+ All Categories
Home > Documents > Gasngo Delivering Fuel Control Premarket technical survey.

Gasngo Delivering Fuel Control Premarket technical survey.

Date post: 16-Jan-2016
Category:
Upload: avis-ruby-daniels
View: 222 times
Download: 0 times
Share this document with a friend
Popular Tags:
18
Gasngo Delivering Fuel Control Premarket technical survey
Transcript
Page 1: Gasngo Delivering Fuel Control Premarket technical survey.

Gasngo Delivering Fuel Control

Premarket technical survey

Page 2: Gasngo Delivering Fuel Control Premarket technical survey.

Premarket technical surveyPresentation Goals:

•Familiarization with the process•Preliminary information required•Specific needs and adaptations

Duration: 45 minutesTarget audience: Management

Page 3: Gasngo Delivering Fuel Control Premarket technical survey.

What is a territory?

Unique requirements pertaining to certain

countries/region

Page 4: Gasngo Delivering Fuel Control Premarket technical survey.

Market specific features

• Vehicle market characteristics• Station/site characteristics• Other unique significant subjects:

•Certification•Regulation•Visibility

Page 5: Gasngo Delivering Fuel Control Premarket technical survey.

Survey goals

• Final result is successful rollout of the Gasngo solution and service

• Adaptations and relevant feature mapping towards that goal

• Efficient stocking and supply chain• Efficient logistics and operational

processes including taxes, local regulation and more.

Page 6: Gasngo Delivering Fuel Control Premarket technical survey.

Survey chronology

• Define territory• Define commercial terms,

distribution model• Cooperate with local

distributor/partner in theoretyal research

• Field research by technical expert and system specialist/architect

• Apply survey conclusions

Page 7: Gasngo Delivering Fuel Control Premarket technical survey.

Application of survey conclusions• Survey should be oriented towards:

• Getting to know legal, financial and regulation environment of the territory.

• Creating logistic processes to support rollout• Creating operational processes to support rollout• Product and system customization• Feature choice• Solution specification for chosen marker,

(tropicalization)• Creating an accurate rollout timeline

Page 8: Gasngo Delivering Fuel Control Premarket technical survey.

Aspects surveyed in premarket technical review

Page 9: Gasngo Delivering Fuel Control Premarket technical survey.

Architecture and common systems• Common authorization mode in target market• Local fiscal regulations (invoicing)• Local fuel commercialization regulations • Common transaction flow• PC/ePC/no PC, operating systems• Common interfaces:

• Controllers in the market and % participation• POS or other

Page 10: Gasngo Delivering Fuel Control Premarket technical survey.

Station environment• Station characterization target market – depot,

special conditions site, commercial chain.• Pumps, number of nozzles• Nozzles and insulators, colors• Presentation and visibility• GRT installation and common station construction• Infrastructures• Internet

availability &stability

Page 11: Gasngo Delivering Fuel Control Premarket technical survey.

Vehicles market• Fleet vehicle makeup• Private vehicle market makeup• Heavy duty vehicles, busses • Additional target market population

(special sites eg. mines) • Define models making up majority of

market• Required solutions for market – AVL, OBD, EH etc.

Page 12: Gasngo Delivering Fuel Control Premarket technical survey.

Purpose and conclusions vehicle survey• To define the Tag solutions relevant

to the territory• Vehicle solutions can be customized -

change requests:• NTH dimensions• Tag ordering• Unique model solutions

Page 13: Gasngo Delivering Fuel Control Premarket technical survey.

Vehicle Tags• Relevant standardization of fuel tanks

(European, Russian, North American) in heavy duty vehicles

• Extent of variety• Local manufacture of tanks• Use of anti-siphon• Standardization in

fuel caps

Page 14: Gasngo Delivering Fuel Control Premarket technical survey.

Vehicle Meter • Market maturity in AVL soltution• OBD / FMS standards• Feature requirement (EH, fuel

siphoning)• Tachograph standardization in

territory• Tachograph

manufacturers

Page 15: Gasngo Delivering Fuel Control Premarket technical survey.

Additional information

• Local standardization: communications, military, oil company internal standards, Government, safety, electricity.

• Personnel and hiring regulation• Import regulation, taxes, customs• Additional certification requirement• Salaries and commissions common in the

market (high management, technicians / drivers / salesmen etc.)

Page 16: Gasngo Delivering Fuel Control Premarket technical survey.

Presentation

• OEM/Gasngo• Specific branding

requirements• Language requirements• User interfaces• Training requirements• Documentation

requirements

Page 17: Gasngo Delivering Fuel Control Premarket technical survey.

Conclusions • Station installation methodology – product

characterization• Requirements from local subcontractors:

installation, maintenance, infrastructures• Required adjustments to product:

• Additional vehicle Ring solutions to cover majority of market

• Insulators• Software and features

Page 18: Gasngo Delivering Fuel Control Premarket technical survey.

Summary & Conclusion

• Operational procedures and product readiness towards rollout.

• Information and recommendations applied in advance to facilitate successful and efficient rollout.

GO√ / X NO-GO


Recommended