GATEWAY FLYOVER CONSTRUCTION LOCATION: I-35/I-435 Interchange; Overland Park, KS OWNER: Kansas DOT Falsework Tower Design for construction of new bridge Staged Erection Analysis of new bridge construction, including wind load analysis Buckling Analysis for single girder stages Girder Analysis for Deck Removal and Equipment Loading Staged Demolition Analysis of existing bridge; including wind load analysis Analysis of I-435 bridge below for support of cranes during demolition Girder Hoisting Adequacy Evaluation (816) 421-1520 [email protected]
Transcript
Page 1: GATEWAY FLYOVER CONSTRUCTION

GATEWAY FLYOVER CONSTRUCTION

LOCATION: I-35/I-435 Interchange; Overland Park, KS OWNER: Kansas DOT

Falsework Tower Design for construction of new bridge Staged Erection Analysis of new bridge construction, including wind load analysis Buckling Analysis for single girder stages Girder Analysis for Deck Removal and Equipment Loading Staged Demolition Analysis of existing bridge; including wind load analysis Analysis of I-435 bridge below for support of cranes during demolition Girder Hoisting Adequacy Evaluation