  • Unique & Not RepetitiousWell Defined ObjectivesSpecific Start and End PointInvolve Cost & TimeCuts Across Many Organizational and Functional Lines

  • Managing and directing time, material, personnel, and costs to complete a particular project in an orderly, economical manner and to meet established objectives in - Time, Money, and Technical results.

  • Investment decision makerWants end resultsCharged with achieving project output under given constraints

    Sponsor

    Owner

    External Project Manager

    Sub-project Manager

    Supervisors

    Activities

  • GANTT CHARTNETWORK

    GANTT CHARTHenry L Gantt (1907)SimpleEasy to Use NETWORKPERT (Program Evaluation and Review Technique)Developed by US Navy (1956 58)ProbabilisticUncertaintyUnknown Technology CPM (Critical Path Method)Developed by Du Pont and Remington Rand (1957)DeterministicCertainKnown Technology

  • Type of bar-chart (but horizontal) that shows both the scheduled and completed work over a period. A time-scale is given on the chart's horizontal axis and each activity is shown as a separate horizontal rectangle (bar) whose length is proportional to the time required (or taken) for the activity's completion. In project planning, these charts show start and finish dates, critical and non-critical activities, slack time, and predecessor-successor relationships. Also called chronogram, it was invented in 1907 by the US engineer and a scientific-management pioneer, Henry L. Gantt (1861-1919).

  • GANTT LOADING CHART

  • DISADVANTAGES

    It does not show the sequential relationship among different activities.It is not easy to establish which parts, in sequence dictate the total duration of the project.It is not easy to use the planning chart for control once the operation has started