All notes to the presentation team have blue backgrounds Slides with white backgrounds are to be used in presentation Game plan for DFW SIM Roundtable 1-Aug-07 1. Leon: Session intro 2. Interactive: Facilitated discussion Where’s IT hurt? 3. Leon: What is EA? 4. Brian: EA as evolution – EA Maturity 5. Michael: CSFs of EA: Institutionalizing EA 6. Break: 7. Ron: Case: EA to solve an IT problem 8. Russ/Rollie: Case: EA to solve a biz problem 9. Q&A session 10. Leon: Close
Transcript
Page 1: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

• All notes to the presentation team have blue backgrounds • Slides with white backgrounds are to be used in presentation

Game plan for DFW SIM Roundtable 1-Aug-07 1. Leon: Session intro2. Interactive: Facilitated discussion Where’s IT hurt?3. Leon: What is EA? 4. Brian: EA as evolution – EA Maturity 5. Michael: CSFs of EA: Institutionalizing EA6. Break: 7. Ron: Case: EA to solve an IT problem8. Russ/Rollie: Case: EA to solve a biz problem9. Q&A session10. Leon: Close

Page 2: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

1. Leon does intro

Page 3: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

The SIM Enterprise Architecture

Working Group (SIMEAWG)

http://simeawg.unt.edu/

Page 4: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

SIMEAWG Member Organizations

• Association of Enterprise Architects• Atos Origin, Inc.• Aviall Services• BAE Systems Information Technology• Chubb & Son• CIBER• Citigroup• City of Denton, Texas• Community College of Southern

Nevada• EA Directions Inc.• EDS• International Paper• Interstate Batteries• LiquidHub, Inc.

• Metallect Corp.• New Madison Avenue• nextPression, Inc.• Northwestern Mutual• Pariveda Solutions• People's Bank • Syracuse University• University of Maryland University

College • University of Missouri - Rolla• University of North Texas• Information Systems Research

Center, University of North Texas,• Zachman Framework Associates• Zachman International

Page 5: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

Enterprise Architectureand the

Next Generation Enterprise

Page 6: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

Today’s panelists• Leon Kappelman, Professor of IS @ UNT • Brian Salmans, USAF & UNT • Michael Holland, Senior IT Analyst, GAO• Ron de Vries, Director ERP Technology

Services, Atos Origin • Russell Douglas, Director Customer &

Supplier Services, Aviall (Boeing)

Page 7: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

Take out your pencils and paper …

Where’s IT hurt?

Page 8: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

2. Interactive session: What’s your problem?

• Facilitated discussion to answer questions like …• What’s keeping you up at night?• What would you like to accomplish but just can’t seem to? • Where is your pain? Where’s IT hurt?

• Table discussions, table reports, distill into main areas for tables to present

• Facilitator observation questions: Is the focus on symptoms or causes? Are all the interrogatives covered (who, what , where, why, when, how)?

• Then Leon will do 3. “What is EA?”

Page 9: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

Mission of the SIMEAWG as endorsed by the SIM Executive Board Oct-2006

• The SIMEAWG will • identify and share processes, methods,

tools, concepts, and best practices;• in order to enable IT organizations to

understand, create, and manage EA in partnership with the business; and

• help these IT organizations substantially enhance the way they manage change, reduce complexity, reengineer processes, plan, strategize, govern, manage projects, and deliver value.

Page 10: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

Although not of one mind, the SIMEAWG believes that …

• EA is the key to achieving alignment and a seat at the strategic table. EA gets to the essence of IT success.

• Mis-alignment and lack of alignment are symptoms of deeper problems. They are not causes.

• Focusing on symptoms instead of their causes is like weighing yourself to lose weight. It won’t work. It can’t.

• Weight loss requires changes in attitudes and behaviors. Achieving alignment and a seat at the table do too.

• “Enterprise Architecture” is what we call that change. EA’snot the best word for it, but it’s the word we now have.

• EA includes many things you are already do; such as, IT strategic planning, requirements analysis, network design, and standard setting, BUT EA is much much more than that.

• EA is about a different way of seeing the enterprise and all of its assets, including its technologies.

Page 11: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

• US government’s GAO says an EA : • …provides “a clear & comprehensive

picture of an … organization.”• Information Technology: Enterprise Architecture Use Across The Federal Government Can Be

Improved, GAO-02-6, February 2002, http://www.gao.gov/new.items/d026.pdf.

• “is a blueprintblueprint for organizational change defined in modelsmodels [of words, graphics, & other depictions] that describe (in both business and technology terms) how the entity operates todaytoday and how it intends to operate in the futurefuture; it also includes a plan for transitioningtransitioning to this future state.”

• Enterprise Architecture: Leadership Remains Key To Establishing And Leveraging Architectures for Organizational Transformation, GAO- 06-831, August 2006, http://www.gao.gov/new.items/d06831.pdf.

What is EA?

Page 12: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

What’s wrong with this picture?

• “top IT management concerns of CIOsin 2006 … the alignment of IT and business at their companies …according to …survey by the Society for Information Management. ” (InformationWeek, 18Sep06)

• “Yet again, alignment is the top priority for CIOs ”Business Alignment: The Eternal Priority” (CIO Insight, 22Mar07)

Page 13: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

Key Issues Facing Information Systems Executives, 2004, Ives & Mandviwalla.

Page 14: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

“KEY ISSUES FOR IT EXECUTIVES 2005” MISQE, 2006, Luftman, Kempaiah, & Nash.

Page 15: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

“KEY ISSUES FOR IT EXECUTIVES 2004” MISQE, 2006, McLean & Luftman.

Page 16: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

• EA is about communications and the creation of a shared language to “think and talk” about the enterprise.

•• CONSIDER THIS:CONSIDER THIS: If the people of the If the people of the enterprise cannot adequately enterprise cannot adequately communicate in order to synchronize communicate in order to synchronize their thinking, then how can we their thinking, then how can we expect the tangible expect the tangible ““thingsthings”” managed managed by those people to be synchronized by those people to be synchronized with the more intangible things like with the more intangible things like strategy, goals, and objectives?strategy, goals, and objectives?

Page 17: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

• “Alignment,” “flexibility,” “nimbleness,”“simplicity,” and so on are design objectives; answers to questions like “what do we want it to look like?”

• The answer to the question “how do we accomplish it?” …• is what most now call “planning” or “strategic

planning” or “analysis and design”; • We call it “Enterprise Architecture.”• Fed Chairman Bernanke calls it "intangible

capital“ …

Page 18: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

Federal Reserve Board ChairmanBen Bernanke says it this way …

"In the case of information and communication technologies …investments in associated intangible capital -- figuring out what to do with the computer once it's out of the box -- are quite important indeed.” June 2006 commencement speech @ MIT

Page 19: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

• The full economic benefits of recent technological changes have not yet been completely realized."

June 2006 commencement speech @ MIT

• To make effective use of such a technology within a specific firm or industry, however,managers must supplement their purchases managers must supplement their purchases of new equipment with investments in firmof new equipment with investments in firm--or industryor industry--specific research and specific research and development, worker training, and development, worker training, and organizational redesignorganizational redesign -- all examples of what economists call intangible capital.

31-August-06 http://www.federalreserve.gov/boarddocs/speeches/2006/20060831/default.htm

Fed Chairman Bernanke says …

Page 20: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

• Industrial Age: Enormous productivity gains due to intellectual/intangible capital of “scientific management”as described by Frederick Taylor.

• Information Age: “EA” is also about enormous increases in productivity & quality.

• THINK ABOUT IT: Managing for productivity and quality is central to management practice today. • But when we say “efficiency” or “productivity” most

don’t think of Taylor, his 1881 paper, 1911 book, or the words “scientific management”

• Nor do we think of Joseph Juran, his 1928 pamphlet, 1951 Quality Control Handbook, or the words “statistical quality control” when we say “quality” or “effectiveness.”

• I don’t know what we’ll call EA in 50 years, but I’m sure successful managers will doing it will.

Productivity and Quality

Page 21: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

• A new way of thinking, communicating, and doing.• Change in culture, hearts, and minds in the

enterprise.• A journey, not a task. • Capturing & managing all the knowledge about

enterprise• Using that knowledge to manage the enterprise in

order to achieve alignment, agility, simplicity, and any other objectives.

What is EA? EA is …

Page 22: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

4. Brian: EA maturity

• EA is evolutionary• Models/Theories of EA maturity

Page 23: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

• Use maturity models to:• Support process improvements• Benchmark effectiveness of EA practices and EA status• Illustrate benefits (current and projected)• Set goals• Support EA program efforts• Measuring EA efforts to ‘sell’ EA to leadership

• Assessing EA through maturity models:• Demonstrates structure • Indicates a plan

Assessing EA as a Process Not a Project

Page 24: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

0 1 2 3 4 5

Enterprise Architecture Maturity Models

Page 25: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

SIM EA Working Group Survey:Incorporating the EA Maturity Models

GAO

CMM

MIT-CISROMB

Page 26: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

State of Enterprise Architecture

Page 27: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

Survey Questions Mapped to EA Maturity Models

Page 28: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

5. Michael: CSFs of EA

• How to Institutionalize EA • How to do EA successfully• CSFs of EA

• Followed by 6. Break

Page 29: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

Enterprise Architecture Critical Success Factors

August 2007

Page 30: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

2

GAO and the U.S. Federal Government

Legislative

Acquisition Sourcing and Management

Defense Capabilities and Management

Education, Workforce, and Income Security

Health Care

Financial Markets and Community Investment

Financial Management and Assurance

Homeland Security and Justice

International Affairs and Trade

Information Technology

Strategic Issues

Natural Resources and Environment

Physical Infrastructure

Page 31: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

3

Critical Success Factors

• Building a Management Foundation

• Sustained Leadership

• Effective Communication

• Workforce Planning

• Etc.

Note: The above list is not intended to include all EA critical success factors.

Page 32: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

4

Building the Management Foundation

Page 33: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

5

GAO’s EAMMF Enterprise Architecture Management Maturity Framework (EAMMF)

• History: EAMMF version 1.0 issued in February 2002; was an extension of the Federal CIO Council’s A Practical Guide to Federal Enterprise Architecture (2001). EAMMF version 1.1 issued in November 2003; reflects comments on version 1.0. Revision of version 1.1 in progress.

• Purpose: Provide enterprise architecture program benchmarking tool to assess state of architecture program and developing improvement plans.

• Application: Does not provide a methodology or approach for applying the framework; depth and breadth of applications can vary.

Page 34: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

6

Note: each stage includes all elements of previous stages.

Attribute 1: Demonstrates commitment

Attribute 2: Provides capability to meet commitment

Attribute 3: Demonstrates satisfaction of commitment

Attribute 4: Verifies satisfaction of commitment

Written and approved organization policy exists for EA maintenance.

EA products and management processes undergo independent verification and validation.

EA products describe both the “as-is” and the “to-be” environments of the enterprise, as well as a sequencing plan for transitioning from the “as-is” to the “to-be. "Both the “as-is” and the “to-be”environments are described in terms of business, performance, information/data, application/service, and technology. Business, performance, information/data, application/service, and technology descriptions address security. Organization CIO has approved current version of EA. Committee or group representing the enterprise or the investment review board has approved current version of EA.

Quality of EA products is measured and reported.

Source: GAO. maturation

Written and approved organization policy exists for IT investment compliance with EA.

Process exists to formally manage EA change.EA is integral component of IT investment management process.

EA products are periodically updated.IT investments comply with EA.Organization head has approved current version of EA.

Return on EA investment is measured and reported.Compliance with EA is measured and reported.

Written and approved organization policy exists for EA development.

EA products are under configuration management.

EA products describe or will describe both the “as-is” and the “to-be” environments of the enterprise, as well as a sequencing plan for transitioning from the “as-is” to the “to-be.”Both the “as-is” and the “to-be”environments are described or will be described in terms of business, performance, information/data, application/service, and technology. Business, performance, information/data, application/service, and technology descriptions address or will address security.

Progress against EA plans is measured and reported.

Adequate resources exist.Committee or group representing the enterprise is responsible for directing, overseeing, or approving EA.

Program office responsible for EA development and maintenance exists.Chief architect exists.EA being developed using a framework, methodology, and automated tool.

EA plans call for describing both the “as-is” and the “to-be”environments of the enterprise, as well as a sequencing plan for transitioning from the “as-is” to the “to-be.”EA plans call for describing both the “as-is” and the “to-be”environments in terms of business, performance, information/data, application/service, and technology.EA plans call for business, performance, information/data, service, and technology descriptions to address security.

EA plans call for developing metrics for measuring EA progress, quality, compliance, and return on investment.

Stage 1:Creating EA awareness

Stage 2:Building the EA management foundation

Stage 3: Developing EA productsStage 4: Completing EA products

Stage 5: Leveraging the EA to manage change

EAMMF Version 1.1

Page 35: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

7

Attribute 1: Demonstrates commitment

Attribute 2: Providescapability to meet commitment

Attribute 3: Demonstrates satisfaction of commitment

Attribute 4: Verifies satisfaction of commitment

Stage 1

Stage 2: Building the EA management foundation

Adequate resources exist.Committee or group representing the enterprise is responsible for directing, overseeing, and approving EA.

Program office responsible for EA development and maintenance exists.Chief architect exists.

EA being developed using a framework, methodology, and automated tool.

EA plans call for describing both the “as-is” and the “to-be” environments of the enterprise, as well as a sequencing plan for transitioning from the “as-is” to the “to-be.”EA plans call for describing both the “as-is” and the “to-be” environments in terms of business, performance, information/data, application/service, and technology.EA plans call for business, performance, information/data, service, and technology descriptions to address security.

EA plans call for developing metrics for measuring EA progress, quality, compliance, and return on investment.

Source: GAO. maturation

EAMMF Version 1.1

Page 36: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

8

Sustained Leadership

Page 37: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

9

In 2006, we reported that the state of the enterprise architecture programs at the 27 major federal departments and agencies is mixed, with several having very immature programs, several having more mature programs, and most being somewhere in between.

• The results showed that the federal government’s departments and agencies have satisfied 77% of the elements related to leadership elements.

• According to our survey, these successful organizations realized that sustained executive leadership was the key to overcoming virtually all challenges facing federal EA programs (e.g., cultural resistance, inadequate funding, etc.).

• Our findings were consistent with that of our 2004 survey, which emphasized that leadership remains key to agencies making progress on EA efforts.

Sustained Leadership

Source: Enterprise Architecture: Leadership Remains Key to Establishing and Leveraging Architectures for Organizational Transformation (GAO-06-831), August 2006

Page 38: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

10

57

82

82

86

46

75

36

Stage 2: Building the EA management foundationStage 3: Developing the EAStage 4: Completing the EAStage 5: Leveraging the EA to Manage Change

Committee or group representing the enterprise is responsible for directing, overseeing, and approving EA. (Stage 2)

Written and approved policy exists for EA development. (Stage 3)

Written and approved policy exists for EA maintenance. (Stage 4)

Organization CIO has approved EA. (Stage 4)

Committee or group representing the enterprise or the investment review board has approved current version of EA. (Stage 4)

Written and approved organization policy exists for IT investment compliance with EA. (Stage 5)

Organization head has approved current version of EA. (Stage 5)

Source: GAO.

Percent SatisfyingElement

Note: This table reflects selected framework elements related to leadership.

Sustained Leadership

Page 39: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

11

Effective Communication

Page 40: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

12

• Enterprise architectures are corporate assets to be owned and used by the major business area executives. As such, it is critical that architecture plans and activities be transparent to, and have the support of, these stakeholders and their teams. (GAO-03-458)

• The Federal CIO Council’s Practical Guide to Federal Enterprise Architecture recommends that, before developing the architecture, organizations initiate a marketing program to educate stakeholders about the value of the architecture and emphasize the agency head’s support and commitment. Once initial participation and commitment is achieved, the guide recommends that an agency develop and implement an enterprise architecture communications strategy to facilitate the exchange of information and to keep business area executives and their teams informed and engaged. (GAO-03-458)

• In 2003, we recommended that The Secretary of Defense ensure that the enterprise architecture program is supported by a proactive marketing and communication program. In 2007, DOD reported that a communications plan was in development. (GAO-07-733)

Effective Communication

Page 41: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

13

Workforce Planning

Page 42: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

14

• Workforce planning is an essential component of program management. Workforce planning enables an entity to be aware of and prepared for its current and future human capital needs, such as workforce size, knowledge and skills, and training. Such planning involves assessing the knowledge and skills needed to execute the program, inventorying existing staff knowledge and skills, identifying any shortfalls, and providing for addressing these shortfalls. (GAO-05-702)

• In 2005, we reported that the absence of effective workforce planning had contributed significantly to the Department of Defense’s limited progress in developing its business enterprise architecture (BEA). (GAO-05-702)

• We recommended that the department ensure that plans and commitments provide for effective BEA workforce planning, including assessing workforce knowledge and skills needs, determining existing workforce capabilities, identifying gaps, and filling these gaps. In 2007, we reported that the department released a human capital strategic plan, but had yet to release an associated human capital implementation plan. (GAO-07-733)

Workforce Planning

Page 43: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

Enterprise Architecture Critical Success Factors

Michael [email protected]

Page 44: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

7. Ron: EA to solve an IT problem

• EA and its parts — Ron’s model• OCM• BSM – optimization• It’s all about discovery• It’s all about requirements• visibility

Page 45: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

EA and an IT Service Provider

Ron de VriesDirector ERP Technology Services

Atos Origin, [email protected]

http://www.na.atosorigin.com

Page 46: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

EA and “My World”

• ERP Technology Service Provider• SAP, MFGPro, Oracle, Managed Objects, Security

Management Service

• Many customers, many variations• Silo organizations (in variations), intrinsically

optimized, but not integrated or focused from Application perspective

Page 47: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

Characteristics of My Customers

Page 48: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

Where on “the EA map”?

Organizational Change

Management

Business Alignment

IT Governance

BusinessService

Management

BusinessApplication

Management

BusinessProcess

Management

Page 49: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

My Answer:Dynamic Current Visibility

• Using Business Service Management to:• Flatten organizational barriers• Provide accurate, real-time visibility• Improve Immediate Root Cause

Detection• Maximize Efficiency• Create seamless universal information

access

Page 50: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

Which Leads To?

• A great Starting Point to:• Begin EngineeringEngineering the Enterprise

Architecture• Ensure CoordinationCoordination and AlignmentAlignment

between Business and IT• Identify the most important Current Current

IssuesIssues• Improve the EffectivenessEffectiveness of IT•• Free up Free up resources to seed the pending

EA activities

Page 51: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

Questions?

http://www.na.atosorigin.comhttp://www.na.atosorigin.com

Page 52: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

8. Russ: EA to solve a biz problem

• How to get the biz involved• How to begin• How to sell it

• Followed by 9. Interactive Q&A

Page 53: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

1

Aviall Services, Inc

EA Journey

“In the beginning”

SIM Meeting

Aug 01, 2008

Page 54: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

2

Overview

• EA Approach –Where to begin?• Funds Allocation• Next Steps

Page 55: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

3

EA Approach-Where to begin?• Strategic Planning

• Annual Planning• Five years plan

• Capabilities Assessments (interviews)• Sales (CSR, Outside, Inside), Branches, Finance, Accounting, Procurement,

Warehouse, Legal, & IS– Current state – Business Issues– Future goals

• Marketing Quarterly and Annual Reporting

• Gap Analysis • Strategic Plan vs Capabilities assessment

• Project Determinations• Required Capabilities to meet Strategic Goals• Consulting Support (Been there, done that!!!)

Page 56: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

4

Funds Allocation

• Budget – (Show me the money! Where is the money?)

• *IT Investment decisions should align with projects and products that enable the strategic direction of the business (ie., needed capabilities)

• Appended “riders” to existing projects or IT investments that link to strategic goals

*Note. This comments assumes that you have a P&L or at least influence on sourcing and procurement decisions.

Page 57: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

5

Next Steps

• Create EA Team– Establish what EA means to Aviall– Create/refine current state business models– Determine best fit EA Framework (ie., Zachman, TOGAF, FEAF,

DODAF, E2AF etc…)– Begin business decomposition process (to discrete services or tasks)– Determine interim business success drivers (from interviews & strategic

plan)

Page 58: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

10. Close … Leon

Page 59: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

EA Action Guidelines: Getting Started• Use collaborative approaches to doing and governing EA:

• Organize an EA working group.• Develop understanding and agreement about language, models, and methods.

• Get participation & commitment from IT & business management:• At all levels (but start as high as possible).

• Determine the goals, focus, scope, and priorities:• Aim for completeness & comprehensiveness

• Embrace change and learning:• Remember, it’s a journey and a process.• Communicate, communicate, communicate!!!!!

• Start small and show early success: • Identify EA initiatives of most value to organization.• Success creates champions and wins hearts and minds.

• Monitor, evaluate, and improve on a continuous basis:• Quantify the benefits• Regularly take a hard look at its cost and value, and make it better.

• Use EA in IT to continuously improve IS development, security, operations, and user support to better serve enterprise needs

• AND TO COMMUNICATE WITH YOUR CUSTOMERS AND STAKEHOLDERS.

Page 60: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

Road to the Future: Institutionalizing EA• This is a new way of life: There is no quick fix; no silver bullet.• This will take time and determination, as well as vision,

courage and commitment: Do not underestimate the difficulty and complexity of architecting (i.e., engineering and manufacturing) one of the most complex object yet conceived by humankind – the Enterprise.

• Do not get discouraged: This is a new way of life, a revolution in thinking, a discipline, an engineering process. Change of this magnitude takes time and perseverance.

• Set realistic expectations: Things will have to be implemented periodically so you have to accept some risk of “scrap and rework."

• Don't assume anything: Make executive education and technical training a continuous process. It is easy to forget long-term issues in the short-term stress of daily life.

• Learn!: The state of the art is only about 20 years old and the "playing field" still pretty level – there is still much to learn and discover, and many opportunities to create advantage and value.

Page 61: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

Where are we now?Where are we now?We have not succeeded in answering all of our questions. Some of the answers we found, only serve to raise a whole set of new questions. In some ways we feel that we are as confused as ever, but we believe that we are confused on a higher level and about more important things.

Page 62: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

For Further InformationReadings:• Finkelstein, Clive (2006). Enterprise Architecture for Integration: Rapid Delivery Methods and Technologies, Artech House,

1580537138.• General Accountability Office (2006). Enterprise Architecture: Leadership Remains Key To Establishing And Leveraging

Architectures for Organizational Transformation, GAO- 06-831, August, http://www.gao.gov/new.items/d06831.pdf.• Kappelman, Leon A. (2007). “Bridging the Chasm,” Architecture and Governance, vol. 3, no. 2,

http://www.architectureandgovernance.com/articles/09-lastword.asp.• Kappelman, Leon A. (2007). “Enterprise Architecture: Not Just Another Management Fad,” Alignment Journal, March-April,

24-27. http://courses.unt.edu/kappelman/aboutwork/articles/Kappelman-AlignJ-Mar-Apr07.pdf• Ross, Jeanne W., Weill, Peter, and Robertson David (2006). Enterprise Architecture As Strategy: Creating A Foundation For

Business Execution, Harvard Business School Press.• Zachman, John A. (1987). “A Framework for Information Systems Architecture,” IBM Systems Journal, vol. 26, no. 3, IBM

Publication G321-5298, http://www.research.ibm.com/journal/sj/382/zachman.pdf. • Zachman, John A. (2007). “Architecture Is Architecture Is Architecture,“ EIMInsight, vol. 1, no. 1, March, Enterprise

Information Management Institute, http://www.eiminstitute.org/library/eimi-archives/volume-1-issue-1-march-2007-edition.• Zachman, John A. and Sowa, J. F. (1992). “Extending and Formalizing the Framework for Information Systems

Architecture,” IBM Systems Journal, vol. 31, no. 3, IBM Publication G321-5488.

Websites:• http://courses.unt.edu/kappelman/SIMEAWG/SIMEAWG.html• http://www.aeajournal.org/• http://www.architectureandgovernance.com/• http://www.cio.gov/index.cfm?function=eastatement• http://www.eaig.org/• http://www.enterprise-architecture.info/• http://www.feacinstitute.org/• http://www.ichnet.org/IAC_EA.htm• http://www.intervista-institute.com/km/km-videos.html• http://www.zachmaninternational.com/• http://www.zifa.com/

• Prepared for the DFW SIM CIO Roundtable to be held in Dallas, Texas on August 1, 2007, by:Leon A. Kappelman, Ph.D.Co-chair, SIM Enterprise Architecture Working GroupProfessor of Information Systems, Information Technology & Decision Sciences DepartmentDirector Emeritus, Information Systems Research CenterCollege of Business, University of North Texas, Denton, Texas 76203Voice: 940-565-4698 Fax: 940-565-4935 Email: [email protected] Mobile: 940-367-0405Website: http://courses.unt.edu/kappelman/

Page 63: Game plan for DFW SIM Roundtable 1-Aug-07 - c.ymcdn.comc.ymcdn.com/sites/ · PDF fileGame plan for DFW SIM Roundtable 1-Aug-07 1. ... • Nor do we think of Joseph Juran, ... November

http://courses.unt.edu/kappelman/aboutwork/articles/Bridging-the-Chasm.pdf


Recommended