GCS 1400
Version 1.0 : July 25, 2008
Overhead Devices or !V
General ElectricityCompany of Libya
8/12/2019 GCS 1400-Overhead Devices(200808)
2/35
Table of Contents
1. Sco"e 1
2. #or$lo% 1
&. Cons'ruc'ion !e'hods 2
3.1 General 2
3.1.1 Location.................................................................................................................................. 2
3.1.2 Checkpoints before installation............................................................................................2
3.1.3 Checkpoints after installation..............................................................................................3
3.2 Sub structures 3
3.2.1 Supporter................................................................................................................................ 3
3.3.2 Main tank..................................................................................................................... ......... 4
3.3.3 Assembly ...........................................................................................................................4
3.3.4 Control cabinet ....................................................................................................................7
3.3.5 o!er source ............................................................................................................. ......... . "
3.3.# $erminal of %e&ice .............................................................................................................'
3.3.7 (arthin) an% sur)e arrester............................................................................................... 1*
4. #or$ (rocedure 11
4.1 Load Break Switch 11
4.2 Recloser and Sectionalizer 11
4.3 Capacitor 11
4.4 Step Voltae Reulator 11
4.! Sure "rrestor 11
5. Chec$lis' 28
). Sae'y *or+ &0
8/12/2019 GCS 1400-Overhead Devices(200808)
3/35
General ElectricityCompany of Libya
Overhead Devices
List of Tables
'a-le 0 (ole 'y"e o each overhead devices /GDO 1000GD& &000 &
List of Figures
*i3. 0 #or$lo% o devices 1
*i3. 0 he cons'ruc'ion direc'ion o 67S 4
*i3. 0 6oad -rea$ s%i'ch /GDO 1400GD& &000 5
*i3. 0 u'o+a'ic circui' recloser/GDO 1400GD& &000 5
*i3. 0 u'o+a'ic circui' sec'ionali9er/GDO 1400GD& &000 )
*i3. 0 Ca"aci'or/GDO 1400GD& &000 )
*i3. 0 S'e" Vol'a3e e3ula'or/GDO 1400GD& &000 ;
*i3. 0
8/12/2019 GCS 1400-Overhead Devices(200808)
4/35
General ElectricityCompany of Libya
Overhead Devices
8/12/2019 GCS 1400-Overhead Devices(200808)
5/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
1. Sco"e
#his standard co$ers the t%pes o& o$erhead de$ices &or 'ediu' $oltae and construction
procedure &or e$er% t%pe o& de$ices on the pole &or up to 3(kV o$erhead lines.
2. #or$lo%
) * is onl% &or the de$ices ha$e such &unctions or accessories
+,i. (- ork&low o& de$ices
125
Connect the lead
)Check batter%*
/nstall the switch
/nstall the brackets
Check the as
pressure or oil
Check the switchin
with hand
/nspect the e0ternal
appearance
Clean up and arrane
the work place
/'pro$e the earth
resistance
/nstall the earth rods
)/nstall the control
cabinet*
)Connect the cables*
)/nstall the source &or
control cabinet*
,inish
sin LV
source
/nstall and connect
the earthin wire
Check the accessories
o& the switch
)Check the switchino& control bo0*
)/nstall the crossar'
and insulator &or lead*
/nstall the L"
Connect the lead o&
sure arrestor
5.#r
secondar% wire
Control cable
Control source cable
,or de$ice
,or tank o& sw.
and control cabinet
6easured $alue
"llowance $alue7
8/12/2019 GCS 1400-Overhead Devices(200808)
6/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
&. Cons'ruc'ion !e'hods
&.1 General
&.1.1 6oca'ion
)a* #he construction point)s* shall be chosen to &it &or the usin purpose o& de$ices.
)b* #he de$ices &or 'ini'izin the outrae area when an% &aults occur on the
distribution line shall be installed takin into consideration as &ollows8
9 /& the de$ice is &or the branch9o&&: it shall be constructed on the &irst pole o& the branch
o&& in principle.
9 "$oid the de$ice installation such pole as &or branch o&&: anular pole: a pole installed
trans&or'er or capacitor. 9 /& the line crosses a ri$er: lake: &orest: etc. the switch shall be constructed be&ore
crossin it.
9 /& the line &low into rural area a&ter passin the urban area: the de$ice shall be
constructed the &irst pole o& the rural area.
9 /& the line passes throuh towns: the de$ice shall be constructed at the border line o&
the towns.
9 #he two kinds o& de$ices shall not be constructed on a pole toether in principle.
&.1.2 Chec$"oin's -eore ins'alla'ion
)a* Check the accessories whether da'aed or not.
)b* Check the condition o& the de$ice and control cabinet.
9 Re'o$e the packin care&ull% and check $isuall% the condition o& the e0ternal
appearance whether there is trans&or'ation or da'ae or not.
"$oid handlin the de$ice b% rippin the switchin handle directl%: bushin itsel&:
assistant wire: etc.
9 /& the switch is an oil i''ersed t%pe: check the leakae and a'ount o& oil.
Re&er to the 'anual o& each switch.
9 /& the switch is a as insulated t%pe: check the pressure o& the as.
9 Check the batter% accordin to the 'anual o& all de$ices.
9 #est the 'anual and auto'atic switchin s%ste' b% turnin on;o&& se$eral ti'es
accordin to the switchin s%ste' o& all de$ices.
,or testin the auto'atic switchin s%ste': connect the source cable &or handlin
the de$ice te'poraril% and test it.
Check the internal contact point o& each phase usin the dielectric resistance tester.
225
8/12/2019 GCS 1400-Overhead Devices(200808)
7/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
&.1.& Chec$"oin's a'er ins'alla'ion
)a* Check the clearance o& all leads between phases each other and to the other &acilities.
"d 1!((*.
)b* Check whether the tools or so'ethin are le&t behind and cleanness on the top o&
'ain bod% and 'ountin bracket.
)c* 6ake sure a 'ountin condition o& the control cabinet and its co'ponents such as
batteries: charer: power trans&or'er &or power suppl%: etc.
)d* Check the charin condition and capacit% o& batteries usin the batter% test button in
the control cabinet.
)e* Check the earthin connection o& 'ain bod% and control cabinet and 'easure the
resistance $alue.)&* Check the connection o& the control cable and power cable.
)* Check the de$ice whether it operates nor'all% b% 'anual handlin and auto'atic
handlin with control cabinet or not.
&.2 Su- s'ruc'ures
&.2.1 Su""or'er
)a* "$oid the pole)s* which easil% da'aed b% $ehicles as &ar as possible.
)b* #he pole t%pe &or the de$ices o& each $oltae is like as &ollows8
table (? 5ole t%pe o& each o$erhead de$ices )G=> 1(((;G=3 3(((*
Devices ?o+inal vol'a3e
/il 13' Stout t%pe
11 11' Stout t%pe
Capacitor 3( 9 13' Sinle )Stout t%pe*
11 11' Sinle)Stout t%pe*
&25
8/12/2019 GCS 1400-Overhead Devices(200808)
8/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
&.&.2 !ain 'an$
)a* #he installation direction o& the switch shall be the roadwa% side usuall% and the
'ini'u' heiht abo$e the round to the botto' o& switch is !.(')G=>14((*.
)b* #he switchin handle on the 'ain tank o& LBS shall be located at the side o& pole.
)c* #he de$ice shall be constructed to keep in balance and the bracket shall be tihten up
stronl% not be shaken when it handled.
+,i. (- #he construction direction o& LBS
&.&.& sse+-ly
)a* Load break switch )LBS*
#he inter$al between bracket and crossar' &or each $oltae is like &ollowin
&iures.
/nter$al between lowest part o& LBS and LV line)i& an%* shall be (.2' or 'ore.
#he sure arrester shall be installed on the crossar' at the both side o& LBS.
425
Roadwa%
Switchin handle
8/12/2019 GCS 1400-Overhead Devices(200808)
9/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
)a* 11kV )b* 3(kV
+,i. (- Load break switch )G=> 14((;G=3 3(((*
)b* Recloser: Sectionalizer: Capacitor
#he sure arrester shall be installed on the crossar' at the both side o& &acilities.
#he lead o& sure arrestor shall be connected &arther than the lead o& de$ices &ro' the
crossar'. /& ine$itable: the lead can be connected on the lead o& de$ices. #he inter$al between bracket and crossar' &or each $oltae is like &ollowin &iures.
/nter$al between lowest part o& LBS and LV line)i& an%* shall be (.2' or 'ore.
)a* 11kV )b* 3(kV
+,i. (- "uto'atic circuit recloser)G=> 14((;G=3 3(((*
525
4((D((
2((
1E(( 3(((
1E((
1E((
1E((
4((D((
D((
2((
3(((
1E((
1(((
1(((
8/12/2019 GCS 1400-Overhead Devices(200808)
10/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
)a* 11kV )b* 3(kV
+,i. (- "uto'atic circuit sectionalizer)G=> 14((;G=3 3(((*
)a* 11kV )b* 3(kV
+,i. (- Capacitor)G=> 14((;G=3 3(((*
)c* Reulator
Reulator is installed with b%pass switches on t%pe poles like &ollowin &i.D.@. But:
a s'all size reulator can be installed on a pole.
)25
1E((
4((D((
D((
2((
3(((
1E((
1(((
1(((
4((D((
D((
2((
1E(( 3(((
1E((
1E((
1E((
8/12/2019 GCS 1400-Overhead Devices(200808)
11/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
)a* 11kV )b* 3(kV
+,i. (- Step Voltae Reulator)G=> 14((;G=3 3(((*
&.&.4 Con'rol ca-ine'
So'e de$ices ha$e control cabinet to control the de$ice re'otel%. hen control cabinet
is installed: below considerations shall be taken into.
)a* #he heiht &ro' round to botto' o& control cabinet shall not be less than 3.!' to
pre$ent pedestrians &ro' unauthorized operation or bein in
8/12/2019 GCS 1400-Overhead Devices(200808)
12/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
+,i. (- /nstallation e0a'ple o& control cabinet )G=> 14((*
#he control cable &ro' control cabinet to 'ain tank shall be wound with ties b% proper
'ethod on the pole not to be shaken. "nd the cable shall not et an% connected point)s*
until the 'ain tank and control cabinet earthed.
&.&.5 (o%er source
#o operate the de$ices like recloser: LBS and sectionalizer at the control cabinet
re'otel%: power cable shall be connected to the control cabinet and the control cable shall
be connected to the 'ain switches &ro' the control cabinet. #he detailed speci&ication o&
the control and power suppl% cable shall be &ollowed the 'anual i$en b% 'anu&acturer.
hen the power cable connected inside the control cabinet: the line shall be in dead
condition and the control cable shall be connected a&ter the power cable connected.
)a* Recloser
#he power source is supplied b% low $oltae distribution line connected to e0ternal
distribution trans&or'er and the rated "C $oltae &or the control cabinet shall be
sinle9phase 23(V and rated =C $oltae &or the control cabinet shall be 24V b% GAS
341@(.
/n case o& the recloser which operated b% "C power: the power interruption should
'ake i'possible &or the control cabinet to control the recloser re'otel%. So: the
e0ternal power shall be supplied b% the source side trans&or'er o& recloser. Be&ore
installation: 'ake sure to check the t%pe o& recloser and 'anual.
825
/a@ /-A
Road
Controlcabinet
Road
6in.3.!'
8/12/2019 GCS 1400-Overhead Devices(200808)
13/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
Considerin the i'portance o& recloser: the trans&or'er 'a% not be shared with other
eneral loads as &ar as possible.
)b* LBS F Sectionalizer
#he control cabinet o& LBS F sectionalizer needs the e0ternal "C power &or charin
the batter% which operates the de$ice re'otel%. #he rated "C $oltae &or the control
cabinet shall be sinle9phase 23(V and rated =C $oltae &or the control shall be 24V
b% GAS 341@(.
#he power source is supplied b% low $oltae distribution line connected to e0ternal
distribution trans&or'er. Generall%: the an% direction o& trans&or'er &or power
suppl%in to the control cabinet is all riht because the de$ices are operated b% =Cpower source. Be&ore installation: 'ake sure to check the t%pe o& de$ice and 'anual.
&.&.) er+inal o device
)a* #er'inal
#here is se$eral 'ethods &or ter'inal connection o& de$ice: so when the lead connected to
the ter'inal: it shall be &ollowed b% the 'anual.
)b* #he lead o& de$ice
#he lead o& de$ice &or connectin to &eeder conductor could be a copper or alu'inu'
conductor. Consider the below reco''endation &or it: but prior to that: &or e0act and sa&e
installation: &ollow the 'anu&acturers reco''endation.
se the sa'e t%pe with the t%pe o& &eeder conductor as &ar as possible.
#he lead o& de$ice connected to the inside o& de$ice: 'al&unction could be occurred b%
bein penetrated the water or 'oisture into the de$ice. So it is hihl% reco''ended
that the conductor o& lead 'a% ha$e the structure which the 'oisture or water cannot
be penetrated easil% or the ter'inal has the structure which has the &unction like that
)e.. 'old con t%pe*.
B25
8/12/2019 GCS 1400-Overhead Devices(200808)
14/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
+,i. (- Lead connection o& switches
&.&.; >ar'hin3 and sur3e arres'er
"ll the 'ain tank and control cabinet o& the de$ices shall be earthed properl%. #he sure
arrester also earthed b% connectin to the earth stud o& tank o& switches.
#he earthin ter'inal is cla'pin screw or bolt t%pe. See the 'anual i$en b%
'anu&acturer &or detailed connection 'ethod o& each de$ice. #he allowance resistance
$alue could be &ound in earthin standard.
#he earthin wire shall be wound with ties b% proper 'ethods on the pole not to be
shaken.
#he sure arrestor shall be installed the both sides o& pole which a de$ice constructed and
it shall be earthed b% the standard.
#he earthin shall be constructed be&ore connectin the lead o& the de$ices and
control cable.
1025
ConnectorConnector
Lead o& de$ice
Conductor
Lead o& de$ice
Conductor
8/12/2019 GCS 1400-Overhead Devices(200808)
15/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
4. #or$ (rocedure
4.1 6oad 7rea$ S%i'ch
4.2 ecloser and Sec'ionali9er
4.& Ca"aci'or
4.4 S'e" Vol'a3e e3ula'or
4.5 Sur3e rres'or
1125
8/12/2019 GCS 1400-Overhead Devices(200808)
16/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
(rocedure *i3ures
1. a$e 'he con'ainer 'o "ieces and chec$ 'he
con'en's
#ake the container to pieces care&ull% and $isual
check the LBS and the contents accordin to the
enclosed 'anual.
=o not re'o$e the additional packin &or
pre$entin the bushin until it installed on
the switch.
=ont hold and handle the control handle:
bushin and leads with hand.
Check the switchin &unction o& inner
contacts and as aues.
,ollow the 'anual.
2.
8/12/2019 GCS 1400-Overhead Devices(200808)
17/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
contact the enerized part.
1&25
8/12/2019 GCS 1400-Overhead Devices(200808)
18/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
(rocedure *i3ures
4. Connec'ion 'he leads
sual ter'inal t%pes o& LBS are bare and bushin boots )supplied b% 'anu&acturer*
t%pe. #he bare t%pe ter'inal usuall% used onl% &or 11kV.
4.1 Bare t%pe
/nsert the lead inside the lu &ull% and co'press it.
6ake sure to the end o& the strands o& lead be e$en b% cuttin all the strands o&
lead at once be&ore insertin to the lu.
be&ore co'pression: bind 1(c' with tie)sa'e t%pe with lead wire* outside on the
lead not to be twisted the strands when it co'pressed.
Connect the lu to the pal' o& bare ter'inal)which 'anu&acturer &itted* usin bolt
and nut tihtl% not to be shaken or loosened.
,Connect the lead to the 'ain conductor directl% usin parallel roo$e cla'p.
6ake sure to use the e0act size cla'p &or that conductor and lead.
4.2 Bushin boots t%pe
#his is the t%pe that the cable ter'inal with lu and bushin boots are alread%
connected to the bushin o& LBS.
Re'o$e the sheath o& cable to &it the cla'p.
#he re'ainder o& the cable shall be cut )dont lea$e the re'ainder on the pole*.
Connect the cable to the conductor usin the parallel roo$e cla'p.
1425
=epth inserted
Lu
Lead wire
Bind )1(c'*
Lu Lead o& LBS
Bare ter'inal)'anu&acturer &itted*
8/12/2019 GCS 1400-Overhead Devices(200808)
19/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
1525
8/12/2019 GCS 1400-Overhead Devices(200808)
20/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
(rocedure *i3ures
5. e+ove 'he "reven'in3 cover o -ushin3
"&ter the switch is installed: re'o$e the co$er o&
bushin insulators &or pre$entin &ro' da'ae.
Be care&ul the bushin not to be da'aed.
).
8/12/2019 GCS 1400-Overhead Devices(200808)
21/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
(rocedure *i3ures
1. a$e 'he con'ainer 'o "ieces and chec$ 'he con'en's
1.1 #ake the container to pieces care&ull% and $isual check the de$ice and the contents
re&errin the enclosed 'anual.
=ont hold and handle the control handle: bushin and leads with hand.
1.2 Check the oil leakae or the a'ount o& oil.
See the 'anual &or proper a'ount o& oil &or the recloser.
1.3 Check the switchin &unction b% testin the 'anual switchin handle )on and o&&*
se$eral ti'es.
Check the switchin &unction o& inner contact point usin insulation resistance
tester.
2. sse+-lin3 'he -rac$e'/i needed
2.1 "sse'ble the bracket accordin to the 'anual
&.
8/12/2019 GCS 1400-Overhead Devices(200808)
22/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
1825
8/12/2019 GCS 1400-Overhead Devices(200808)
23/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
(rocedure *i3ures
5. Connec'in3 'he leads
!.1 Connect the leads usin the connector.
See the procedure o& LBS.
).
8/12/2019 GCS 1400-Overhead Devices(200808)
24/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
(rocedure *i3ures
1. Decision 'he 3a" o "ole and erec' su""or'
1.1 Arect the support straihtl% b% the ap as &ollow &iures.
,ollow the standards &or the poles erection and earthin. /& the reulator is the t%pes
which the control cabinet installed separatel% )not attached to the reulator*: then
e$er% poles which the control cabinet installed shall be earthed.
/t needs the lenth o& !.3' )3(kV: 3.!' &or 11kV* &ro' the top o& the pole to the top
o& bushin o& reulator.
#he size o& &ittin set is !.( 2.!'. Be&ore erect the supporters: the proper inter$al
between the poles b% considerin the size o& reulator and the &ittin set.
+11kV- +3(kV-
11kV 4.!' /#he heiht o& reulator)bushinH reulator butt end*
3(kV !.3' /#he heiht o& reulator)bushinH reulator butt end*
#he burial depth o& poles could be chaned b% the soil characteristics which de&ined
at Itable 3? o& support desin standard )G=> 1(((*.
2025
4.& Cons'ruc'ion o S'e" Vol'a3e e3ula'or
installation,ittin set
point
2.(
E.E
2.2 2.2
1(.E
"
!.(
2.E
E.(
3.( 2.2
1(.E
!.(
"
A
+unit J '-
8/12/2019 GCS 1400-Overhead Devices(200808)
25/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
(rocedure *i3ures
2. sse+-lin3 'he i''in3 se' on 'he "ole or
su""or'in3 o 'he re3ula'or.
2.1 "sse'ble the &ittin set as like &iures.
,ollow the asse'bl% construction
standard &or detail procedures.
6ake sure to 'aintain the proper balance
between crossar's.
&.
8/12/2019 GCS 1400-Overhead Devices(200808)
26/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
(rocedure *i3ures
4. Connec' 'he conduc'or
4.1 /nstall the crossar' &or conductor on the
13' poles (.2' below )11kV: 1.E' &or
3(kV* &ro' the top o& the pole.
4.2 /nstall the insulators and sure arrestors
on the crossra's.
4.3 ,or connection the conductor to the
b%pass switches: asse'ble the
'aterials like &ollow &iure.
4.4 Connect the conductor to the asse'bl%
and tie on the pin)or line post*
insulators.
5. ar'hin3
@.1 Connect the lead o& sure arrestor to the
conductor.
@.2 Connect the all &acilities which need to
be earthed and earthed to the round.
See the earthin chapter &or detail.
2225
A0tensionCo'positeinsulator
=eadendcla'p
A0tension
Aarthinwire
L" earthinwire
8/12/2019 GCS 1400-Overhead Devices(200808)
27/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
2&25
8/12/2019 GCS 1400-Overhead Devices(200808)
28/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
(rocedure *i3ures
1. a$e 'he con'ainer 'o "ieces and chec$ 'he
con'en's
1.1 #ake the container to pieces care&ull% and
$isual check the switch and the contents
re&errin the enclosed 'anual
=ont hold and handle the control handle:
bushin and leads with hand
2. S and sure
arrestor (.D')&or 11kV* or 1.E')&or 3(kV*
below the crossar' &or conductor.
2.3. /nstall 3 o& pin t%pe )or line post &or 3(kV*
insulators &or supportin the leads.
+11kV-
&.sse+-lin3 'he con'ainer or ca"aci'or
3.1 "sse'ble the container accordin to the
'anual.
3.2 Li&t it on the pole and &i0 to the pole where
the top o& bushin o& capacitor to be located
at the point o& (.D')&or 11kV* or 1.E')&or
3(kV* below the crossar' &or supportin
=>S and arrester.
+3(kV-
2425
4.4 Cons'ruc'ion "rocedure or Ca"aci'or
D((
2((
1E((
1(((
8/12/2019 GCS 1400-Overhead Devices(200808)
29/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
(rocedure *i3ures
4. 6i'in3 'he ca"aci'or
4.1 Li&t the capacitor b% hanin the li&tin e%es
with rope and &it into the container.
hen the switch li&ted: be care&ul not to
contact the enerized part )i& an%*.
5. Sur3e arres'er and ear'hin3
!.1 /nstall the sure arresters.
See the chapter &or sure arrester.
!.2 Aarth the switch container.
Aarth be&ore connectin the leads and cables
&or control.
See the chapter &or earthin.
). Connec'in3 'he leads
@.1 Connect the leads usin the connector.
,ollow the 'anual.
+11kV-
+3(kV-
2525
8/12/2019 GCS 1400-Overhead Devices(200808)
30/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
2)25
8/12/2019 GCS 1400-Overhead Devices(200808)
31/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
(rocedure *i3ures
1.
8/12/2019 GCS 1400-Overhead Devices(200808)
32/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
5. Chec$lis'
CACL/S#
(roec' Su"ervisor
Con'rac'or Si'e >n3.
(ole ?o Da'e
Chec$in3
8/12/2019 GCS 1400-Overhead Devices(200808)
33/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
CACL/S#
(roec' Su"ervisor
Con'rac'or Si'e >n3.
(ole ?o Da'e
Chec$in3
8/12/2019 GCS 1400-Overhead Devices(200808)
34/35
July 25, 2008Version 1.0G>CO6
Overhead Devices
). Sae'y *or+
S*>E
8/12/2019 GCS 1400-Overhead Devices(200808)
35/35
Overhead Devices
Checkin ite's /nspection Re'ark
Con. Sup.
nder
installation
6aintain proper distance to the
li$e part
"&ter