1
GAS IMPORT JETTY AND PIPELINE PROJECT ENVIRONMENT EFFECTS STATEMENT
INQUIRY AND ADVISORY COMMITTEE
TECHNICAL NOTE
TECHNICAL NOTE NUMBER: TN 039
DATE: 21 October 2020
LOCATION: Crib Point Jetty Works and Pipeline Works
EES/MAP BOOK REFERENCE: N/A
SUBJECT: Response to Item 1 in Table 4-1 of the Expert Evidence
(Groundwater) prepared by Christopher Smitt for Mornington
Peninsula Shire Council and Cardinia Shire Council.
SUMMARY This document provides written explanation and figures to
address the concern raised by Christopher Smitt with respect
to the adequacy of the groundwater level baseline data set.
REQUEST: N/A
NOTE:
Item 1 in Table 4-1 of the Expert Evidence (Groundwater) prepared by Christopher Smitt
– Concern: No Groundwater baseline has been established (Table 4-1 and Section
4.1.3.11 of Smitt (2020))
Response:
1. As per Section 1.2.6 (Construction) of EES Technical Report D: Groundwater impact
assessment (the ‘impact assessment’), pipeline installation is expected to occur primarily
during summer. As such, the groundwater levels measured on 30 January 2019 (and included
in Section 5.3 and Table B2 Appendix B of the impact assessment) are representative of
groundwater levels that might reasonably be expected to be encountered during construction
works.
2. Any variability in the actual groundwater levels at the time of construction, as compared to
that measured in January 2019, has been accounted for in the assumed groundwater levels
encountered in the trench and bellholes.
3. Specifically, the estimated radius of influence (groundwater level drawdown from dewatering)
provided in the impact assessment is based on dewatering 2.0m in the trench and 3.5m in
the bellhole.
4. As recognised in Section 4.1.3.1.1 of Smitt (2020), the dewatering scenario included a number
of conservative estimates including ‘depth to groundwater could be as high as 0.5 mbgl…..;
adoption of the upper end of permeability for soils….; and the adoption of a low water specific
yield of one percent.’ In fact, in the case of trench dewatering the groundwater was considered
to be at surface (that is, 2 metres of drawdown required at the trench).
5. Another key conservative assumption used in the groundwater impact assessment relates to
the duration of dewatering. Standard industry practice is to minimise dewatering to reduce
the volume of water to be discharged and managed, and to avoid structural issues within the
excavations.
2
6. For trenches, 48 hours of continuous pumping (dewatering) was assumed for the purposes of
the assessment. In reality, the dewatering would likely occur for only hours at a time,
immediately prior to the installation of the pipe, and would not be expected to extend
overnight.
7. At thrust bore bellholes, the impact assessment considered the conservative scenario of 10
days of continuous dewatering but would more typically be expected to be up to five days.
8. The drawdown estimates indicating a limited extent, magnitude and duration of dewatering
effects are therefore considered a conservative, hypothetical worst case scenario given the
multiple conservative assumptions used. Predicted impacts would be even less under a most
likely case scenario that adopted a less conservative set of assumptions.
9. As such, given i) the stated intention to install the pipeline during summer, ii) the shallow
nature of the pipeline construction, iii) temporary nature and short-term duration of
dewatering activities (in the order of hours to days) and iv) the conservative assumptions
used in the impact assessment - the use of one groundwater level data set from summer
2018/2019 is considered adequate to describe existing conditions and commensurate with the
level of risk and potential impacts on groundwater users.
10. In terms of addressing the issue of additional baseline data raised by Smitt (2020), a
groundwater level monitoring event was undertaken in September 2019. This was conducted
outside of the EES scope to inform construction design and was not considered warranted as
part of the impact assessment for the reasons described above. The results are however
considered below in the context of the issue raised. Figures showing depths to groundwater
measured in January 2019 and September 2019 are provided in Attachment A and Attachment
B, and a summary table provided in Attachment C of this Technical Note.
11. Groundwater levels were below ground surface at all locations monitored in September 2019
and therefore within the groundwater level assumption for the trench dewatering scenario
adopted in the impact assessment (which assumed that groundwater levels were at the
surface for trench dewatering assessment purposes).
12. With the exception of monitoring well locations MW06, MW21 and MW22, the groundwater
levels in September 2019 were consistent with assumptions made in the impact assessment
for the thrust bore bellhole dewatering scenario.
13. At MW06 (0.2 mbgs), MW21 (0.3 mbgs) and MW22 (0.12 mbgs) the groundwater levels were
measured to be higher than the impact assessment assumption of 0.5 metres below ground
surface (mbgs). However, at MW06, MW21 and MW22 the geology is described as being
medium to high plasticity clay (as per borelogs included at Appendix D of the impact
assessment), and hydraulic conductivities of 2 x 10-3 m/day (MW21) and 7.1 x 10-3 (MW22)
were estimated from aquifer testing (refer to Section 5.4 of the impact assessment). These
are up to two orders of magnitude lower than the conservative assumption of 0.32 m/day
used in drawdown estimates for the impact assessment, and would result in a smaller
drawdown extent away from the excavation than that predicted in the impact assessment.
14. The groundwater levels measured in September 2019 are consistent with the high watertable
scenario considered as part of the impact assessment when considered together with the other
conservative assumptions adopted, and do not change the findings of the impact assessment.
15. We trust that this document adequately addresses the query raised with respect to a
groundwater level baseline data set.
CORRESPONDENCE: N/A
3
ATTACHMENTS: 3 Attachments:
1. Jan and Sep 2019 Groundwater Level Overview Map
2. Mapsheet Series
3. GWL Table
4
Attachment 1
Jan and Sep 2019 Groundwater Level Overview Map
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!A!A
!A!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A
!A!A!A!A!A!A
5
GW02(3.78)(3.27)GW03
(3.29)(NG)
GW04(2.45)(1.88)
GW05(1.74)(0.80)
MW01(3.80)(2.60)
MW02(1.52)(0.30)
MW03(3.54)(2.34)
MW04(DRY)(4.12)
MW05(1.41)(0.27)
MW06(3.31)(0.20)
MW07(2.60)(1.46)
MW08(3.53)(1.04)
MW09(1.62)(NG)
MW10(1.99)(0.68)
MW11(3.05)(0.83)
MW12(3.23)(0.47)
MW13(2.22)(0.23)
MW14(2.23)(0.45) MW15
(2.24)(2.28)
MW16(4.00)(2.60)
MW17(DRY)(1.32)
MW18(3.92)(1.64)
MW19(DRY)(3.49)
MW21(1.15)(0.38)
MW22(1.09)(0.12)
MW23(DRY)(0.67)
10
15
20
25
30
35
40
45
50
55
MLV 2 -Land area
Crib PointReceivingFacility
MLV 1
PakenhamDeliveryFacility
MLV 2
EOLSS
0 2,000 4,000 6,000metres
´
1:118,884 (when printed at A3)
A3 size
AECO
M does
not w
arrant
the ac
curacy
or co
mplete
ness o
f infor
mation
displa
yed in
this ma
p and
any pe
rson u
sing it
does
so at t
heir o
wn ris
k. A
ECOM
shall
bear n
o resp
onsibil
ity or
liability
for an
y erro
rs, fau
lts, de
fects,
or om
ission
s in the
inform
ation.
www.aecom.com
PROJECT ID
LAST MODIFIEDCREATED BY
60582811 sam.schroder sam.schroder 07 NOV 2019
LEGEND!A Groundwater wells!( Kilometre points
PipelineAlignment OptionsKooWeeRup Water Supply Protection Area
Coordinate System: GDA 1994 MGA Zone 55
Groundwater Impact AssessmentGas Import Jetty and Pipeline ProjectEnvironment Effects Statement
Map Document: (\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\Groundwater Impact Assessment\2019\11\FA1_GW_Geology.mxd)
A1Figu re
AGL/APL
Gro u n dw a ter Ga u gin g – Ja n u a ry a n dSeptember 2019
W e s t e r n P o r t
(3.27)(2.11)
Water level in mbgs Jan 2019Water level in mbgs Sept 2019
!A
!A
!A
!A
!A
!A
MW1(NG)(7.8)
MW5(NG)(6.14)
MW4(NG)(0.81)
MW3(NG)(6.05)
MW2(NG)(6.78)
BH20(NG)(0.63)
NG Not Guaged
End Of Line Scraper StationEOLSSMain Line ValveMLV
mbgs Metres below ground surface
MW17 water level greater than 4.01 mbgsMW19 water level greater than 4.03 mbgsMW23 water level greater than 4.26 mbgsMW04 water level greater than 4.16 mbgs
Dry w ells (Ja n 2019)
Attachment 2
Mapsheet Series
V
VVVVVVVVVV
VVVVVVVVVVVVVVVVVVVVVVVVVVVVV
VV
VV
VV
VV
VV
V V
V
V V V V V V V V V VVV
V V V VV V V V
VV V
V
V VVV
V V
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
V V V V V V V V V VV
V V V V V V V V V VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V V V V V V V V V V V V V V V V V VV
V V V V V VV
V
VV
VV
VV
VV
VV
V
V
VVV
VV
V
VV
VV
VVV
VV
VVVVVVVVVVVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VVVVVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V V V V V V V V VV
VV
V VV
VVVV
VVVVVVVVVVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VVVVVVVVVVV
VV
VVVVVVVVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VVVV
VV
VVV V V
VV
VV
VV
VV
VVV
VV
VV
VV
VV
VV
VV
VV
V
VVVVVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
!
!
!
!
! ! !
!
!
!
!
!
!
!
!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!<
!
!
!
!
!
CRIB POINTRECREATION
RESERVE
JACKS BEACHRESERVE
PARK
WOOLLEYSBEACH
RESERVE
CRIB POINTGovernors Rd
Poi
nt R
d
Tobruk Ct
Colin Pde
Bond
Cl
Co
om
a St
Oro
tava
St
Pe
ttit St
Disney St
Lorimer St
Th
e E
spla
na
de
Par
kR
d
Creswell St
Patey St
Ba
y S
t
Lo
ch
St
Os
me
nt
CtA
us
tinC
t
Pe
ters
on
St
Pe
ters
on
St
Me
nti
pla
y S
t
Ka
ra C
t
Glo
ss
op
St
Crib Point Rd
Heather St
Mar
tin S
t
Miln
eS
t
Lincoln St
Ve
rdu
n S
t
Sa
rra
il S
t
Garfield Cr
Fis
he
r S
t
R O
W Y
Woolleys Rd
LNG Carrier
ConstructionLaydown Area
1.3 km 1.2 km
1 km
0.8 km
0.7 km
0.6 km
0.5 km
0.4 km
1.5 km
0.3 km
1.1 km
0.2 km
0.9 km
0.1 km
1.4 km
MW01(3.80)
MORNINGTONPENINSULA
Crib PointJetty
VictorianMaritimeCentre
Berth 1 (United)
Berth 2 (Project)
FSRU
CPT 006
CPT 003
CPT 001
CPT 004
CPT 007
CPT 005
CPT 002
CPT 008
Crib PointReceivingFacility
Gas Import Jetty and
Pipeline Project
Mapsheet 1 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
!< Groundwater wells (water level in mbgs, 30 January 2019)
Open - Cut
Trenchless, Bore
Trenchless, HDD
Crib Point Receiving Facility
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Aquatic GDEsHigh potential GDE (regional studies)
Moderate potential GDE (regional studies)Terrestrial GDEs
High potential GDE (national assessment)
Moderate potential GDE (national assessment)
Low potential GDE (national assessment)
V V V VV
VV
VV
V V V V V V V V V V V
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
V V
VV
V
V V V
VVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V V V V V V V V VV
VV
V
V V
VVV
V
VVVVVVVVVVVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VVVVVVVVVVV
VV
VV VVVVVV
V
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VVVV
VV
VVV V V
VV
VV
VV
VV
VVV
VV
VV
VV
VV
VV
VV
VV
V
VVVVVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VVVVVVVVVVVVVVVV
VV
VV
VV
VV
V V V V V V V V V V V V V
VV
VV
VV
VV
VVV
VV
VV
VV
VV
VV VV
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!<
!<
!
!
!
!
!
JACKS BEACHRESERVE
PARK
Bu
rton
St Mills Av
Tubb St
Woolleys Rd
Kin
g S
t
Go
rrie
Pl
The Esplanade
Buckley St
Ge
org
e S
t
Triton Av
Co
om
a St
Woolleys Rd
Florence Cr
Starb
oardW
alk
Woolleys Rd
Wo
olleysRd
Hall St
Po
rtW
alk
Mid
shipW
alk
Stony Point Rd
3.7 km
3.6 km3.5 km
3.4 km
3.3 km
3.2 km
3 km
2.9 km
2.8 km 2.7 km
2.6 km
2.3 km
2.2 km
1.7 km1.8 km
1.6 km
2.4 km
1.3 km1.2
km 1
km
0.8
km 0.7 km
1.5 km
2.1 km
2 km
1.1 km
2.5 km
0.9
km
1.9 km
1.4 km
3.1 km
MW01(3.80)
MORNINGTONPENINSULA
FRENCH-ELIZABETH-SANDSTONEISLANDS (UNINC)
CPT 012
CPT 006
CPT 003
CPT 010
CPT 013
CPT 004
CPT 007
CPT 011
CPT 005CPT 002
CPT 012-W
CPT 011-W
CPT 014
CPT013-W
CPT 008
CPT 009
Gas Import Jetty and
Pipeline Project
Mapsheet 2 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
!< Groundwater wells (water level in mbgs, 30 January 2019)
!( Waterway crossing locations
Open - Cut
Trenchless, Bore
Trenchless, HDD
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Aquatic GDEsModerate potential GDE (regional studies)
Terrestrial GDEsHigh potential GDE (national assessment)
Moderate potential GDE (national assessment)
V V V VV
VV
VV
V V V V V V V V V V V
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
V V
VV
V
V V V
VVV
VV
VV
VV
VV
VV
VV V
V V
VVVVVVV
VV
VVV
VV
VV
VV
VV
VV
VV
VV
VVVV
VV
VV
VV
VV
VV
VV
VV
VVV V
VV
VV
VV
VVV
VVVVVVVVVV
V VV
VV
V
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V V V V V V V V V V V V V V V V V V VV
VV
V V V V V V V V V V V
V V VV V V V V V V V V
VV V V V V
V
V V V V V V V V
VV
V
VVV
VV
VV
VV
VV
VV
VV
VV
VV
VV V V V V V V V
V
VV
VV
V
VV V
V
VVVV
VVVVVVVVVVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VVVVVVVVVVV
VV
VVVVVVVV
V
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VVVV
VV
VVV V V
VV
VV
VV
VV
VVV
VV
VV
VV
VV
VV
VV
VV
V
VVVVVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VVVVVVVVVVVVVVVV
VV
VV
VV
VV
V V V V V V V V V V V V
VV
VV
VV
VV
VVV
VV
VV
VV
VV
VVV V
V
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!<
!<
!<
!
!
!
!
!
PARK
RECREATIONRESERVE
WARR INGINE CREEK
Martin St
Jam
es
Hir
dD
r
Sa
lmo
nS
t
Reid Pde
Po
un
d R
d
Bray St
Will
iam
St
Seaglades Lane
Jam
es Hird Dr
Ro
ss
St
Warrenda Pl
James St
Warranq
iteC
r
Kinfauns Lane
Gaskin Av
Ra
ilwa
yC
r
Ca
rinya
Ct
Ku
rra
jon
g S
t
WindrestPl
Ash CtP
ep
pe
rmin
t P
l Cedar Rose Tce
Pepp er mint Pl
Sk
inn
er
St
War
ring
ine
Cre
ekLa
ne
Heritage Way
Sandstone Island Cir
Lady Nelson Pwy
Douglas St
Bayvie
wC
ountry
Lan
e
Warrenda Pl
Stony Point Rd
Frank
ston -
Flind
ers R
d
Stony
Poin
t Line
4.9 km 4.8 km
4.7 km
4.3 km
3.9 km
4.2 km
3.8 km
3.7 km
3.6 km
3.5 km
3.4 km
3.3 km
4.4 km
3.2 km
3 km
2.9 km
4.1 km
2.8 km
4.5 km
4.6 km
4 km
5.2 km
5.3 km
5.1 km
5 km
3.1 km
MW02(1.52)
MW03(3.54)
MW04(DRY)
MORNINGTONPENINSULA
1
2 Warringine Creek
CPT 012
CPT 012
CPT 013
CPT 011
CPT 012-W
CPT 011-W
CPT 014
CPT 014-W
CPT 015
CPT 012-W-1
CPT 013-W
CPT 016
CPT 015-A
CPT 016-W
Gas Import Jetty and
Pipeline Project
Mapsheet 3 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
!< Groundwater wells (water level in mbgs, 30 January 2019)
!( Waterway crossing locations
Open - Cut
Trenchless, Bore
Trenchless, HDD
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Aquatic GDEsModerate potential GDE (regional studies)
High potential GDE (national assessment)Terrestrial GDEs
High potential GDE (national assessment)
Moderate potential GDE (national assessment)
Low potential GDE (national assessment)
V V V VV
VV
VV
V V V V V V V V V V V
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
V V
VV
V
V V V
VVV
VV
VV
VV
VV
VV
VV V
V V
VVVVVVV
VV
VVV
VV
VV
VV
VV
VV
VV
VV
VVVV
VV
VV
VV
VV
VV
VV
VV
VVV V
VV
VV
VV
VVV
VVVVVVVVVV
VV
VV
VV
VVV
V
V VV
V
V
V V VV V V V V
VV
VV
VV
VV
VV V V V V V V V V V V V V V V V
VV
VV
VV
VV
VV
VV
VV V V
VV
V
VVV
VVVVV
V V VV
V V V V VV
VV
VV
V V V V V V V V V VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV V
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
V V V V V V V V V V V V V V V V V V VVV
VV
V V V V V V VV V V
V V V V
V V V V V V V V VV V V V V
V V
V V V V V V V
VV
VV
VVV
VV
VV
VV
VV
VV
VV
VV
VV
VV V V V V V VV
V
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV V
VVVVVVVVVVVVVVVVVVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VV
VV
VV
VVVVVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VVVVVVVVVVVVVVVV
VV
VV
VV
VV
V V V V V V V V V V V V
VV
VV
VV
VV
VVV
VV
VV
VV
VV
VVV V
V
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!<
!<
!<
!<
!
!
!
!
!
HASTINGS OVAL
PARK
RECREATIONRESERVE
HASTINGS
K INGS CREEK
WARRINGINE CREE K
Martin St
Jam
es
Hir
dD
r
Helen Dr
Lomica
Dr
Bianca Dr
Reid Pde
Curacoa D
r
MatthewCc
t
Kristy Dr
Autumn Ct
Su
ns
et
Rise
Bray St
Pound Rd
Phillip Ct
Cool Store Rd
High St
Sail Dr
Ta
ve
n S
t
Vill
aw
oo
d D
r Ma
rineP
de
La
ch
lan
Ct
Pe
ns
hu
rst
Av
Tambar Pl
Sta
lwa
rt A
v
Elizabeth St
Will
iam
St
Ha
rbo
ur D
r
Dolphin St
C
i nd y
Dr
Portside
Dr
Ro
ss
St
Hodgins Rd
Brydon Ct
Georgia Way
Ro
se
ma
ry D
r
Isis
Pl
Bilgola St
Hodgins Rd
Sa
lmo
n S
t
Church St
Warren Cr
Spring St
Wa
llaroo
Pl
Ce
da
r D
r
Greythorn Rd
Melaleuca
Dr
Sp
ruc
e D
r
Chloe Dr
Seahaven St
High St
OakCt
Hill
top
Ris
e
Sk
inn
er
St
James St
J
ames Hird Dr
Gascoyne
Ct
Ta
ra D
r
Em
an
Tc
e
Mic
he
lle D
r
Constantine
Wa
y
Lea Ct
Ro
ma Ct
Me
na
i
Ct
Lewis St
Emily Pl
Vic
tor
Dr
Wa
r ran
qi t e
Cr
Qu
ee
n S
t
Te
al
Ct
Vic
tori
a S
t
Jarrod Dr
Gaskin Av
Jenola CtW
ing
alaCt
Ra
ilwa
yC
r
Fo
rb
es Pl
Mullet St
De
llwo
od
Ct
Sa
mu
elC
t
Ba
bin
gto
n C
l
Carin
ya
Ct
Jacaranda Ct
N icho las
Ct
Ash Ct
Otway Ct
Laurel Ct
Isis Pl
Quality Ct
Sta
tio
nS
t
Alexander Dr
Me
rle
ba
h C
t
Sh
elly
Pl
Kin
g S
t
Sim
on
St
Lintel Ct
Art
hu
r S
t
Ply
mo
uth
St
Alf
red
St
Natalie Ct
High St
Albert St
Mary Gr
Stephen St
Herring St
Fra
nk
sto
n-
Flin
de
rsR
d
Mc
ca
llum
St
Ra
nk
in R
dK
urr
ajo
ng
St
Wa
llis
Dr
Pin
ew
oo
dD
r
Edward St
Douglas St
Gle
nd
ale
Av
Oliv
ia W
ay
Frank
ston -
Flind
ers R
d
Stony
Poin
t Line
6.9 km6.8 km
6.5 km
6.4 km
6.2 km
5.8
km
5.5 km
4.9 km
6.7 km
7 km
5.7 km
5.4 km
5.6 km
6.1 km
6 km5.9 km
5.2 km
6.6 km
6.3 km
5.3 km
5.1 km
5 km
7.1 km
GW02(3.78)
GW03(3.29)
MW04(DRY)
MORNINGTONPENINSULA
3 Kings Creek
CPT 012
CPT 021-D
CPT021
CPT 019
CPT014
CPT 014
CPT 018
CPT018
CPT 014-W
CPT 015CPT 016
CPT020
CPT 015-A
CPT021-C
CPT 016-W
CPT 021-B
CPT 021-A
CPT021-W
Gas Import Jetty and
Pipeline Project
Mapsheet 4 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
!< Groundwater wells (water level in mbgs, 30 January 2019)
!( Waterway crossing locations
Open - Cut
Trenchless, HDD
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Aquatic GDEsHigh potential GDE (regional studies)
Moderate potential GDE (regional studies)
High potential GDE (national assessment)Terrestrial GDEs
High potential GDE (national assessment)
Moderate potential GDE (national assessment)
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V V
VV
V
V V V
VVV
VV
VV
VV
VV
VV
VV V
V V
VVVVVVV
VV
VVV
VV
VV
VV
VV
VV
VV
VV
VVVV
VV
VV
VV
VV
VV
VV
VV
VVV V
VV
VV
VV
VVV
VVVVVVVVVV
VV
VV
VV
VVV
VV V
VV
V
V V VV V V V V
VV
VVV
VV
VV V V V V V V V V V V V V V V V V
VV
VV
VV
VV
VV
VV
VV V V
VV
V
VVV
VVVVV
V V VV
V V V V V VV
VV
VV V V V V V V V V V
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VV
VVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV V
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
V V V V V V V V V V V V V V V V V V VVV
VV
V V V V V V VV V V
V V V V
V V V V V V V V VV V V V V
V V
V V V V V V V
VV
VV
VVV
VV
VV
VV
VV
VV
VV
VV
VV
VV V V V V V VV
V
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV V
V V
VV
VV
VV
VV
VVVVVVVVVVVVVVVVVVVVVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VV
VV
VV
VV
VV
VV
V
V
VV
VV
VV
VV
VV
VV
V
V
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!<
!<
!<
!<
!
!
!
!
!
HASTINGS OVALPARK
RECREATIONRESERVE
WESTPARK
OLD TYABB
KINGSCREE K
KINGS CREEK
OLIVERSCREEK
Helen Dr
Cu
rac
oa
Dr
Su
ns
et
Rise
Wills St
Ma
rin
e P
de
Pe
ns
hu
rst
Av
Robertson St
Ellery St
Haddock St
Tambar Pl
Sta
lwar
tA
v
Kristy Dr
Hodgins Rd
Georgia Way
Barclay Cr
Hodgins Rd
Wa
ll aroo
Pl
Hill
top
Ris
e
Spruce Dr
OakCt
Bu
rke S
t
Lya
ll St
John Coleman Cl
GascoyneC
t
Em
an
Tc
e
Ce
da
r D
r
Mic
he
lle D
r
Constanti ne
Wa
y
Bayview Rd
Vic
tor
Dr
Bu
rke S
t
Wright St
Te
al Ct
Wright St
Du
ch
ess
Ct
Ca
llan
an S
t
Quad
ran
tC
t
Vam
pir
eC
t
Curlew Ct
Fo
rbes Pl
Ons
low
Ct
Vic
toria
St
Ma
rine
Pd
e
Thornhill St
Ellery St
Drake
Ct
Fra
nk
sto
n -
Flin
de
rs R
d
Otway Ct
Kip
pe
sL
an
e
Mo
rra
h S
t
Junee Ct
Madang Ct
Ardent Ct
Mo
rra
h S
t
Mo
rrah
St
Je
rem
iah
s R
d
Natalie Ct
Ca
llan
an S
t
Lya
ll St
Ma
yne
Av
Sovereign Dr
Stephen St
Ka
no
wn
a S
t
Wa
llis
Dr
Pin
ew
oo
dD
r
Graydens Rd
Frank
ston -
Flind
ers R
d
Stony
Point
Line
8.8 km
8.6 km
7.8 km
7.4 km
6.9 km6.8 km
6.7
km
7 km
8.4 km
8.7
km
8.3 km
7.3 km
8.5 km
8.1 km
8.2 km
7.5 km
6.6 km
7.2 km
8 km
7.7 km
7.9 km
7.1 km
7.6 km
GW03(3.29)
MW05(1.41)
MW06(3.31)
MORNINGTONPENINSULA
4
5
3 Kings Creek
CPT021-D
CPT 027 CPT 028
CPT 026CPT 025
CPT021-C
CPT 024-A
CPT021-B
CPT 021-A
CPT021-W
Gas Import Jetty and
Pipeline Project
Mapsheet 5 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
!< Groundwater wells (water level in mbgs, 30 January 2019)
!( Waterway crossing locations
Open - Cut
Trenchless, Bore
Trenchless, HDD
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Aquatic GDEsHigh potential GDE (regional studies)
High potential GDE (national assessment)Terrestrial GDEs
High potential GDE (national assessment)
Moderate potential GDE (national assessment)
Low potential GDE (national assessment)
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V V VV
VVV V
VVVV
VV
VV
VV
VV
VV
V
V V V
VVVVVVVV
VV
V
VV
VV
VVV
VV
VV
VV
VV
VVVV
VV
VV
VV
VV
VV
VV
VV
VV
V V VV
VV
VV
VV
VV
VVVVVVVVV
VV
VV
VV
V
VV
VV V
V
V V
V V VV V
V V V
VV
VV
VVV
VV
V V V V V V V V V V V V V V V V
VV
VV
VV
VV
VV
VV
VVV V V
VV
VVV
VVVVV
V V V
V
V V V V VV
V VV
VV
V V V V V V V V VVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V V V V V V V V V V V V V V V V V V V VV
VV
V V V V V V V V V VV
V V V
V V V V V V V V VV V V V V
V VV V V V V V V V
VV
V
VVV
VV
VV
VV
VV
VV
VV
VV
VV
VV V V V V V V V
V
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV V V V
VV
VV
VV
VV
VVVVVVVVVVVVVVVVVVVVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
V
V
VV
VV
VV
V
VV V
VV
VV
VV
VV V
V VV
V
VV
V
VV
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!
!
!
!
!
RECREATIONRESERVE
OL IVERS CREEK
Ce
me
tery
Rd
Bayview Rd
Beach Dr
Warramunga Dr
Ce
me
tery
Rd
Be
ac
h D
r
Vo
ya
ge
r S
t
Pic
nic
Av
Outlook Av
Stu
art
Ct
Ba
rbe
cu
e C
t
Highland Av
Arunta Av
Quickmatch St
Kippes Lane
Je
rem
iah
s R
d
Fo
res
ho
re A
v
Lo
ng
Isla
nd
Dr
ConstructionLaydown Area
ConstructionLaydown AreaMORNINGTON
PENINSULA
IndustrialSteel Wharf
CPT PipeLaydown 01
Gas Import Jetty and
Pipeline Project
Mapsheet 6 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Aquatic GDEsKnown GDE (regional studies)
High potential GDE (regional studies)
High potential GDE (national assessment)Terrestrial GDEs
High potential GDE (national assessment)
Moderate potential GDE (national assessment)
Low potential GDE (national assessment)
VV
VV
VV
VV
VV
V V VV
VV
VV
VV V
V
VVVVVVVVV
VV
VV
VV
V VVV
V V
V
V
VV V V
V VV V V
VV
VV
VVV
VV
V V V V V V V V V V V V V V V V
VV
VV
VV
VV
VV
VV
VVV V V
VV
VVV
VVVVV
V V VV
V V V V VV
V VV
VV
V V V V V V V V VVV
VV
VV
VV
VV
VV
VV
VV
VV
VV V
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V V V V V V V VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV V V V
VV
VV
VV
VV
VVVVVVVVVVVVVVVVVVVVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
V
V
VV
VV
VV
V
VV V
V
VV
VV
VV
V VV
!!!
!! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!<
!
!
!
!
!
OLIVE
RS C
REEK
OLIV
ERS
CREE
K
FRAN
KSTO
N-FL
INDE
RS R
OAD
DANDENONG-HASTINGS ROAD
Ra
ilwa
yR
dR
ailw
ay
Rd
Ma
rine
Pd
e
Kip
pe
sL
ane
Stu
art
Rd
Bayview Rd
Mo
rra
h S
t
Ka
no
wn
aS
t
Denham Rd
Graydens Rd
Frank
ston -
Flind
ers R
d
Frank
ston-
Flind
ersRd
Stony
Poin
t Line
11.1 km10.8 km10.5 km10.2 km
10.3 km10.1 km
9.8 km
9.7 km
9.5 km
9.4 km
9.1 km
8.9 km
8.8 km
8.6 km
10.6 km
9 km
8.4 km
11 km
9.3 km
8.7
km
8.3 km
9.2 km
10.7
km
8.5 km
10.4
km
10.9
km10 km
9.9 km
MW06(3.31)
MORNINGTONPENINSULA
5
6 Olivers CreekCPT 032
CPT 035
CPT 027
CPT 029
CPT 031CPT 033
CPT 028
CPT 034
CPT 030
CPT 026CPT 025
CPT 024-A
Gas Import Jetty and
Pipeline Project
Mapsheet 7 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
!< Groundwater wells (water level in mbgs, 30 January 2019)
!( Waterway crossing locations
Open - Cut
Trenchless, Bore
Trenchless, HDD
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Aquatic GDEsHigh potential GDE (national assessment)
Terrestrial GDEsHigh potential GDE (national assessment)
Moderate potential GDE (national assessment)
Low potential GDE (national assessment)
V V V V V V V V V V V V V V V V
VV
VV
VV
VV
VV
VV
VVV V
VV
V
VVV
VVVVV
V V VV
V V V V VV
VV
VV V V V V V V V V V V
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV V
VV
V VV V
VV
VV
VV
VV
VVVVVVVVVVVVVVVVVVVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VV
VV
VV
VV
VV
VV
V
V
VV
VV
VV
VV
VV
VV
V
VV
VV
VV
V
VV
VV
V
VV
V
VV
VV
VV
V
VV V
VV
VV
V VV
V V
VVVVVVVVVVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VV
VV
VV
VV
VV
VV
VV
VV
!
!
!
!
!!!!!
!
!
!
!!
!!!
!!
! !
!
!!
!
!
!
!
!
!
!
!
!
!
!!
!!
!
!
!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!<
!<
!<
!
!
!
!
!
DANDENONG-HASTINGS ROAD
Whitneys Rd
Thornells Rd
Mc
kir
dy
s R
d
Denham Rd
14.2 km
14.1 km
14 km
13.8 km13.6 km
13.5
km
13.2 km
12.9 km
12.8 km
13.1 km
11.9 km11.5 km11.4
km
11.3 km
11.1 km10.8 km
10.5 km
11.8 km11.2 km
10.6 km
12.3 km
11
km
12.6 km
10.7 km
13 km
11.6 km
12.2 km
12.1 km
11.7 km
12.7 km
13.7 km
10.4 km
10.9 km
12 km
12.5 km
12.4 km
13.9 km
GW04(2.45)
GW05(1.74)
MW07(2.60)
MORNINGTONPENINSULA
8
7
CPT 036CPT 036-A CPT 036-C CPT 036-E
CPT 032
CPT 036-B
CPT 035
CPT 036-F
CPT 038
CPT 040-A
CPT 045
CPT 040-B
CPT 039
CPT 036-H
CPT 036-D
CPT 033
CPT 036-I
CPT028
CPT 034
CPT030
CPT 040
CPT 036-G
CPT PipeLaydown 01
MLV 1
Gas Import Jetty and
Pipeline Project
Mapsheet 8 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
!< Groundwater wells (water level in mbgs, 30 January 2019)
!( Waterway crossing locations
Open - Cut
Trenchless, Bore
Trenchless, HDD
MLV 1
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Aquatic GDEsKnown GDE (regional studies)
Terrestrial GDEsHigh potential GDE (national assessment)
Moderate potential GDE (national assessment)
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
V
V
V
VV
VV
VV
V
VV
V
VV
VV
VV
V
VV
V VV
V
VV
V
VV
VV
VV
VV V V
VV
VV V
VV V
VVVVVVVVVVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VV
VV
VV
VV
VV
VV
VV
VV
VV
V V V
VV
VV
VV
VV
VVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VVVVVV
VV
VV
VVVVVVVVVVVVVVVVVV
VV
VVVVVVVVVVV V V V V
V V V V V V VV V V V V V V V V V V
VV
V
VV
VV
VVVV V V V V
VV
VV
VV
VV
VV
VV
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!!!!!
!
!
!
!
!
!
!
! !!
!!
!
!
!
!
!
!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!>
!>
!<
!<
!<
!<
!
!
!
!
!
DAND
ENON
G-HA
STIN
GS R
OAD
Yaringa Rd
Wh
itn
ey
s R
d
Lumeah Rd
Mc
kir
dy
s R
d
Iluka Rd
Pikes Rd
Ka
tan
dra
Rd
Oneills Rd
Tyabb
- Toora
din Rd
16.9 km
16.5 km
16.4 km
16 km
15.8 km
15.7 km15.3 km15 km14.9 km
14.6 km
14.5 km
16.3 km
14.3 km
14.2 km
15.6 km
14.1 km
14 km13.8 km
13.6 km
13.5
km13.4 km
13.2 km
15.9 km
16.6 km
14.8 km
16.8 km
15.4 km15.5 km
15.1 km
13.7
km
13.3 km
16.2 km
14.7 km
16.1 km
15.2
km
17 km
14.4 km
16.7 km
13.9 km
142356
121049
GW04(2.45)
GW05(1.74)
MW07(2.60)
MW08(3.53)
Option BG-11
Option B
B-10
MORNINGTONPENINSULA
8
9
7
CPT 049
CPT 045
CPT 040-B
CPT048
CPT 047
CPT 046
Gas Import Jetty and
Pipeline Project
Mapsheet 9 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
!< Groundwater wells (water level in mbgs, 30 January 2019)
!> Consumptive use bores within 30 m of pipeline
!( Waterway crossing locations
Open - Cut
Trenchless, HDD
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Aquatic GDEsKnown GDE (regional studies)
Terrestrial GDEsHigh potential GDE (national assessment)
Moderate potential GDE (national assessment)
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV V V
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VVVVVVVV
VV
VVVVVVVVVVVVVVVVVV
VV
VVVVVVVVVV
V V V V V V V V V V VV V V
V V V V V V V V V
VV
V
VV
VV
VVVV V V V V
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VVVVVVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VV
VV
V V V V V V V V V V V V V V V V V V V VVV
V
V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V VV
VV
VV
VV
VVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV V
VV
VV
VV
V
!
!
!
!
!
!
!
!
!
!
!
!
!
!!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!>
!<
!<
!<
!
!
!
!
!
WATSON CREEK
PEARCEDALESOUTH
CREEK
WATSON CREEK
Bembridge Rd
Wh
itn
ey
s R
d
Bungower RdBungower Rd
Tyab
b - To
oradin
Rd
19.6 km
19.5 km
19.3 km
19.7 km
19.2 km
19.1 km
19 km
18.6 km
18.5 km
18.4 km
18.3 km18.1 km
18 km17.9 km
17.7 km
17.6 km
17.4 km
17.3 km
17.2 km
16.9 km
18.2 km
19.4 km
17.5 km
17.1 km
18.7 km
18.8 km
16.8 km
18.9 km
17.8 km
17 km
16.7 km
121049
MW08(3.53)
MW09(1.62)
MW10(1.99)
Option
BB-10
MORNINGTONPENINSULA
10 Watson Creek
11 Pearcedale South Creek
CPT 051-A
CPT 049-A
CPT 056
CPT 049
CPT049-B
CPT 051-C
CPT 053
CPT 055
CPT 051-B
CPT 052
CPT 048
CPT 054
CPT 050
CPT 047
Gas Import Jetty and
Pipeline Project
Mapsheet 10 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
!< Groundwater wells (water level in mbgs, 30 January 2019)
!> Consumptive use bores within 30 m of pipeline
!( Waterway crossing locations
Open - Cut
Trenchless, HDD
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Aquatic GDEsKnown GDE (regional studies)
Unclassified potential GDE (regional studies)
High potential GDE (national assessment)Terrestrial GDEs
High potential GDE (national assessment)
Moderate potential GDE (national assessment)
VV
VV
VV
VV
VV
VV
VV
VV
VVV V
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VVVVVVVV
VV
VV
VVVVVVVVVVVVVVVVV
V
VVVVVVVVVV
VV V V V V V V V V V VV V V V V V V V V V V V
VV
VV
VV
VVV
V V V V V
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VVVVVVVVVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV V V V V V V V V V V V V V V V V V V VV
V
V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V
VV
VV
VV
VV
V
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VVVVVVVVV
VV
VV
VV
VV
VV
VV
VV
V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!<
!<
!
!
!
!
!
PEARCEDALE SOUTH CREEK
LANGWARRIN CREEK
Vo
we
ll D
r
Ca
llan
an
s L
an
e
Shekleton St
Ea
st
Rd
South Boundary Rd East
Tyabb
- Toora
din Rd
22.7
km
22.6 km
22.2 km21.9 km
21.8 km
21.7 km
21.3 km
21.2 km
20.6 km
20.4 km
20.2 km20 km
19.8 km
19.6 km
22.4 km
19.5 km
19.7 km
21.4 km
20.3 km
20.9 km
21.5 km
22.3 km
21.6 km
20.8 km
20.1 km
22.1 km
19.9 km
22.8 km
21.1
km
22 km
21 km
20.7 km
20.5 km
22.5 km
MW11(3.05)
MORNINGTONPENINSULA
CASEY12 Langwarrin Creek
13 14
CPT 056
CPT 062-W
CPT 057
CPT 057-ACPT 057-A
CPT 059
CPT 055
CPT062
CPT 060
CPT 060
CPT 061
CPT 061-W Gas Import Jetty and
Pipeline Project
Mapsheet 11 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
!< Groundwater wells (water level in mbgs, 30 January 2019)
!( Waterway crossing locations
Open - Cut
Trenchless, HDD
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Aquatic GDEsKnown GDE (regional studies)
High potential GDE (national assessment)Terrestrial GDEs
High potential GDE (national assessment)
Moderate potential GDE (national assessment)
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VVVVVVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VV
VV
V V V V V V V V V V V V V V V V V V V VVV
V
V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V
VV
VV
VV
VV
VVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV V
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VVVVVVVVVV
VV
VV
VV
VV
VV
VV
VVV V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V VV
VV
VV
VV
VV
V
V V V V V V V V V V V V V V V V V VV
VV
VV V V V V V VV
VV
VV
VV
VV
VVV
VV
VV
VV
VV
V V
V
VV
VV V V V V V
VV
VV
V V V V V V
VVVV
VV
VV
VV
VV
VV
VV
VV
VV
V
VV
VV
VV
VV
VV
VVVV
VVV
VV
VVV
VV
VV
VV
VV
VV
VV
VV
V V V V V V V V V V V V V V V V
VV
V
VV
VV
VVV
VV
V V V
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!<
!
!
!
!
!
Craigs Lane Drain
Vo
we
ll D
r
Cra
ig R
d
Cra
igs
La
ne
Noaki St
Baxter - Tooradin Rd
24.6
km
24.4 km
23.7 km
23.2 km
23 km
23.3 km
22.9 km
22.7 km
22.6 km
22.2 km
21.9 km
21.8 km
21.7 km
24.2 km
24.5 km
22.4 km
23.4 km
23.8 km
23.9 km24.3 km
24 km
22.3 km
23.1 km
21.6 km
23.5 km
23.6 km
22.1 km
22.8 km
22 km
22.5 km
MW12(3.23)
CASEY
17
18
1516 CPT 063
CPT 064
CPT 062-W
CPT 065
CPT 062
CPT 060
CPT 060
CPT 061
CPT 061-W
Gas Import Jetty and
Pipeline Project
Mapsheet 12 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
!< Groundwater wells (water level in mbgs, 30 January 2019)
!( Waterway crossing locations
Open - Cut
Trenchless, Bore
Trenchless, HDD
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Aquatic GDEsKnown GDE (regional studies)
Terrestrial GDEsHigh potential GDE (national assessment)
Moderate potential GDE (national assessment)
V V V VVV
V
V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V
VV
VV
VV
VV
VVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV V
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
V
VVVVVVVVVV
VV
VV
VV
VV
VV
VV
VVV V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V V VV
VV
VV
VV
VV
V
V V V V V V V V V V V V V V V V V VV
VV
VV V V V V V VV
VV
VV
VV
VV
VVV
VV
VV
VV
VV
V V
V
VV
VV V V V V V
VV
VV
V V V V V V V V V VV
VV
VV
VV
VV
VV
V
V V V V V V V V V V VV
VV
VV
VV
V
VV
VV
VV
VV
VV
VV V V V V V V V VV
VV
VV
VV
VV
VV
V V V V V V V
VV
VV
VV
VV
VV
VV
VV
VV
VVV V V V V V V
VV V V V V V V V V
V
VV V V V V V V
VV
VV
VV
VV
VV
VV
VV
VV
VVV V
VV
VV
VV
VV
VV
V
VVV
VV
VV
VV
VVVVVVVVVVVVVVVVVVVV
VV
VV
VV
VV
VV
V V V V V V V VVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VVVVVVVVVVVVVVVVVVVVV
VV
VV
VV
VVVVVVVV
VV
VV
VVVV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VVVV
VV
VVVV
VV
VV
V VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
VV
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!<
!<
!
!
!
!
!
Le
mn
os
Rd
Cannons C
reek Rd
Daly Dr
Currawong Gr
Fis
he
rie
s R
d
Bronze Wing Ct
Pivato Ct
Ibis
Way
Baxter - Tooradin Rd
27.5 km
27.2 km
27.1 km
26.5 km
26.4 km26.1 km
26 km
25.7 km25.6 km
25.4 km
24.9 km24.6 km
24.4 km
26.9 km
27.4 km
27.3 km
24.5
km
26.2 km
26.3 km
24.3
km
26.6 km
26.8 km
25.2 km
25.9
km25.5
km
24.8
km
25 km
25.3 km
25.1 km
27 km
24.7 km
25.8
km
MW12(3.23)
MW13(2.22)
CASEY
1820
19
21
2322 Quail Inlet Drain
24
CPT064
CPT 065 CPT 066
CPT 068
CPT 067
CPT 069
Gas Import Jetty and
Pipeline Project
Mapsheet 13 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
!< Groundwater wells (water level in mbgs, 30 January 2019)
!( Waterway crossing locations
Open - Cut
Trenchless, Bore
Trenchless, HDD
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Aquatic GDEsKnown GDE (regional studies)
Terrestrial GDEsHigh potential GDE (national assessment)
Moderate potential GDE (national assessment)
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!<
!<
!<
!
!
!
!
!
RUTH
ERFO
RDCR
EEK
SOUTH GIPPSLAND HIGHWAY
North Rd
Ad
en
ey
s R
d
Fis
he
rie
s R
d
Ad
en
ey
s R
d
Baxter - Tooradin Rd
29.9 km
29.6 km
29.5 km
29.3 km
29.8 km
29.2 km28.9 km
28.7 km
28.6 km28.1 km
27.9 km27.6 km
29.1
km
27.5 km
27.2 km27.1
km
27.4 km
27.3 km
28.4 km
29.7 km
30.1 km
28.8 km
28.2 km
29
km
30
km
29.4 km
27.8 km
28.3 km 28.5 km
27.7 km
28 km
MW14(2.23)
Option AN-9
CASEY
25 Christies Drain26
27
28 Rutherford Creek
CPT 070
CPT 074
CPT 072
CPT 074-A
CPT 073-B
CPT 073
CPT 075-W
CPT 071
CPT 076
CPT 073-A
CPT 069
Gas Import Jetty and
Pipeline Project
Mapsheet 14 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
!< Groundwater wells (water level in mbgs, 30 January 2019)
!( Waterway crossing locations
Open - Cut
Trenchless, Bore
Trenchless, HDD
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Aquatic GDEsHigh potential GDE (national assessment)
Terrestrial GDEsHigh potential GDE (national assessment)
Moderate potential GDE (national assessment)
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!>
!<
!
!
!
!
!
WESTE
RNOUTF
ALL D
RAIN
RUTH
ERFO
RD C
REEK
MUDDY GATES DRAIN
MUDDY GATES DRAIN
WESTERN OUTFALL DRAIN
SOUTH GIPPSLAND HIGHWAY
North Rd
Lynes Rd
Lynes Rd
Mu
dd
y G
ate
s L
an
e
Baxter - Tooradin Rd
32 km
31.9 km
31.5
km31.4
km
31.3 km
31.2 km31.1 km
30.9 km
30.7 km
30.5 km
30.4 km30.3 km
29.9 km
29.6 km
29.5
km
29.8 km
30.8 km
29.7
km
30.1 km
31.8 km
30.6 km
31.6 km
30.2 km
32.1 km
32.2 km
31.7 km
30 km
31 km
91465
MW15(2.24)
Option
AN-9
Option AM-9
Option AE-8_0.1
CASEY
28 Rutherford Creek
29 Western Outfall Drain
CPT074
CPT 080
CPT 082
CPT074-A
CPT 077
CPT 073-B
CPT 084
CPT 075-W
CPT 076
CPT 083
CPT 081CPT 077-A
Gas Import Jetty and
Pipeline Project
Mapsheet 15 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
!< Groundwater wells (water level in mbgs, 30 January 2019)
!> Consumptive use bores within 30 m of pipeline
!( Waterway crossing locations
Open - Cut
Trenchless, HDD
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Aquatic GDEsHigh potential GDE (national assessment)
Terrestrial GDEsHigh potential GDE (national assessment)
Moderate potential GDE (national assessment)
!!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!<
!
!
!
!
!
MANKS ROAD DRAIN
MUDD
Y GAT
ES D
RAIN
WES
TERN
OUTF
ALL D
RAIN
MUDDY GATES DRAIN
Manks Rd
Langtree Rd
Mu
dd
y G
ate
s L
an
eM
calpine Rd
Mu
dd
y G
ate
s L
an
e
La
nd
ale
Rd
Ya
llam
be
e R
d
Wandook Rd
Dandenong-Leongatha34.3 km
34.2 km
33.8 km33.7 km
33.6 km33.4 km33.2 km
33 km
32.9 km32.8 km
32.7 km
32.5 km
32 km
31.9 km
31.5 km
31.4 km
34.4 km
32.3 km
32.4 km
34 km
33.1 km
33.5
km
31.8 km
33.9
km
32.6 km
32.1 km
32.2 km
31.7 km
34.5
km
MW16(4.00)
Optio
n Z-8
Option AE-8_0.1
CASEY31 Manks Rd Drain
32
30 Muddy Gates Drain
29 Western Outfall Drain
CPT087
CPT 080
CPT 090
CPT 082
CPT 084
CPT 083
CPT 081
CPT 088
CPT 077-A
Gas Import Jetty and
Pipeline Project
Mapsheet 16 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
!< Groundwater wells (water level in mbgs, 30 January 2019)
!( Waterway crossing locations
Open - Cut
Trenchless, Bore
Trenchless, HDD
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Aquatic GDEsHigh potential GDE (national assessment)
Terrestrial GDEsHigh potential GDE (national assessment)
Moderate potential GDE (national assessment)
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!
!
!
!
!
TOORADIN RD DRAIN
RUTTERS RD DRAIN
TOOR
ADIN
RD
DRAIN
MANKS ROAD DRAIN
MANKS ROAD DRAIN
To
ora
din
Sta
tio
n R
d
Manks Rd
Dandenong-Leongatha
37.1 km
36.9 km
36.7 km
36.2 km
36.1 km36 km
36.6 km
35.9 km35.7 km
35.6 km35.5 km
35.3 km
35.1 km
34.3 km34.2 km
34.6 km
35.8 km
34.9 km
34.4 km
34.7 km
34 km
36.4 km
35.2 km
37 km
36.5 km
34.8 km
33.9 km
36.8 km
36.3 km
35.4 km
35 km
34.5 km
Option D-8
Option D-8
Option AU-9
Option Z-8 CARDINIA
CASEY
31 Manks Rd Drain32
33
36
34
37
35 Tooradin Road Drain
CPT 093
CPT 092
CPT 098
CPT 087
CPT 090
CPT 091
CPT 094
CPT 096
CPT097
CPT 097
CPT 095
CPT 088
Gas Import Jetty and
Pipeline Project
Mapsheet 17 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
!( Waterway crossing locations
Open - Cut
Trenchless, Bore
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Terrestrial GDEsHigh potential GDE (national assessment)
Moderate potential GDE (national assessment)
!
!
!
!!
!!
!!
!
!
!
!!
!!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!>
!<
!
!
!
!
!
WEST
DAL
MORE
RD D
RAIN
ADAMS DRAIN
TOORADIN INLET DRAIN
CARDINIA CREEK
WEST
DAL
MORE
RD
DRAIN
RIDG
EWAY
S DRA
IN
BOWDENS DRAIN
Da
lmo
re R
d
Be
azl
ey
Rd
Ad
am
s R
d
Ric
es
Rd
Bloomfield Lane
39.8
km
39.5 km
39.3 km39.1 km
39 km
38.8 km
38.7 km
38.6 km
38.5 km
38.3 km
38.2 km
38.1 km38 km37.9 km
37.8 km
37.7 km
37.5 km
37.1 km
36.9 km
36.7 km
39.4 km
37.3 km
38.4 km
37.6
km
36.8 km
39.7 km
WRK070589
MW17(DRY)
Optio
n D-8
Option BE-10Op
tion D
-8
Option AT-9
CARDINIA
43 44
39 Ridgeways Drain
40
41
42 West Dalmore Rd Drain
38 Tooradin Inlet Drain
CPT 092
CPT 098
CPT094
CPT 096
CPT 097
CPT 097
CPT 106
CPT 104
CPT 102-WCPT 099
CPT 095
CPT 100-A
CPT 107
CPT 105
CPT 100
Gas Import Jetty and
Pipeline Project
Mapsheet 18 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
!< Groundwater wells (water level in mbgs, 30 January 2019)
!> Consumptive use bores within 30 m of pipeline
!( Waterway crossing locations
Open - Cut
Trenchless, Bore
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Aquatic GDEsHigh potential GDE (national assessment)
Terrestrial GDEsHigh potential GDE (national assessment)
Moderate potential GDE (national assessment)
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!<
!
!
!
!
!
BALLARTO ROADWEST DRAIN
LOWE
R GU
M SC
RUB C
REEK
LOWER GUM SCRUB CREEK
HAGELTHORNES D RAIN
CARDINIA CREEK
DEEP
CRE
EK
TOOM
UC C
REEK
We
nn
Rd
Ho
bs
on
Rd
Bloomfield Lane
Ballarto Rd
42.5 km
42.2 km
41.8 km
41.7 km
41.5 km
41.4 km
41.3 km
41.2 km
41.1 km
40.8 km
40.7 km
39.8
km
39.5 km
39.3 km
39.2 km
41.6 km
41 km
39.4 km
41.9 km
42.3 km
40.5 km
42.1 km
40.3 km
39.7 km
40.4 km
40.9 km
40.2 km
42.4 km
40.6 km
42 km
MW18(3.92)
Option AO-9
CARDINIA
43 44
48
45
47
49 Lower Gum Scrub Ck
50 Toomuc Creek
5251 Deep Creek
46 Cardinia Creek
CPT105-A
CPT 108
CPT 110
CPT 109
CPT 106
CPT 106
CPT 104
CPT102-W
CPT 107
CPT 105
CPT 105
MLV 2 -Land area MLV 2
Gas Import Jetty and
Pipeline Project
Mapsheet 19 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
!< Groundwater wells (water level in mbgs, 30 January 2019)
!( Waterway crossing locations
Open - Cut
Trenchless, HDD
MLV 2
MLV 2 - Land area
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Aquatic GDEsHigh potential GDE (national assessment)
Terrestrial GDEsHigh potential GDE (national assessment)
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!<
!<
!
!
!
!
!
RYTHDALE
RYTH
DALE
DRA
IN
HAGE
LTHO
RNES
DRAI
N
BALLARTO ROAD WEST DRAIN
SOLDIERS RD WEST DR
SOLDIERS RD WEST DR
HAGELTHORNES DRAIN
TOOM
UC C
REEK
DEEP
CRE
EK
Soldiers Rd
Rythdale Rd
Fowler Rd
We
nn
Rd
Mc
gre
go
r R
d
Ho
bso
n R
d
Ballarto Rd
44.1 km
44 km
43.5 km43.2 km
42.8 km42.6 km
42.5 km42.2 km
41.8 km
41.7 km
41.5 km
41.4 km
41.1 km
41.6 km
43 km
44.5 km
41.9 km
43.7 km
42.3 km
42.1 km
43.8 km
42.7
km
44.2 km
44.3 km
43.6 km
44.4 km
43.1 km
43.9 km
43.3 km
43.4 km42.9 km
42.4 km
42 km
44.6 km
MW19(DRY)
Option AG-8
Option AO-9
CARDINIA
52
53
51 Deep Creek
54 Soldiers Rd West Dr
CPT105-A
CPT 111
CPT 112
CPT 108
CPT 110
CPT116
CPT 114
CPT 109
CPT 113
CPT105
Gas Import Jetty and
Pipeline Project
Mapsheet 20 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
!< Groundwater wells (water level in mbgs, 30 January 2019)
!( Waterway crossing locations
Open - Cut
Trenchless, Bore
Trenchless, HDD
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Aquatic GDEsHigh potential GDE (national assessment)
Terrestrial GDEsHigh potential GDE (national assessment)
Moderate potential GDE (national assessment)
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!<
!
!
!
!
!
DEEP C
REEK
FOGARTYS ROAD DRAIN
SOLDIERSRD WEST DR
FOGA
RTYS DRAIN
MC GREGORS DRAIN
MC G
REGO
RS D
RAIN
DEEP CREEKHAGELTHORNES DRAIN
Hall Rd
Soldiers Rd
Ho
bs
on
Rd
Watson Rd
Koo W
eeRu
p Rd
47.2 km
47 km
46.9 km
46.6 km46.5 km
46.4 km46.3 km
46.2 km45.9 km
45.7 km
45.6 km
45.5 km
45.4 km
45.3 km45.2 km
45 km
44.9 km
44.1
km
44.8 km
46.1 km
46 km
45.1 km
47.3
km
44.5 km
46.8 km
44.2 km
44.3 km
47.1 km
44.4 km
44.7 km
45.8 km
46.7 km
44.6 km
MW19(DRY)
CARDINIA
56 McGregors Drain58
55 Hagelthornes Drain
57
54 Soldiers Rd West DrCPT 112
CPT 117
CPT116
CPT 114
CPT 115
CPT 115
CPT 118
CPT 113
CPT 120CPT 119
CPT 121
CPT 120-A
Gas Import Jetty and
Pipeline Project
Mapsheet 21 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
!< Groundwater wells (water level in mbgs, 30 January 2019)
!( Waterway crossing locations
Open - Cut
Trenchless, Bore
Trenchless, HDD
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Aquatic GDEsHigh potential GDE (national assessment)
Terrestrial GDEsHigh potential GDE (national assessment)
Moderate potential GDE (national assessment)
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!
!
!
!
!
FOGA
RTYS
DRAIN
MCGREGORS DRAIN
NORTHERN BOUNDARY DRAIN
PAKENHAM CREEKDEEP CREEK
Mc
do
na
lds
Dra
in R
d
Mc
do
na
lds
Dra
in R
d E
as
t
Mc
do
na
lds
Dra
in R
d W
es
t
Watson Rd
Bourke Rd
Koo Wee Rup Rd
49.9 km
49.7 km
49.6 km
49.5 km
49.1 km
48.8 km48.4 km
48.1 km
47.9 km
47.7 km
47.6 km
47.4 km
47.2 km
47 km46.9 km
46.6 km
46.5 km
46.4 km
46.3
km
48.2 km
49.3 km
49.2 km
48.9 km
47.3 km
48.6 km
48.7 km
48 km
48.3 km 48.5 km
49 km
49.4 km
47.5 km
47.1 km
47.8 km
49.8 km
46.7
km
CARDINIA
56 McGregors Drain
5857
59 Deep Creek (lower)
CPT 117
CPT 116
CPT 118
CPT 126
CPT 126
Option AQ9
CPT 123
CPT 120
CPT 126-A
CPT 119
CPT 122
CPT 125CPT 125
CPT 124
CPT 121
CPT 120-A
CPT 120-B
Gas Import Jetty and
Pipeline Project
Mapsheet 22 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
!( Waterway crossing locations
Open - Cut
Trenchless, HDD
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Aquatic GDEsHigh potential GDE (national assessment)
Terrestrial GDEsHigh potential GDE (national assessment)
Moderate potential GDE (national assessment)
Low potential GDE (national assessment)
!
!
!
!
!
!!
!!
!!
!!
!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!<
!
!
!
!
!
DEEP CREEK
Bald Hill Rd
Mc
do
na
lds
Dra
in R
d
Bourke Rd
Ry
an
Rd
Co
op
Rd
52.8 km
52.7 km
52.6 km
52.5 km
52.4 km52.3 km
52.2 km
52.1 km
51.9 km
51.8 km
51.7 km
51.6 km
51.5 km
51.3 km
51.2 km
50.5 km
49.9 km
49.7 km
49.6 km
50.6 km
50.4 km
50.8 km
50.3 km
50.7 km
51 km
50.2 km
52.9 km
51.4 km
50.1 km
49.8 km
53 km
50 km
50.9 km
51.1 km
MW21(1.15)
CARDINIA
60
6261
CPT 130
CPT 126-B
CPT 131
CPT 129
CPT 126CPT 126
CPT 126-C
CPT 126-A
CPT 132
Gas Import Jetty and
Pipeline Project
Mapsheet 23 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
!< Groundwater wells (water level in mbgs, 30 January 2019)
!( Waterway crossing locations
Open - Cut
Trenchless, Bore
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Aquatic GDEsHigh potential GDE (national assessment)
Terrestrial GDEsHigh potential GDE (national assessment)
Moderate potential GDE (national assessment)
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!<
!
!
!
!
!
Oa
kv
iew
La
ne
Canty Lane
Bairnsdale Line
55.9 km
55.8 km
55.7 km55.6 km
55 km
54.8 km
54.7 km
54.6
km54.5 km
54.4
km54.3 km
54.2 km54.1 km
54 km
53.7 km
53.6 km53.5 km
53.3 km
53.1 km
52.8 km
52.7 km
53.4 km
53.8 km
55.3 km
55.5 km
54.9 km
53.2 km
55.1 km
55.2 km
55.4 km
53.9 km
52.9 km
53 km
MW22(1.09)
CARDINIA
63
64
CPT 130
CPT 135
CPT 131
CPT 136
CPT 133
CPT 134
CPT 137
CPT 138
CPT 131-A
CPT 132
CPT 139 Pakenham East Delivery Facility
Gas Import Jetty and
Pipeline Project
Mapsheet 24 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
!< Groundwater wells (water level in mbgs, 30 January 2019)
!( Waterway crossing locations
Open - Cut
Trenchless, Bore
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Terrestrial GDEsHigh potential GDE (national assessment)
Moderate potential GDE (national assessment)
Low potential GDE (national assessment)
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!
!
!
!
!
SEVEN MILE DRAIN
PRINCES HIGHWAYM
ou
nt
Ara
rat
No
rth
Rd
Oa
kv
iew
La
ne
Mo
un
tA
rara
tS
ou
thR
d
56.7 km
56.6 km
56.5 km
56.4 km
56.3 km
55.9 km
55.8 km
55.7 km
55.6 km
56 km
56.1 km
56.75 km
55.5 km
56.2 km
CARDINIA
CPT 142
CPT 136CPT 137
CPT 138
CPT 139
CPT 141
PakenhamEast Delivery
Facility
EOLSS
Gas Import Jetty and
Pipeline Project
Mapsheet 25 (of 25)
0 100 200
Metres
\\aumel1fp001\Projects\605X\60592634\900_CAD_GIS\920_GIS\02_Maps\GIS_MXDs\MXD_TECH_DDP\Groundwater\CPT_DDP_GWWater_A3_20200903_Rev01.mxd Date Saved: 4/09/2020Source: Vicmap 2019 (c), Imagery - Nearmap 2019 (c).
!
!
!
CRIB POINT
PAKENHAM
KOO WEE RUP
123
45
252423
222021
181916 17
1512 13 14
1110987 6
AE
CO
M d
oe
s n
ot
wa
rra
nt
the
ac
cu
rac
y o
r c
om
ple
ten
es
s o
f in
form
ati
on
dis
pla
yed
in t
his
ma
p a
nd
an
y p
ers
on
us
ing
it d
oe
s s
o a
t th
eir
ow
n r
isk.
AE
CO
M s
ha
ll b
ea
r n
o r
es
po
ns
ibili
ty o
r lia
bili
ty f
or
an
y e
rro
rs, f
au
lts
, de
fec
ts, o
r o
mis
sio
ns
in t
he
info
rma
tio
n.
! Kilometre point
Open - Cut
Trenchless, Bore
Gas Import Jetty Works area
Pipeline Works Area
Construction Footprint
Local Government Area
VV VVV Western Port Ramsar site boundary
Terrestrial GDEsHigh potential GDE (national assessment)
Moderate potential GDE (national assessment)
Low potential GDE (national assessment)
Attachment 3
GWL Table
Gas Import Jetty and Pipeline Project EESInquiry and Advisroy CommitteeGroundwater Level Gauging: January and Septmber 2019
Top of Casing Elevation
Ground Surface Elevation
mAHD mAHD 30/01/2019 23/09/2019 30/01/2019 23/09/2019 30/01/2019 23/09/2019
CPT006_MW01 MW01 7.375 6.594 4.58 3.38 3.80 2.60 2.80 4.00CPT012_MW02 MW02 5.231 5.348 1.41 0.18 1.52 0.30 3.83 5.05CPT012_MW03 MW03 3.408 3.522 3.43 2.23 3.54 2.34 -0.02 1.18CPT015_MW04 MW04 7.992 8.135 >4.09 3.98 >4.23 4.12 NK 4.01CPT000_GW02 GW02 13.574 13.674 3.68 3.17 3.78 3.27 9.89 10.40CPT000_GW03 GW03 7.636 7.753 3.17 Decom. 3.29 - 4.46 -CPT022_MW05 MW05 6.791 6.899 1.30 0.16 1.41 0.27 5.49 6.63CPT027_MW06 MW06 6.772 6.016 4.06 0.96 3.31 0.20 2.71 5.81CPT036_C_MW23 MW23 15.463 14.860 >4.86 1.27 >4.26 0.67 NK 14.19CPT040_B_MW07 MW07 11.575 10.974 3.20 2.06 2.60 1.46 8.38 9.52CPT040_B_GW04 GW04 10.812 10.122 3.14 2.57 2.45 1.88 7.68 8.24CPT045_GW05 GW05 8.601 7.867 2.48 1.53 1.74 0.80 6.12 7.07CPT000_MW08 MW08 8.382 8.509 3.40 0.91 3.53 1.04 4.98 7.47CPT051_MW09 MW09 3.203 3.341 1.48 NG 1.62 - 1.72 -CPT055_MW10 MW10 2.708 2.809 1.89 0.58 1.99 0.68 0.82 2.13CPT000_MW11 MW11* 3.530 3.645 2.94 0.71 3.05 0.83 0.59 2.82CPT064_MW12 MW12 4.367 3.607 3.99 1.23 3.23 0.47 0.38 3.14CPT068_MW13 MW13 5.323 4.622 2.92 0.93 2.22 0.23 2.40 4.39CPT037_B_MW14 MW14* 4.876 4.116 2.99 1.21 2.23 0.44 1.89 3.67CPT000_MW15 MW15* 3.578 3.675 2.14 2.18 2.24 2.28 1.44 1.40CPT000_MW16 MW16* 3.805 3.948 3.85 2.46 4.00 2.60 -0.05 1.35CPT099_MW17 MW17 2.895 2.941 >3.96 1.28 >4.01 1.32 NK 1.62CPT107_MW18 MW18 3.925 3.009 4.83 2.56 3.92 1.64 -0.91 1.37CPT114_MW19 MW19 4.911 4.162 >4.78 4.24 >4.03 3.49 NK 0.67CPT129_MW21 MW21 17.626 17.716 1.06 0.29 1.15 0.38 16.57 17.34CPT134_MW22 MW22 23.902 24.001 1.00 0.02 1.09 0.12 22.91 23.88
Top of Casing
Elevation# Ground Surface Elevation
Depth to Water (mbTOC)
Total depth of well
(mBTOC)mAHD mAHD 23/09/2019 23/09/2019 30/01/2019 23/09/2019 30/01/2019 23/09/2019
MW1 8.40 8.10 8.10 8.75 - 7.80 - 0.30MW2 8.45 7.95 7.28 8.11 - 6.78 - 1.17MW3 7.68 7.28 6.45 9.00 - 6.05 - 1.23MW4 2.86 2.96 0.72 5.00 - 0.82 - 2.15MW5 6.96 7.06 6.04 8.40 - 6.14 - 0.92BH20 2.77 2.87 0.53 3.23 - 0.63 - 2.24
Note:* - MW11, MW14, MW15 & MW16 gauged on 24 Sep 2019NK - not known (well dry or not gauged in Jan 2019 and/or Sep 2019)Dry to base of well
# Top of casing elevation and height of casing above ground level not known, elevation and heights estimated
Crib Point Receiving Facility Monitoring Wells
Groundwater Elevation (mAHD)
Depth to Water (mbgs)
Depth to Water (mbTOC)
Depth to Water (mbgs)
Groundwater Elevation (mAHD)
GIJPP EES Monitoring Wells