, cost-effective process possible through
our advanced Design-Build Construction and Value Engineering services.
• BIM is now applied in all projects
• Started self-execution of the Electro-mechanical scope of work
• Gama managed to be a preferred contractor in almost all the reputable
management offices and consultants (e.g. ECG / EHAF / MACE / SNC LAVALIN /
ACE / SHAKER / MCECH ….)
• ERP system (Oracle based) is now applied to integrate financial with operations.
New Strategy, Restructuring & Achievements
• Company is now active in Libya and Qatar, with a plan to expand to markets in
KSA and Africa
• Detailed targets and action plans for 2016 are now in perspective, and plan is to
work on achieving them.
• As of 2014, Gama has included new value added services to clients:
- Partnerships with major design and consultancy offices, allowing more
flexibility to provide Design Build service in all engineering trades
- As a part of Triangle Group, Gama can offer facility management service to
clients through a specialized company
- As part of Triangle Group, Gama can offer its clients privilege to certain
equipment as Triangle Heavy Equipment is the sole Agent for “FG-WILSON”
generators and “COMP-AIR” Compressors
New Strategy, Restructuring & Achievements
Client Satisfaction:
Our past experience has shown that the most successful companies benefit from
implementing systems that not only to address the needs of their clients, but also
to provide a framework for analyzing errors and using these information to improve
the way they operate.
New Strategy, Restructuring & Achievements
201320142015Planned for2016Year
86%92%95%98%Client Satisfaction %
Financially:• Gama now utilizes large available credit facilities with first class international banks
• In order to accommodate company targets and objectives for 2015 onwards, Partners
have increased Capital as follows:
- In 2012: Capital was EGP 10,000,000
- In May 2013: Capital was increased to EGP 18,500,000
- In August 2013: Capital was increased to EGP 23,500,000
- In December 2013: Capital was increased to EGP 30,500,000
- In January 2014: Capital was increased to EGP 31,200,000
- In August 2014: Capital was increased to EGP 36,200,000
- In February 2015: Capital was increased to EGP 41,200,000
- In May 2015: Capital was increased to EGP 46,200,000
- In August 2015: Capital was increased to EGP 51,200,000
- In January 2016: Capital was increased to EGP 56,200,000
New Strategy, Restructuring & Achievements
- Amr El Tawil (Chairman)- Ahmed El Tawil (Board Member)- Mohamed Aglan (Board Member / Vice Chairman Business Development)- Ayman Moharam (Board Member / Vice Chairman Operations)- Fakhry Eid (Board Member)- Mohamed El Dahshoury (CEO /Board Member)
Board of Directors & Executives
Position Name Date of JoiningCEO Mohamed El Dahshoury October 1, 2013Commercial Director Halim Fansa March 1, 2013CEO Executive Coordinator& QC Manager Aly Elnokaly March 5, 2014
Civil/Arch. Tender Manager Ahmed Farouk October 1, 2013QA / HSE Senior Manager Ahmed Sarwat May 1, 2015
Technical & Procurement Director Ahmed Helal January 1, 2014
Projects Control Shereen Wagdy December 1, 2013
Chief Financial Officer Sarah Abdel Gawad October 1, 2012
Human Recourses Manager Sameh Helal September 1,2014
Executives Organization Chart
Business Sectors
Scope of Work by Trade
2012
ELECTRICAL22%
2013
ELECTRICAL15%
2014
ELECTRICAL13%
2015
ELECTRICAL13%
Quality, Safety & Environment Policy
From the evolving thinking and in order to increase the competitiveness of the company, Gama was keen to apply quality management system ISO 9001:2008, OHSAS 18001:2007 & ISO 14001:2004, as follows:
1. Gama is committed to provide the best quality, lowest cost on time with the lowest impact on the environment & the lowest risk in the working environment.
2. We achieve the customer’s requirements & expectations.3. Take the necessary procedure to prevent pollution of air, water, soil and reduce waste
and rationalize resources.4. Our goals are directed toward continuous improvement as a basic for strengthening
our competitive position.5. Working as a team of well selected, highly qualified personnel and trainees on all
modern techniques.6. Work to prevent injuries and occupational diseases for workers, neighbors,
customers, contractors and company’s visitors.7. Achieve and review quality & safety objectives.8. We are committed to satisfy statutory and regulatory requirements related to works &
any other requirements.9. Distribute the policy to employees and interested parties.
Gama HSE Statistics
Safety Certificates
Safety Certificates
ISO Certificates
Company Clients Logos
Ongoing Projects
Experience Projects List
Experience Projects List
Experience Projects List
Experience Projects
INDUSTRIAL AND MANUFACTURINGPROJECTS
Experience Projects
PROJECT NAME: GOE 2X5775TPD ARISH CEMENT PRODUCTION PLANT PHASE 2 CIVIL WORKS (2014)SCOPE: CIVIL WORKS, INCLUDING (75000 M3 CONCRETE FOR COMPLETE LINE)AMOUNT: 209,000,000 EGP
PROJECT NAME: HANGAR 7000 (EGYPT AIR MAINTENANCE & ENGINEERING) (2014)SCOPE: DEMOLITION, CONCRETE FOR NEW STRUCTURES, FINISHING OF EXISTING AND NEW STRUCTURES, HVACPLUMBING, FIREFIGHTING, ELECTRIC & LIGHT CURRENT WORKSAMOUNT: 98,000,000 EGP
PROJECT NAME: UNILEVER MASHREQ FACTORY RENOVATION & REFURNISHING (2015)SCOPE: RENOVATION OF EXISTING PRODUCTION & PACKING FACILITY TBUA: 13000 M2, INCLUDING:CIVIL WORKS, ELECTRICAL, HVAC & FIRE FIGHTING WORKS & PROCESS EQUIPMENT & PIPING INSTALLATION.AMOUNT: 74,124,318 EGP
PROJECT NAME: EDITA Factory (Phase2) (2014)SCOPE: CONCRETE FOR STRUCTURES, STEEL STRUCTUREFOR PRODUCTION BUILDING, LASE FINISHED CONCRETE SOGFINISHING WORKS, SOFT & HARDSCAPE, HVAC, PLUMBING,FIREFIGHTING, ELECTRIC & LIGHT CURRENT WORKSAMOUNT: 72,000,000 EGP
PROJECT NAME: BEYTI PLANT EXTENSION (B04, B05 & B07) (2015)SCOPE: SUPPLY & INSTALLATION OF TBUA: 10,000 M2, INCLUDING: STEEL STRUCTURE BUILDING 418 TON, CIVIL WORKS, ELECTRICAL, HVAC & FIRE FIGHTING WORKSAMOUNT: 45,000,000 EGP
Experience Projects
PROJECT NAME: LG (ELECTRONICS EGYPT FACTORY) (2014)SCOPE: CIVIL & ARCHITECTURE WORKS INCLUDING (MASONRY, PLASTER, PAINTS, MARBLE, DOORS, WINDOWS, PARTITION & FALSE CEILING).AMOUNT: 50,000,000 EGP
PROJECT NAME: KRAFT FACTORY (2014)SCOPE: CIVIL - ARCHITECT - ELECTRICITY - MECHANICSAMOUNT: 65,000,000 EGP
PROJECT NAME: PHARMA PACK (PHARMACEUTICAL FACTORY) (2014)SCOPE: STEEL STRUCTURE, CONCRETE WORKS, FINISHING WORKS, HVAC, PLUMBING, FIREFIGHTING, ELECTRICAL & LIGHT CURRENT WORKSAMOUNT: 43,000,000 EGP
PROJECT NAME: PEGAS FACTORY (2012)SCOPE: CIVIL - FINISHING & STEEL STRUCTURE BUILDINGAMOUNT: 40,000,000 EGP
PROJECT NAME: SAMSUNG FACTORY (2012)SCOPE: CIVIL – LANDSCAPE - INFRASTRUCTURE - ROADS AMOUNT: 15,200,000 EGP
PROJECT NAME: JUHAYNA (WAREHOUSE) (2013)SCOPE: CIVIL - MEP WORKS AMOUNT: 19,000,000 EGP
Experience Projects
PROJECT NAME: Chipsy Factory Extension [FPW & Line 4&5] (2014)SCOPE: CIVIL, STEEL STRUCTURE, FINISHING, UNDERGROUND INFRASTRUCTURE, PIPING WORKS, EQUIPMENT ERECTION,PLATE WORK FABRICATION & ERECTION, FIREFIGHTING NETWORK, HVAC & PLUMBING.AMOUNT: 70,000,000 EGP
PROJECT NAME: CHIPSY FACTORY (EL OBOUR CITY) (2011)SCOPE: CIVIL - MEP WORKS AMOUNT: 51,500,000 EGP
Experience Projects
PROJECT NAME: BARIQ FACTORY (2012)SCOPE: CIVIL - MEP WORKS AMOUNT: 20,000,000 EGP
PROJECT NAME: DANONE DAIRY FARM (2010)SCOPE: CIVIL & MEPAMOUNT: 54,000,000 EGP
PROJECT NAME: DABUR AMLA FACTORY (2011)SCOPE: CIVIL - MEP WORKS AMOUNT: 28,000,000 EGP
PROJECT NAME: CHLORIDE FACTORY (2010)SCOPE: CIVIL - MEP WORKS AMOUNT: 28,000,000 EGP
PROJECT NAME: EL BORG FACTORY (2011)SCOPE: CIVIL - MEP WORKS AMOUNT: 16,000,000 EGP
PROJECT NAME: BEL EGYPT FACTORY (2012)SCOPE: CIVIL - MEP WORKS AMOUNT: 16,000,000 EGP
Experience Projects
PROJECT NAME: DANONE FACTORY (2011)SCOPE: CIVIL - MEP WORKS AMOUNT: 10,000,000 EGP
PROJECT NAME: SCIB FACTORY (2010)SCOPE: CIVIL - MEP WORKS AMOUNT: 20,000,000 EGP
PROJECT NAME: HALWANI BRO. FACTORY (2011)SCOPE: CIVIL - MEP WORKS AMOUNT: 6,500,000 EGP
Experience Projects
PROJECT NAME: CHIPSY FACTORY (6TH OF OCTOBER CITY) (2009)SCOPE: CIVIL - MEP WORKS AMOUNT: 55,000,000 EGP
PROJECT NAME: ALEX FIBER FACTORY (2005)SCOPE: CIVIL – LANDSCAPE - MEP WORKSAMOUNT: 40,000,000 EGP
PROJECT NAME: SCHNEIDER ELECTRIC FACTORY (2008)SCOPE: CIVIL - LANDSCAPE - MEP WORKS AMOUNT: 33,000,000 EGP
PROJECT NAME: C.S.A TEXTILE FACTORY (2008)SCOPE: CIVIL WORKS AMOUNT: 18,000,000 EGP
PROJECT NAME: INDOMIE FACTORY (2009)SCOPE: CIVIL WORKS AMOUNT: 10,000,000 EGP
Experience Projects
PROJECT NAME: ARAMEX FACTORY (2010)SCOPE: CIVIL - MEP WORKS (FIRST GREEN WAREHOUSE IN EGYPT TO LEED REQUIREMENTS)AMOUNT: 35,500,000 EGP
PROJECT NAME: UNILEVER FACTORY (2004)SCOPE: CIVIL - MEP WORKS AMOUNT: 15,000,000 EGP
PROJECT NAME: CEMEX FACTORY (2002)SCOPE: CIVIL – MEP WORKS AMOUNT: 6,000,000 EGP
PROJECT NAME: BEYTI FACTORY (2013)SCOPE: CIVIL - MEP WORKS AMOUNT: 15,000,000 EGP
Experience Projects
PROJECT NAME: CADBURY FACTORY (2008)SCOPE: CIVIL - MEP WORKS AMOUNT: 6,000,000 EGP
PROJECT NAME: CSA FACTORY (2008)SCOPE: CIVIL WORKS AMOUNT: 20,000,000 EGP
PROJECT NAME: EVYAP FACTORY (2009)SCOPE: CIVIL - FINISHING - LANDSCAPE - MEP WORKS AMOUNT: 20,000,000 EGP
PROJECT NAME: SIKA FACTORY (1999)SCOPE: EPC CONTRACT - DESIGN - CIVIL - MEP WORKS AMOUNT: 17,000,000 EGP
Experience Projects
PROJECT NAME: PEPSI DOMIAT (2009)SCOPE: CIVIL - MEP AMOUNT: 4,000,000 EGP
Experience Projects
PROJECT NAME: PRESIDENT FACTORY (2007)SCOPE: CIVIL - MEP WORKS AMOUNT: 11,500,000 EGP
Experience Projects
COMMERCIAL, RESIDENTIAL& ADMIN. BUILDINGS PROJECTS
PROJECT NAME: NEW GIZA (FAIRWAY VILLAS - CLUSTERS 6,7 & 10) TOWN HOUSE (2014)SCOPE: CONCRETE SKELETON, SEMI-FINISHING WORKS, PLUMBING & ELECTRIC FIRST FIXAMOUNT: 15,500,000 EGP
Experience Projects
PROJECT NAME: CFC Oriana Villas [Phase 3] (2015)SCOPE: 61 VILLAS, 2 STORY SEMI FINISHED VILLAS WITHTBA= 33,877 M2, INCLUDING CONCRETE STRUCTURE,EXTERNAL FINISHING + MEP FIRST FIXAMOUNT: 122,721,725 EGP
PROJECT NAME: ZAYAN CENTER (2014)SCOPE: DETAILED CIVIL DESIGN FOR CONCRETE POSTTENSIONED SLABS, CONCRETE SKELETON INCLUDING POSTTENSIONING OF CONCRETE SLABSAMOUNT: 93,700,000 EGP
PROJECT NAME: CARREFOUR HYPERMARKET (CITY LIGHT) (2014)SCOPE: FINISHING & MEPAMOUNT: 48,000,000 EGP
PROJECT NAME: PORTO MATROUH (RESIDENTIAL BUILDINGS & HOTEL) (2014)SCOPE: CIVIL WORKS, ARCHITECT, PLUMBING AND LANDSCAPEAMOUNT: 98,000,000 EGP
PROJECT NAME: TRIANGLE GROUP OFFICE BUILDING (2015)SCOPE: CONCRETE SKELETON, FINISHING WORKS, HVAC, PLUMBING, FIREFIGHTING, ELEVATORS, ELECTRIC & LIGHT CURRENT WORKSAMOUNT: 45,000,000 EGP
Experience Projects
PROJECT NAME: CARREFOUR MALL OF EGYPT (2015)SCOPE: FIT OUT FOR 13,814 M2, INCLUDING: FINISHING, ELECTRICAL, HVAC, PLUMBING & FIRE FIGHTING WORKS.AMOUNT: 67,200,000 EGP
PROJECT NAME: CAIRO FESTIVAL CITY (2011)SCOPE: CIVIL WORKS AMOUNT: 60,000,000 EGP
PROJECT NAME: JUNGLE PROJECT (VILLAS) (2012)SCOPE: CIVIL - FINISHING WORKSAMOUNT: 25,000,000 EGP
PROJECT NAME: CLEOPATRA PLAZA (2013)SCOPE: EXCAVATION WORKS - CONCRETE WORKS - INSULATION BUILDINGS – MASONRY WORKSAMOUNT: 35,500,000 EGP
Experience Projects
PROJECT NAME: SMOUHA SPORTS SOCIAL CLUB (2006)SCOPE: CIVIL – LANDSCAPE - MEP WORKS AMOUNT: 3,000,000 EGP
PROJECT NAME: BRIDGESTONE MALL (2011)SCOPE: CIVIL WORKS AMOUNT: 6,250,000 EGP
Experience Projects
POWER & WATERPROJECTS
PROJECT NAME: HAZARDOUS WASTE TREATMENTPLANT (2006)SCOPE: CIVIL WORKS AMOUNT: 5,250,000 EGP
PROJECT NAME: NAGAA HAMMADI SUBSTATION (2008)SCOPE: CIVIL & MEPAMOUNT: 6,000,000 EGP
Experience Projects
PROJECT NAME: BADR 500/220 KV GIS SUBSTATION (2014)SCOPE: CIVIL WORKS, FINISHING & PLUMBING.AMOUNT: 19,050,000 EGP
Cairo Head Office:38 Aly Amin St.(Mustafa El Nahas), 7th district - Nasr City - Cairo Tel: (+202)23824195–23824196 - Fax: (+202)23824361E-mail: [email protected] Web: www.gama-construction.com
Alexandria:Behind 226 Port Said St., SportingTel/Fax: (+203)5426238
Cairo Head Office:38 Aly Amin St.(Mustafa El Nahas), 7th district - Nasr City - Cairo Tel: (+202)23824195–23824196 - Fax: (+202)23824361E-mail: [email protected] Web: www.gama-construction.com
Alexandria:Behind 226 Port Said St., SportingTel/Fax: (+203)5426238
Thank You